SrNo | WORK ORDER NO | CIRCLE | WORK NAME | ESTIMATE COST & DATE | TENDER AMOUNT & DATE | AGREEMENT DATE & ACTUAL WORK START DATE | Target date of Work Completion | Agreement date & ACTUAL work start DATE1 | CONTRACTOR NAME & PHONE NO. | ENG. NAME AND PHONE NO | circle1 | Physical Progress |
1
| 02/SE(V)/CD-3/2017-2018 | Circle Vrindavan | 64 NOS HOUSES (G+3) LIG | 0.00 | 643.84 24/05/2017 | 21/09/2017 21/09/2017 | 20/09/2019 | 21/09/2017 21/09/2017 | SHAIL BUILDERS & CONTRACTOR 9415029218 | KAMAL DEO PRASAD 8795810262JE SHARAD KUMAR T 8795810558AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
2
| 05/SE(V)/CD-3/2017-2018 | Circle Vrindavan | 64 NOS HOUSES (G+3) LIG | 0.00 | 643.84 21/06/2017 | 19/09/2017 19/09/2017 | 19/09/2019 | 19/09/2017 19/09/2017 | SINGH ASSOCIATE | KAMAL DEO PRASAD 8795810294JE U. V. SINGH 8795810363AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
3
| 06/SE(V)/CD-3/2017-2018 | Circle Vrindavan | 96 NOS HOUSES(G+3) LIG | 0.00 | 965.76 21/06/2017 | 23/09/2017 23/09/2017 | 22/09/2017 | 23/09/2017 23/09/2017 | T Y TRADERS 9004537987 | ANOOP JAISWAL 8795810262JE U. V. SINGH 8795810558AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
4
| 08/SE(V)/CD-3/2017-2018 | Circle Vrindavan | 96 HOUSES(G+3) LIG | 0.00 | 965.76 21/06/2017 | 27/09/2017 27/09/2017 | 26/09/2019 | 27/09/2017 27/09/2017 | RAJAWAT ASSOCIATE 9415523037 | ANOOP JAISWAL 8795810564JE UDAIVEER SINGH 8795810363AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
5
| 10/SE(V)/CD-3/2017-2018 | Circle Vrindavan | 64 NOS HOUSES(G+3) LIG | 0.00 | 643.84 14/09/2017 | 15/01/2018 15/01/2018 | 14/01/2020 | 15/01/2018 15/01/2018 | INDIA STONE COMPANY 9648555666 | NARAYAN PRASHAD 8795810262JE R.P. GUPTA 8795810289AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
6
| 11/SE(V)/CD-3/2017-2018 | Circle Vrindavan | 96 NOS HOUSES (G+3) LIG | 0.00 | 965.76 14/09/2017 | 15/01/2018 15/01/2018 | 14/01/2020 | 15/01/2018 15/01/2018 | INDIA STONE COMPANY 9648555666 | NARAYAN PRASHAD 8795810262JE R.P. GUPTA 8795810289AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
7
| 03/SE(V)/CD-3/2017-2018 | Circle Vrindavan | 64 NOS HOUSES(G+3) EWS | 0.00 | 425.60 21/06/2017 | 21/09/2017 21/09/2017 | 20/09/2019 | 21/09/2017 21/09/2017 | SHARIK MIYA 9412710500 | KAMAL DEO PRASAD 8795810294JE U. V. SINGH 8795810363AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
8
| 04/SE(V)/CD-3/2017-2018 | Circle Vrindavan | 96 NOS HOUSES(G+3) EWS | 0.00 | 638.40 21/06/2017 | 27/09/2017 27/09/2017 | 26/09/2019 | 27/09/2017 27/09/2017 | GOPI CHAND RANGLINI 9956510351 | KAMAL DEO PRASAD 8795810262JE SHARAD KUMAR 8795810558AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
9
| 07/SE(V)/CD-3/2017-2018 | Circle Vrindavan | 64 NOS HOUSES (G+3) EWS | 0.00 | 425.60 21/06/2017 | 27/09/2017 27/09/2017 | 26/09/2019 | 27/09/2017 27/09/2017 | S. P. & COMPANY 9935586687 | ANOOP JAISWAL 8795810564JE UDAIVEER SINGH 8795810363AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
10
| 05/SE-III/CD-19/2018-19 | Circle 3 | Construction of 192 Nos., EWS Flat under PMAY (Shahari) Sector-7A, Part-I, Avadh Vihar Yojna, Lucknow | 0.00 | 752.00 02/04/2018 | 28/07/2018 28/07/2018 | 27/01/2020 | 28/07/2018 28/07/2018 | M/S Neel Constructions 9415117988 | HEM SINGH JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XE | Circle 3 | In Progress |
11
| 04/SE-III/CD-19/2018-19 | Circle 3 | Construction of 192 Nos. EWS Houses Under PMAY (Sahari) at Sector-7A, Awadh Vihar Yojna, Lucknow | 0.00 | 752.00 02/04/2018 | 28/07/2018 28/07/2018 | 27/01/2020 | 28/07/2018 28/07/2018 | M/S Apex Construction Company 9839098580 | HEM SINGH JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XE | Circle 3 | In Progress |
12
| 07/SEHQ/CD-7/18-19 | Circle HQ | CONSTRUCTION OF 288 NOS FOUR STORIED (G+3) FLATS AT SECTOR 10B, AWADH VIHAR YOJNA LUCKNOW | 0.00 | 1128.00 04/04/2018 | 08/08/2018 08/08/2018 | 07/02/2020 | 08/08/2018 08/08/2018 | R.S.CONSTRUCTION | J.N. MISHRA,PARMOD KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XE | Circle HQ | In Progress |
13
| 08/SEHQ/CD-7/18-19 | Circle HQ | CONSTRUCTION OF 288 NOS FOUR STORIED (G+3) FLATS AT SECTOR 10B, AWADH VIHAR YOJNA LUCKNOW | 0.00 | 1128.00 04/04/2018 | 08/08/2018 08/08/2018 | 07/02/2020 | 08/08/2018 08/08/2018 | R.S.CONSTRUCTION | J.N. MISHRA,PARMOD KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XE | Circle HQ | In Progress |
14
| 09/SEHQ/CD-7/18-19 | Circle HQ | CONSTRUCTION OF 288 NOS FOUR STORIED (G+3) FLATS AT SECTOR 10B, AWADH VIHAR YOJNA LUCKNOW | 0.00 | 1128.00 04/04/2018 | 08/08/2018 08/08/2018 | 07/02/2020 | 08/08/2018 08/08/2018 | R.S.CONSTRUCTION | A.B.SINGH,J.N. MISHRA JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XE | Circle HQ | In Progress |
15
| .4.09/SEHQ/CD15/2015-16 | Circle HQ | CONSTRUCTION OF 1680 MULTISTORY IN RESIDENTIAL FLATS IN SAMAJWADI AVAS YOJNA & 448 NOS SEMIFINISHED MULTISTORY RESIDENTIAL FLATS IN GOMTI ENCLAVE SECTOR-8 | 0.00 | 27010.00 06/11/2015 | 27/01/2016 27/01/2016 | 28/02/2020 | 27/01/2016 27/01/2016 | LARSEN & TOUBRO LIMITED 09450000009 | AMARJEET YADAV,KAMTA PRASAD,MANUDEV JE A.K.SHAHU,D.K.GOYAL AE D.B.YADAV XE | Circle HQ | In Progress |
16
| 08/SEHQ/CD-7/15-16 | Circle HQ | ENGINEERING PROCUREMENT AND CONSTRUCTION OF MULTI-STOREYED RESIDENTIAL FLATS IN
SARYU ENCLAVE | 0.00 | 52529.33 08/11/2015 | 25/01/2016 25/01/2016 | 14/08/2020 | 25/01/2016 25/01/2016 | N.C.C.LIMITED 09952301417 | A.B.SINGH,J.N. MISHRA,LALIT KUMAR,MOH. KHURSHEED,PRAMOD KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XE | Circle HQ | In Progress |
17
| 10/SE(HQ)/CD-31/18-19dt.29-8-18 | Circle HQ | Constt. of 96 No. EWS (G+3) Houses under PMAY at Sultanpur | 0.00 | 378.34 28/02/2018 | 29/08/2018 29/08/2018 | 20/02/2020 | 29/08/2018 29/08/2018 | M/S Shiv Giri Traders 9984854111 | MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XE | Circle HQ | In Progress |
18
| 4130/A-4/96 | Circle 4 | Construction of 50 Nos A-72 type Semi Finished houses at Spinning Mill Campus Etawah | 0.00 | 373.67 16/12/2016 | 12/10/2017 12/10/2017 | 11/07/2018 | 12/10/2017 12/10/2017 | RAJAWAT ASSOCIATE 9415523037 | SRI ARUN KUMAR PATEL,SRI ARVIND KUMAR JE NAGENDRA KUMAR,NAVJOT SINGH VERMA,SRI ABHISHEK VERMA AE PRADEEP KUMAR XE | Circle 4 | In Progress |
19
| 4131/A-4/96 | Circle 4 | Construction of 32 Nos A-72 type Finished houses at Spinning Mill Campus Etawah | 0.00 | 392.00 06/10/2017 | 25/01/2018 25/01/2018 | 24/01/2019 | 25/01/2018 25/01/2018 | Gun-Gun Construction & Electricals 9410487559 | SRI DEVENDRA YADAV JE ARVIND KUMAR,NAGENDRA KUMAR,NAVJOT SINGH VERMA,SRI ABHISHEK VERMA AE PRADEEP KUMAR XE | Circle 4 | In Progress |
20
| .6.04/SEHQ/CD15/18-19 | Circle HQ | Construction of 288 Nos. (G+3) Flats under PMAY at Sector-10B, Avadh Vihar Yojna, Lucknow. | 0.00 | 1095.88 05/04/2018 | 25/07/2018 25/07/2018 | 24/01/2020 | 25/07/2018 25/07/2018 | T Y TRADERS 9004537987 | AMARJEET YADAV JE D.K.GOYAL AE D.B.YADAV XE | Circle HQ | In Progress |
21
| 05/SEHQ/CD15/18-19 | Circle HQ | Construction of 224 Nos. (G+3) Flats under PMAY, at Sector-10 Avadh Vihar Yojna, Lucknow | 0.00 | 851.86 05/04/2018 | 25/07/2018 25/07/2018 | 24/01/2020 | 25/07/2018 25/07/2018 | GOPI CHAND RANGLINI 9956510351 | MANUDEV JE A.K.SHAHU AE D.B.YADAV XE | Circle HQ | In Progress |
22
| 11/SEHQ/CD-7/18-19 | Circle HQ | CONSTRUCTION OF 240 NOS FOUR STORIED (G+3) FLATS AT SECTOR 10B, AWADH VIHAR YOJNA LUCKNOW | 0.00 | 846.63 20/07/2018 | 09/10/2018 09/10/2018 | 08/04/2020 | 09/10/2018 09/10/2018 | SHAKTI CONSTRUCTION CO. 09121900191 | A.B.SINGH,LALIT KUMAR JE A.K.AGRAWAL AE PRAMOD KUMAR SINGH XE | Circle HQ | In Progress |
23
| 06/SEHQ/CD15/18-19 | Circle HQ | Construction of 224 Nos. (G+3) Flats under PMAY at Sector-10B, Avadh Vihar Yojna, Lucknow. | 0.00 | 851.86 05/04/2018 | 25/07/2018 25/07/2018 | 24/01/2020 | 25/07/2018 25/07/2018 | SHARIK MIYA 9412710500 | MANUDEV JE A.K.SHAHU AE D.B.YADAV XE | Circle HQ | In Progress |
24
| 05/SE-III/CD13/13-14 | Circle 3 | Const. of Multi Storeyed (S+13) Flats Residential Flats ( Everest Enclave) in Sect-18, Vrindavan Yojna No.4 Lucknow | 0.00 | 13362.38 26/12/2013 | 05/03/2014 26/02/2014 | 25/02/2017 | 05/03/2014 26/02/2014 | Vascon Engineers Ltd 7525046101 | MEWALAL JE SAMRAJ AE BRIJEDRA PRATAP XE | Circle 3 | In Progress |
25
| 01/S.E-2/2018-19 | Circle 2 | Const. of 144 Nos Houses (G+3) under PMAY at Sector-4 Jagriti Vihar (Ext.) Scheme No-11, Meerut | 0.00 | 563.21 16/04/2018 | 24/08/2018 24/08/2018 | 23/02/2020 | 24/08/2018 24/08/2018 | M/s Kumar Builders 9358403917 | AJAB SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XE | Circle 2 | In Progress |
26
| 01/SE-V/2016-17 | Circle 5 | CONTSTRUCTION OF 30 mtr and 24 mtr TRUNK ROADS IN MAJHOLA YOJNA NO-4 PH-2 VISTAR MORADABAD. | 0.00 | 404.00 31/05/2016 | 17/08/2016 17/08/2016 | 16/11/2016 | 17/08/2016 17/08/2016 | M/s R.G, Buildwell Engineers Ltd 9837391824 | RAHUL KUMAR JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
27
| 02/SE(M)/CD-38/2018-19 | Circle Mantola | Const of Ineternal Road in Campus of Gulmohar Enclave in sec-15 | 0.00 | 115.00 23/02/2018 | 01/06/2018 01/06/2018 | 30/11/2018 | 01/06/2018 01/06/2018 | SHIVAM CONTRACTOR 8755427501 | ABHISHEK KUMAR MISHRA JE ALOKSHEEL DWIVEDI,NARESH GUPTA,SATYENDRA SINGH AE BISHEMBER SINGH,S.K. SIRVASTAVA,SHOBHIT KUMAR PATHAK XE | Circle Mantola | In Progress |
28
| 01/SE-3/CD-2/2018-19Dt04.05.2018 | Circle 3 | Construction of 128 Nos EWS houses in Sec-13 VVy-4 Lucknow | 0.00 | 708.96 15/12/2017 | 04/05/2018 04/05/2018 | 03/05/2020 | 04/05/2018 04/05/2018 | M/s Harihar contractor & suppliers 9984427700 | ADIL BEG,HEMANT KUMAR JE M.M.SRIVASTAVA AE A.K.MITTAL XE | Circle 3 | In Progress |
29
| 01/EE/CD-1/2019-20 | Circle 7 | Construction of 06 Nos. Kuda Ghar in differt. Sectors of Siddharth Vihar Yojna Ghaziabad. | 0.00 | 34.40 02/03/2019 | 26/06/2019 | 25/12/2019 | 26/06/2019 | M/s Shri Ram Construction Co. 9412469569 | NARENDRA PAL JE YOGENDRA KUMAR VERMA AE ATUL KUMAR SINGH XE | Circle 7 | In Progress |
30
| 07/SE-II/2019-20 | Circle 2 | Re-construction of Road from CO mandi thana Residance to end towards Railway Station Muzaffarnagar | 0.00 | 119.00 28/05/2019 | 21/09/2019 21/09/2019 | 20/02/2020 | 21/09/2019 21/09/2019 | M/s Om Shiv Construction 9837085092 | SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XE | Circle 2 | In Progress |
31
| 05/SE(M)/2018-19 | Circle Mantola | Construction of Balance Part of 24 M Road along scheme boundary | 0.00 | 308.16 28/08/2018 | 28/01/2019 28/01/2019 | 12/09/2019 | 28/01/2019 28/01/2019 | Shree Ji Infraproject P Ltd | ABHISHEK KUMAR MISHRA,RADHESHYAM JE ALOKSHEEL DWIVEDI,NARESH GUPTA AE AMAN TYAGI,SHOBHIT KUMAR PATHAK,UMA NATH SHUKLA XE | Circle Mantola | In Progress |
32
| 03/SE(M)/CD-38/2018-19 | Circle Mantola | Const of 12M, 6M, & 6M set back Road in sec-16B | 0.00 | 186.00 28/04/2018 | 28/08/2018 20/08/2018 | 19/02/2019 | 28/08/2018 20/08/2018 | ANUJ ASSOCIATE 9411902544 | VEER SINGH,VIVEK KUMAR MAURYA JE ALOKSHEEL DWIVEDI,RAVINDRA BHATT,SATYENDRA SINGH AE AMAN TYAGI,BISHEMBER SINGH,SHOBHIT KUMAR PATHAK,UMA NATH SHUKLA XE | Circle Mantola | In Progress |
33
| 14/SE(HQ)/CD-31 | Circle HQ | Constt. of 96 No. EWS (G+3) Houses (Group-A) under PMAY at Sultanpur | 0.00 | 378.34 28/02/2018 | 02/08/2019 02/08/2019 | 01/02/2021 | 02/08/2019 02/08/2019 | M/S Navneet Enterprises 9918381889 | MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XE | Circle HQ | In Progress |
34
| 13/EE/19-20ED-1 | Circle Electrical | Construction of 220 mtr. deep 01 No. Tubewell Boring By D.G. Rig machine at Sector-15 Vrindavan Yojna No. 4 Lucknow | 0.00 | 23.36 19/09/2019 | 24/10/2019 24/10/2019 | 23/12/2019 | 24/10/2019 24/10/2019 | GOPAL ELECTRICALS | | Circle Electrical | In Progress |
35
| 04/EE/CD-38/2018-19 | Circle Mantola | Laying of Water Supply line sec 15 (Plot Pocket) & 16 B Rising Main sec-17 | 0.00 | 61.00 26/09/2018 | 19/12/2018 19/12/2018 | 18/03/2019 | 19/12/2018 19/12/2018 | RAMAXE CONSTRUCTION 9811554477 | JEET SINGH,VEER SINGH JE ALOKSHEEL DWIVEDI,RAVINDRA BHATT,SATYENDRA SINGH AE AMAN TYAGI,BISHEMBER SINGH,SHOBHIT KUMAR PATHAK,UMA NATH SHUKLA XE | Circle Mantola | In Progress |
36
| 06/SE(M)/2015-16 | Circle Mantola | Construction of 1856 No Multistory Houses in sec-7 | 0.00 | 45000.00 18/04/2015 | 03/07/2015 03/07/2015 | 02/07/2020 | 03/07/2015 03/07/2015 | N.C.C.LIMITED 09952301417 | ABHISHEK KUMAR MISHRA,AJAY KUMAR AGNIHOTRI,H.S.TIWARI,JEET SINGH,LOKENDRA KUMAR,NARESH KUMAR GUPTA,U.S.CHAURASIYA,VEER SINGH,VIVEK KUMAR MAURYA JE ALOKSHEEL DWIVEDI,AMAN TYAGI,NAVEEN KUMAR JAIN,O.P. VERMA,RAM AVTAR MITTAL,SATYENDRA SINGH AE AKHILESHWAR SINGH,BISHEMBER SINGH,D.V.SINGH,K.P.TRIPATHI,LALTA PRASAD,MANEESH KUMAR PATHAK,S.K. SIRVASTAVA,SHOBHIT KUMAR PATHAK XE | Circle Mantola | In Progress |
37
| 15/EE/19-20ED-1 | Circle Electrical | Balance Ext. Electrification work of EWS & LIG Flats at sector-13 in Vrindavan yojna Lucknow | 0.00 | 119.05 22/10/2019 | 05/11/2019 05/11/2019 | 04/02/2020 | 05/11/2019 05/11/2019 | Electro Builders | | Circle Electrical | In Progress |
38
| 02/EE/CD38/2019-20 | Circle Mantola | Construction of 2 No Parks in Sec-15 | 0.00 | 15.50 14/10/2019 | 31/12/2019 31/12/2019 | 31/03/2020 | 31/12/2019 31/12/2019 | SNG Enterprises | RADHESHYAM JE NARESH GUPTA AE AMAN TYAGI,SHOBHIT KUMAR PATHAK,UMA NATH SHUKLA XE | Circle Mantola | In Progress |
39
| 3268/A-4/511 | Circle 4 | Construction of drain and culvert in spining mill awasiya yojna Etawah | 0.00 | 77.50 27/09/2018 | 26/11/2019 26/11/2019 | 25/05/2020 | 26/11/2019 26/11/2019 | M/s Siwansi Concrete Product 9412183483 | SRI ANIL KUMAR CHAUDHARY JE ARVIND KUMAR AE PRADEEP KUMAR XE | Circle 4 | In Progress |
40
| 30/EE/19-20ED-1 | Circle Electrical | Construction of 11 KV line Feeder of 33/11 KV S/S Sector-8 at Avadh Vihar Yojna Luxknow | 0.00 | 722.91 28/09/2019 | 10/01/2020 10/01/2020 | 09/05/2020 | 10/01/2020 10/01/2020 | PREETI ELECTRIC WORK 9150011801 | | Circle Electrical | In Progress |
41
| 03/EE/CD-12/2019-20 | Circle Vrindavan | Construction of Pump House and Operator Room at Gokul Gram Yojna No-1, Munnu Khera, Lucknow | 0.00 | 0.00 30/09/2019 | 16/12/2019 16/12/2019 | 15/06/2020 | 16/12/2019 16/12/2019 | M/S Shivrudram Construction 9838308833 | HIMANSHU SINGH JE A.K.SINHA AE SHASHANK PANDEY XE | Circle Vrindavan | In Progress |
42
| 02/SE-1/VNS/CD-37/2019-20 | Circle 1 | Const. & strengthing of Internal Road at Avas Vikas Colony, Surajkund Gorakhpur In Infrastructure Fund(Group-1(B)) | 0.00 | 99.97 26/11/2019 | 12/02/2020 12/02/2020 | 31/10/2020 | 12/02/2020 12/02/2020 | M/S SHIVAM ENTERPRISES 9670328000 | RAJNEESH SRIVASTAV JE ASHOK KUMAR SINGH AE J K KAUSHAL XE | Circle 1 | In Progress |
43
| 02/EE.CD-4/2019-20 | Circle 3 | Laying of Rising Main in Bahraich Bhinga Marg yojna, Bahraich | 0.00 | 12.12 17/07/2019 | 02/11/2019 02/11/2019 | 01/03/2020 | 02/11/2019 02/11/2019 | M/S Savitri Associate | CHANDAN KUMAR JE K.K ACHARYA AE PRASHANT VARDHAN XE | Circle 3 | In Progress |
44
| 06/EE/2019-20DT13-11-2019 | Circle 5 | FABRICATION & FIXING OF 6MM THICK POLYCARBONATE SHEET IN M.S. STRUCTURE AT BOUNDARY WALL OF SWIMMING POOL AT GANDHI STADIUM, DISTT.: PILIBHIT [U.P.] | 0.00 | 89.28 30/07/2019 | 13/11/2019 13/11/2019 | 10/02/2020 | 13/11/2019 13/11/2019 | B.D Gaurav | | Circle 5 | In Progress |
45
| 03/EE.CD-4/2019-20 | Circle 3 | Construction of boundary Wall around 400KL Over Head Tank in Bahraich Bhinga Marg Yojna,Bahraich | 0.00 | 10.07 06/09/2019 | 07/12/2019 07/12/2019 | 06/03/2020 | 07/12/2019 07/12/2019 | M/S Imam Ali Contractor 8840934493 | CHANDAN KUMAR JE K.K ACHARYA AE PRASHANT VARDHAN XE | Circle 3 | In Progress |
46
| 02/EE/ED-2GZB/19-20 | Circle Electrical | EXTERNAL ELECTRIFICATION WORK FOR CONNECTING 11 KV FEEDERS FROM 33/11 KV S/S AT SEC-7 TO EXISTING PVVNL 11 KV FEEDER VASUNDHARA YOJNA GZB | 0.00 | 14.20 07/12/2018 | 01/06/2019 01/06/2019 | 30/06/2019 | 01/06/2019 01/06/2019 | K. ELECTRIC WORKS PVT. LTD | SUDHAKAR PATHAK JE TEAJBIR SINGH AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
47
| 03/EE/ED-2GZB/19-20 | Circle Electrical | AMC OF KONE MAKE LIFT AT SIKHAR ENCLAVE BLOCK A,B SEC-15 VASUNDHARA GZB | 0.00 | 3.07 01/05/2019 | 26/06/2019 26/06/2019 | 25/06/2020 | 26/06/2019 26/06/2019 | KONE ALIVETOR INDIA PVT. LTD. 9560361414 | ER. U C MISHRA JE TEAJBIR SINGH AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
48
| 04/EE/ED-2GZB/19-20 | Circle Electrical | S/I OF 02 NO PUMPING PLANT AT CWR SEC-8 SIDDHARTHA VIHAR YOJNA GZB | 0.00 | 120.92 11/10/2019 | 06/01/2020 06/01/2020 | 05/04/2020 | 06/01/2020 06/01/2020 | Sai Sudha Enterprises | SUDHAKAR PATHAK JE TEAJBIR SINGH AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
49
| 05/EE/ED-2GZB/19-20 | Circle Electrical | SITC OF LT PANNEL AND XLPE CABLE FOR COMMON AREA AND POWER BACKUP AT GYH ENCLAVE SIDDHARTHA VIHAR YOJNA GZB | 0.00 | 34.00 11/11/2020 | 09/01/2020 09/01/2020 | 23/01/2020 | 09/01/2020 09/01/2020 | OM ASSOCIATES 9312359633 | ER. U C MISHRA JE TEAJBIR SINGH AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
50
| 02/SE(E)LKO/19-20 | Circle Electrical | INTERNAL ELECTRIFICATION, EXTERNAL LIGHTING, DG SET, T/W AND AC WORK OF COMMUNITY CENTRE SEC-9 SIDDHARTA VIHAR YOJNA GZB | 0.00 | 121.07 29/09/2019 | 03/01/2020 03/01/2020 | 02/03/2020 | 03/01/2020 03/01/2020 | KRISHNA REFRIGRATION 09652303229 | SUDHAKAR PATHAK JE TEAJBIR SINGH AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
51
| 02/EE/CD-1GZB/2019-20 | Circle 7 | Construction of 12.00M and 7.50 M Wide Road Service | 0.00 | 53.13 13/12/2019 | 10/01/2020 10/01/2020 | 09/07/2020 | 10/01/2020 10/01/2020 | M/s Ramesh Chand & Co. 9213288266 | RANDHIR SINGH JE NARENDRA PAL AE ATUL KUMAR SINGH XE | Circle 7 | In Progress |
52
| 11/SE-2/CD-6/2019-20 | Circle 2 | Construction of remaining 45.00 mt. wide road (Node No.-25-26-27), Scheme No.-11, Jagriti Vihar (Ext.), Meerut. | 0.00 | 395.00 18/08/2019 | 01/02/2020 01/02/2020 | 31/07/2020 | 01/02/2020 01/02/2020 | M/s S.K. Singh 9837488572 | AJAB SINGH,NAVRATAN SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XE | Circle 2 | In Progress |
53
| 09/SE-II/2019-20 | Circle 2 | WATER DISPOSAL WORK BY RCC HUME PIPE LINE FROM C.O. MANDI THANA RESIDENCE TO RAILWAY STATION MUZAFFARNAGAR | 0.00 | 165.00 06/02/2019 | 16/01/2020 16/01/2020 | 15/05/2020 | 16/01/2020 16/01/2020 | M/S PROGRESSIVE CONSTRUCTION COM. 9810846441 | SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XE | Circle 2 | In Progress |
54
| 02/SE(M)/2016-17 | Circle Mantola | Const of Flyover across SH 57 | 0.00 | 5312.82 | 23/04/2016 23/04/2016 | 22/04/2018 | 23/04/2016 23/04/2016 | U.P.STATE BRIDGE CORPORATION LIMITED | NARESH KUMAR GUPTA JE ALOKSHEEL DWIVEDI,RAVINDRA BHATT,SATYENDRA SINGH AE BISHEMBER SINGH,S.K. SIRVASTAVA,S.K.PATHAK,SH. D.V. SINGH XE | Circle Mantola | In Progress |
55
| 03/SE(M)/2016-17 | Circle Mantola | Cons. of 24 M wide Road between sec-14 (B) & 15 | 0.00 | 398.00 09/03/2016 | 23/04/2016 23/04/2016 | 11/11/2016 | 23/04/2016 23/04/2016 | A.S CONSRTUCTION 8273230008 | RADHEY SHYAM JE NARESH GUPTA,SATYENDRA SINGH AE BISHEMBER SINGH,S.K. SIRVASTAVA,S.K.PATHAK,SH. D.V. SINGH XE | Circle Mantola | In Progress |
56
| 04/SE(M)/2016-17 | Circle Mantola | Const of Internal Road in sec 15 (Farmer Plot Pocket) | 0.00 | 140.00 16/09/2016 | 26/12/2016 26/12/2016 | 25/06/2017 | 26/12/2016 26/12/2016 | A.S CONSRTUCTION 8273230008 | MUNNA LAL,RADHESHYAM JE NARESH GUPTA,SATYENDRA SINGH AE AMAN TYAGI,BISHEMBER SINGH,S.K. SIRVASTAVA,S.K.PATHAK,UMA NATH SHUKLA XE | Circle Mantola | In Progress |
57
| 03/EE/2015-16 | Circle 5 | Construction of Internal Road In Amroha Yojna No.-2 Amroha | 0.00 | 15.00 24/07/2015 | 01/08/2015 | 31/10/2015 | 01/08/2015 | M/S BHAVYA TRADERS 0937019037 | GYAN PRAKASH JE DEVENDRA PAL SINGH AE PRADEEP KUMAR XE | Circle 5 | Not Started |
58
| 10/EE/2015-16 | Circle Mantola | Const of Central Verge in 24 M Road | 0.00 | 98.00 28/12/2015 | 04/03/2016 | 03/09/2016 | 04/03/2016 | K.S. Construction co | ABHISHEK KUMAR MISHRA,MUNNA LAL,RADHEY SHYAM JE AMAN TYAGI,NARESH GUPTA,SATYENDRA SINGH AE BISHEMBER SINGH,S.K. SIRVASTAVA,SH. D.V. SINGH XE | Circle Mantola | In Progress |
59
| 09/EE/2015-16 | Circle Mantola | Const of Central Verge in 24 M Road | 0.00 | 98.00 28/12/2015 | 04/03/2016 04/03/2016 | 03/09/2016 | 04/03/2016 04/03/2016 | D.P. ULTRA ENGINEERS PVT. LTD. 9871533996 | ABHISHEK KUMAR MISHRA,RADHEY SHYAM JE ALOKSHEEL DWIVEDI,AMAN TYAGI,NARESH GUPTA,SATYENDRA SINGH AE BISHEMBER SINGH,S.K. SIRVASTAVA,S.K.PATHAK,SH. D.V. SINGH XE | Circle Mantola | In Progress |
60
| 10/SE-II/19-20 | Circle 2 | Construction of 12.00m & 18.00m wide roads in Sector-2 at Scheme No. 11, Jagriti Vihar (Ext.), Meerut. | 0.00 | 183.07 04/09/2019 | 22/01/2020 22/01/2020 | 21/07/2020 | 22/01/2020 22/01/2020 | G.K. Constructions 9997294280 | SH. RAVINDRA KUMAR JE M BKAUSHIK AE M.B. KAUSHIK XE | Circle 2 | In Progress |
61
| 03/EE/CD-8/2019-20 | Circle 2 | Construction of 9.00m and 12.00m wide road (Balance work) and Parks in Sector-3 at Scheme-11, Jagriti Vihar (Ext.), Meerut. | 0.00 | 69.43 04/09/2019 | 22/01/2020 22/01/2020 | 21/05/2020 | 22/01/2020 22/01/2020 | G.K. Constructions 9997294280 | SH. SANDEEP KUMAR JE SH. SANJAI SHARMA AE M.B. KAUSHIK XE | Circle 2 | In Progress |
62
| 02/E.E./C.D.-34/AWASTHPNANIDHI/2019-20 | Circle 1 | Renovation of Internal Road, K.C. Drain, Interlocking tiles in Patel Nagar, Varanasi | 0.00 | 65.86 13/12/2019 | 05/02/2020 05/02/2020 | 04/05/2020 | 05/02/2020 05/02/2020 | JWALAMUKHI CONSTRUCTION 09648999945 | ARJUN VERMA JE AE AJIT KUMAR CHAUDHARY XE | Circle 1 | In Progress |
63
| 05/EE/CD-22/2019-20 | Circle Mantola | Supply of Rising mains in sector-4A &5 Mandola | 0.00 | 47.00 24/07/2019 | 07/11/2019 | 06/02/2020 | 07/11/2019 | M/s Ramesh Chand & Co. 9213288266 | U.S.CHAURASIYA JE HARI SHANKAR TIWARI AE UMA NATH SHUKLA XE | Circle Mantola | In Progress |
64
| 01/SE-06/2020-2021 | Circle 6 | GENREL EARTH WORK CUTTING AND FILLING AT BHUMI VIKASH EWAM GARHSTHAAN YOJNA -03 JHANSI | 0.00 | 282.45 19/12/2019 | 12/05/2020 12/05/2020 | 11/11/2020 | 12/05/2020 12/05/2020 | SATYAM CONSTRUCTION 9415030154 | ANUP KUMAR,MANVENDRA DHAMANIYA JE DAYASAGAR AE EKHLAQUE AHMAD XE | Circle 6 | In Progress |
65
| 09/SE(E)LKO/2016-17 | Circle Electrical | INT. ELE. WORK IN SAMAJWADI YOJNA 352 NOS 2 BHK TYPE HOUSES AT SEC-16 B, MANDOLA VIHAR YOJNA GZB. (GROUP-C) | 0.00 | 175.00 14/03/2016 | 26/10/2016 26/10/2016 | 25/10/2017 | 26/10/2016 26/10/2016 | SPG INFRAPROJECT PVT. LTD. 9410030650 | ALOK KUMAR,PANKAJ KUMAR PUSHKAR,SUNILKUMAR JE D.C SHUKLA,D.K PANDEY AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
66
| 10/SE(E)LKO/2016-17 | Circle Electrical | INT. ELE. WORK IN SAMAJWADI YOJNA 544 NOS 1 BHK TYPE HOUSES AT SEC-15, MANDOLA VIHAR YOJNA GZB. (GROUP-G) | 0.00 | 160.00 05/07/2016 | 02/01/2017 02/01/2017 | 01/01/2018 | 02/01/2017 02/01/2017 | ARJUNVANSH INFRA STRUCTURE PVT. LTD. 9310125757 | PANKAJ KUMAR PUSHKAR,SANJEEV KUMAR SINGH JE D.K PANDEY AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
67
| 02/EE/ED-III/20-21 | Circle Electrical | | 0.00 | 12.32 23/07/2020 | 31/07/2020 | 30/09/2020 | 31/07/2020 | GYANTI CONSTRUCTION 9598461802 | VINOD KUMAR JE ER. D. R. MAURYA AE XE | Circle Electrical | In Progress |
68
| 01/SE-VIth/2020-21 | Circle 5 | Construction of Trunk Road in Civil Lines Yojna No 2 Phase 2 Budaun | 0.00 | 258.04 05/06/2020 | 16/07/2020 17/07/2020 | 16/11/2020 | 16/07/2020 17/07/2020 | MS J.P Bhatiya | | Circle 5 | In Progress |
69
| 02ee19-20 | Circle HQ | Water sewer connection in 76 nos houses at Lohramau yojna Sultanpur | 0.00 | 13.90 25/10/2019 | 14/01/2020 26/05/2020 | 13/05/2020 | 14/01/2020 26/05/2020 | M/S KAILASH RAM 9651534882 | MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XE | Circle HQ | In Progress |
70
| 08/EE/ED-2GZB/2016-17 | Circle Electrical | S/I OF PUMPING PLANT IN UGR AT SHIKHAR ENCLAVE SEC-15, VASUNDHARA YOJNA GZB. | 0.00 | 16.00 06/07/2016 | 27/09/2016 27/09/2016 | 26/11/2016 | 27/09/2016 27/09/2016 | AAR BROTHERS 9415027508 | SITARAM CHAUHAN JE D.C SHUKLA AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
71
| 03/SE-V/2020-21 | Circle 5 | Construction of 12.0 M, 9 M 7.50, M and 3.0 M wide Internal Roads in Sec 15 Majhola Yojna No 4 Ph 2 Vistar Moradabad. (Excluding of PMAY Pocket) | 0.00 | 216.50 24/06/2020 | 30/07/2020 30/07/2020 | 29/01/2021 | 30/07/2020 30/07/2020 | M/S Arora R.C.C. Works 9837391824 | SARVESH KUMAR VERMA JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
72
| 02/SE-V/2020-21 | Circle 5 | Construction of 12.0 M, 9.00 M, 6.0 M and 3.0 M wide Internal Roads in Sec 16 Majhola Yojna No 4 Ph 2 Vistar Moradabad. (Excluding PMAY pocket). | 0.00 | 113.50 24/06/2020 | 30/07/2020 30/07/2020 | 29/01/2021 | 30/07/2020 30/07/2020 | M/s M.A. Associates | RAHUL KUMAR JE RAJENDRA BAHADUR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
73
| 02/EE/CD29/19-20 | Circle 6 | CONSTRUCTION OF BOUNDRYWALL IN PARK OF PASHCHIMPURI BETWEEN HOUSE NO-179 TO H.N-205 | 0.00 | 29.11 31/05/2019 | 30/11/2019 | 30/11/2019 | 30/11/2019 | SHYAM JI TRADERS 9917475285 | | Circle 6 | In Progress |
74
| 02/SE-3/CD-2/2018-19DT04.05.2018 | Circle 3 | Construction of 128 Nos EWS Houses in Sec-13 VVY-4 Lucknow | 0.00 | 708.96 15/12/2017 | 04/05/2018 04/05/2018 | 03/05/2020 | 04/05/2018 04/05/2018 | Dream Construction 9936086993 | A.B.SINGH,K.K.KATIYAR JE A.K.SAXENA AE A.K.MITTAL XE | Circle 3 | In Progress |
75
| 03/SEHQ/CD15/18-19 | Circle HQ | Construction of 288 Nos. (G+3) Flats under PMAY at Sector-10B, Avadh Vihar Yojna, Lucknow. | 0.00 | 1095.88 05/04/2018 | 25/07/2018 25/07/2018 | 24/01/2020 | 25/07/2018 25/07/2018 | SINGHAL BROTHERS | KAMTA PRASAD JE D.K.GOYAL AE D.B.YADAV XE | Circle HQ | In Progress |
76
| 06/SE-III/CD-13/18-19 | Circle 3 | Construction of 192 Nos. EWS PMAY ( Shahri) Sector-7A Avadh Vihar Yojna Lucknow. | 0.00 | 758.59 28/02/2018 | 25/08/2018 25/08/2018 | 24/02/2020 | 25/08/2018 25/08/2018 | SHAIL BUILDERS | MEWALAL JE SAMRAJ AE BRIJEDRA PRATAP XE | Circle 3 | In Progress |
77
| 07/S.E-III/EE.CD-4/2018-19 | Circle 3 | Construction of 176 Nos EWS PMAY(Shahri) Avas Yojna at Sec-7A Avadh Vihar Yojna Lucknow | 0.00 | 779.89 29/06/2018 | 03/10/2018 03/10/2018 | 02/04/2020 | 03/10/2018 03/10/2018 | M/S Shagun Associates 9580328127 | CHANDAN KUMAR JE K.K ACHARYA AE PRASHANT VARDHAN XE | Circle 3 | In Progress |
78
| .5.02/SE(V)/CU3/2014-15 | Circle HQ | ARAVALI ENCLAVE, CONSTRUCTION OF 560NOS. MULTISTORIED FLATS(B+S+10) | 0.00 | 17600.00 20/02/2014 | 25/08/2014 | 24/08/2016 | 25/08/2014 | EKDANT INDIA LTD 07905208858 | ANIRUDDH PANDEY,MISHRI LAL,GANGA PRASAD,RAMASHANKAR RAM,MANOJ KUMAR KEWAT,TRILOKI RAM JE | Circle HQ | In Progress |
79
| 02/SE-IV/Kanpur/2015-16 | Circle 4 | Construction of 274 Nos. Multistoreyed Residential Flat in Sector-E, Scheme No. 3, Kanpur | 0.00 | 8849.95 27/12/2014 | 12/05/2015 12/05/2015 | 11/11/2017 | 12/05/2015 12/05/2015 | M/S R.S. CONTRACTORS 9919919999 | ER VINAY CHAUHAN,ER. SUGHAR SINGH JE ER. VIKAS GAUTAM,KAILASH NATH AE ABHISHEK RAJ XE | Circle 4 | In Progress |
80
| 08/SE-III/CD-13/18-19 | Circle 3 | Const. of 144 Nos EWS Flats under PMAY Sector-7 | 0.00 | 567.30 12/10/2018 | 07/01/2019 07/01/2019 | 06/07/2020 | 07/01/2019 07/01/2019 | PARWATI CONSTRUCTION 09950603874 | ROHAN RAJPUT JE RAGHUNANDAN PRASAD GUPTA AE BRIJEDRA PRATAP XE | Circle 3 | In Progress |
81
| 09/SE-III/CD-13/18-19 | Circle 3 | Const. of 96 Nos EWS Houses (G+3) Under PMAY (Shahri) Sector-7 | 0.00 | 378.24 12/10/2018 | 07/01/2019 07/01/2019 | 06/07/2020 | 07/01/2019 07/01/2019 | M/s Bansal Traders 9450364731 | J.P. GAUTAM JE RAGHUNANDAN PRASAD GUPTA AE BRIJEDRA PRATAP XE | Circle 3 | In Progress |
82
| 04/E.E/C.D-5/2018-19 | Circle 2 | Construction of Boundray Wall & Gard Room of F-32 type Houses at sector-4 Scheme No-11 Jagriti Vihar (Ext.) Meerut. | 0.00 | 55.00 14/08/2018 | 26/09/2018 26/09/2018 | 25/12/2018 | 26/09/2018 26/09/2018 | M/s Satish Kumar Contractor 9412705290 | ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XE | Circle 2 | In Progress |
83
| 13/SE(HQ)/CD-31 | Circle HQ | Construction of 42 Nos. 45/75 type house at Lohramau Yojna, Sultanpur | 0.00 | 277.07 | 08/03/2019 08/03/2019 | 07/09/2020 | 08/03/2019 08/03/2019 | M/S Navneet Enterprises 9918381889 | MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XE | Circle HQ | In Progress |
84
| 02/S.E.-I/LKO/Awasthpna | Circle 1 | अवस्थापना निधि के अन्तर्गत जनपद-वाराणसी नगर क्षेत्र के पाण्डेयपुर योजना (आवास विकास कालोनी) में स्थित विभिन्न पार्कों एवं पाथ वे का मिर्नाण कार्य | 0.00 | 134.83 20/01/2017 | 28/06/2017 28/06/2017 | 27/10/2017 | 28/06/2017 28/06/2017 | Akhilesh Infra structure Pvt. Ltd. 9415202926 | ARJUN VERMA JE SUMIT KUMAR AE SAMAR UPADHAYAY XE | Circle 1 | In Progress |
85
| 03/SE-5/2016-17 | Circle 5 | Construction of Office Complex (G+2) in Sector-5 at Majhola Yojna No.-4, Phase-2, Moradabad | 0.00 | 454.00 09/09/2016 | 08/12/2016 08/12/2016 | 02/03/2018 | 08/12/2016 08/12/2016 | M/S ANIL KUMAR 9415011392 | ANOOP KUMAR SHRIVASTAV,SATENDRA HYANKI JE ANIL KUMAR SAXENA,DEVENDRA PAL SINGH AE SASMIT KATIYAR,SHOBHIT KUMAR PATHAK XE | Circle 5 | In Progress |
86
| 02/EE/2019-20Dt09-08-2019 | Circle 5 | Construction of Road and drain from 100 foota Road near Virsavaerkar Nagar to Kharanja of Viharmaan Nagla Vaya Holi Chauraha at Distt. Bareilly | 0.00 | 99.63 11/06/2019 | 09/08/2019 | 07/11/2019 | 09/08/2019 | Bhatia Construction Co. | | Circle 5 | In Progress |
87
| 01/EE/2019-20DT01-07-2019 | Circle 5 | Construcion of RCC Drain From Shri Kishan Honda to Khanna Furniture in Ward No 33 Swale Nagar Distt. Bareilly | 0.00 | 92.59 01/03/2019 | 01/07/2019 01/07/2019 | 30/09/2019 | 01/07/2019 01/07/2019 | Vipin Bhatiya | R.P TRIVEDI JE NAVEEN KUMAR VERMA AE RAJEEV KUMAR XE | Circle 5 | Not Started |
88
| 09/SEII/CD-6/2018-19 | Circle 2 | Const. of 7.5M, 9.0M & 12.0M with wide road in Sec-8 Jagriti Vihar (Ext.) Meerut. | 0.00 | 162.25 14/12/2018 | 01/03/2019 01/03/2019 | 30/06/2019 | 01/03/2019 01/03/2019 | M/s Juneja Construction Pvt. Ltd. 9810787577 | S.P. SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XE | Circle 2 | In Progress |
89
| 03/SE-II/2017-18 | Circle 2 | Construction of 7.50M, 9.00M & 12.00M wide Internal Roads at Sector-2, Jagriti Vihar (Ext.), Meerut | 0.00 | 126.40 16/05/2017 | 01/01/2018 01/01/2018 | 30/04/2018 | 01/01/2018 01/01/2018 | G.K. Constructions 9997294280 | JE M BKAUSHIK AE M.B. KAUSHIK XE | Circle 2 | In Progress |
90
| 03/SE(P)CIRCLE/CD-21/2018-19 | Circle Vrindavan | CONSTRUCTION OF 240 NOS FLATS (G+3) | 0.00 | 1062.39 25/07/2018 | 06/09/2018 15/11/2018 | 05/12/2020 | 06/09/2018 15/11/2018 | SINGH ASSOCIATES 9450453113 | ADITYA KUMAR TRIPATHI JE A.K.SINHA AE JAGDISH KUMAR XE | Circle Vrindavan | In Progress |
91
| 04/SE(P)CIRCLE/CD-21/2018-19 | Circle Vrindavan | CONSTRUCTION OF 240 NOS FLATS (G+3) | 0.00 | 1062.39 25/07/2018 | 06/09/2018 15/11/2018 | 05/12/2020 | 06/09/2018 15/11/2018 | RAMSEVAK HARGOVIND SAHAI 9415149653 | ADITYA KUMAR TRIPATHI JE RAJ KAMAL SAXENA AE JAGDISH KUMAR XE | Circle Vrindavan | In Progress |
92
| 07/SE-II/2018-19 | Circle 2 | CONSTRUCTION OF 48 NOS F-45 TYPE (G+3) STOREY FLAT AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR (GROUP-A) | 0.00 | 342.00 31/01/2018 | 30/07/2018 30/07/2018 | 29/01/2020 | 30/07/2018 30/07/2018 | M/S MOHAN INFRA DEVELOPERS PVT LTD 9412293363 | SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XE | Circle 2 | In Progress |
93
| 08/SE-II/2018-19 | Circle 2 | CONSTRUCTION OF 32 NO. F-45 TYPE (G+3) HOUSES AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR (GROUP-B) | 0.00 | 228.00 31/01/2018 | 30/07/2018 30/07/2018 | 29/01/2020 | 30/07/2018 30/07/2018 | M/s Mohan Infradevelopers Pvt. Ltd. 9675411111 | SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XE | Circle 2 | In Progress |
94
| 02/SE-II/2018-19 | Circle 2 | CONSTRUCTION OF 32 NO. F-70 TYPE (G+3) HOUSES AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR | 0.00 | 394.00 31/01/2018 | 30/07/2018 30/07/2018 | 29/01/2020 | 30/07/2018 30/07/2018 | M/s Subodh Construction Co. | INDERSAIN JE YOGENDRA KUMAR VERMA AE MUKESH YADAV XE | Circle 2 | In Progress |
95
| 03/SE-II/2018-19 | Circle 2 | CONSTRUCTION OF 32 NO. F-70 TYPE (G+3) HOUSES AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR | 0.00 | 394.00 31/01/2018 | 30/07/2018 30/07/2018 | 29/01/2020 | 30/07/2018 30/07/2018 | M/s Subodh Construction Co. | INDERSAIN JE YOGENDRA KUMAR VERMA AE MUKESH YADAV XE | Circle 2 | In Progress |
96
| 04/SE-II/2018-19 | Circle 2 | CONSTRUCTION OF 32 NO. F-70 TYPE (G+3) HOUSES AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR | 0.00 | 394.00 31/01/2018 | 30/07/2018 30/07/2018 | 29/01/2020 | 30/07/2018 30/07/2018 | M/s Subodh Construction Co. | INDERSAIN JE YOGENDRA KUMAR VERMA AE MUKESH YADAV XE | Circle 2 | In Progress |
97
| 05/SE-II/2018-19 | Circle 2 | CONSTRUCTION OF 32 NO. F-70 TYPE (G+3) HOUSES AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR | 0.00 | 394.00 31/01/2018 | 30/07/2018 30/07/2018 | 29/01/2020 | 30/07/2018 30/07/2018 | M/s Subodh Construction Co. | INDERSAIN JE YOGENDRA KUMAR VERMA AE MUKESH YADAV XE | Circle 2 | In Progress |
98
| 06/SE-II/2018-19 | Circle 2 | CONSTRUCTION OF 32 NO. F-70 TYPE (G+3) HOUSES AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR | 0.00 | 394.00 31/01/2018 | 30/07/2018 30/07/2018 | 29/01/2020 | 30/07/2018 30/07/2018 | M/s Subodh Construction Co. | INDERSAIN JE YOGENDRA KUMAR VERMA AE MUKESH YADAV XE | Circle 2 | In Progress |
99
| 04/SE(E)/LKO/18-19 | Circle Electrical | EXT. ELECT. SEC-15, 1 BHK TYPE HOUSES AT MANDOLA VIHAR YOJNA GHAZIABAD | 0.00 | 419.57 14/02/2019 | 10/03/2019 10/03/2019 | 09/09/2019 | 10/03/2019 10/03/2019 | M/S PRAKASH ENGINEERS 8527167618 | PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
100
| 05/SE(E)LKO/18-19 | Circle Electrical | EXT.ELECT. WORK IN 2 BHK HOUSES SEC-16 B AT MANDOLA VIHAR YOJNA GHAZIABAD | 0.00 | 576.00 25/01/2019 | 10/03/2019 10/03/2019 | 09/09/2019 | 10/03/2019 10/03/2019 | M/S PRAKASH ENGINEERS 8527167618 | PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
101
| 03/SE(E)LKO/18-19 | Circle Electrical | CONSTR. OF 33/11 KV S/S AND 33 KV LINE AT SEC-7 MANDOLA VIHAR YOJNA GHAZIABAD | 0.00 | 323.57 07/12/2018 | 06/03/2019 06/03/2019 | 05/03/2020 | 06/03/2019 06/03/2019 | M/S PRAKASH ENGINEERS 8527167618 | PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
102
| 02/SE(E)LKO/18-19 | Circle Electrical | CONSTR. OF 33/11 KV S/S & 33 KV LINE AT SEC-3 MANDOLA VIHAR YOJNA GHAZIANAD . | 0.00 | 323.78 07/12/2018 | 06/03/2019 06/03/2019 | 05/03/2020 | 06/03/2019 06/03/2019 | M/S PRAKASH ENGINEERS 8527167618 | PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
103
| 03/SE-V/2018-19 | Circle 5 | Construction of 96 nos Flats ( G+3) under PM Avas Yojna (Urban) at Sec-16, Majhola Yojna, No-4, Ph-2 (Vistar) Moradabad (Gr-1A) | 0.00 | 398.81 09/10/2018 | 11/01/2019 11/01/2019 | 10/07/2020 | 11/01/2019 11/01/2019 | M/s Swaroop Construction 9634245710 | RAHUL KUMAR,RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
104
| 19/EE/2018-19 | Circle Electrical | SITC of 01 Nop. 1200 LPM 62 mtr. head KSB make submersible pumping plant at Sector-19 Vrindavan Yojna Lucknow | 0.00 | 7.89 22/09/2018 | 06/12/2018 06/12/2018 | 05/01/2018 | 06/12/2018 06/12/2018 | Preeti Electric works | | Circle Electrical | In Progress |
105
| 02/SE-V/2018-19 | Circle 5 | Construction of 96 nos Flats ( G+3) under PM Avas Yojna (Urban) at Sec-16, Majhola Yojna, No-4, Ph-2 (Vistar) Moradabad (Gr-1B) | 0.00 | 398.81 09/10/2018 | 11/01/2019 11/01/2019 | 10/07/2020 | 11/01/2019 11/01/2019 | M/s Swaroop Construction 9634245710 | RAJENDRA BAHADUR,SARVESH KUMAR VERMA JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
106
| 01/SE(E)LKO/18-19 | Circle Electrical | PROVIDING OF STREET LIGHT WORK AT VARIOUS SECTORS AT SIDDHARTHA VIHAR YOJNA | 0.00 | 383.37 04/04/2018 | 28/08/2018 28/08/2018 | 01/06/2019 | 28/08/2018 28/08/2018 | M/S PRAKASH ENGINEERS 8527167618 | PANKAJ KUMAR PUSHKAR,SANJEEV KUMAR SINGH JE D.C SHUKLA,D.K PANDEY AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
107
| 04/SE-V/2018-19 | Circle 5 | Construction of 96 nos Flats ( G+3) under PM Avas Yojna (Urban) at Sec-16, Majhola Yojna, No-4, Ph-2 (Vistar) Moradabad (Gr-1C) | 0.00 | 398.81 09/10/2018 | 01/03/2019 01/03/2019 | 31/08/2020 | 01/03/2019 01/03/2019 | M/s Swaroop Construction 9634245710 | RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
108
| 10/EE/19-20ED-1 | Circle Electrical | Const. 01 No. T/W 200 mtr. deep and its related work at Bhinga Road Avasiy yojna Bahraich | 0.00 | 20.09 10/07/2019 | 13/08/2019 | 12/11/2019 | 13/08/2019 | Rajkaran tubewell Pvt. Ltd. | | Circle Electrical | In Progress |
109
| 04/SEM/2018-19 | Circle Mantola | Construction of 9m & 12m wide road in sec 4A (Plot Portion) Mandola Vihar Yojana Ghaziabad | 0.00 | 195.00 22/12/2018 | 15/01/2019 15/01/2019 | 14/07/2019 | 15/01/2019 15/01/2019 | Ms Ramaxe Construction Co 9811554477 | H.S.TIWARI,U.S.CHAURASIYA JE R.A.MITTAL AE K. P. TRIPATHI,UMA NATH SHUKLA XE | Circle Mantola | In Progress |
110
| 04/EE/ED-2,GZB/18-19 | Circle Electrical | BALANCE EXTR. ELECT. WORK (LT) AT GANGA YAMUNA HINDON ENCLAVE SEC-7 SIDDHARTHA VIHAR YOJNA GHAZIABAD | 0.00 | 41.89 04/10/2018 | 03/12/2018 03/12/2018 | 01/05/2019 | 03/12/2018 03/12/2018 | M/S OM ASSOCIATES 9312388633 | C.L. MAURYA JE TEAJ BIR SINGH AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
111
| 05/EE/CD-10/2018-19 | Circle Mantola | Const. of Boundary Wall of 1BHK Flats in Sec-15 at Manodla Vihar Yojana, Gzb. | 0.00 | 55.45 19/11/2018 | 08/03/2019 08/03/2019 | 07/09/2019 | 08/03/2019 08/03/2019 | M/s Mavi Construction Company 9818664691 | PRANVEER SINGH CD10,RADHEY SHYAM JE RAVINDRA BHATT AE CD-10,SUMIT KUMAR CD10 AE A.V. SINGH,AMAN TYAGI,FARAZ ASLAM XE | Circle Mantola | In Progress |
112
| 04/SE-PC/2015-16 | Circle Vrindavan | CONSTRUCTION OF FLATS AT SECTOR H-6 1BHK & 2BHK FLATS 1044 NOS AND 216 NOS SFS FLAT AT AMRAPALI YOJNA HARDOI | 0.00 | 28089.88 23/10/2015 | 25/02/2016 25/02/2016 | 10/09/2019 | 25/02/2016 25/02/2016 | SHAPOORJI PALLONJI & COMPANY. PVT. LTD 7624001125 | ANIL KUMAR,SHAILENDRA SINGH JE A.K.SINHA AE JAGDISH KUMAR XE | Circle Vrindavan | In Progress |
113
| 31/EE/2018-19 | Circle Electrical | Construction of 01 No. Tubewell 200 mtr deep & its related wrok in sector-17 at Vrindavan Yojna no. 4 Lucknow. | 0.00 | 18.70 22/12/2018 | 23/03/2019 23/03/2019 | 22/06/2019 | 23/03/2019 23/03/2019 | M.A. Engineering works | | Circle Electrical | In Progress |
114
| 03/EE/ED-2,GZB/18-19 | Circle Electrical | EXTR. ELECT. WORK LT RINGMAIN (UGS) AT VISTHAPIT AREA SEC-7 SIDDHARTHA VIHAR YOJNA GHAZIABAD | 0.00 | 9.88 04/10/2018 | 03/12/2018 03/12/2018 | 01/05/2019 | 03/12/2018 03/12/2018 | M/S K ELECTRIC WORK PRIVATE LIMITED 9451446898 | C.L. MAURYA JE TEAJ BIR SINGH AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
115
| 01/EE/ED-2GZB/18-19 | Circle Electrical | SITC OF MAIN LT PANNEL AT GANGA YAMUNA HINDON AT SIDDHARTHA VIHAR YOJNA. | 0.00 | 76.70 04/05/2018 | 14/06/2018 14/06/2018 | 31/12/2018 | 14/06/2018 14/06/2018 | EAGLE CONSTRUCTION 9415103222 | C.L. MAURYA JE TEAJ BIR SINGH AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
116
| 08/EE/ED-2GZB/18-19 | Circle Electrical | PREPRATION OF SURVEY REPORT AND OBTAINING FROM CGWA FOR BORING WATER AT MANDOLA VIHAR YOJNA GHAZIABAD | 0.00 | 15.34 07/12/2018 | 09/03/2019 09/03/2019 | 08/05/2019 | 09/03/2019 09/03/2019 | M/S THINK GREEN ENVIRO SYSTEMS 8468919498 | PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
117
| 05/SE(V)/CD-3/2018-19 | Circle Vrindavan | प्रधानमंत्री आवास योजना 240 नग भवन (ग्रुप-अ) | 0.00 | 940.00 28/02/2018 | 06/09/2018 06/09/2018 | 05/03/2020 | 06/09/2018 06/09/2018 | Mahesh Infracon Pvt. Ltd. 9456607152 | ANOOP JAISWAL JE UDAIVEER SINGH AE PANKAJ VERMA XE | Circle Vrindavan | In Progress |
118
| 03/SE(V)/CD-3/2018-19 | Circle Vrindavan | प्रधानमंत्री आवास योजना 240 नग भवन (ग्रुप-बी) | 0.00 | 940.00 28/02/2018 | 16/08/2018 16/08/2018 | 15/02/2020 | 16/08/2018 16/08/2018 | Mahesh Infracon Pvt. Ltd. 9456607152 | NARAYAN PRASHAD JE R.P. GUPTA AE PANKAJ VERMA XE | Circle Vrindavan | In Progress |
119
| 04/SE(V)/CD-3/2018-19 | Circle Vrindavan | प्रधानमंत्री आवास योजना 192 नग भवन (ग्रुप-सी) | 0.00 | 752.00 28/02/2018 | 23/08/2018 23/08/2018 | 22/02/2020 | 23/08/2018 23/08/2018 | Mahesh Infracon Pvt. Ltd. 9456607152 | KAMAL DEO PRASAD JE UDAIVEER SINGH AE PANKAJ VERMA XE | Circle Vrindavan | In Progress |
120
| 01/SE(V)/CD-3/2018-19 | Circle Vrindavan | प्रधानमंत्री आवास योजना 144 नग (ग्रुप-डी) | 0.00 | 564.00 28/02/2018 | 23/07/2018 23/07/2018 | 22/01/2020 | 23/07/2018 23/07/2018 | M/S Aditya Engineers & Builders 9415149007 | KAMAL DEO PRASAD JE SHARAD KUMAR AE PANKAJ VERMA XE | Circle Vrindavan | In Progress |
121
| 02/SE(V)/CD-3/2018-19 | Circle Vrindavan | प्रधानमंत्री आवास योजना 144 नग भवन (ग्रुप-ई) | 0.00 | 564.00 28/02/2018 | 27/07/2018 27/07/2018 | 26/01/2020 | 27/07/2018 27/07/2018 | Ahmad Builders 7905820562 | KAMAL DEO PRASAD JE SHARAD KUMAR AE PANKAJ VERMA XE | Circle Vrindavan | In Progress |
122
| 04/EE/CD-10/2018-19 | Circle Mantola | Const. of Boundary Wall of 2BHK Flats in Sec-16B, Mandola Vihar Yojana, Gzb. | 0.00 | 85.86 19/11/2018 | 08/03/2019 08/03/2019 | 07/09/2019 | 08/03/2019 08/03/2019 | M/s Mavi Construction Company 9818664691 | OMPRAKASH CD10,RADHEY SHYAM CD-10 JE T.K. BANERJEE AE A.V. SINGH,AMAN TYAGI,FARAZ ASLAM XE | Circle Mantola | In Progress |
123
| 02/EE/2018-19 | Circle 2 | CONSTRUCTION OF BOUNDRYWALL (PART) AT SHAKUNTLAM YOJNA MUZAFFARNAGAR | 0.00 | 15.00 31/01/2019 | 06/03/2019 06/03/2019 | 05/06/2019 | 06/03/2019 06/03/2019 | M/S VICTORIOUS INFRASTRUCTURE PVT LTD 9891814935 | SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XE | Circle 2 | In Progress |
124
| 09/EE/2018-19CD-28 | Circle 6 | Const. of Road, Drain, Park & Sewer Line in Sector-4, Firozabad | 0.00 | 64.64 27/06/2018 | 26/10/2018 26/10/2018 | 25/01/2019 | 26/10/2018 26/10/2018 | Maa Chandrawati Construction 9412652907 | RAKESH KUMAR VERMA,SUDHIR KUMAR JE ALOKSHEEL DWIVEDI,ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XE | Circle 6 | In Progress |
125
| 13/EE/2018-19CD-28 | Circle 6 | Stregthening of Road, Drain at Sikandra Yojna, Agra From Sec.-14 to Sec.-15 | 0.00 | 55.21 27/06/2018 | 26/10/2018 26/10/2018 | 25/12/2018 | 26/10/2018 26/10/2018 | Siddarth Associates 9457000613 | RAKESH KUMAR VERMA,SANJAY SHARMA JE ALOKSHEEL DWIVEDI,ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XE | Circle 6 | In Progress |
126
| 03/SE(P)/CU-3/2018-19Dated27/07/2018 | Circle HQ | Construction of 192 Nos EWS Flats under P.M.A.Y. at Sector-
3, part-1, Avadh Vihar Yojna, Lucknow. - Group-5C | 0.00 | 736.36 28/02/2018 | 27/07/2018 15/11/2018 | 26/01/2020 | 27/07/2018 15/11/2018 | R.P.M. Construction 9450397977 | ANIRUDDH PANDEY,TRILOKI RAM JE AJAY GOEL AE RAHUL YADAV XE | Circle HQ | In Progress |
127
| 11/EE/2018-19CD-28 | Circle 6 | Const. of Road From NH-2 to Zila Panchyat Office, Civil Lines in Firozabad | 0.00 | 58.39 27/06/2018 | 26/10/2018 26/10/2018 | 25/01/2019 | 26/10/2018 26/10/2018 | Siddarth Associates 9457000613 | RAKESH KUMAR VERMA,SUDHIR KUMAR JE ALOKSHEEL DWIVEDI,ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XE | Circle 6 | In Progress |
128
| 14/EE/2018-19CD-28 | Circle 6 | Const. of Drain & Road At Yojna No.-1, Shikohabad | 0.00 | 25.68 27/06/2018 | 13/12/2018 13/12/2018 | 12/02/2019 | 13/12/2018 13/12/2018 | Maa Chandrawati Construction 9412652907 | RAKESH KUMAR VERMA,SUDHIR KUMAR JE ALOKSHEEL DWIVEDI,ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XE | Circle 6 | In Progress |
129
| 12/EE/2018-19CD-28 | Circle 6 | Const. of Road and Drain in Premanand Kunj Colony, Brij Vihar, Kamla Nagar, Agra | 0.00 | 70.78 02/06/2018 | 26/10/2018 26/10/2018 | 25/01/2019 | 26/10/2018 26/10/2018 | Siddarth Associates 9457000613 | RAMSHANKAR JE ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XE | Circle 6 | In Progress |
130
| 01/EE/CD-6/2017-18 | Circle 2 | Laying of Internal Sewer line in Sec-8. | 0.00 | 60.78 05/05/2017 | 17/06/2017 17/06/2017 | 16/09/2017 | 17/06/2017 17/06/2017 | M/s Gaurav Enterprises 9837408485 | S.P. SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XE | Circle 2 | In Progress |
131
| 02/EE/CD-6/2018-19 | Circle 2 | Const. of Internal drains & culverts in Sec-8. | 0.00 | 36.05 16/03/2018 | 02/06/2018 02/06/2018 | 01/10/2018 | 02/06/2018 02/06/2018 | M/s Ganga and Componay 9412201897 | S.P. SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XE | Circle 2 | In Progress |
132
| 12/SE(V)/2015-16 | Circle Vrindavan | 2020 Nos. Multistoried Flats at Goverdhan Enclave | 0.00 | 39278.32 19/10/2015 | 30/03/2016 30/03/2016 | 28/12/2019 | 30/03/2016 30/03/2016 | LARSEN & TOUBRO LIMITED 09450000009 | AJAY KUMAR MISHRA,AKBAR ALI,ARUN KUMAR RAI,RAJESH KUMAR VERMA,RAJIV RASTOGI,RAKESH KUMAR SAXENA JE AKHILESHWAR SINGH,HARISHANKAR SINGH,RAJIV SRIVASTAVA AE ANIL KUMAR MISHRA,NAVJOT SINGH VERMA,U.C. SINGH XE | Circle Vrindavan | In Progress |
133
| 05/EE/ED-2GZB/18-19 | Circle Electrical | S/I/T/C OF 1 NO 40 KVA TROLLY MOUNTED DIESEL E/A SET FOR TUBEWELL SIDDHARTH VIHAR YOJNA GZB | 0.00 | 14.16 04/10/2018 | 04/10/2018 03/12/2018 | 02/02/2019 | 04/10/2018 03/12/2018 | M/S OM ASSOCIATES 9312388633 | C.L. MAURYA JE TEAJ BIR SINGH AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
134
| 10/EE/ED-2GZB/17-18 | Circle Electrical | SUPPLY OF 1 NO. 10 MVA 33/11 KV POWER T/F FOR 33/11 KV S/S SEC-7 VASUNDHARA YOJNA GZB | 0.00 | 60.00 01/04/2017 | 05/08/2017 05/08/2017 | 04/10/2017 | 05/08/2017 05/08/2017 | Elecon Conductor 9837007408 | V.K. RAI JE V.V TRIPATHI AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
135
| 04/EE/CD29/17-18 | Circle 6 | CONSTRUCTION OF PARK IN SECTOR-6A, SIKANDRA YOJNA, AGRA | 0.00 | 11.75 31/08/2017 | 27/10/2017 27/10/2017 | 26/10/2018 | 27/10/2017 27/10/2017 | PEMPER PETS 7906702954 | A.D. SHANDILYA JE AMIT RATHOR AE CHANDRAMA RAM XE | Circle 6 | Not Started |
136
| 02/EE/ED-2GZB/18-19 | Circle Electrical | S/I OF OUT DOOR TYPE 11/.433 KV 63 KVA T/F (L-2) AND RELATED WORK AT SECTOR 5,8,9,10 TUBEWELL SIDDHARTHA VIHAR YOJNA GHAZIABAD | 0.00 | 7.47 05/07/2018 | 22/10/2018 22/10/2018 | 21/11/2018 | 22/10/2018 22/10/2018 | M/S OM ASSOCIATES 9312388633 | C.L. MAURYA JE TEAJ BIR SINGH AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
137
| 08/EE/CD29/2018-19 | Circle 6 | WIDENING AND CONSTRUCTION OF CULVERT AT MUGHAL ROAD NEAR SULTANGANJ CHAURAHA | 0.00 | 64.48 11/01/2019 | 08/03/2019 08/03/2019 | 07/06/2019 | 08/03/2019 08/03/2019 | SUSHIL SINGHAL 9412255916 | NAVRATAN SINGH,RAJIV KUMAR VERMA JE A.P. AGRAWAL AE CHANDRAMA RAM XE | Circle 6 | In Progress |
138
| 08/SE-II/2019-20 | Circle 2 | Construction of Service roads of 24m, 36m, 30m & 30m HT Line wide trunk road at Jagriti Vihar (Ext.), Scheme-11, Meerut | 0.00 | 477.25 14/08/2019 | 25/10/2019 25/10/2019 | 24/02/2020 | 25/10/2019 25/10/2019 | M/s Jeet Construction Co. 9837021527 | SH. RAVINDRA KUMAR JE M BKAUSHIK AE M.B. KAUSHIK XE | Circle 2 | In Progress |
139
| 07/EE/ED-2GZB/17-18 | Circle Electrical | EXT. ELECT. & T/F WORK FOR CAMPUS OF GANGA, YAMUNA, HINDON ENCLAVE SEC-7 SIDDHARTHA VIHAR YOJNA GZB | 0.00 | 101.00 28/10/2016 | 27/06/2017 27/06/2017 | 26/08/2017 | 27/06/2017 27/06/2017 | M/S OM ASSOCIATES 9312388633 | C.L. MAURYA JE TEAJ BIR SINGH AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
140
| 06/EE/CD-25/2017-18 | Circle 5 | Construction work at community center by Infrastructure fund in Moradabad city village mau | 0.00 | 60.00 13/04/2017 | 27/05/2017 26/01/2018 | 26/01/2018 | 27/05/2017 26/01/2018 | M/s Imran Arif Construction 9917007828 | RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
141
| 01/EE/CD-38/2019-20 | Circle Mantola | Construction of 33/11 KV Sub Station Building in sec -7 | 0.00 | 46.50 | 02/07/2019 02/07/2019 | 01/04/2020 | 02/07/2019 02/07/2019 | Arsh Contractor 9410497498 | VEER SINGH JE ALOKSHEEL DWIVEDI,RAVINDRA BHATT AE SHOBHIT KUMAR PATHAK XE | Circle Mantola | In Progress |
142
| 3557/A-4/87 | Circle 4 | Construction of Park in Spining Mill Awasiya Yojna Etawah | 0.00 | 91.50 16/12/2017 | 13/07/2017 13/07/2017 | 12/11/2017 | 13/07/2017 13/07/2017 | M/s Siwansi Concrete Product 9412183483 | SRI DEVENDRA YADAV JE NAGENDRA KUMAR,NAVJOT SINGH VERMA,SRI ABHISHEK VERMA AE PRADEEP KUMAR XE | Circle 4 | In Progress |
143
| 12/EE/17-18ED-1 | Circle Electrical | Supply & Installation of pre paid Electric meter (Service/L&T make) ad its related work for giving service connection to flats in Himalaya Enclave phase-1 Sector-18 Vrindavan Yojna No. 4 Lucknow | 0.00 | 99.00 15/05/2017 | 14/07/2017 14/07/2017 | 13/10/2017 | 14/07/2017 14/07/2017 | S.M.CONSTRUCTION | | Circle Electrical | In Progress |
144
| 01/SE-V/2018-19 | Circle 5 | Laying of trunk sewer line proposed in tender in Majhola Yojna No 4 Ph 2 vistar Moradabad | 0.00 | 422.00 17/07/2018 | 03/01/2019 03/01/2019 | 02/07/2019 | 03/01/2019 03/01/2019 | M/s Ganga and Componay 9412201897 | RAHUL KUMAR,SARVESH KUMAR VERMA JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
145
| 06/EE/18-19ED-1 | Circle Electrical | S/I of pre-paid electric meter Alakhnanda Enclave Sector-3 Avadh Vihar Yojna Lucknow | 0.00 | 214.35 07/03/2018 | 05/05/2018 05/05/2018 | 04/09/2018 | 05/05/2018 05/05/2018 | S.J.S. System & Solution | | Circle Electrical | In Progress |
146
| 12/EE/ED-III/2018-19 | Circle Electrical | Supply of 11 KV Indoor type and 33 KV Out Door Type Breaker for 33/1 Sub-Station at Sector-3A Jagrati Vihar (Ext.) Meerut | 0.00 | 60.11 25/01/2019 | 01/03/2019 01/03/2019 | 30/06/2019 | 01/03/2019 01/03/2019 | R K and Company 8171211222 | ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE ER. RAJENDRA SINGH XE | Circle Electrical | In Progress |
147
| 13/EE/ED-III/2018-19 | Circle Electrical | External Electrification work at Sector-3 Jagrati Vihar Scheme No. 11, Meerut | 0.00 | 88.47 28/02/2019 | 07/03/2019 07/03/2019 | 06/09/2019 | 07/03/2019 07/03/2019 | YASH ENTERPRISES | ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE ER. RAJENDRA SINGH XE | Circle Electrical | In Progress |
148
| 14/EE/ED-III/2018-19 | Circle Electrical | External Electrification work at Sector-2 Jagrati Vihar Scheme No. 11, Meerut | 0.00 | 107.36 28/02/2019 | 07/03/2019 07/03/2019 | 06/09/2019 | 07/03/2019 07/03/2019 | R K and Company 8171211222 | ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE ER. RAJENDRA SINGH XE | Circle Electrical | In Progress |
149
| 01/SE-6/2018-19CD-28 | Circle 6 | Laying and Jointing of Trunk Sewerline from Sect.-4, Sikandra Yojna, Agra to Bodla Choraha. | 0.00 | 170.81 16/11/2018 | 26/02/2019 26/02/2019 | 25/06/2019 | 26/02/2019 26/02/2019 | Rakesh Singh Nursery 9810117408 | RAKESH KUMAR VERMA,SANJAY SHARMA JE ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XE | Circle 6 | In Progress |
150
| 08/EE/ED-2GZB/17-18 | Circle Electrical | INT. ELECT. AND STREET LIGHTING WORK IN SHAMSAN GHAT SEC-13 MANDOLA VIHAR YOJNA GZB | 0.00 | 12.00 22/04/2017 | 27/06/2017 27/06/2017 | 26/09/2017 | 27/06/2017 27/06/2017 | R.V. BROS & CO 9415052258 | ER. SUNIL KUMAR,PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR,D.C SHUKLA,V.V TRIPATHI AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
151
| 20/EE/ED-III/2018-19 | Circle Electrical | Construction of 33 KV Line for 220/132/33 KV Substation Sector-3A Jagrati Vihar External Scheme No. 11, Meerut | 0.00 | 107.67 28/02/2019 | 25/03/2019 25/03/2019 | 24/11/2019 | 25/03/2019 25/03/2019 | SPARKLE ENTERPRISES 9837394838 | ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE ER. RAJENDRA SINGH XE | Circle Electrical | In Progress |
152
| 16/EE/ED-2GZB/17-18 | Circle Electrical | REMAINING BALANCE WORK OF INT.ELECT, FIRE FIGHTING & LIFT IN 108 NO. FLATS BLOCK A & B IN SHIKHAR ENCLAVE VASUNDHARA GZB | 0.00 | 88.50 05/02/2018 | 22/03/2018 02/03/2018 | 21/04/2018 | 22/03/2018 02/03/2018 | M/S OM ASSOCIATES 9312388633 | PANKAJ KUMAR PUSHKAR,RAM KUMAR,V.K. RAI JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
153
| 15/EE/ED-2GZB/17-18 | Circle Electrical | REMAINING BALANCE OF INT. ELECT. L.A. & SERVICE CONNECTION IN BHRAMHAPUTRA ENCLAVE SEC-10 SIDHARTHA VIHAR YOJNA GHAZIABAD | 0.00 | 88.50 05/02/2018 | 22/03/2018 22/03/2018 | 21/04/2018 | 22/03/2018 22/03/2018 | K.S. ELECTRICALS 9650148106 | PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
154
| 06/EE/ED-2GZB/17-18 | Circle Electrical | INT.ELECT. WORK IN CLUB HOUSE AT SECTOR-15 SHIKHAR ENCLAVE, VASUNDHARA GZB | 0.00 | 5.00 22/04/2017 | 27/06/2017 27/06/2017 | 26/08/2017 | 27/06/2017 27/06/2017 | ELFIN ELECTRICALS 9415902755 | PANKAJ KUMAR PUSHKAR,V.K. RAI JE ASHOK KUMAR,D.C SHUKLA,V.V TRIPATHI AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
155
| 01/SE(E)LKO/17-18 | Circle Electrical | CONST. OF 33 KV LINE FROM 220 KV S/S TRONICA CITY TO COMMON POINT OF SEC-3&7 MANDOLA VIHAR YOJNA GZB | 0.00 | 242.00 31/03/2017 | 24/07/2017 24/07/2017 | 23/01/2018 | 24/07/2017 24/07/2017 | S S CONSTRUCTION 9999999645 | PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
156
| 14/EE/ED-2GZB/17-18 | Circle Electrical | CONST. OF 350X200 MM DIA 200 MT DEPTH 1 NO T/W BY D.C. RIG MACHINE AT SECTOR-17 T/W NO.-2 MANDOLA VIHAR YOJNA GZB | 0.00 | 18.00 22/09/2017 | 17/02/2017 17/02/2018 | 16/05/2018 | 17/02/2017 17/02/2018 | SUDHIR ENGINEERING WORKS 9810466565 | PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
157
| 05/EE/ED-2GZB/17-18 | Circle Electrical | FIRE ALARMING WORK FOR SHIKHAR ENCLAVE HOUSES AT SEC-15 VASUNDHARA GZB | 0.00 | 18.00 02/04/2017 | 23/06/2017 23/06/2017 | 22/08/2017 | 23/06/2017 23/06/2017 | AQUACHEM ENGINEERS 9810458884 | BHOOPLAL,V.K. RAI JE ASHOK KUMAR,V.V TRIPATHI AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
158
| 07/EE/ED-2GZB/18-19 | Circle Electrical | AMC OF KONE MAKE LIFT AT SEC-15 SHIKHAR ENCLAVE BLOCK- C&D VASUNDHARA GZB | 0.00 | 6.21 06/12/2018 | 24/12/2018 24/12/2018 | 23/12/2019 | 24/12/2018 24/12/2018 | KONE ALIVETOR INDIA PVT. LTD. 9560361414 | C.L. MAURYA,PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
159
| 01/SEHQ/CD-14/2018-19 | Circle HQ | CONST. OF 32 NOS. 2BHK+32 NOS. 3BHK (S+8) FLATS | 0.00 | 1882.00 24/02/2018 | 19/05/2018 19/05/2018 | 18/05/2020 | 19/05/2018 19/05/2018 | ANGELIC INFRACON PVT. LTD. 8052315129 | GAUTAM KUMAR,RAMESH CHANDRA CHAURASIYA,SUBEDAR NAVIK,SUGENDRA KUMAR VISHWAKARMA JE YOUGESH KUMAR AE D. K GUPTA XE | Circle HQ | In Progress |
160
| 06/EE/ED-2GZB/18-19 | Circle Electrical | AMC OF KONE MAKE LIFT AT OFFICE COMPLEX SEC-16 VASUNDHARA GZB | 0.00 | 0.94 15/12/2018 | 19/12/2018 19/12/2018 | 18/12/2019 | 19/12/2018 19/12/2018 | KONE ALIVETOR INDIA PVT. LTD. 9560361414 | C.L. MAURYA JE TEAJ BIR SINGH AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
161
| 03/EE/Cu-Etawah/2018-19 | Circle 4 | Bituminous Road Work in Spining Mill Yojna Etawah | 0.00 | 79.83 08/03/2019 | 08/03/2019 08/03/2019 | 01/06/2019 | 08/03/2019 08/03/2019 | M/s R.N. Agrawal 9319062251 | SRI ANIL KUMAR CHAUDHARY JE ARVIND KUMAR,NAGENDRA KUMAR,SRI ABHISHEK VERMA AE PRADEEP KUMAR XE | Circle 4 | In Progress |
162
| 03/EE/2019-20ED-1 | Circle Electrical | SITC of 01 No. 1000 LPM 62 mtr. head at Gokul Gram Yojna Munnu Khera Lucknow. | 0.00 | 6.36 18/03/2019 | 20/06/2019 20/06/2019 | 19/09/2019 | 20/06/2019 20/06/2019 | M.A. Engineering works | | Circle Electrical | In Progress |
163
| 03/S.E-2/C.D-5/2019-20 | Circle 2 | Construction of 45/75 type 79 Nos Semi-Finished Houses at Sector 5 in Scheme No. 11 Jagriti Vihar (Extension) Meerut. Group-C | 0.00 | 341.66 08/03/2019 | 08/07/2019 08/07/2019 | 07/04/2020 | 08/07/2019 08/07/2019 | M/s Kumar Builders 9358403917 | ER. SUNIL KUMAR BHUTANI JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XE | Circle 2 | In Progress |
164
| 04/S.E-2/C.D-5/2019-20 | Circle 2 | Construction of 45/75 type 87 Nos Semi-Finished Houses at Sector 5 in Scheme No. 11 Jagriti Vihar (Extension) Meerut. Group-B | 0.00 | 376.26 08/03/2019 | 08/07/2019 08/07/2019 | 07/04/2020 | 08/07/2019 08/07/2019 | M/s Kumar Builders 9358403917 | ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XE | Circle 2 | In Progress |
165
| 05/S.E-2/C.D-5/2019-20 | Circle 2 | Construction of 31/63 type 88 Nos Semi-Finished Houses at Sector 5 in Scheme No. 11 Jagriti Vihar (Extension) Meerut. | 0.00 | 256.31 01/06/2019 | 19/07/2019 19/07/2019 | 18/04/2020 | 19/07/2019 19/07/2019 | A.S CONSRTUCTION 8273230008 | ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XE | Circle 2 | In Progress |
166
| 04/EE/2019-20ED-1 | Circle Electrical | S/F of Caging for Bus BAr & Meetring pannel at sector-7(in basera flat area) Avadh Vihar Yojna Lucknow | 0.00 | 6.71 04/01/2019 | 28/06/2019 28/06/2019 | 27/07/2019 | 28/06/2019 28/06/2019 | M.A. Engineering works | | Circle Electrical | In Progress |
167
| 01/pm/cu-jhs/19-20 | Circle 6 | CONSTRUCTION OF BOUNADRY WALL YOJNA NO-03/JHANSI | 0.00 | 135.25 01/10/2014 | 17/06/2019 17/06/2019 | 16/12/2019 | 17/06/2019 17/06/2019 | muskaan enterprises 9415586688 | MANVENDRA DHAMANIYA JE DAYASAGAR AE EKHLAQUE AHMAD XE | Circle 6 | In Progress |
168
| 01/EE.CD-4/2019-20 | Circle 3 | Providing and laying and internal water supply line in Bahraich Bhinga Marg Bhoomi Vikas Evam Grihsthan Yojna, Bahraich. | 0.00 | 43.34 24/01/2019 | 13/06/2019 13/06/2019 | 12/10/2019 | 13/06/2019 13/06/2019 | M/S KAILASH RAM 9651534882 | CHANDAN KUMAR JE K.K ACHARYA AE PRASHANT VARDHAN XE | Circle 3 | In Progress |
169
| 02/EE/CD-8/2017-18 | Circle 2 | Internal Development work (Sewer Line, Water Line, Road, Park) at Sector-12, Scheme-7, Shastri Nagar, Meerut | 0.00 | 37.00 03/04/2017 | 14/06/2017 14/06/2017 | 13/10/2017 | 14/06/2017 14/06/2017 | Vishal Gupta | SH. SANDEEP KUMAR JE SH. SANJAI SHARMA AE M.B. KAUSHIK XE | Circle 2 | In Progress |
170
| 02/S.E-2/C..D-5/2019-20 | Circle 2 | Construction of 45/75 type 86 Nos Semi-Finished Houses at Sector 5 in Scheme No. 11 Jagriti Vihar (Extension) Meerut. Group-A | 0.00 | 371.93 08/03/2019 | 08/07/2019 08/07/2019 | 07/04/2020 | 08/07/2019 08/07/2019 | M/s Gaurav Enterprises 9837408485 | ER. SUNIL KUMAR BHUTANI JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XE | Circle 2 | In Progress |
171
| 02/EE/ED-2GZB/2015-16 | Circle Electrical | INT. ELE. IN COMMUNITY CENTRE AT SEC-4A, MANDOLA VIHAR YOJNA GZB. | 0.00 | 28.00 21/09/2015 | 18/11/2015 18/11/2015 | 17/07/2016 | 18/11/2015 18/11/2015 | OM ASSOCIATES 9312359633 | SUNILKUMAR JE D.C SHUKLA AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
172
| 01ee20-21 | Circle HQ | Internal Development work (road, drain, sewer, water supply) in PMAY area at Lohramau Yojna sultanpur | 0.00 | 50.09 14/01/2020 | 11/05/2020 | 10/11/2020 | 11/05/2020 | DEV CONSTRUCTION CO. | MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XE | Circle HQ | In Progress |
173
| 03/EE/ED-2GZB/2015-16 | Circle Electrical | S/I OF 1000/1200/1500 LPM 60 MTR. HEAD KSB MAKE PUMPING PLANT (05 NOS.) AT MANDOLA VIHAR YOJNA GZB. | 0.00 | 25.00 21/11/2015 | 20/02/2016 20/02/2016 | 19/04/2016 | 20/02/2016 20/02/2016 | SUDHIR ENGINEERING WORKS 9810466565 | SUNILKUMAR JE ER. D. R. MAURYA AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
174
| 04/EE/CD-1GZB/2019-20DATE21-03-2020 | Circle 7 | Strengthening of 50mtr wide Road (Part) at Siddharth Vihar Yojna, Gzb. | 0.00 | 88.36 01/02/2020 | 21/03/2020 21/03/2020 | 20/09/2020 | 21/03/2020 21/03/2020 | M/s Ramesh Chand & Co. 9213288266 | RANDHIR SINGH JE NARENDRA PAL AE ATUL KUMAR SINGH XE | Circle 7 | In Progress |
175
| 08/SE(M)/CD-22/2016-17 | Circle Mantola | construction of internal raods on sector-2 mandola vihar yojna | 0.00 | 468.00 04/10/2016 | 04/01/2017 | 03/07/2017 | 04/01/2017 | KRISHNA CONSTRUCTION COMPANY | K.V.SINGH,U.S.CHAURASIYA JE HARI SHANKAR TIWARI AE UMA NATH SHUKLA XE | Circle Mantola | In Progress |
176
| 11/EE/CD-2/19-20 | Circle 3 | Construction of Pump house at Sec-15 VVY-4 Lucknow. | 0.00 | 8.72 04/10/2019 | 14/11/2019 14/11/2019 | 13/12/2019 | 14/11/2019 14/11/2019 | J.P.TRADERS | HEMANT KUMAR JE SUNIL KUMAR SINGH AE RAMAYAN SHARAN XE | Circle 3 | In Progress |
177
| 03/E.E./C.D.-34/AWASTHPNANIDHI/2019-20 | Circle 1 | Renovation of Patri with Interlocking Tiles & K.C. Drain & Culvert at Patrakarpuram Colony, Shivpur, Varanasi. | 0.00 | 70.12 13/12/2019 | 03/01/2020 05/02/2020 | 04/05/2020 | 03/01/2020 05/02/2020 | JWALAMUKHI CONSTRUCTION 09648999945 | TRIBHUVAN LAL JE AE AJIT KUMAR CHAUDHARY XE | Circle 1 | In Progress |
178
| 03/SE(E)LKO/2016-17 | Circle Electrical | INT. ELE. WORK IN SAMAJWADI YOJNA 336 NOS. 2BHK TYPE HOUSES AT SEC-17, MANDOLA VIHAR YOJNA GZB. (GROUP-B) | 0.00 | 170.00 14/03/2016 | 23/08/2016 23/08/2016 | 22/08/2017 | 23/08/2016 23/08/2016 | K.S. ELECTRICALS 9650148106 | ALOK KUMAR,PANKAJ KUMAR PUSHKAR,SUNILKUMAR JE D.C SHUKLA,D.K PANDEY AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
179
| 04/SE(E)LKO/2016-17 | Circle Electrical | INT. ELE. WORK IN SAMAJWADI YOJNA 256 NOS 2 BHK TYPE HOUSES AT SEC-16B, MANDOLA VIHAR YOJNA GZB, (GROUP-F) | 0.00 | 125.00 14/03/2016 | 23/08/2016 23/08/2016 | 22/08/2017 | 23/08/2016 23/08/2016 | K.S. ELECTRICALS 9650148106 | PANKAJ KUMAR PUSHKAR,SANJEEV KUMAR SINGH JE D.C SHUKLA AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
180
| 05/SE(E)LKO/2016-17 | Circle Electrical | INT. ELE. WORK IN SAMAJWADI YOJNA IN 640 NOS. 1 BHK TYPE HOUSES AT SET-15, MANDOLA VIHAR YOJNA GZB. (GROUP-H) | 0.00 | 190.00 14/03/2016 | 23/08/2016 | 22/08/2017 | 23/08/2016 | K.S. ELECTRICALS 9650148106 | ALOK KUMAR,PANKAJ KUMAR PUSHKAR JE D.C SHUKLA,D.K PANDEY AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
181
| 07/SE(E)LKO/2016-17 | Circle Electrical | INT. ELE. WORK IN SAMAJWADI YOJNA 384 NOS 2 BHK TYPE HOUSES AT SEC-16 B, MANDOLA VIHAR YOJNA GZG. (GROUP-E) | 0.00 | 190.00 14/03/2016 | 26/10/2016 26/10/2016 | 25/10/2017 | 26/10/2016 26/10/2016 | KASHYAPI INFRASTRUCTURE PVT. LTD. 9971799850 | ALOK KUMAR,PANKAJ KUMAR PUSHKAR JE D.C SHUKLA,D.K PANDEY AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
182
| 02/SE(E)LKO/2016-17 | Circle Electrical | CONSTRUCTION OF 33/11 KV S/S AND 33 KV LINE AT SEC-15, MANDOLA VIHAR YOJNA GZB. | 0.00 | 800.00 12/02/2016 | 13/06/2016 13/06/2016 | 12/03/2017 | 13/06/2016 13/06/2016 | Electro Builders | ALOK KUMAR,PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR,D.C SHUKLA,D.K PANDEY AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
183
| 07/EE/CD-22/2019-20 | Circle Mantola | Construction of 33/11 KVA Electric Sub-station in Sector-3 Mandola | 0.00 | 46.22 14/10/2019 | 11/12/2019 11/12/2019 | 10/08/2020 | 11/12/2019 11/12/2019 | VISHAL BUILDERS 9536606047 | KAMAL SINGH JE RAM AVTAR MITTAL AE UMA NATH SHUKLA XE | Circle Mantola | In Progress |
184
| 01/EE/CD-25/2020-21 | Circle 5 | Patch reparing work internal road sec 6A 7B 7C 9B and Trunk Road | 0.00 | 11.35 26/06/2020 | 26/06/2020 26/06/2020 | 25/07/2020 | 26/06/2020 26/06/2020 | M/s Arif khan contractor 9760674305 | RAHUL KUMAR,SARVESH KUMAR VERMA JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
185
| 01/EE/CD-1/2020-21 | Circle 7 | Supply and Fixing of RCC Pannels Tree Guards at sec-7 & Sec-8 Siddharth Vihar Yojna, Gzb | 0.00 | 6.67 | 08/07/2020 08/07/2020 | 07/08/2020 | 08/07/2020 08/07/2020 | Manpal 9917316437 | YOGENDRA KUMAR GUPTA JE NARENDRA PAL,YOGENDRA KUMAR VERMA AE ATUL KUMAR SINGH XE | Circle 7 | In Progress |
186
| 04/EE/CD-38/2020-21 | Circle Mantola | Laying of Sewer Line in Sec-1B | 0.00 | 28.25 15/01/2020 | 18/08/2020 18/08/2020 | 17/12/2020 | 18/08/2020 18/08/2020 | Jai Jagdamba Contractor & Engineers 9971688121 | ABHISHEK KUMAR MISHRA,RADHESHYAM JE NARESH GUPTA AE AMAN TYAGI XE | Circle Mantola | In Progress |
187
| 01/EE/CD-22/2019-20 | Circle Mantola | Providing and fixing R.C.C. post and barbed wire fencingaround green belt in sector-10 mandola | 0.00 | 27.28 24/07/2019 | 27/09/2019 | 26/01/2020 | 27/09/2019 | ANUJ ASSOCIATE 9411902544 | U.S.CHAURASIYA JE RAM AVTAR MITTAL AE UMA NATH SHUKLA XE | Circle Mantola | In Progress |
188
| 02/EE/CD-22/2019-20 | Circle Mantola | laying of internal waterline in sector 4A(plot portion) mandola | 0.00 | 17.55 01/08/2019 | 27/09/2019 | 26/12/2019 | 27/09/2019 | Laxman Buildcon | U.S.CHAURASIYA JE RAM AVTAR MITTAL AE UMA NATH SHUKLA XE | Circle Mantola | In Progress |
189
| 01/EE/CD29/19-20 | Circle 6 | LAYING OF INTERLOCKING TILES, C.C ROAD,DRAIN & CULVERT IN MAHARANI BAAG 'A' BLOCK AGRA NEAR & FRONT OF PLOT NO-79 TO 87, 87 TO SALONI COMPLEX,PLOT 75 TO76 | 0.00 | 96.63 04/06/2019 | 30/11/2019 30/11/2019 | 29/02/2020 | 30/11/2019 30/11/2019 | SHIVAM GROUPS 9837001873 | RAJIV KUMAR VERMA JE ASHOK KUMAR SHARMA AE CHANDRAMA RAM XE | Circle 6 | In Progress |
190
| 03/EE/CD-25/2017-18 | Circle 5 | Const of central verge under HT line in majhola no-4 ph-2 vistar mbd | 0.00 | 46.60 13/04/2017 | 27/05/2017 | 26/08/2017 | 27/05/2017 | M/s Arif khan contractor 9760674305 | RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
191
| 08/EE/CD-25/2017-18 | Circle 5 | Electrification work at community center at Village Mau mbd | 0.00 | 11.00 13/04/2017 | 30/05/2017 30/05/2017 | 30/05/2017 | 30/05/2017 30/05/2017 | M/s Jain Power Construction 9412245572 | RAHUL KUMAR,RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
192
| 02/EE/CD-25/2017-18 | Circle 5 | construction of public toilet block in mbd | 0.00 | 9.70 13/04/2017 | 27/05/2017 26/08/2017 | 26/08/2017 | 27/05/2017 26/08/2017 | M/s Z M H Construction Co 9927701805 | RAHUL KUMAR,RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | Not Started |
193
| 01/SE(M)/2020-21 | Circle Mantola | laying of sewer line in sector-2 mandola vihar | 0.00 | 130.00 15/01/2020 | 05/05/2020 | 04/11/2020 | 05/05/2020 | RAMAXE CONSTRUCTION 9811554477 | KAMAL SINGH JE HARI SHANKAR TIWARI AE UMA NATH SHUKLA XE | Circle Mantola | In Progress |
194
| 01/E.E/C.D-5/2019-20 | Circle 2 | Laying of 80 mm thick Interlocking Tiles on Parties of External Road, Demarcation of Plots and Water Connection in Sector-5 at Jagriti vihar (extension) Yojna No. 11 , Meerut | 0.00 | 74.00 13/12/2019 | 15/02/2020 15/02/2020 | 14/05/2020 | 15/02/2020 15/02/2020 | M/s S.K. Singh 9837488572 | ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XE | Circle 2 | In Progress |
195
| 01/EE/CD-8/2020-21 | Circle 2 | Development works (Internal Water Supply System, Internal Sewerage System & Internal Drainage System) in Pocket of Sector-3 (Part), Jagriti Vihar (Ext.), Scheme-11, Meerut. | 0.00 | 28.17 06/02/2020 | 02/05/2020 02/05/2020 | 01/08/2020 | 02/05/2020 02/05/2020 | M/s Ramaxe Construction Co 9811554477 | SH. SANDEEP KUMAR JE SH. SANJAI SHARMA AE M.B. KAUSHIK XE | Circle 2 | In Progress |
196
| 04/E.E/C.D-5/2019-20 | Circle 2 | Construction of Drain & Culvert Sector-5 Part at Scheme No.11 Jagriti Vihar (Ext.) Meerut. | 0.00 | 24.46 13/12/2019 | 06/03/2020 06/03/2020 | 05/06/2020 | 06/03/2020 06/03/2020 | M/s Ramaxe Construction Co 9811554477 | ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XE | Circle 2 | In Progress |
197
| 03/E.E/C.D-5/2019-20 | Circle 2 | Laying & Jointing Internal Water Supply Line in Sector-5 (Part) at Scheme No-11, Jagriti Vihar (Extension), Meerut. | 0.00 | 8.80 13/12/2019 | 29/02/2020 29/02/2020 | 28/05/2020 | 29/02/2020 29/02/2020 | M/s Manpal 9719316437 | ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XE | Circle 2 | In Progress |
198
| 12/S.E-2/C.D-5/2019-20 | Circle 2 | Construction of 9.00 M & 12.00 M Wide Bituminous Road in Sector-5 at Scheme No-11, Jagriti Vihar (Extension), Meerut. | 0.00 | 148.67 22/11/2019 | 13/03/2020 13/03/2020 | 12/07/2020 | 13/03/2020 13/03/2020 | M/s S.K. Singh 9837488572 | ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XE | Circle 2 | In Progress |
199
| 01/E.E/C.D-5/2020-21 | Circle 2 | Construction of Switch Room Cum S.D.O.
Office for 33/11 K.V.A. Sub-Station at Sector-5, in Jagriti Vihar
(Extension) Scheme No-11, Meerut. | 0.00 | 49.00 25/02/2020 | 15/05/2020 15/05/2020 | 14/11/2020 | 15/05/2020 15/05/2020 | A.S CONSRTUCTION 8273230008 | ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XE | Circle 2 | In Progress |
200
| 04/EE/CD11/2016-17 | Circle Vrindavan | Third Party Quality Assurance, Goverdhan Enclave, Vrindavan Yojna-4, Lucknow. | 0.00 | 0.00 | 25/07/2016 26/07/2016 | 24/01/2019 | 25/07/2016 26/07/2016 | SERTECH CONSULTANTS | JE HARISHANKAR SINGH AE NAVJOT SINGH VERMA XE | Circle Vrindavan | In Progress |
201
| 19/EE/CD-21/2017-18 | Circle Vrindavan | Development work of Pond Vill. Peer nagar Amarapali Yojna hardoi Road, Lucknow (Group-B) | 0.00 | 21.51 28/12/2016 | 30/06/2017 30/06/2017 | 29/09/2017 | 30/06/2017 30/06/2017 | Ahmad Builders 7905820562 | ANIL KUMAR JE A.K.SINHA AE JAGDISH KUMAR XE | Circle Vrindavan | In Progress |
202
| 07/EE/CD-21/2017-18 | Circle Vrindavan | Construction of Platform Sector H-2 Amrapali Yojna Hardoi Road Lucknow | 0.00 | 24.67 28/06/2016 | 12/06/2017 | 11/09/2017 | 12/06/2017 | Tirupati Construction | SHAILENDRA SINGH JE A.K.SINHA AE JAGDISH KUMAR XE | Circle Vrindavan | Not Started |
203
| 13/EE/CD-21/2017-18 | Circle Vrindavan | Construction of Plateform at Sector H-2 Amrapali Yojna Hardoi Road Lucknow | 0.00 | 25.95 28/12/2016 | 12/06/2017 12/06/2017 | 11/09/2017 | 12/06/2017 12/06/2017 | A.S.A. ENTERPRISES | SHAILENDRA SINGH JE A.K.SINHA AE JAGDISH KUMAR XE | Circle Vrindavan | Not Started |
204
| 14/EE/CD-21/2017-18 | Circle Vrindavan | Construction of Plateform at sector H--2 at Amrapali Yojna Hardoi Road Lucknow | 0.00 | 14.83 28/12/2016 | 29/06/2017 29/06/2017 | 28/09/2017 | 29/06/2017 29/06/2017 | RAJARAM TRADERS | ANIL KUMAR JE A.K.SINHA AE JAGDISH KUMAR XE | Circle Vrindavan | Not Started |
205
| 17/SEHQ/CD-7/19-20 | Circle HQ | Patch work and strengthening of road node no. 8 to 3 in AVY Lucknow | 0.00 | 190.00 16/12/2019 | 13/01/2020 13/01/2020 | 27/01/2020 | 13/01/2020 13/01/2020 | SAILANI | J.N. MISHRA,LALIT KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XE | Circle HQ | In Progress |
206
| 04/EE/CD-3/2019-20 | Circle Vrindavan | Construction of 01 No. 600KL capacity & 26.00M Staging RCC Over Head Tank in Sector-13, Vrindavan Yojna No.-4, Lucknow | 0.00 | 73.80 08/03/2019 | 14/10/2019 14/10/2019 | 13/08/2020 | 14/10/2019 14/10/2019 | P. K. Sharma | KAMAL DEO PRASAD JE RAJESH KR VERMA AE GYANESHWAR PRASHAD XE | Circle Vrindavan | In Progress |
207
| 15/SEHQ/CD-7/18-19 | Circle HQ | Interlocking tiles work in service road node 11 to 16 AVY | 0.00 | 350.00 21/02/2019 | 23/10/2019 23/10/2019 | 22/01/2020 | 23/10/2019 23/10/2019 | SHAKTI CONSTRUCTION CO. 09121900191 | MOH. KHURSHEED,PRAMOD KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XE | Circle HQ | In Progress |
208
| 05/EE/CD-3/2019-20 | Circle Vrindavan | Painting of Staff Quarter Houses and supply with installation of PVC Water Storage Tank at Staff Quarter Sector-23, Indira Nagar, Luckow | 0.00 | 18.00 13/12/2019 | 01/02/2020 01/02/2020 | 30/04/2020 | 01/02/2020 01/02/2020 | Lakhan Construction | KAMAL DEO PRASAD JE RAJESH KR VERMA AE PANKAJ VERMA XE | Circle Vrindavan | In Progress |
209
| 06/EE/CD-3/2019-20 | Circle Vrindavan | Painting Work of Sri Arvind Park at Sector-13, Indira nagar, Lucknow. | 0.00 | 4.10 13/12/2019 | 19/02/2020 19/02/2020 | 18/04/2020 | 19/02/2020 19/02/2020 | OM SAI ENTERPRISES | KAMAL DEO PRASAD JE AE PANKAJ VERMA XE | Circle Vrindavan | In Progress |
210
| 05/EE/CD-2/19-20 | Circle 3 | Interlocking tiles road work from Metrology office to Jagnehta in Barabanki. | 0.00 | 38.24 25/06/2019 | 10/09/2019 10/09/2019 | 09/12/2019 | 10/09/2019 10/09/2019 | Mahek Enterprises 8423036649 | | Circle 3 | In Progress |
211
| 06/EE/CD-2/19-20 | Circle 3 | Interloking tile and drain work from 2/82 to OHT & park 2/62 to 2/72 in Obri Barabanki | 0.00 | 53.26 25/06/2019 | 10/09/2019 09/12/2019 | 09/12/2019 | 10/09/2019 09/12/2019 | Mahek Enterprises 8423036649 | | Circle 3 | In Progress |
212
| 14/EE/CD-2/19-20 | Circle 3 | Interlocking road work from 4/142 to 4/116 in obri yojna,Barabanki. | 0.00 | 10.52 25/06/2019 | 16/11/2019 16/11/2019 | 15/02/2020 | 16/11/2019 16/11/2019 | Mahek Enterprises 8423036649 | | Circle 3 | Not Started |
213
| 16/EE/CD-2/19-20 | Circle 3 | Interloking tile and drain work from Kanshiram colony to Faizabad road in Barabanki | 0.00 | 35.85 25/06/2019 | 04/01/2020 04/01/2020 | 03/04/2020 | 04/01/2020 04/01/2020 | Ganesh Enterprises | | Circle 3 | In Progress |
214
| 01/EE/CD-2/19-20 | Circle 3 | Interlocking tiles road and drain work from 2/4/64 to 2/4/33 in obri yojna Barabanki. | 0.00 | 8.70 24/01/2019 | 20/07/2019 20/07/2019 | 19/10/2019 | 20/07/2019 20/07/2019 | Mahek Enterprises 8423036649 | | Circle 3 | In Progress |
215
| 02/EE/CD-2/19-20 | Circle 3 | Construction of CC road & drain in Moharipurwa in Barabanki. | 0.00 | 50.17 24/01/2019 | 20/07/2019 | 19/10/2019 | 20/07/2019 | Mahek Enterprises 8423036649 | | Circle 3 | Not Started |
216
| 07/EE/CD-2/19-20 | Circle 3 | Interlocking tiles work on road patri and road work in Khasra 339 ,Obri Yojna,Barabanki. | 0.00 | 18.93 25/06/2019 | 30/10/2019 30/10/2019 | 29/01/2020 | 30/10/2019 30/10/2019 | M/S Savitri Associate | | Circle 3 | In Progress |
217
| 11/EE/20-21ED-1 | Circle Electrical | External Electrification work of G+3 Type houses area in Sec-13 at Vrindavan Yojna Lucknow | 0.00 | 153.32 03/10/2019 | 11/05/2020 11/05/2020 | 10/09/2020 | 11/05/2020 11/05/2020 | PREETI ELECTRIC WORK 9150011801 | | Circle Electrical | In Progress |
218
| 02/EE/CD-19/2020-21 | Circle 3 | Renovation work of Office Complex, Sector-9, Vrindavan Yojna, Lucknow | 0.00 | 116.67 02/06/2020 | 23/06/2020 23/06/2020 | 22/09/2020 | 23/06/2020 23/06/2020 | T Y TRADERS 9004537987 | AJAY KUMAR JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XE | Circle 3 | In Progress |
219
| 04/EE/CUETAWAH/2020-21 | Circle 4 | Construction of 02 Nos. Vehicle Stoppage (With Toilet Block) Near Numaish Chauraha Etawah | 0.00 | 42.35 28/01/2020 | 28/07/2020 28/07/2020 | 27/10/2020 | 28/07/2020 28/07/2020 | Lal Bahadur Singh Contractor 9415472725 | DEVENDRA YADAV JE ARVIND KUMAR AE PRADEEP KUMAR XE | Circle 4 | Not Started |
220
| 02/EE/CUETAWAH/2020-21 | Circle 4 | Construction of 02 Nos. Vehicle Stoppage (With Toilet Block) Near DM Chauraha Etawah | 0.00 | 42.35 28/01/2020 | 28/07/2020 | 27/10/2020 | 28/07/2020 | Lal Bahadur Singh Contractor 9415472725 | SRI ANIL KUMAR CHAUDHARY JE ARVIND KUMAR AE PRADEEP KUMAR XE | Circle 4 | Not Started |
221
| 02/EE/CD-2/2020-21 | Circle 3 | GENERAL EARTH WORK AT GONDA FAIZABAD MARG BHOOMI VIKAS YOJNA GONDA | 0.00 | 28.85 10/12/2019 | 10/08/2020 | 09/11/2020 | 10/08/2020 | Ansh Contruction 9450072493 | | Circle 3 | In Progress |
222
| 05/EE/CD-38/2020-21 | Circle Mantola | Const of Internal Drain & Culvert in sec-15 & 16B | 0.00 | 62.50 11/05/2020 | 18/08/2020 18/08/2020 | 17/02/2021 | 18/08/2020 18/08/2020 | Jai Jagdamba Contractor & Engineers 9971688121 | VEER SINGH JE RAVINDRA BHATT AE AMAN TYAGI XE | Circle Mantola | In Progress |
223
| 01/EE/CD-38/2020-21 | Circle Mantola | Const of Park in sector-16B | 0.00 | 10.34 15/01/2020 | 26/06/2020 26/06/2020 | 25/09/2020 | 26/06/2020 26/06/2020 | Santosh Enterprises 8368572852 | ABHISHEK KUMAR MISHRA JE NARESH GUPTA AE AMAN TYAGI,SHOBHIT KUMAR PATHAK,UMA NATH SHUKLA XE | Circle Mantola | In Progress |
224
| 02/EE/CD-38/2020-21 | Circle Mantola | Const of RCC Post & Barbed wire Fencing work in green belt at sec-14 a & 14 B | 0.00 | 10.57 04/12/2019 | 26/06/2020 26/06/2020 | 25/09/2020 | 26/06/2020 26/06/2020 | ANUJ ASSOCIATE 9411902544 | ABHISHEK KUMAR MISHRA JE NARESH GUPTA AE AMAN TYAGI,SHOBHIT KUMAR PATHAK,UMA NATH SHUKLA XE | Circle Mantola | In Progress |
225
| 13/EE/20-21ED-1 | Circle Electrical | Construction of 33 KV line ofor 220/132/33 KV S/S to 33/11 KV S/S sector-8 Avadh Vihar Yojna Lucknow. | 0.00 | 433.81 27/09/2019 | 13/05/2020 13/05/2020 | 12/09/2020 | 13/05/2020 13/05/2020 | Preeti Electric works | | Circle Electrical | In Progress |
226
| 02/E.E./CD-24/MBD/2020-21 | Circle 5 | Laying of Water Supply Line in Kotdwar Road Bhumi Vikas Evam Grahsthan Yojna No. 1, Najibabad, Bijnor | 0.00 | 19.00 15/07/2020 | 18/08/2020 18/08/2020 | 17/11/2020 | 18/08/2020 18/08/2020 | VIKAS ENGINEERING | YOGESH KUMAR JE A.K.SAXENA AE FARAZ ASLAM XE | Circle 5 | Not Started |
227
| 02/EE/2020-21 | Circle 5 | Maintenance/Repair of Pot Holes and Trunk Roads in Majhola Yojna No.-4, Phase-2, Moradabad | 0.00 | 12.45 24/08/2020 | 03/10/2020 03/10/2020 | 02/11/2020 | 03/10/2020 03/10/2020 | M/s Rakesh Kumar 9837019057 | | Circle 5 | In Progress |
228
| 03/EE/CUETAWAH/2020-21 | Circle 4 | Construction of 02 Nos. Vehicle Stoppage (With Toilet Block) Near Shastri Chauraha Etawah | 0.00 | 42.35 28/01/2020 | 28/07/2020 28/07/2020 | 27/10/2020 | 28/07/2020 28/07/2020 | Lal Bahadur Singh Contractor 9415472725 | DEVENDRA YADAV JE ARVIND KUMAR AE PRADEEP KUMAR XE | Circle 4 | Not Started |
229
| 01/EE/CUETAWAH/2020-21 | Circle 4 | Construction of 02 Nos. Vehicle Stoppage (With Toilet Block) Near ITI Chauraha Etawah | 0.00 | 42.35 28/01/2020 | 28/07/2020 28/07/2020 | 27/10/2020 | 28/07/2020 28/07/2020 | Lal Bahadur Singh Contractor 9415472725 | SRI DEVENDRA YADAV JE ARVIND KUMAR AE PRADEEP KUMAR XE | Circle 4 | Not Started |
230
| 05/EE/CUETAWAH/2020-21 | Circle 4 | Construction of 02 Nos. Vehicle Stoppage (With Toilet Block) Near Gwalior Bus Stand Etawah | 0.00 | 42.35 28/01/2020 | 28/07/2020 28/07/2020 | 27/10/2020 | 28/07/2020 28/07/2020 | Lal Bahadur Singh Contractor 9415472725 | ARUN KUMAR PATEL JE ARVIND KUMAR AE PRADEEP KUMAR XE | Circle 4 | Not Started |
231
| 03/S.E.-1/VNS/CD-34/2020-21 | Circle 1 | INTERLOCKING IN ROAD PATRIES IN AWAS VIKAS COLONY PANDEYPUR, VARANASI | 0.00 | 140.00 04/05/2020 | 24/07/2020 24/07/2020 | 23/10/2020 | 24/07/2020 24/07/2020 | PUJA ENTERPRISES 9653030053 | TRIBHUVAN LAL JE V. P. MISHRA AE AJIT KUMAR CHAUDHARY XE | Circle 1 | In Progress |
232
| 01/EE/ED-III/20-21 | Circle Electrical | Construction of 420 Meter Deep Tubewell at Ganga Enclave Scheme No. -3, Kanpur | 0.00 | 45.92 28/05/2020 | 26/06/2020 26/06/2020 | 25/10/2020 | 26/06/2020 26/06/2020 | CIT DRILLERS & DEVELOPERS | | Circle Electrical | In Progress |
233
| 02/S.E.-1/C.D.-34/2020-21 | Circle 1 | CONSTRUCTION OF INTER LOCKING & DRAIN FROM RAILWAY STATION TO SHATISH CHANDRA COLLAGE VIA MALGODAM IN BALLIA | 0.00 | 227.00 09/06/2020 | 24/07/2020 24/07/2020 | 23/01/2021 | 24/07/2020 24/07/2020 | M/S Sai Enterprises 9653091241 | ARJUN VERMA JE V. P. MISHRA AE AJIT KUMAR CHAUDHARY XE | Circle 1 | In Progress |
234
| 02/E.E/C.D-5/2020-21 | Circle 2 | Laying of Sectorial Sewer Line In Sector-5 at Scheme No-11 Jagriti Vihar (Ext.) Meerut | 0.00 | 52.38 21/11/2019 | 29/05/2020 29/05/2020 | 28/08/2020 | 29/05/2020 29/05/2020 | M/s Ramaxe Construction Co 9811554477 | ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XE | Circle 2 | In Progress |
235
| 49/EE/2020-21 | Circle Electrical | Construction of 33 KV line to crossing Railway line only from 220/33 KV S/S Avadh Vihar Lucknow to connect the proposed 33/11 KV S/S at Avadh Vihar Yojna Lucknow | 0.00 | 109.33 28/08/2020 | 13/10/2020 13/10/2020 | 12/12/2020 | 13/10/2020 13/10/2020 | PREETI ELECTRIC WORK 9150011801 | | Circle Electrical | In Progress |
236
| 11/SE-II/CD-6/2019-20 | Circle 2 | Construction of remaining 45.00m wide road (node 25, 26, 27) at Scheme-11, Jagriti Vihar (Ext.), Meerut | 0.00 | 388.35 14/08/2019 | 01/02/2020 01/02/2020 | 31/07/2020 | 01/02/2020 01/02/2020 | M/s S.K. Singh 9837488572 | AJAB SINGH JE VIRENDRA KUMAR AE M.B. KAUSHIK XE | Circle 2 | In Progress |
237
| 1445/TQ/01/2020-21 | Circle 7 | Construction of 50.00 Mtr Wide Road(Part) Siddharth Vihar Yojna Ghaziabad. | 0.00 | 247.66 27/02/2020 | 22/06/2020 22/06/2020 | 21/12/2020 | 22/06/2020 22/06/2020 | S S CONSTRUCTION 9999999645 | RANDHIR SINGH JE NARENDRA PAL AE ATUL KUMAR SINGH XE | Circle 7 | In Progress |
238
| 761/PRO-50/49 | Circle 7 | Laying & Jointing Internal Sewer Line on 24.00 mtr wide road between sec-1 & 3 in Siddhath Vihar Yojna, Gzb | 0.00 | 19.77 10/07/2020 | 17/08/2020 17/08/2020 | 16/12/2020 | 17/08/2020 17/08/2020 | 3D CREATION | R.K. GUPTA JE NARENDRA PAL AE ATUL KUMAR SINGH XE | Circle 7 | In Progress |
239
| 66/EE/20-21 | Circle Electrical | External Electrification work in the area of PMAY at Lohramau Bhoomi Vikas Evam Grehsthan Yojna Sultanpur | 0.00 | 34.89 24/11/2020 | 18/12/2020 18/12/2020 | 17/02/2021 | 18/12/2020 18/12/2020 | ADITYA ENTERPRISES | | Circle Electrical | In Progress |
240
| 03ee20-21 | Circle Vrindavan | Construction of boundary wall around Amber masque at Sec-16, Vrindavan Yojna, Lucknow | 0.00 | 20.16 26/06/2020 | 19/08/2020 19/08/2020 | 18/10/2020 | 19/08/2020 19/08/2020 | OM SAI ENTERPRISES | MANOJ KUMAR JE K.N. MISHRA AE D.K. SRIVASTAVA XE | Circle Vrindavan | In Progress |
241
| 02/PM/CU-JHS/20-21 | Circle 6 | CONSTRUCTION OF PARK IN YOJANA NO-3 JHANSI | 0.00 | 39.77 20/03/2020 | 28/08/2020 | 27/11/2020 | 28/08/2020 | RAJESH KUMAR LITORIYA 9450034807 | ANUP KUMAR JE DAYASAGAR AE EKHLAQUE AHMAD XE | Circle 6 | In Progress |