SrNo | WORK ORDER NO | CIRCLE | WORK NAME | ESTIMATE COST & DATE | TENDER AMOUNT & DATE | AGREEMENT DATE & ACTUAL WORK START DATE | Target date of Work Completion | Agreement date & ACTUAL work start DATE1 | CONTRACTOR NAME & PHONE NO. | ENG. NAME AND PHONE NO | circle1 | Physical Progress |
1
| 02/SE(V)/CD-3/2017-2018 | Circle Vrindavan | 64 NOS HOUSES (G+3) LIG | 0.00 | 643.84 24/05/2017 | 21/09/2017 21/09/2017 | 20/09/2019 | 21/09/2017 21/09/2017 | SHAIL BUILDERS & CONTRACTOR 9415029218 | KAMAL DEO PRASAD 8795810262JE SHARAD KUMAR T 8795810558AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
2
| 05/SE(V)/CD-3/2017-2018 | Circle Vrindavan | 64 NOS HOUSES (G+3) LIG | 0.00 | 643.84 21/06/2017 | 19/09/2017 19/09/2017 | 19/09/2019 | 19/09/2017 19/09/2017 | SINGH ASSOCIATE | KAMAL DEO PRASAD 8795810294JE U. V. SINGH 8795810363AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
3
| 06/SE(V)/CD-3/2017-2018 | Circle Vrindavan | 96 NOS HOUSES(G+3) LIG | 0.00 | 965.76 21/06/2017 | 23/09/2017 23/09/2017 | 22/09/2017 | 23/09/2017 23/09/2017 | T Y TRADERS 9004537987 | ANOOP JAISWAL 8795810262JE U. V. SINGH 8795810558AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
4
| 08/SE(V)/CD-3/2017-2018 | Circle Vrindavan | 96 HOUSES(G+3) LIG | 0.00 | 965.76 21/06/2017 | 27/09/2017 27/09/2017 | 26/09/2019 | 27/09/2017 27/09/2017 | RAJAWAT ASSOCIATE 9415523037 | ANOOP JAISWAL 8795810564JE UDAIVEER SINGH 8795810363AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
5
| 10/SE(V)/CD-3/2017-2018 | Circle Vrindavan | 64 NOS HOUSES(G+3) LIG | 0.00 | 643.84 14/09/2017 | 15/01/2018 15/01/2018 | 14/01/2020 | 15/01/2018 15/01/2018 | INDIA STONE COMPANY 9648555666 | NARAYAN PRASHAD 8795810262JE R.P. GUPTA 8795810289AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
6
| 11/SE(V)/CD-3/2017-2018 | Circle Vrindavan | 96 NOS HOUSES (G+3) LIG | 0.00 | 965.76 14/09/2017 | 15/01/2018 15/01/2018 | 14/01/2020 | 15/01/2018 15/01/2018 | INDIA STONE COMPANY 9648555666 | NARAYAN PRASHAD 8795810262JE R.P. GUPTA 8795810289AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
7
| 03/SE(V)/CD-3/2017-2018 | Circle Vrindavan | 64 NOS HOUSES(G+3) EWS | 0.00 | 425.60 21/06/2017 | 21/09/2017 21/09/2017 | 20/09/2019 | 21/09/2017 21/09/2017 | SHARIK MIYA 9412710500 | KAMAL DEO PRASAD 8795810294JE U. V. SINGH 8795810363AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
8
| 04/SE(V)/CD-3/2017-2018 | Circle Vrindavan | 96 NOS HOUSES(G+3) EWS | 0.00 | 638.40 21/06/2017 | 27/09/2017 27/09/2017 | 26/09/2019 | 27/09/2017 27/09/2017 | GOPI CHAND RANGLINI 9956510351 | KAMAL DEO PRASAD 8795810262JE SHARAD KUMAR 8795810558AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
9
| 07/SE(V)/CD-3/2017-2018 | Circle Vrindavan | 64 NOS HOUSES (G+3) EWS | 0.00 | 425.60 21/06/2017 | 27/09/2017 27/09/2017 | 26/09/2019 | 27/09/2017 27/09/2017 | S. P. & COMPANY 9935586687 | ANOOP JAISWAL 8795810564JE UDAIVEER SINGH 8795810363AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
10
| 05/SE-III/CD-19/2018-19 | Circle 3 | Construction of 192 Nos., EWS Flat under PMAY (Shahari) Sector-7A, Part-I, Avadh Vihar Yojna, Lucknow | 0.00 | 752.00 02/04/2018 | 28/07/2018 28/07/2018 | 27/01/2020 | 28/07/2018 28/07/2018 | M/S Neel Constructions 9415117988 | HEM SINGH JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XE | Circle 3 | In Progress |
11
| 04/SE-III/CD-19/2018-19 | Circle 3 | Construction of 192 Nos. EWS Houses Under PMAY (Sahari) at Sector-7A, Awadh Vihar Yojna, Lucknow | 0.00 | 752.00 02/04/2018 | 28/07/2018 28/07/2018 | 27/01/2020 | 28/07/2018 28/07/2018 | M/S Apex Construction Company 9839098580 | HEM SINGH JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XE | Circle 3 | In Progress |
12
| 07/SEHQ/CD-7/18-19 | Circle HQ | CONSTRUCTION OF 288 NOS FOUR STORIED (G+3) FLATS AT SECTOR 10B, AWADH VIHAR YOJNA LUCKNOW | 0.00 | 1128.00 04/04/2018 | 08/08/2018 08/08/2018 | 07/02/2020 | 08/08/2018 08/08/2018 | R.S.CONSTRUCTION | J.N. MISHRA,PARMOD KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XE | Circle HQ | In Progress |
13
| 08/SEHQ/CD-7/18-19 | Circle HQ | CONSTRUCTION OF 288 NOS FOUR STORIED (G+3) FLATS AT SECTOR 10B, AWADH VIHAR YOJNA LUCKNOW | 0.00 | 1128.00 04/04/2018 | 08/08/2018 08/08/2018 | 07/02/2020 | 08/08/2018 08/08/2018 | R.S.CONSTRUCTION | J.N. MISHRA,PARMOD KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XE | Circle HQ | In Progress |
14
| 09/SEHQ/CD-7/18-19 | Circle HQ | CONSTRUCTION OF 288 NOS FOUR STORIED (G+3) FLATS AT SECTOR 10B, AWADH VIHAR YOJNA LUCKNOW | 0.00 | 1128.00 04/04/2018 | 08/08/2018 08/08/2018 | 07/02/2020 | 08/08/2018 08/08/2018 | R.S.CONSTRUCTION | A.B.SINGH,J.N. MISHRA JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XE | Circle HQ | In Progress |
15
| .4.09/SEHQ/CD15/2015-16 | Circle HQ | CONSTRUCTION OF 1680 MULTISTORY IN RESIDENTIAL FLATS IN SAMAJWADI AVAS YOJNA & 448 NOS SEMIFINISHED MULTISTORY RESIDENTIAL FLATS IN GOMTI ENCLAVE SECTOR-8 | 0.00 | 27010.00 06/11/2015 | 27/01/2016 27/01/2016 | 28/02/2020 | 27/01/2016 27/01/2016 | LARSEN & TOUBRO LIMITED 09450000009 | AMARJEET YADAV,KAMTA PRASAD,MANUDEV JE A.K.SHAHU,D.K.GOYAL AE D.B.YADAV XE | Circle HQ | In Progress |
16
| 08/SEHQ/CD-7/15-16 | Circle HQ | ENGINEERING PROCUREMENT AND CONSTRUCTION OF MULTI-STOREYED RESIDENTIAL FLATS IN
SARYU ENCLAVE | 0.00 | 52529.33 08/11/2015 | 25/01/2016 25/01/2016 | 14/08/2020 | 25/01/2016 25/01/2016 | N.C.C.LIMITED 09952301417 | A.B.SINGH,J.N. MISHRA,LALIT KUMAR,MOH. KHURSHEED,PRAMOD KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XE | Circle HQ | In Progress |
17
| 10/SE(HQ)/CD-31/18-19dt.29-8-18 | Circle HQ | Constt. of 96 No. EWS (G+3) Houses under PMAY at Sultanpur | 0.00 | 378.34 28/02/2018 | 29/08/2018 29/08/2018 | 20/02/2020 | 29/08/2018 29/08/2018 | M/S Shiv Giri Traders 9984854111 | MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XE | Circle HQ | In Progress |
18
| 4130/A-4/96 | Circle 4 | Construction of 50 Nos A-72 type Semi Finished houses at Spinning Mill Campus Etawah | 0.00 | 373.67 16/12/2016 | 12/10/2017 12/10/2017 | 11/07/2018 | 12/10/2017 12/10/2017 | RAJAWAT ASSOCIATE 9415523037 | SRI ARUN KUMAR PATEL,SRI ARVIND KUMAR JE NAGENDRA KUMAR,NAVJOT SINGH VERMA,SRI ABHISHEK VERMA AE PRADEEP KUMAR XE | Circle 4 | In Progress |
19
| 4131/A-4/96 | Circle 4 | Construction of 32 Nos A-72 type Finished houses at Spinning Mill Campus Etawah | 0.00 | 392.00 06/10/2017 | 25/01/2018 25/01/2018 | 24/01/2019 | 25/01/2018 25/01/2018 | Gun-Gun Construction & Electricals 9410487559 | SRI DEVENDRA YADAV JE ARVIND KUMAR,NAGENDRA KUMAR,NAVJOT SINGH VERMA,SRI ABHISHEK VERMA AE PRADEEP KUMAR XE | Circle 4 | In Progress |
20
| .6.04/SEHQ/CD15/18-19 | Circle HQ | Construction of 288 Nos. (G+3) Flats under PMAY at Sector-10B, Avadh Vihar Yojna, Lucknow. | 0.00 | 1095.88 05/04/2018 | 25/07/2018 25/07/2018 | 24/01/2020 | 25/07/2018 25/07/2018 | T Y TRADERS 9004537987 | AMARJEET YADAV JE D.K.GOYAL AE D.B.YADAV XE | Circle HQ | In Progress |
21
| 05/SEHQ/CD15/18-19 | Circle HQ | Construction of 224 Nos. (G+3) Flats under PMAY, at Sector-10 Avadh Vihar Yojna, Lucknow | 0.00 | 851.86 05/04/2018 | 25/07/2018 25/07/2018 | 24/01/2020 | 25/07/2018 25/07/2018 | GOPI CHAND RANGLINI 9956510351 | MANUDEV JE A.K.SHAHU AE D.B.YADAV XE | Circle HQ | In Progress |
22
| 11/SEHQ/CD-7/18-19 | Circle HQ | CONSTRUCTION OF 240 NOS FOUR STORIED (G+3) FLATS AT SECTOR 10B, AWADH VIHAR YOJNA LUCKNOW | 0.00 | 846.63 20/07/2018 | 09/10/2018 09/10/2018 | 08/04/2020 | 09/10/2018 09/10/2018 | SHAKTI CONSTRUCTION CO. 09121900191 | A.B.SINGH,LALIT KUMAR JE A.K.AGRAWAL AE PRAMOD KUMAR SINGH XE | Circle HQ | In Progress |
23
| 06/SEHQ/CD15/18-19 | Circle HQ | Construction of 224 Nos. (G+3) Flats under PMAY at Sector-10B, Avadh Vihar Yojna, Lucknow. | 0.00 | 851.86 05/04/2018 | 25/07/2018 25/07/2018 | 24/01/2020 | 25/07/2018 25/07/2018 | SHARIK MIYA 9412710500 | MANUDEV JE A.K.SHAHU AE D.B.YADAV XE | Circle HQ | In Progress |
24
| 05/SE-III/CD13/13-14 | Circle 3 | Const. of Multi Storeyed (S+13) Flats Residential Flats ( Everest Enclave) in Sect-18, Vrindavan Yojna No.4 Lucknow | 0.00 | 13362.38 26/12/2013 | 05/03/2014 26/02/2014 | 25/02/2017 | 05/03/2014 26/02/2014 | Vascon Engineers Ltd 7525046101 | MEWALAL JE SAMRAJ AE BRIJEDRA PRATAP XE | Circle 3 | In Progress |
25
| 01/S.E-2/2018-19 | Circle 2 | Const. of 144 Nos Houses (G+3) under PMAY at Sector-4 Jagriti Vihar (Ext.) Scheme No-11, Meerut | 0.00 | 563.21 16/04/2018 | 24/08/2018 24/08/2018 | 23/02/2020 | 24/08/2018 24/08/2018 | M/s Kumar Builders 9358403917 | S.P. SINGH JE SANJEEV KUMAR TIWARI AE SHRI RAJEEV KUMAR XE | Circle 2 | In Progress |
26
| 01/SE-V/2016-17 | Circle 5 | CONTSTRUCTION OF 30 mtr and 24 mtr TRUNK ROADS IN MAJHOLA YOJNA NO-4 PH-2 VISTAR MORADABAD. | 0.00 | 404.00 31/05/2016 | 17/08/2016 17/08/2016 | 16/11/2016 | 17/08/2016 17/08/2016 | M/s R.G, Buildwell Engineers Ltd 9837391824 | RAHUL KUMAR JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
27
| 01/SE-3/CD-2/2018-19Dt04.05.2018 | Circle 3 | Construction of 128 Nos EWS houses in Sec-13 VVy-4 Lucknow | 0.00 | 708.96 15/12/2017 | 04/05/2018 04/05/2018 | 03/05/2020 | 04/05/2018 04/05/2018 | M/s Harihar contractor & suppliers 9984427700 | ADIL BEG,HEMANT KUMAR JE M.M.SRIVASTAVA AE A.K.MITTAL XE | Circle 3 | In Progress |
28
| 01/EE/CD-1/2019-20 | Circle 7 | Construction of 06 Nos. Kuda Ghar in differt. Sectors of Siddharth Vihar Yojna Ghaziabad. | 0.00 | 34.40 02/03/2019 | 26/06/2019 | 25/12/2019 | 26/06/2019 | M/s Shri Ram Construction Co. 9412469569 | NARENDRA PAL JE YOGENDRA KUMAR VERMA AE ATUL KUMAR SINGH XE | Circle 7 | In Progress |
29
| 07/SE-II/2019-20 | Circle 2 | Re-construction of Road from CO mandi thana Residance to end towards Railway Station Muzaffarnagar | 0.00 | 119.00 28/05/2019 | 21/09/2019 21/09/2019 | 20/02/2020 | 21/09/2019 21/09/2019 | M/s Om Shiv Construction 9837085092 | SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XE | Circle 2 | In Progress |
30
| 14/SE(HQ)/CD-31 | Circle HQ | Constt. of 96 No. EWS (G+3) Houses (Group-A) under PMAY at Sultanpur | 0.00 | 378.34 28/02/2018 | 02/08/2019 02/08/2019 | 01/02/2021 | 02/08/2019 02/08/2019 | M/S Navneet Enterprises 9918381889 | MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XE | Circle HQ | In Progress |
31
| 06/SE(M)/2015-16 | Circle Mantola | Construction of 1856 No Multistory Houses in sec-7 | 0.00 | 45000.00 18/04/2015 | 03/07/2015 03/07/2015 | 02/07/2020 | 03/07/2015 03/07/2015 | N.C.C.LIMITED 09952301417 | ABHISHEK KUMAR MISHRA,AJAY KUMAR AGNIHOTRI,H.S.TIWARI,JEET SINGH,LOKENDRA KUMAR,NARESH KUMAR GUPTA,U.S.CHAURASIYA,VEER SINGH,VIVEK KUMAR MAURYA JE ALOKSHEEL DWIVEDI,AMAN TYAGI,NAVEEN KUMAR JAIN,O.P. VERMA,RAM AVTAR MITTAL,SATYENDRA SINGH AE AKHILESHWAR SINGH,BISHEMBER SINGH,D.V.SINGH,K.P.TRIPATHI,LALTA PRASAD,MANEESH KUMAR PATHAK,S.K. SIRVASTAVA,SHOBHIT KUMAR PATHAK XE | Circle Mantola | In Progress |
32
| 3268/A-4/511 | Circle 4 | Construction of drain and culvert in spining mill awasiya yojna Etawah | 0.00 | 77.50 27/09/2018 | 26/11/2019 26/11/2019 | 25/05/2020 | 26/11/2019 26/11/2019 | M/s Siwansi Concrete Product 9412183483 | SRI ANIL KUMAR CHAUDHARY JE ARVIND KUMAR AE PRADEEP KUMAR XE | Circle 4 | In Progress |
33
| 03/EE/CD-12/2019-20 | Circle Vrindavan | Construction of Pump House and Operator Room at Gokul Gram Yojna No-1, Munnu Khera, Lucknow | 0.00 | 0.00 30/09/2019 | 16/12/2019 16/12/2019 | 15/06/2020 | 16/12/2019 16/12/2019 | M/S Shivrudram Construction 9838308833 | HIMANSHU SINGH JE A.K.SINHA AE SHASHANK PANDEY XE | Circle Vrindavan | In Progress |
34
| 02/SE-1/VNS/CD-37/2019-20 | Circle 1 | Const. & strengthing of Internal Road at Avas Vikas Colony, Surajkund Gorakhpur In Infrastructure Fund(Group-1(B)) | 0.00 | 99.97 26/11/2019 | 12/02/2020 12/02/2020 | 31/10/2020 | 12/02/2020 12/02/2020 | M/S SHIVAM ENTERPRISES 9670328000 | RAJNEESH SRIVASTAV JE ASHOK KUMAR SINGH AE J K KAUSHAL XE | Circle 1 | In Progress |
35
| 02/EE.CD-4/2019-20 | Circle 3 | Laying of Rising Main in Bahraich Bhinga Marg yojna, Bahraich | 0.00 | 12.12 17/07/2019 | 02/11/2019 02/11/2019 | 01/03/2020 | 02/11/2019 02/11/2019 | M/S Savitri Associate | CHANDAN KUMAR JE K.K ACHARYA AE PRASHANT VARDHAN XE | Circle 3 | In Progress |
36
| 06/EE/2019-20DT13-11-2019 | Circle 5 | FABRICATION & FIXING OF 6MM THICK POLYCARBONATE SHEET IN M.S. STRUCTURE AT BOUNDARY WALL OF SWIMMING POOL AT GANDHI STADIUM, DISTT.: PILIBHIT [U.P.] | 0.00 | 89.28 30/07/2019 | 13/11/2019 13/11/2019 | 10/02/2020 | 13/11/2019 13/11/2019 | B.D Gaurav | | Circle 5 | In Progress |
37
| 03/EE.CD-4/2019-20 | Circle 3 | Construction of boundary Wall around 400KL Over Head Tank in Bahraich Bhinga Marg Yojna,Bahraich | 0.00 | 10.07 06/09/2019 | 07/12/2019 07/12/2019 | 06/03/2020 | 07/12/2019 07/12/2019 | M/S Imam Ali Contractor 8840934493 | CHANDAN KUMAR JE K.K ACHARYA AE PRASHANT VARDHAN XE | Circle 3 | In Progress |
38
| 18/SE-HQ/2019-20 | Circle Vrindavan | CONSTRUCTION OF 192 NOS HOUSES UNDER PMAY | 0.00 | 883.45 12/09/2019 | 25/02/2020 25/02/2020 | 20/12/2021 | 25/02/2020 25/02/2020 | Mahesh Infracon Pvt. Ltd. 9456607152 | SHAILENDRA SINGH JE A.K.SINHA AE JAGDISH KUMAR XE | Circle Vrindavan | In Progress |
39
| 19/SE-HQ/2019-20 | Circle Vrindavan | CONSTRUCTION OF 144 NOS HOUSES UNDER PMAY | 0.00 | 662.59 12/09/2019 | 25/02/2020 25/02/2020 | 20/12/2021 | 25/02/2020 25/02/2020 | Mahesh Infracon Pvt. Ltd. 9456607152 | ANIL KUMAR JE A.K.SINHA AE JAGDISH KUMAR XE | Circle Vrindavan | In Progress |
40
| 20/SE-HQ/2019-20 | Circle Vrindavan | CONSTRUCTION OF 144 NOS HOUSES UNDER PMAY | 0.00 | 662.58 12/09/2019 | 25/02/2020 25/02/2020 | 20/12/2021 | 25/02/2020 25/02/2020 | Mahesh Infracon Pvt. Ltd. 9456607152 | ANIL KUMAR JE A.K.SINHA AE JAGDISH KUMAR XE | Circle Vrindavan | In Progress |
41
| 02/EE/CD-1GZB/2019-20 | Circle 7 | Construction of 12.00M and 7.50 M Wide Road Service | 0.00 | 53.13 13/12/2019 | 10/01/2020 10/01/2020 | 09/07/2020 | 10/01/2020 10/01/2020 | M/s Ramesh Chand & Co. 9213288266 | RANDHIR SINGH JE NARENDRA PAL AE ATUL KUMAR SINGH XE | Circle 7 | In Progress |
42
| 06/SE-III/CD-19/2019-20 | Circle 3 | Const. of 144Nos. G+3 Flats under PMAY (Urban) at Village Anura, Tehsil-Sadar, Distt-Lucknow | 0.00 | 586.35 25/06/2019 | 11/03/2020 11/03/2020 | 10/09/2021 | 11/03/2020 11/03/2020 | M/S SKY LARK ENTERPRISES 9838937027 | J.P. MAURYA JE ER. SURENDRA NATH AE ER. RAMESH CHANDRA YADAV XE | Circle 3 | In Progress |
43
| 07/SE-III/CD-19/2019-20 | Circle 3 | Const. of 144Nos. G+3 Flats under PMAY (Urban) at Village Anura, Tehsil-Sadar, Distt-Lucknow (Group-1B) | 0.00 | 586.35 25/06/2019 | 11/03/2020 11/03/2020 | 10/09/2021 | 11/03/2020 11/03/2020 | M/S SKY LARK ENTERPRISES 9838937027 | J.P. MAURYA JE ER. SURENDRA NATH AE ER. RAMESH CHANDRA YADAV XE | Circle 3 | In Progress |
44
| 08/SE-III/CD-19/2019-20 | Circle 3 | Const. of 96Nos. G+3 Flats under PMAY (Urban) at Village Anura, Tehsil-Sadar, Distt-Lucknow | 0.00 | 390.90 25/06/2019 | 11/03/2020 11/03/2020 | 10/09/2021 | 11/03/2020 11/03/2020 | M/S Kashi Vishwanath & Co. 9005341633 | J.P. MAURYA JE ER. SURENDRA NATH AE ER. RAMESH CHANDRA YADAV XE | Circle 3 | In Progress |
45
| 11/SE-2/CD-6/2019-20 | Circle 2 | Construction of remaining 45.00 mt. wide road (Node No.-25-26-27), Scheme No.-11, Jagriti Vihar (Ext.), Meerut. | 0.00 | 395.00 18/08/2019 | 01/02/2020 01/02/2020 | 31/07/2020 | 01/02/2020 01/02/2020 | M/s S.K. Singh 9837488572 | AJAB SINGH,NAVRATAN SINGH JE M BKAUSHIK AE SHRI RAJEEV KUMAR XE | Circle 2 | In Progress |
46
| 09/SE-II/2019-20 | Circle 2 | WATER DISPOSAL WORK BY RCC HUME PIPE LINE FROM C.O. MANDI THANA RESIDENCE TO RAILWAY STATION MUZAFFARNAGAR | 0.00 | 165.00 06/02/2019 | 16/01/2020 16/01/2020 | 15/05/2020 | 16/01/2020 16/01/2020 | M/S PROGRESSIVE CONSTRUCTION COM. 9810846441 | SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XE | Circle 2 | In Progress |
47
| 02/SE(M)/2016-17 | Circle Mantola | Const of Flyover across SH 57 | 0.00 | 5312.82 | 23/04/2016 23/04/2016 | 22/04/2018 | 23/04/2016 23/04/2016 | U.P.STATE BRIDGE CORPORATION LIMITED | NARESH KUMAR GUPTA JE ALOKSHEEL DWIVEDI,RAVINDRA BHATT,SATYENDRA SINGH AE BISHEMBER SINGH,S.K. SIRVASTAVA,S.K.PATHAK,SH. D.V. SINGH XE | Circle Mantola | In Progress |
48
| 04/SE(M)/2016-17 | Circle Mantola | Const of Internal Road in sec 15 (Farmer Plot Pocket) | 0.00 | 140.00 16/09/2016 | 26/12/2016 26/12/2016 | 25/06/2017 | 26/12/2016 26/12/2016 | A.S CONSRTUCTION 8273230008 | MUNNA LAL,RADHESHYAM JE NARESH GUPTA,SATYENDRA SINGH AE AMAN TYAGI,BISHEMBER SINGH,S.K. SIRVASTAVA,S.K.PATHAK,UMA NATH SHUKLA XE | Circle Mantola | In Progress |
49
| 03/EE/2015-16 | Circle 5 | Construction of Internal Road In Amroha Yojna No.-2 Amroha | 0.00 | 15.00 24/07/2015 | 01/08/2015 | 31/10/2015 | 01/08/2015 | M/S BHAVYA TRADERS 0937019037 | GYAN PRAKASH JE DEVENDRA PAL SINGH AE PRADEEP KUMAR XE | Circle 5 | Not Started |
50
| 03/EE/CD-8/2019-20 | Circle 2 | Construction of 9.00m and 12.00m wide road (Balance work) and Parks in Sector-3 at Scheme-11, Jagriti Vihar (Ext.), Meerut. | 0.00 | 69.43 04/09/2019 | 22/01/2020 22/01/2020 | 21/05/2020 | 22/01/2020 22/01/2020 | G.K. Constructions 9997294280 | SH. SANDEEP KUMAR JE SH. RAVINDRA KUMAR AE M.B. KAUSHIK XE | Circle 2 | In Progress |
51
| 01/SE-06/2020-2021 | Circle 6 | GENREL EARTH WORK CUTTING AND FILLING AT BHUMI VIKASH EWAM GARHSTHAAN YOJNA -03 JHANSI | 0.00 | 282.45 19/12/2019 | 12/05/2020 12/05/2020 | 11/11/2020 | 12/05/2020 12/05/2020 | SATYAM CONSTRUCTION 9415030154 | ANUP KUMAR,MANVENDRA DHAMANIYA JE DAYASAGAR AE EKHLAQUE AHMAD XE | Circle 6 | In Progress |
52
| 02/EE/ED-III/20-21 | Circle Electrical | | 0.00 | 12.32 23/07/2020 | 31/07/2020 31/07/2020 | 30/09/2020 | 31/07/2020 31/07/2020 | GYANTI CONSTRUCTION 9598461802 | VINOD KUMAR JE ER. D. R. MAURYA AE XE | Circle Electrical | In Progress |
53
| 04/SE(V)/CD-11/2020-21 | Circle Vrindavan | Construction of 144 Nos. Group (n) (G+3) EWS houses at Village Kankaha, Mohanlalganj, Lucknow. | 0.00 | 586.05 04/02/2019 | 18/06/2020 | 17/12/2021 | 18/06/2020 | T Y TRADERS 9004537987 | NEERAJ KUMAR JE AKBAR ALI,RAJIV RASTOGI AE NAVJOT SINGH VERMA XE | Circle Vrindavan | In Progress |
54
| 02ee19-20 | Circle HQ | Water sewer connection in 76 nos houses at Lohramau yojna Sultanpur | 0.00 | 13.90 25/10/2019 | 14/01/2020 26/05/2020 | 13/05/2020 | 14/01/2020 26/05/2020 | M/S KAILASH RAM 9651534882 | MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XE | Circle HQ | In Progress |
55
| 03/SE-V/2020-21 | Circle 5 | Construction of 12.0 M, 9 M 7.50, M and 3.0 M wide Internal Roads in Sec 15 Majhola Yojna No 4 Ph 2 Vistar Moradabad. (Excluding of PMAY Pocket) | 0.00 | 216.50 24/06/2020 | 30/07/2020 30/07/2020 | 29/01/2021 | 30/07/2020 30/07/2020 | M/S Arora R.C.C. Works 9837391824 | SARVESH KUMAR VERMA JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
56
| 02/SE-V/2020-21 | Circle 5 | Construction of 12.0 M, 9.00 M, 6.0 M and 3.0 M wide Internal Roads in Sec 16 Majhola Yojna No 4 Ph 2 Vistar Moradabad. (Excluding PMAY pocket). | 0.00 | 113.50 24/06/2020 | 30/07/2020 30/07/2020 | 29/01/2021 | 30/07/2020 30/07/2020 | M/s M.A. Associates | RAHUL KUMAR JE RAJENDRA BAHADUR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
57
| 02/EE/CD29/19-20 | Circle 6 | CONSTRUCTION OF BOUNDRYWALL IN PARK OF PASHCHIMPURI BETWEEN HOUSE NO-179 TO H.N-205 | 0.00 | 29.11 31/05/2019 | 30/11/2019 | 30/11/2019 | 30/11/2019 | SHYAM JI TRADERS 9917475285 | | Circle 6 | In Progress |
58
| 02/SE-3/CD-2/2018-19DT04.05.2018 | Circle 3 | Construction of 128 Nos EWS Houses in Sec-13 VVY-4 Lucknow | 0.00 | 708.96 15/12/2017 | 04/05/2018 04/05/2018 | 03/05/2020 | 04/05/2018 04/05/2018 | Dream Construction 9936086993 | A.B.SINGH,K.K.KATIYAR JE A.K.SAXENA AE A.K.MITTAL XE | Circle 3 | In Progress |
59
| 03/SEHQ/CD15/18-19 | Circle HQ | Construction of 288 Nos. (G+3) Flats under PMAY at Sector-10B, Avadh Vihar Yojna, Lucknow. | 0.00 | 1095.88 05/04/2018 | 25/07/2018 25/07/2018 | 24/01/2020 | 25/07/2018 25/07/2018 | SINGHAL BROTHERS | KAMTA PRASAD JE D.K.GOYAL AE D.B.YADAV XE | Circle HQ | In Progress |
60
| 06/SE-III/CD-13/18-19 | Circle 3 | Construction of 192 Nos. EWS PMAY ( Shahri) Sector-7A Avadh Vihar Yojna Lucknow. | 0.00 | 758.59 28/02/2018 | 25/08/2018 25/08/2018 | 24/02/2020 | 25/08/2018 25/08/2018 | SHAIL BUILDERS | MEWALAL JE SAMRAJ AE BRIJEDRA PRATAP XE | Circle 3 | In Progress |
61
| 07/S.E-III/EE.CD-4/2018-19 | Circle 3 | Construction of 176 Nos EWS PMAY(Shahri) Avas Yojna at Sec-7A Avadh Vihar Yojna Lucknow | 0.00 | 779.89 29/06/2018 | 03/10/2018 03/10/2018 | 02/04/2020 | 03/10/2018 03/10/2018 | M/S Shagun Associates 9580328127 | CHANDAN KUMAR JE K.K ACHARYA AE PRASHANT VARDHAN XE | Circle 3 | In Progress |
62
| .5.02/SE(V)/CU3/2014-15 | Circle HQ | ARAVALI ENCLAVE, CONSTRUCTION OF 560NOS. MULTISTORIED FLATS(B+S+10) | 0.00 | 17600.00 20/02/2014 | 25/08/2014 | 24/08/2016 | 25/08/2014 | EKDANT INDIA LTD 07905208858 | ANIRUDDH PANDEY,MISHRI LAL,GANGA PRASAD,RAMASHANKAR RAM,MANOJ KUMAR KEWAT,TRILOKI RAM JE | Circle HQ | In Progress |
63
| 02/SE-IV/Kanpur/2015-16 | Circle 4 | Construction of 274 Nos. Multistoreyed Residential Flat in Sector-E, Scheme No. 3, Kanpur | 0.00 | 8849.95 27/12/2014 | 12/05/2015 12/05/2015 | 11/11/2017 | 12/05/2015 12/05/2015 | M/S R.S. CONTRACTORS 9919919999 | ER VINAY CHAUHAN,ER. SUGHAR SINGH JE ER. VIKAS GAUTAM,KAILASH NATH AE ABHISHEK RAJ XE | Circle 4 | In Progress |
64
| 08/SE-III/CD-13/18-19 | Circle 3 | Const. of 144 Nos EWS Flats under PMAY Sector-7 | 0.00 | 567.30 12/10/2018 | 07/01/2019 07/01/2019 | 06/07/2020 | 07/01/2019 07/01/2019 | PARWATI CONSTRUCTION 09950603874 | ROHAN RAJPUT JE RAGHUNANDAN PRASAD GUPTA AE BRIJEDRA PRATAP XE | Circle 3 | In Progress |
65
| 09/SE-III/CD-13/18-19 | Circle 3 | Const. of 96 Nos EWS Houses (G+3) Under PMAY (Shahri) Sector-7 | 0.00 | 378.24 12/10/2018 | 07/01/2019 07/01/2019 | 06/07/2020 | 07/01/2019 07/01/2019 | M/s Bansal Traders 9450364731 | J.P. GAUTAM JE RAGHUNANDAN PRASAD GUPTA AE BRIJEDRA PRATAP XE | Circle 3 | In Progress |
66
| 13/SE(HQ)/CD-31 | Circle HQ | Construction of 42 Nos. 45/75 type house at Lohramau Yojna, Sultanpur | 0.00 | 277.07 | 08/03/2019 08/03/2019 | 07/09/2020 | 08/03/2019 08/03/2019 | M/S Navneet Enterprises 9918381889 | MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XE | Circle HQ | In Progress |
67
| 10/SE-2/2018-19 | Circle 2 | Const. of 240 No. Houses (G+3) under PMAY in Sec-2 Scheme No. 11 Meerut. Group A | 0.00 | 927.70 21/01/2019 | 06/03/2019 06/03/2019 | 05/03/2021 | 06/03/2019 06/03/2019 | M/s Kumar Builders 9358403917 | S.P. SINGH JE SANJEEV KUMAR TIWARI AE SHRI RAJEEV KUMAR XE | Circle 2 | In Progress |
68
| 11/SE-2/2018-19 | Circle 2 | Const. of 240 No. EWS Houses (G+3) under PMAY in Sec-2 | 0.00 | 927.70 21/01/2019 | 07/03/2019 07/03/2019 | 06/03/2021 | 07/03/2019 07/03/2019 | M/s Hindustan Steels 9415119201 | KHUSHALI JE MANOJ KUMAR SAXENA AE SHRI RAJEEV KUMAR XE | Circle 2 | In Progress |
69
| 03/SE-5/2016-17 | Circle 5 | Construction of Office Complex (G+2) in Sector-5 at Majhola Yojna No.-4, Phase-2, Moradabad | 0.00 | 454.00 09/09/2016 | 08/12/2016 08/12/2016 | 02/03/2018 | 08/12/2016 08/12/2016 | M/S ANIL KUMAR 9415011392 | ANOOP KUMAR SHRIVASTAV,SATENDRA HYANKI JE ANIL KUMAR SAXENA,DEVENDRA PAL SINGH AE SASMIT KATIYAR,SHOBHIT KUMAR PATHAK XE | Circle 5 | In Progress |
70
| 02/EE/2019-20Dt09-08-2019 | Circle 5 | Construction of Road and drain from 100 foota Road near Virsavaerkar Nagar to Kharanja of Viharmaan Nagla Vaya Holi Chauraha at Distt. Bareilly | 0.00 | 99.63 11/06/2019 | 09/08/2019 | 07/11/2019 | 09/08/2019 | Bhatia Construction Co. | | Circle 5 | In Progress |
71
| 01/EE/2019-20DT01-07-2019 | Circle 5 | Construcion of RCC Drain From Shri Kishan Honda to Khanna Furniture in Ward No 33 Swale Nagar Distt. Bareilly | 0.00 | 92.59 01/03/2019 | 01/07/2019 01/07/2019 | 30/09/2019 | 01/07/2019 01/07/2019 | Vipin Bhatiya | R.P TRIVEDI JE NAVEEN KUMAR VERMA AE RAJEEV KUMAR XE | Circle 5 | Not Started |
72
| 09/SEII/CD-6/2018-19 | Circle 2 | Const. of 7.5M, 9.0M & 12.0M with wide road in Sec-8 Jagriti Vihar (Ext.) Meerut. | 0.00 | 162.25 14/12/2018 | 01/03/2019 01/03/2019 | 30/06/2019 | 01/03/2019 01/03/2019 | M/s Juneja Construction Pvt. Ltd. 9810787577 | S.P. SINGH JE SANJEEV KUMAR TIWARI AE SHRI RAJEEV KUMAR XE | Circle 2 | In Progress |
73
| 03/SE(P)CIRCLE/CD-21/2018-19 | Circle Vrindavan | CONSTRUCTION OF 240 NOS FLATS (G+3) | 0.00 | 1062.39 25/07/2018 | 06/09/2018 15/11/2018 | 05/12/2020 | 06/09/2018 15/11/2018 | SINGH ASSOCIATES 9450453113 | ADITYA KUMAR TRIPATHI JE A.K.SINHA AE JAGDISH KUMAR XE | Circle Vrindavan | In Progress |
74
| 04/SE(P)CIRCLE/CD-21/2018-19 | Circle Vrindavan | CONSTRUCTION OF 240 NOS FLATS (G+3) | 0.00 | 1062.39 25/07/2018 | 06/09/2018 15/11/2018 | 05/12/2020 | 06/09/2018 15/11/2018 | RAMSEVAK HARGOVIND SAHAI 9415149653 | ADITYA KUMAR TRIPATHI JE RAJ KAMAL SAXENA AE JAGDISH KUMAR XE | Circle Vrindavan | In Progress |
75
| 07/SE-II/2018-19 | Circle 2 | CONSTRUCTION OF 48 NOS F-45 TYPE (G+3) STOREY FLAT AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR (GROUP-A) | 0.00 | 342.00 31/01/2018 | 30/07/2018 30/07/2018 | 29/01/2020 | 30/07/2018 30/07/2018 | M/S MOHAN INFRA DEVELOPERS PVT LTD 9412293363 | SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XE | Circle 2 | In Progress |
76
| 08/SE-II/2018-19 | Circle 2 | CONSTRUCTION OF 32 NO. F-45 TYPE (G+3) HOUSES AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR (GROUP-B) | 0.00 | 228.00 31/01/2018 | 30/07/2018 30/07/2018 | 29/01/2020 | 30/07/2018 30/07/2018 | M/s Mohan Infradevelopers Pvt. Ltd. 9675411111 | SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XE | Circle 2 | In Progress |
77
| 02/SE-II/2018-19 | Circle 2 | CONSTRUCTION OF 32 NO. F-70 TYPE (G+3) HOUSES AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR | 0.00 | 394.00 31/01/2018 | 30/07/2018 30/07/2018 | 29/01/2020 | 30/07/2018 30/07/2018 | M/s Subodh Construction Co. | INDERSAIN JE YOGENDRA KUMAR VERMA AE MUKESH YADAV XE | Circle 2 | In Progress |
78
| 03/SE-II/2018-19 | Circle 2 | CONSTRUCTION OF 32 NO. F-70 TYPE (G+3) HOUSES AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR | 0.00 | 394.00 31/01/2018 | 30/07/2018 30/07/2018 | 29/01/2020 | 30/07/2018 30/07/2018 | M/s Subodh Construction Co. | INDERSAIN JE YOGENDRA KUMAR VERMA AE MUKESH YADAV XE | Circle 2 | In Progress |
79
| 04/SE-II/2018-19 | Circle 2 | CONSTRUCTION OF 32 NO. F-70 TYPE (G+3) HOUSES AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR | 0.00 | 394.00 31/01/2018 | 30/07/2018 30/07/2018 | 29/01/2020 | 30/07/2018 30/07/2018 | M/s Subodh Construction Co. | INDERSAIN JE YOGENDRA KUMAR VERMA AE MUKESH YADAV XE | Circle 2 | In Progress |
80
| 05/SE-II/2018-19 | Circle 2 | CONSTRUCTION OF 32 NO. F-70 TYPE (G+3) HOUSES AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR | 0.00 | 394.00 31/01/2018 | 30/07/2018 30/07/2018 | 29/01/2020 | 30/07/2018 30/07/2018 | M/s Subodh Construction Co. | INDERSAIN JE YOGENDRA KUMAR VERMA AE MUKESH YADAV XE | Circle 2 | In Progress |
81
| 06/SE-II/2018-19 | Circle 2 | CONSTRUCTION OF 32 NO. F-70 TYPE (G+3) HOUSES AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR | 0.00 | 394.00 31/01/2018 | 30/07/2018 30/07/2018 | 29/01/2020 | 30/07/2018 30/07/2018 | M/s Subodh Construction Co. | INDERSAIN JE YOGENDRA KUMAR VERMA AE MUKESH YADAV XE | Circle 2 | In Progress |
82
| 03/SE(E)LKO/18-19 | Circle Electrical | CONSTR. OF 33/11 KV S/S AND 33 KV LINE AT SEC-7 MANDOLA VIHAR YOJNA GHAZIABAD | 0.00 | 323.57 07/12/2018 | 06/03/2019 06/03/2019 | 05/03/2020 | 06/03/2019 06/03/2019 | M/S PRAKASH ENGINEERS 8527167618 | PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
83
| 02/SE(E)LKO/18-19 | Circle Electrical | CONSTR. OF 33/11 KV S/S & 33 KV LINE AT SEC-3 MANDOLA VIHAR YOJNA GHAZIANAD . | 0.00 | 323.78 07/12/2018 | 06/03/2019 06/03/2019 | 05/03/2020 | 06/03/2019 06/03/2019 | M/S PRAKASH ENGINEERS 8527167618 | PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
84
| 03/SE-V/2018-19 | Circle 5 | Construction of 96 nos Flats ( G+3) under PM Avas Yojna (Urban) at Sec-16, Majhola Yojna, No-4, Ph-2 (Vistar) Moradabad (Gr-1A) | 0.00 | 398.81 09/10/2018 | 11/01/2019 11/01/2019 | 10/07/2020 | 11/01/2019 11/01/2019 | M/s Swaroop Construction 9634245710 | RAHUL KUMAR,RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
85
| 02/SE-V/2018-19 | Circle 5 | Construction of 96 nos Flats ( G+3) under PM Avas Yojna (Urban) at Sec-16, Majhola Yojna, No-4, Ph-2 (Vistar) Moradabad (Gr-1B) | 0.00 | 398.81 09/10/2018 | 11/01/2019 11/01/2019 | 10/07/2020 | 11/01/2019 11/01/2019 | M/s Swaroop Construction 9634245710 | RAJENDRA BAHADUR,SARVESH KUMAR VERMA JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
86
| 04/SE-V/2018-19 | Circle 5 | Construction of 96 nos Flats ( G+3) under PM Avas Yojna (Urban) at Sec-16, Majhola Yojna, No-4, Ph-2 (Vistar) Moradabad (Gr-1C) | 0.00 | 398.81 09/10/2018 | 01/03/2019 01/03/2019 | 31/08/2020 | 01/03/2019 01/03/2019 | M/s Swaroop Construction 9634245710 | RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
87
| 04/SEM/2018-19 | Circle Mantola | Construction of 9m & 12m wide road in sec 4A (Plot Portion) Mandola Vihar Yojana Ghaziabad | 0.00 | 195.00 22/12/2018 | 15/01/2019 15/01/2019 | 14/07/2019 | 15/01/2019 15/01/2019 | Ms Ramaxe Construction Co 9811554477 | H.S.TIWARI,U.S.CHAURASIYA JE R.A.MITTAL AE K. P. TRIPATHI,UMA NATH SHUKLA XE | Circle Mantola | In Progress |
88
| 04/SE-PC/2015-16 | Circle Vrindavan | CONSTRUCTION OF FLATS AT SECTOR H-6 1BHK & 2BHK FLATS 1044 NOS AND 216 NOS SFS FLAT AT AMRAPALI YOJNA HARDOI | 0.00 | 28089.88 23/10/2015 | 25/02/2016 25/02/2016 | 10/09/2019 | 25/02/2016 25/02/2016 | SHAPOORJI PALLONJI & COMPANY. PVT. LTD 7624001125 | ANIL KUMAR,SHAILENDRA SINGH JE A.K.SINHA AE JAGDISH KUMAR XE | Circle Vrindavan | In Progress |
89
| 08/EE/ED-2GZB/18-19 | Circle Electrical | PREPRATION OF SURVEY REPORT AND OBTAINING FROM CGWA FOR BORING WATER AT MANDOLA VIHAR YOJNA GHAZIABAD | 0.00 | 15.34 07/12/2018 | 09/03/2019 09/03/2019 | 08/05/2019 | 09/03/2019 09/03/2019 | M/S THINK GREEN ENVIRO SYSTEMS 8468919498 | PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
90
| 05/SE(V)/CD-3/2018-19 | Circle Vrindavan | प्रधानमंत्री आवास योजना 240 नग भवन (ग्रुप-अ) | 0.00 | 940.00 28/02/2018 | 06/09/2018 06/09/2018 | 05/03/2020 | 06/09/2018 06/09/2018 | Mahesh Infracon Pvt. Ltd. 9456607152 | ANOOP JAISWAL JE UDAIVEER SINGH AE PANKAJ VERMA XE | Circle Vrindavan | In Progress |
91
| 03/SE(V)/CD-3/2018-19 | Circle Vrindavan | प्रधानमंत्री आवास योजना 240 नग भवन (ग्रुप-बी) | 0.00 | 940.00 28/02/2018 | 16/08/2018 16/08/2018 | 15/02/2020 | 16/08/2018 16/08/2018 | Mahesh Infracon Pvt. Ltd. 9456607152 | NARAYAN PRASHAD JE R.P. GUPTA AE PANKAJ VERMA XE | Circle Vrindavan | In Progress |
92
| 04/SE(V)/CD-3/2018-19 | Circle Vrindavan | प्रधानमंत्री आवास योजना 192 नग भवन (ग्रुप-सी) | 0.00 | 752.00 28/02/2018 | 23/08/2018 23/08/2018 | 22/02/2020 | 23/08/2018 23/08/2018 | Mahesh Infracon Pvt. Ltd. 9456607152 | KAMAL DEO PRASAD JE UDAIVEER SINGH AE PANKAJ VERMA XE | Circle Vrindavan | In Progress |
93
| 01/SE(V)/CD-3/2018-19 | Circle Vrindavan | प्रधानमंत्री आवास योजना 144 नग (ग्रुप-डी) | 0.00 | 564.00 28/02/2018 | 23/07/2018 23/07/2018 | 22/01/2020 | 23/07/2018 23/07/2018 | M/S Aditya Engineers & Builders 9415149007 | KAMAL DEO PRASAD JE SHARAD KUMAR AE PANKAJ VERMA XE | Circle Vrindavan | In Progress |
94
| 02/SE(V)/CD-3/2018-19 | Circle Vrindavan | प्रधानमंत्री आवास योजना 144 नग भवन (ग्रुप-ई) | 0.00 | 564.00 28/02/2018 | 27/07/2018 27/07/2018 | 26/01/2020 | 27/07/2018 27/07/2018 | Ahmad Builders 7905820562 | KAMAL DEO PRASAD JE SHARAD KUMAR AE PANKAJ VERMA XE | Circle Vrindavan | In Progress |
95
| 02/EE/2018-19 | Circle 2 | CONSTRUCTION OF BOUNDRYWALL (PART) AT SHAKUNTLAM YOJNA MUZAFFARNAGAR | 0.00 | 15.00 31/01/2019 | 06/03/2019 06/03/2019 | 05/06/2019 | 06/03/2019 06/03/2019 | M/S VICTORIOUS INFRASTRUCTURE PVT LTD 9891814935 | SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XE | Circle 2 | In Progress |
96
| 09/EE/2018-19CD-28 | Circle 6 | Const. of Road, Drain, Park & Sewer Line in Sector-4, Firozabad | 0.00 | 64.64 27/06/2018 | 26/10/2018 26/10/2018 | 25/01/2019 | 26/10/2018 26/10/2018 | Maa Chandrawati Construction 9412652907 | RAKESH KUMAR VERMA,SUDHIR KUMAR JE ALOKSHEEL DWIVEDI,ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XE | Circle 6 | In Progress |
97
| 13/EE/2018-19CD-28 | Circle 6 | Stregthening of Road, Drain at Sikandra Yojna, Agra From Sec.-14 to Sec.-15 | 0.00 | 55.21 27/06/2018 | 26/10/2018 26/10/2018 | 25/12/2018 | 26/10/2018 26/10/2018 | Siddarth Associates 9457000613 | RAKESH KUMAR VERMA,SANJAY SHARMA JE ALOKSHEEL DWIVEDI,ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XE | Circle 6 | In Progress |
98
| 03/SE(P)/CU-3/2018-19Dated27/07/2018 | Circle HQ | Construction of 192 Nos EWS Flats under P.M.A.Y. at Sector-
3, part-1, Avadh Vihar Yojna, Lucknow. - Group-5C | 0.00 | 736.36 28/02/2018 | 27/07/2018 15/11/2018 | 26/01/2020 | 27/07/2018 15/11/2018 | R.P.M. Construction 9450397977 | ANIRUDDH PANDEY,TRILOKI RAM JE AJAY GOEL AE RAHUL YADAV XE | Circle HQ | In Progress |
99
| 11/EE/2018-19CD-28 | Circle 6 | Const. of Road From NH-2 to Zila Panchyat Office, Civil Lines in Firozabad | 0.00 | 58.39 27/06/2018 | 26/10/2018 26/10/2018 | 25/01/2019 | 26/10/2018 26/10/2018 | Siddarth Associates 9457000613 | RAKESH KUMAR VERMA,SUDHIR KUMAR JE ALOKSHEEL DWIVEDI,ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XE | Circle 6 | In Progress |
100
| 14/EE/2018-19CD-28 | Circle 6 | Const. of Drain & Road At Yojna No.-1, Shikohabad | 0.00 | 25.68 27/06/2018 | 13/12/2018 13/12/2018 | 12/02/2019 | 13/12/2018 13/12/2018 | Maa Chandrawati Construction 9412652907 | RAKESH KUMAR VERMA,SUDHIR KUMAR JE ALOKSHEEL DWIVEDI,ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XE | Circle 6 | In Progress |
101
| 12/EE/2018-19CD-28 | Circle 6 | Const. of Road and Drain in Premanand Kunj Colony, Brij Vihar, Kamla Nagar, Agra | 0.00 | 70.78 02/06/2018 | 26/10/2018 26/10/2018 | 25/01/2019 | 26/10/2018 26/10/2018 | Siddarth Associates 9457000613 | RAMSHANKAR JE ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XE | Circle 6 | In Progress |
102
| 12/SE(V)/2015-16 | Circle Vrindavan | 2020 Nos. Multistoried Flats at Goverdhan Enclave | 0.00 | 39278.32 19/10/2015 | 30/03/2016 30/03/2016 | 28/12/2019 | 30/03/2016 30/03/2016 | LARSEN & TOUBRO LIMITED 09450000009 | AJAY KUMAR MISHRA,AKBAR ALI,ARUN KUMAR RAI,RAJESH KUMAR VERMA,RAJIV RASTOGI,RAKESH KUMAR SAXENA JE AKHILESHWAR SINGH,HARISHANKAR SINGH,RAJIV SRIVASTAVA AE ANIL KUMAR MISHRA,NAVJOT SINGH VERMA,U.C. SINGH XE | Circle Vrindavan | In Progress |
103
| 10/EE/ED-2GZB/17-18 | Circle Electrical | SUPPLY OF 1 NO. 10 MVA 33/11 KV POWER T/F FOR 33/11 KV S/S SEC-7 VASUNDHARA YOJNA GZB | 0.00 | 60.00 01/04/2017 | 05/08/2017 05/08/2017 | 04/10/2017 | 05/08/2017 05/08/2017 | Elecon Conductor 9837007408 | V.K. RAI JE V.V TRIPATHI AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
104
| 04/EE/CD29/17-18 | Circle 6 | CONSTRUCTION OF PARK IN SECTOR-6A, SIKANDRA YOJNA, AGRA | 0.00 | 11.75 31/08/2017 | 27/10/2017 27/10/2017 | 26/10/2018 | 27/10/2017 27/10/2017 | PEMPER PETS 7906702954 | A.D. SHANDILYA JE AMIT RATHOR AE CHANDRAMA RAM XE | Circle 6 | Not Started |
105
| 08/EE/CD29/2018-19 | Circle 6 | WIDENING AND CONSTRUCTION OF CULVERT AT MUGHAL ROAD NEAR SULTANGANJ CHAURAHA | 0.00 | 64.48 11/01/2019 | 08/03/2019 08/03/2019 | 07/06/2019 | 08/03/2019 08/03/2019 | SUSHIL SINGHAL 9412255916 | NAVRATAN SINGH,RAJIV KUMAR VERMA JE A.P. AGRAWAL AE CHANDRAMA RAM XE | Circle 6 | In Progress |
106
| 06/EE/CD-25/2017-18 | Circle 5 | Construction work at community center by Infrastructure fund in Moradabad city village mau | 0.00 | 60.00 13/04/2017 | 27/05/2017 26/01/2018 | 26/01/2018 | 27/05/2017 26/01/2018 | M/s Imran Arif Construction 9917007828 | RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
107
| 01/EE/CD-38/2019-20 | Circle Mantola | Construction of 33/11 KV Sub Station Building in sec -7 | 0.00 | 46.50 | 02/07/2019 02/07/2019 | 01/04/2020 | 02/07/2019 02/07/2019 | Arsh Contractor 9410497498 | VEER SINGH JE ALOKSHEEL DWIVEDI,RAVINDRA BHATT AE SHOBHIT KUMAR PATHAK XE | Circle Mantola | In Progress |
108
| 3557/A-4/87 | Circle 4 | Construction of Park in Spining Mill Awasiya Yojna Etawah | 0.00 | 91.50 16/12/2017 | 13/07/2017 13/07/2017 | 12/11/2017 | 13/07/2017 13/07/2017 | M/s Siwansi Concrete Product 9412183483 | SRI DEVENDRA YADAV JE NAGENDRA KUMAR,NAVJOT SINGH VERMA,SRI ABHISHEK VERMA AE PRADEEP KUMAR XE | Circle 4 | In Progress |
109
| 01/SE-V/2018-19 | Circle 5 | Laying of trunk sewer line proposed in tender in Majhola Yojna No 4 Ph 2 vistar Moradabad | 0.00 | 422.00 17/07/2018 | 03/01/2019 03/01/2019 | 02/07/2019 | 03/01/2019 03/01/2019 | M/s Ganga and Componay 9412201897 | RAHUL KUMAR,SARVESH KUMAR VERMA JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
110
| 06/EE/18-19ED-1 | Circle Electrical | S/I of pre-paid electric meter Alakhnanda Enclave Sector-3 Avadh Vihar Yojna Lucknow | 0.00 | 214.35 07/03/2018 | 05/05/2018 05/05/2018 | 04/09/2018 | 05/05/2018 05/05/2018 | S.J.S. System & Solution | | Circle Electrical | In Progress |
111
| 12/EE/ED-III/2018-19 | Circle Electrical | Supply of 11 KV Indoor type and 33 KV Out Door Type Breaker for 33/1 Sub-Station at Sector-3A Jagrati Vihar (Ext.) Meerut | 0.00 | 60.11 25/01/2019 | 01/03/2019 01/03/2019 | 30/06/2019 | 01/03/2019 01/03/2019 | R K and Company 8171211222 | ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE ER. RAJENDRA SINGH XE | Circle Electrical | In Progress |
112
| 13/EE/ED-III/2018-19 | Circle Electrical | External Electrification work at Sector-3 Jagrati Vihar Scheme No. 11, Meerut | 0.00 | 153.30 28/02/2019 | 07/03/2019 07/03/2019 | 06/09/2019 | 07/03/2019 07/03/2019 | YASH ENTERPRISES | ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE ER. RAJENDRA SINGH XE | Circle Electrical | In Progress |
113
| 14/EE/ED-III/2018-19 | Circle Electrical | External Electrification work at Sector-2 Jagrati Vihar Scheme No. 11, Meerut | 0.00 | 107.36 28/02/2019 | 07/03/2019 07/03/2019 | 06/09/2019 | 07/03/2019 07/03/2019 | R K and Company 8171211222 | ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE ER. RAJENDRA SINGH XE | Circle Electrical | In Progress |
114
| 01/SE-6/2018-19CD-28 | Circle 6 | Laying and Jointing of Trunk Sewerline from Sect.-4, Sikandra Yojna, Agra to Bodla Choraha. | 0.00 | 170.81 16/11/2018 | 26/02/2019 26/02/2019 | 25/06/2019 | 26/02/2019 26/02/2019 | Rakesh Singh Nursery 9810117408 | RAKESH KUMAR VERMA,SANJAY SHARMA JE ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XE | Circle 6 | In Progress |
115
| 04/SE-V/2020-21 | Circle 5 | Construction of 162 Nos EWS 18/40 Type Semifinished Houses in Kotdwar Road Yojna, Najibabad, Bijnor | 0.00 | 302.00 24/06/2020 | 30/07/2020 30/07/2020 | 29/04/2021 | 30/07/2020 30/07/2020 | M/s Vision Builders & Developers 7055036555 | SURESH CHANDRA JE A.K.SAXENA AE FARAZ ASLAM XE | Circle 5 | In Progress |
116
| 08/EE/ED-2GZB/17-18 | Circle Electrical | INT. ELECT. AND STREET LIGHTING WORK IN SHAMSAN GHAT SEC-13 MANDOLA VIHAR YOJNA GZB | 0.00 | 12.00 22/04/2017 | 27/06/2017 27/06/2017 | 26/09/2017 | 27/06/2017 27/06/2017 | R.V. BROS & CO 9415052258 | ER. SUNIL KUMAR,PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR,D.C SHUKLA,V.V TRIPATHI AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
117
| 20/EE/ED-III/2018-19 | Circle Electrical | Construction of 33 KV Line for 220/132/33 KV Substation Sector-3A Jagrati Vihar External Scheme No. 11, Meerut | 0.00 | 107.67 28/02/2019 | 25/03/2019 25/03/2019 | 24/11/2019 | 25/03/2019 25/03/2019 | SPARKLE ENTERPRISES 9837394838 | ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE ER. RAJENDRA SINGH XE | Circle Electrical | In Progress |
118
| 01/SEHQ/CD-14/2018-19 | Circle HQ | CONST. OF 32 NOS. 2BHK+32 NOS. 3BHK (S+8) FLATS | 0.00 | 1882.00 24/02/2018 | 19/05/2018 19/05/2018 | 18/05/2020 | 19/05/2018 19/05/2018 | ANGELIC INFRACON PVT. LTD. 8052315129 | GAUTAM KUMAR,RAMESH CHANDRA CHAURASIYA,SUBEDAR NAVIK,SUGENDRA KUMAR VISHWAKARMA JE YOUGESH KUMAR AE D. K GUPTA XE | Circle HQ | In Progress |
119
| 03/EE/Cu-Etawah/2018-19 | Circle 4 | Bituminous Road Work in Spining Mill Yojna Etawah | 0.00 | 79.83 08/03/2019 | 08/03/2019 08/03/2019 | 01/06/2019 | 08/03/2019 08/03/2019 | M/s R.N. Agrawal 9319062251 | SRI ANIL KUMAR CHAUDHARY JE ARVIND KUMAR,NAGENDRA KUMAR,SRI ABHISHEK VERMA AE PRADEEP KUMAR XE | Circle 4 | In Progress |
120
| 01/pm/cu-jhs/19-20 | Circle 6 | CONSTRUCTION OF BOUNADRY WALL YOJNA NO-03/JHANSI | 0.00 | 135.25 01/10/2014 | 17/06/2019 17/06/2019 | 16/12/2019 | 17/06/2019 17/06/2019 | muskaan enterprises 9415586688 | MANVENDRA DHAMANIYA JE DAYASAGAR AE EKHLAQUE AHMAD XE | Circle 6 | In Progress |
121
| 01/EE.CD-4/2019-20 | Circle 3 | Providing and laying and internal water supply line in Bahraich Bhinga Marg Bhoomi Vikas Evam Grihsthan Yojna, Bahraich. | 0.00 | 43.34 24/01/2019 | 13/06/2019 13/06/2019 | 12/10/2019 | 13/06/2019 13/06/2019 | M/S KAILASH RAM 9651534882 | CHANDAN KUMAR JE K.K ACHARYA AE PRASHANT VARDHAN XE | Circle 3 | In Progress |
122
| 01ee20-21 | Circle HQ | Internal Development work (road, drain, sewer, water supply) in PMAY area at Lohramau Yojna sultanpur | 0.00 | 50.09 14/01/2020 | 11/05/2020 | 10/11/2020 | 11/05/2020 | DEV CONSTRUCTION CO. | MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XE | Circle HQ | In Progress |
123
| 04/EE/CD-1GZB/2019-20DATE21-03-2020 | Circle 7 | Strengthening of 50mtr wide Road (Part) at Siddharth Vihar Yojna, Gzb. | 0.00 | 88.36 01/02/2020 | 21/03/2020 21/03/2020 | 20/09/2020 | 21/03/2020 21/03/2020 | M/s Ramesh Chand & Co. 9213288266 | RANDHIR SINGH JE NARENDRA PAL AE ATUL KUMAR SINGH XE | Circle 7 | In Progress |
124
| 08/SE(M)/CD-22/2016-17 | Circle Mantola | construction of internal raods on sector-2 mandola vihar yojna | 0.00 | 468.00 04/10/2016 | 04/01/2017 | 03/07/2017 | 04/01/2017 | KRISHNA CONSTRUCTION COMPANY | K.V.SINGH,U.S.CHAURASIYA JE HARI SHANKAR TIWARI AE UMA NATH SHUKLA XE | Circle Mantola | In Progress |
125
| 11/EE/CD-2/19-20 | Circle 3 | Construction of Pump house at Sec-15 VVY-4 Lucknow. | 0.00 | 8.72 04/10/2019 | 14/11/2019 14/11/2019 | 13/12/2019 | 14/11/2019 14/11/2019 | J.P.TRADERS | HEMANT KUMAR JE SUNIL KUMAR SINGH AE RAMAYAN SHARAN XE | Circle 3 | In Progress |
126
| 07/EE/CD-22/2019-20 | Circle Mantola | Construction of 33/11 KVA Electric Sub-station in Sector-3 Mandola | 0.00 | 46.22 14/10/2019 | 11/12/2019 11/12/2019 | 10/08/2020 | 11/12/2019 11/12/2019 | VISHAL BUILDERS 9536606047 | KAMAL SINGH JE RAM AVTAR MITTAL AE UMA NATH SHUKLA XE | Circle Mantola | In Progress |
127
| 01/EE/CD-25/2020-21 | Circle 5 | Patch reparing work internal road sec 6A 7B 7C 9B and Trunk Road | 0.00 | 11.35 26/06/2020 | 26/06/2020 26/06/2020 | 25/07/2020 | 26/06/2020 26/06/2020 | M/s Arif khan contractor 9760674305 | RAHUL KUMAR,SARVESH KUMAR VERMA JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
128
| 02/SE(V)/CD-11/2020-21 | Circle Vrindavan | Construction of 96 Nos. Group (n) (G+3) EWS houses at Village Kankaha, Mohanlalganj, Lucknow. | 0.00 | 390.70 04/02/2019 | 18/06/2020 | 17/12/2021 | 18/06/2020 | SINGH ASSOCIATES 9450453113 | NEERAJ KUMAR JE AKBAR ALI,RAJIV RASTOGI AE NAVJOT SINGH VERMA XE | Circle Vrindavan | In Progress |
129
| 01/EE/CD-1/2020-21 | Circle 7 | Supply and Fixing of RCC Pannels Tree Guards at sec-7 & Sec-8 Siddharth Vihar Yojna, Gzb | 0.00 | 6.67 | 08/07/2020 08/07/2020 | 07/08/2020 | 08/07/2020 08/07/2020 | Manpal 9917316437 | YOGENDRA KUMAR GUPTA JE NARENDRA PAL,YOGENDRA KUMAR VERMA AE ATUL KUMAR SINGH XE | Circle 7 | In Progress |
130
| 01/EE/CD-22/2020-21 | Circle Mantola | plantation and maintenance in green belt in sector-10 mandola | 0.00 | 70.50 15/01/2020 | 08/05/2020 | 07/11/2021 | 08/05/2020 | M/S D.B.GARDEN TRADERS 9761410176 | U.S.CHAURASIYA JE RAM AVTAR MITTAL AE UMA NATH SHUKLA XE | Circle Mantola | In Progress |
131
| 02/EE/CD-22/2019-20 | Circle Mantola | laying of internal waterline in sector 4A(plot portion) mandola | 0.00 | 17.55 01/08/2019 | 27/09/2019 | 26/12/2019 | 27/09/2019 | Laxman Buildcon | U.S.CHAURASIYA JE RAM AVTAR MITTAL AE UMA NATH SHUKLA XE | Circle Mantola | In Progress |
132
| 01/EE/CD29/19-20 | Circle 6 | LAYING OF INTERLOCKING TILES, C.C ROAD,DRAIN & CULVERT IN MAHARANI BAAG 'A' BLOCK AGRA NEAR & FRONT OF PLOT NO-79 TO 87, 87 TO SALONI COMPLEX,PLOT 75 TO76 | 0.00 | 96.63 04/06/2019 | 30/11/2019 30/11/2019 | 29/02/2020 | 30/11/2019 30/11/2019 | SHIVAM GROUPS 9837001873 | RAJIV KUMAR VERMA JE ASHOK KUMAR SHARMA AE CHANDRAMA RAM XE | Circle 6 | In Progress |
133
| 03/EE/CD-25/2017-18 | Circle 5 | Const of central verge under HT line in majhola no-4 ph-2 vistar mbd | 0.00 | 46.60 13/04/2017 | 27/05/2017 | 26/08/2017 | 27/05/2017 | M/s Arif khan contractor 9760674305 | RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
134
| 08/EE/CD-25/2017-18 | Circle 5 | Electrification work at community center at Village Mau mbd | 0.00 | 11.00 13/04/2017 | 30/05/2017 30/05/2017 | 30/05/2017 | 30/05/2017 30/05/2017 | M/s Jain Power Construction 9412245572 | RAHUL KUMAR,RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
135
| 02/EE/CD-25/2017-18 | Circle 5 | construction of public toilet block in mbd | 0.00 | 9.70 13/04/2017 | 27/05/2017 26/08/2017 | 26/08/2017 | 27/05/2017 26/08/2017 | M/s Z M H Construction Co 9927701805 | RAHUL KUMAR,RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | Not Started |
136
| 01/SE(M)/2020-21 | Circle Mantola | laying of sewer line in sector-2 mandola vihar | 0.00 | 130.00 15/01/2020 | 05/05/2020 | 04/11/2020 | 05/05/2020 | RAMAXE CONSTRUCTION 9811554477 | KAMAL SINGH JE HARI SHANKAR TIWARI AE UMA NATH SHUKLA XE | Circle Mantola | In Progress |
137
| 5/SE(V)/CD-11/ | Circle Vrindavan | Construction of 96/144 G+3 EWS Flats of PMAY | 0.00 | 390.70 25/06/2019 | 18/06/2020 18/06/2020 | 17/12/2021 | 18/06/2020 18/06/2020 | Rituraj Traders 9415180245 | | Circle Vrindavan | In Progress |
138
| 01/SE(V)/CD-12/2020-2021 | Circle Vrindavan | Construction of 144/176 Nos. G+3 EWS (PMAY) Houses (Group-C) in Village Miranpur Pinvat, Sarojini, Nagar, Lucknow. | 0.00 | 716.65 04/02/2019 | 18/05/2020 18/05/2020 | 17/11/2021 | 18/05/2020 18/05/2020 | M/S Aditya Engineers & Builders 9415149007 | | Circle Vrindavan | Not Started |
139
| 01/EE/CD-8/2020-21 | Circle 2 | Development works (Internal Water Supply System, Internal Sewerage System & Internal Drainage System) in Pocket of Sector-3 (Part), Jagriti Vihar (Ext.), Scheme-11, Meerut. | 0.00 | 28.17 06/02/2020 | 02/05/2020 02/05/2020 | 01/08/2020 | 02/05/2020 02/05/2020 | M/s Ramaxe Construction Co 9811554477 | SH. SANDEEP KUMAR JE SAURAV KUMAR AE AFTAB AHMAD XE | Circle 2 | In Progress |
140
| 04/E.E/C.D-5/2019-20 | Circle 2 | Construction of Drain & Culvert Sector-5 Part at Scheme No.11 Jagriti Vihar (Ext.) Meerut. | 0.00 | 24.46 13/12/2019 | 06/03/2020 06/03/2020 | 05/06/2020 | 06/03/2020 06/03/2020 | M/s Ramaxe Construction Co 9811554477 | ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XE | Circle 2 | In Progress |
141
| 03/E.E/C.D-5/2019-20 | Circle 2 | Laying & Jointing Internal Water Supply Line in Sector-5 (Part) at Scheme No-11, Jagriti Vihar (Extension), Meerut. | 0.00 | 8.80 13/12/2019 | 29/02/2020 29/02/2020 | 28/05/2020 | 29/02/2020 29/02/2020 | M/s Manpal 9719316437 | ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XE | Circle 2 | In Progress |
142
| 12/S.E-2/C.D-5/2019-20 | Circle 2 | Construction of 9.00 M & 12.00 M Wide Bituminous Road in Sector-5 at Scheme No-11, Jagriti Vihar (Extension), Meerut. | 0.00 | 148.67 22/11/2019 | 13/03/2020 13/03/2020 | 12/07/2020 | 13/03/2020 13/03/2020 | M/s S.K. Singh 9837488572 | ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XE | Circle 2 | In Progress |
143
| 01/E.E/C.D-5/2020-21 | Circle 2 | Construction of Switch Room Cum S.D.O.
Office for 33/11 K.V.A. Sub-Station at Sector-5, in Jagriti Vihar
(Extension) Scheme No-11, Meerut. | 0.00 | 49.00 25/02/2020 | 15/05/2020 15/05/2020 | 14/11/2020 | 15/05/2020 15/05/2020 | A.S CONSRTUCTION 8273230008 | ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XE | Circle 2 | In Progress |
144
| 04/EE/CD11/2016-17 | Circle Vrindavan | Third Party Quality Assurance, Goverdhan Enclave, Vrindavan Yojna-4, Lucknow. | 0.00 | 0.00 | 25/07/2016 26/07/2016 | 24/01/2019 | 25/07/2016 26/07/2016 | SERTECH CONSULTANTS | JE HARISHANKAR SINGH AE NAVJOT SINGH VERMA XE | Circle Vrindavan | In Progress |
145
| 19/EE/CD-21/2017-18 | Circle Vrindavan | Development work of Pond Vill. Peer nagar Amarapali Yojna hardoi Road, Lucknow (Group-B) | 0.00 | 21.51 28/12/2016 | 30/06/2017 30/06/2017 | 29/09/2017 | 30/06/2017 30/06/2017 | Ahmad Builders 7905820562 | ANIL KUMAR JE A.K.SINHA AE JAGDISH KUMAR XE | Circle Vrindavan | In Progress |
146
| 07/EE/CD-21/2017-18 | Circle Vrindavan | Construction of Platform Sector H-2 Amrapali Yojna Hardoi Road Lucknow | 0.00 | 24.67 28/06/2016 | 12/06/2017 | 11/09/2017 | 12/06/2017 | Tirupati Construction | SHAILENDRA SINGH JE A.K.SINHA AE JAGDISH KUMAR XE | Circle Vrindavan | Not Started |
147
| 13/EE/CD-21/2017-18 | Circle Vrindavan | Construction of Plateform at Sector H-2 Amrapali Yojna Hardoi Road Lucknow | 0.00 | 25.95 28/12/2016 | 12/06/2017 12/06/2017 | 11/09/2017 | 12/06/2017 12/06/2017 | A.S.A. ENTERPRISES | SHAILENDRA SINGH JE A.K.SINHA AE JAGDISH KUMAR XE | Circle Vrindavan | Not Started |
148
| 14/EE/CD-21/2017-18 | Circle Vrindavan | Construction of Plateform at sector H--2 at Amrapali Yojna Hardoi Road Lucknow | 0.00 | 14.83 28/12/2016 | 29/06/2017 29/06/2017 | 28/09/2017 | 29/06/2017 29/06/2017 | RAJARAM TRADERS | ANIL KUMAR JE A.K.SINHA AE JAGDISH KUMAR XE | Circle Vrindavan | Not Started |
149
| 17/SEHQ/CD-7/19-20 | Circle HQ | Patch work and strengthening of road node no. 8 to 3 in AVY Lucknow | 0.00 | 190.00 16/12/2019 | 13/01/2020 13/01/2020 | 27/01/2020 | 13/01/2020 13/01/2020 | SAILANI | J.N. MISHRA,LALIT KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XE | Circle HQ | In Progress |
150
| 04/EE/CD-3/2019-20 | Circle Vrindavan | Construction of 01 No. 600KL capacity & 26.00M Staging RCC Over Head Tank in Sector-13, Vrindavan Yojna No.-4, Lucknow | 0.00 | 73.80 08/03/2019 | 14/10/2019 14/10/2019 | 13/08/2020 | 14/10/2019 14/10/2019 | P. K. Sharma | KAMAL DEO PRASAD JE RAJESH KR VERMA AE GYANESHWAR PRASHAD XE | Circle Vrindavan | In Progress |
151
| 15/SEHQ/CD-7/18-19 | Circle HQ | Interlocking tiles work in service road node 11 to 16 AVY | 0.00 | 350.00 21/02/2019 | 23/10/2019 23/10/2019 | 22/01/2020 | 23/10/2019 23/10/2019 | SHAKTI CONSTRUCTION CO. 09121900191 | MOH. KHURSHEED,PRAMOD KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XE | Circle HQ | In Progress |
152
| 05/EE/CD-3/2019-20 | Circle Vrindavan | Painting of Staff Quarter Houses and supply with installation of PVC Water Storage Tank at Staff Quarter Sector-23, Indira Nagar, Luckow | 0.00 | 18.00 13/12/2019 | 01/02/2020 01/02/2020 | 30/04/2020 | 01/02/2020 01/02/2020 | Lakhan Construction | KAMAL DEO PRASAD JE RAJESH KR VERMA AE PANKAJ VERMA XE | Circle Vrindavan | In Progress |
153
| 06/EE/CD-3/2019-20 | Circle Vrindavan | Painting Work of Sri Arvind Park at Sector-13, Indira nagar, Lucknow. | 0.00 | 4.10 13/12/2019 | 19/02/2020 19/02/2020 | 18/04/2020 | 19/02/2020 19/02/2020 | OM SAI ENTERPRISES | KAMAL DEO PRASAD JE AE PANKAJ VERMA XE | Circle Vrindavan | In Progress |
154
| 05/EE/CD-2/19-20 | Circle 3 | Interlocking tiles road work from Metrology office to Jagnehta in Barabanki. | 0.00 | 38.24 25/06/2019 | 10/09/2019 10/09/2019 | 09/12/2019 | 10/09/2019 10/09/2019 | Mahek Enterprises 8423036649 | | Circle 3 | In Progress |
155
| 06/EE/CD-2/19-20 | Circle 3 | Interloking tile and drain work from 2/82 to OHT & park 2/62 to 2/72 in Obri Barabanki | 0.00 | 53.26 25/06/2019 | 10/09/2019 09/12/2019 | 09/12/2019 | 10/09/2019 09/12/2019 | Mahek Enterprises 8423036649 | | Circle 3 | In Progress |
156
| 14/EE/CD-2/19-20 | Circle 3 | Interlocking road work from 4/142 to 4/116 in obri yojna,Barabanki. | 0.00 | 10.52 25/06/2019 | 16/11/2019 16/11/2019 | 15/02/2020 | 16/11/2019 16/11/2019 | Mahek Enterprises 8423036649 | | Circle 3 | Not Started |
157
| 16/EE/CD-2/19-20 | Circle 3 | Interloking tile and drain work from Kanshiram colony to Faizabad road in Barabanki | 0.00 | 35.85 25/06/2019 | 04/01/2020 04/01/2020 | 03/04/2020 | 04/01/2020 04/01/2020 | Ganesh Enterprises | | Circle 3 | In Progress |
158
| 01/EE/CD-2/19-20 | Circle 3 | Interlocking tiles road and drain work from 2/4/64 to 2/4/33 in obri yojna Barabanki. | 0.00 | 8.70 24/01/2019 | 20/07/2019 20/07/2019 | 19/10/2019 | 20/07/2019 20/07/2019 | Mahek Enterprises 8423036649 | | Circle 3 | In Progress |
159
| 02/EE/CD-2/19-20 | Circle 3 | Construction of CC road & drain in Moharipurwa in Barabanki. | 0.00 | 50.17 24/01/2019 | 20/07/2019 | 19/10/2019 | 20/07/2019 | Mahek Enterprises 8423036649 | | Circle 3 | Not Started |
160
| 07/EE/CD-2/19-20 | Circle 3 | Interlocking tiles work on road patri and road work in Khasra 339 ,Obri Yojna,Barabanki. | 0.00 | 18.93 25/06/2019 | 30/10/2019 30/10/2019 | 29/01/2020 | 30/10/2019 30/10/2019 | M/S Savitri Associate | | Circle 3 | In Progress |
161
| 02/EE/CD-19/2020-21 | Circle 3 | Renovation work of Office Complex, Sector-9, Vrindavan Yojna, Lucknow | 0.00 | 116.67 02/06/2020 | 23/06/2020 23/06/2020 | 22/09/2020 | 23/06/2020 23/06/2020 | T Y TRADERS 9004537987 | AJAY KUMAR JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XE | Circle 3 | In Progress |
162
| 04/EE/CUETAWAH/2020-21 | Circle 4 | Construction of 02 Nos. Vehicle Stoppage (With Toilet Block) Near Numaish Chauraha Etawah | 0.00 | 42.35 28/01/2020 | 28/07/2020 28/07/2020 | 27/10/2020 | 28/07/2020 28/07/2020 | Lal Bahadur Singh Contractor 9415472725 | DEVENDRA YADAV JE ARVIND KUMAR AE PRADEEP KUMAR XE | Circle 4 | Not Started |
163
| 02/EE/CUETAWAH/2020-21 | Circle 4 | Construction of 02 Nos. Vehicle Stoppage (With Toilet Block) Near DM Chauraha Etawah | 0.00 | 42.35 28/01/2020 | 28/07/2020 | 27/10/2020 | 28/07/2020 | Lal Bahadur Singh Contractor 9415472725 | SRI ANIL KUMAR CHAUDHARY JE ARVIND KUMAR AE PRADEEP KUMAR XE | Circle 4 | Not Started |
164
| 03/SE(V)/CD-11/2020-21 | Circle Vrindavan | Construction of 96 Nos. Group (n) (G+3) EWS houses at Village Kankaha, Mohanlalganj, Lucknow. | 0.00 | 390.70 04/02/2019 | 18/06/2020 18/06/2020 | 17/12/2021 | 18/06/2020 18/06/2020 | M/s Bansal Traders 9450364731 | PRAMOD KUMAR YADAV JE JITENDRA PRAKASH SINGH,RAKESH KUMAR SAXENA AE NAVJOT SINGH VERMA XE | Circle Vrindavan | In Progress |
165
| 02/EE/CD-2/2020-21 | Circle 3 | GENERAL EARTH WORK AT GONDA FAIZABAD MARG BHOOMI VIKAS YOJNA GONDA | 0.00 | 28.85 10/12/2019 | 10/08/2020 | 09/11/2020 | 10/08/2020 | Ansh Contruction 9450072493 | | Circle 3 | In Progress |
166
| 09/SE-III/CD-19/2019-20 | Circle 3 | Const. of 96 Nos. (G+3) Flats under PMAY (Urban) at Village-Anaura, Tehsil-Sadar, Distt.- Lucknow | 0.00 | 398.77 20/06/2019 | 21/03/2020 21/03/2020 | 20/09/2021 | 21/03/2020 21/03/2020 | M/S Neel Constructions 9415117988 | AJAY KUMAR JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XE | Circle 3 | In Progress |
167
| 10/SE-III/CD-19/2019-20 | Circle 3 | Const. of 96 Nos. (G+3) Flats under PMAY (Urban) at Village-Anaura, Tehsil-Sadar, Distt.-Lucknow | 0.00 | 398.77 20/06/2019 | 21/03/2020 21/03/2020 | 20/09/2021 | 21/03/2020 21/03/2020 | M/S Neel Constructions 9415117988 | AJAY KUMAR JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XE | Circle 3 | In Progress |
168
| 11/SE-III/CD-19/2019-20 | Circle 3 | Const. of 96 Nos. (G+3) Flats under PMAY (Urban) at Village-Anaura, Tehsil-Sadar, Distt.-Lucknow | 0.00 | 398.77 20/06/2019 | 21/03/2020 21/03/2020 | 20/09/2021 | 21/03/2020 21/03/2020 | M/S Neel Constructions 9415117988 | AJAY KUMAR JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XE | Circle 3 | In Progress |
169
| 05/SE-3/2019-20 | Circle 3 | Construction of 96 Nos PMAY (U) houses at civil line Gonda. | 0.00 | 394.57 15/02/2020 | 25/02/2020 25/02/2020 | 24/08/2021 | 25/02/2020 25/02/2020 | Izhar Ali Contractor | | Circle 3 | In Progress |
170
| 01/SE-I/VNS/CD-37/2020-21 | Circle 1 | Remaining Work of 48 Nos. Houses of Manyawar Kashiram Ji Shahri Garib Avas Yojna (Phase-III) At Basi Siddarthnagar | 0.00 | 57.44 04/12/2019 | 08/07/2020 08/07/2020 | 07/07/2021 | 08/07/2020 08/07/2020 | AVADH ENTERPRISES 09152105232 | JEYOTI NARAYAN JE ASHOK KUMAR AE J K KAUSHAL XE | Circle 1 | In Progress |
171
| 08/SE(V)/CD-12/2020-21 | Circle Vrindavan | Construction of 1.00 MLD capacity sewage treatment plant based on constructed wet land technology including O&M for 3 years at Gokul Gram Yojna-1, Munnu Khera, Lucknow. | 0.00 | 273.00 17/06/2020 | 27/08/2020 27/08/2020 | 26/02/2022 | 27/08/2020 27/08/2020 | SOLAR TECH ENGINEER | MANOJ KUMAR KEWAT JE A.K.SINHA AE SHASHANK PANDEY XE | Circle Vrindavan | In Progress |
172
| 02/E.E./CD-24/MBD/2020-21 | Circle 5 | Laying of Water Supply Line in Kotdwar Road Bhumi Vikas Evam Grahsthan Yojna No. 1, Najibabad, Bijnor | 0.00 | 19.00 15/07/2020 | 18/08/2020 18/08/2020 | 17/11/2020 | 18/08/2020 18/08/2020 | VIKAS ENGINEERING | YOGESH KUMAR JE A.K.SAXENA AE FARAZ ASLAM XE | Circle 5 | Not Started |
173
| 02/EE/CD-22/2020-21 | Circle Mantola | Laying of internal sewer line in sector-4A plots at Mandola Vihar Ghaziabad | 0.00 | 48.71 13/05/2020 | 31/08/2020 31/08/2020 | 28/02/2021 | 31/08/2020 31/08/2020 | RAMAXE CONSTRUCTION 9811554477 | | Circle Mantola | In Progress |
174
| 02/EE/2020-21 | Circle 5 | Maintenance/Repair of Pot Holes and Trunk Roads in Majhola Yojna No.-4, Phase-2, Moradabad | 0.00 | 12.45 24/08/2020 | 03/10/2020 03/10/2020 | 02/11/2020 | 03/10/2020 03/10/2020 | M/s Rakesh Kumar 9837019057 | | Circle 5 | In Progress |
175
| 03/EE/CD-24/MBD/2020-21 | Circle 5 | Construction of 29 Nos LIG 29/60 Type Semifinished Houses in Kotdwar Road Yojna, Najibabad, Bijnor | 0.00 | 105.00 04/08/2020 | 08/10/2020 08/10/2020 | 07/07/2021 | 08/10/2020 08/10/2020 | M/S PARI ENTERPRISES 9540747089 | | Circle 5 | In Progress |
176
| 03/EE/CUETAWAH/2020-21 | Circle 4 | Construction of 02 Nos. Vehicle Stoppage (With Toilet Block) Near Shastri Chauraha Etawah | 0.00 | 42.35 28/01/2020 | 28/07/2020 28/07/2020 | 27/10/2020 | 28/07/2020 28/07/2020 | Lal Bahadur Singh Contractor 9415472725 | DEVENDRA YADAV JE ARVIND KUMAR AE PRADEEP KUMAR XE | Circle 4 | Not Started |
177
| 01/EE/CUETAWAH/2020-21 | Circle 4 | Construction of 02 Nos. Vehicle Stoppage (With Toilet Block) Near ITI Chauraha Etawah | 0.00 | 42.35 28/01/2020 | 28/07/2020 28/07/2020 | 27/10/2020 | 28/07/2020 28/07/2020 | Lal Bahadur Singh Contractor 9415472725 | SRI DEVENDRA YADAV JE ARVIND KUMAR AE PRADEEP KUMAR XE | Circle 4 | Not Started |
178
| 05/EE/CUETAWAH/2020-21 | Circle 4 | Construction of 02 Nos. Vehicle Stoppage (With Toilet Block) Near Gwalior Bus Stand Etawah | 0.00 | 42.35 28/01/2020 | 28/07/2020 28/07/2020 | 27/10/2020 | 28/07/2020 28/07/2020 | Lal Bahadur Singh Contractor 9415472725 | ARUN KUMAR PATEL JE ARVIND KUMAR AE PRADEEP KUMAR XE | Circle 4 | Not Started |
179
| 01/EE/ED-III/20-21 | Circle Electrical | Construction of 420 Meter Deep Tubewell at Ganga Enclave Scheme No. -3, Kanpur | 0.00 | 45.92 28/05/2020 | 26/06/2020 26/06/2020 | 25/10/2020 | 26/06/2020 26/06/2020 | CIT DRILLERS & DEVELOPERS | | Circle Electrical | In Progress |
180
| 05/EE/ED-III/20-21 | Circle Electrical | Constructions of 11 K.V.Feeder (Under External Electrification) work for Sector-2, for 33/11 K.V. Sub Station at Sector-2, Scheme No.-11 Jagrati Vihar (Ext.) Meerut. | 0.00 | 9.92 15/07/2020 | 24/09/2020 24/09/2020 | 23/12/2020 | 24/09/2020 24/09/2020 | ADITYA ENTERPRISES | | Circle Electrical | Not Started |
181
| 07/EE/ED-III/20-21 | Circle Electrical | Supply and Installation of 11 K.V. Outgoing V.C.B. Panel for 33/11 K.V. Sub Station at Sector-3, Jagravi Vihar (Ext.) Scheme No.-11, Meerut. | 0.00 | 9.77 15/07/2020 | 24/09/2020 24/09/2020 | 23/12/2020 | 24/09/2020 24/09/2020 | SINGH CONSTRUCTION 9794412774 | | Circle Electrical | In Progress |
182
| 05/SE(V)/CD-11/2020-21 | Circle Vrindavan | Construction of 96 Nos. Group (n) (G+3) EWS houses at Village Kankaha, Mohanlalganj, Lucknow. | 0.00 | 390.70 04/02/2019 | 18/06/2020 18/06/2020 | 17/12/2021 | 18/06/2020 18/06/2020 | Rituraj Traders 9415180245 | NEERAJ KUMAR JE AKBAR ALI,RAJIV RASTOGI AE NAVJOT SINGH VERMA XE | Circle Vrindavan | In Progress |
183
| 06/SE(V)/CD-11/2020-21 | Circle Vrindavan | Construction of 96 Nos. Group (n) (G+3) EWS houses at Village Kankaha, Mohanlalganj, Lucknow. | 0.00 | 390.70 04/02/2019 | 18/06/2020 18/06/2020 | 17/12/2021 | 18/06/2020 18/06/2020 | M/S Ram Sewak Hargovind Sahai 9415149653 | PRAMOD KUMAR YADAV JE JITENDRA PRAKASH SINGH,RAKESH KUMAR SAXENA AE NAVJOT SINGH VERMA XE | Circle Vrindavan | In Progress |
184
| 07/SE(V)/CD-11/2020-21 | Circle Vrindavan | Construction of 96 Nos. Group (n) (G+3) EWS houses at Village Kankaha, Mohanlalganj, Lucknow. | 0.00 | 390.70 04/02/2019 | 18/06/2020 18/06/2020 | 17/12/2021 | 18/06/2020 18/06/2020 | GOPI CHAND RANGLINI 9956510351 | PRAMOD KUMAR YADAV JE JITENDRA PRAKASH SINGH,RAKESH KUMAR SAXENA AE NAVJOT SINGH VERMA XE | Circle Vrindavan | In Progress |
185
| 1445/TQ/01/2020-21 | Circle 7 | Construction of 50.00 Mtr Wide Road(Part) Siddharth Vihar Yojna Ghaziabad. | 0.00 | 247.66 27/02/2020 | 22/06/2020 22/06/2020 | 21/12/2020 | 22/06/2020 22/06/2020 | S S CONSTRUCTION 9999999645 | RANDHIR SINGH JE NARENDRA PAL AE ATUL KUMAR SINGH XE | Circle 7 | In Progress |
186
| 761/PRO-50/49 | Circle 7 | Laying & Jointing Internal Sewer Line on 24.00 mtr wide road between sec-1 & 3 in Siddhath Vihar Yojna, Gzb | 0.00 | 19.77 10/07/2020 | 17/08/2020 17/08/2020 | 16/12/2020 | 17/08/2020 17/08/2020 | 3D CREATION | R.K. GUPTA JE NARENDRA PAL AE ATUL KUMAR SINGH XE | Circle 7 | In Progress |
187
| 03/EE/CDBagpat-02/2020-21 | Circle Mantola | Making Water and Sewer Connection Work in Sector-4A (Plots Portion) | 0.00 | 24.29 | 17/12/2020 | 16/04/2021 | 17/12/2020 | Tahir Hussain Ansari 9990619560 | | Circle Mantola | In Progress |
188
| 03/EE/ED-III/20-21 | Circle Electrical | Supply and Installation of 02 No. 1000 LPM 40 Mtr. Head Submersible Pumping Plant at Gange Enclave in Scheme No. 3, Ambedkarpuram, Kanpur | 0.00 | 8.20 13/07/2020 | 13/08/2020 13/08/2020 | 12/10/2020 | 13/08/2020 13/08/2020 | M.A. Engineering works | | Circle Electrical | In Progress |
189
| 04/EE/CD,MRT-02/2020-21 | Circle 2 | Internal Sewerage System Works in the Campus of 624 (480+144) Nos PMAY Scheme Flats in Sector-2 & 4, Scheme No.-11, Jagriti Vihar (Ext.), Meerut | 0.00 | 40.70 12/11/2020 | 29/12/2020 28/03/2021 | 28/03/2021 | 29/12/2020 28/03/2021 | M/s G.A. Enterprises 9548760117 | S.P. SINGH JE SANJEEV KUMAR TIWARI AE SHRI RAJEEV KUMAR XE | Circle 2 | In Progress |
190
| 02/EE/CDR-02/2020-21 | Circle 5 | Laying of Internal Sewer line for 288 No Houses in the permisses of 816 No PMAY (Urban) Houses at Sector-16 of Majhola Yojna No-4, Ph-2 (Vistar) Moradabad | 0.00 | 43.73 30/09/2020 | 30/12/2020 03/12/2020 | 02/04/2021 | 30/12/2020 03/12/2020 | M/s Progressive Construction Co. 9810846441 | | Circle 5 | In Progress |
191
| 03/EE/CDR-02/2020-21 | Circle 5 | Laying of Internal Sewer Line at Sec-16 Excluding PMAY Pocket in Majhola Yojna No-4, Ph-2 (Vistar), Moradabad. | 0.00 | 25.42 04/08/2020 | 03/12/2020 03/12/2020 | 02/04/2021 | 03/12/2020 03/12/2020 | M/s M.A. Associates | | Circle 5 | In Progress |
192
| 01/EE/ED-III/2020-21 | Circle Electrical | Construction of 420 Mtr. Deep Tubewell at Ganga Enclave Scheme No. - 3, Ambedkarpuram, Kanpur | 0.00 | 41.00 14/05/2020 | 26/06/2020 26/06/2020 | 25/10/2020 | 26/06/2020 26/06/2020 | CIT DRILLERS & DEVELOPERS | | Circle Electrical | In Progress |
193
| 04/EE/CDBaghpat-01/2020-21 | Circle Mantola | Construction of Remaining 45M. & 30M. Wide Trunk Roads of Sec.-20 to 25 in Mandola Vihar Yojna, Gzb. | 0.00 | 79.74 09/02/2021 | 20/03/2021 20/03/2021 | 19/09/2021 | 20/03/2021 20/03/2021 | RAMAXE CONSTRUCTION 9811554477 | | Circle Mantola | In Progress |
194
| 02/SE-Bkd/2021-22 | Project | Construction of Sewer Line in Yojana No-3 Jhansi | 0.00 | 387.60 29/04/2021 | 20/07/2021 20/07/2021 | 19/07/2022 | 20/07/2021 20/07/2021 | ISHWAR SINGH 9415084207 | | Project | In Progress |
195
| 2/SE-VI/2020-21 | Circle 6 | CONSTRUCTION OF ROAD IN YOJANA NO-3JHANSI | 0.00 | 141.35 08/06/2020 | 22/09/2020 22/09/2020 | 21/06/2021 | 22/09/2020 22/09/2020 | R. N. Agarwal 9319062251 | MANVENDRA DHAMANIYA JE DAYASAGAR AE EKHLAQUE AHMAD XE | Circle 6 | In Progress |
196
| 02/PM/CU-JHS/20-21 | Circle 6 | CONSTRUCTION OF PARK IN YOJANA NO-3 JHANSI | 0.00 | 39.77 20/03/2020 | 28/08/2020 | 27/11/2020 | 28/08/2020 | RAJESH KUMAR LITORIYA 9450034807 | ANUP KUMAR JE DAYASAGAR AE EKHLAQUE AHMAD XE | Circle 6 | In Progress |
197
| 02/SE-Ruhelkhand/21-22 | Circle 5 | Construction of 96/144 nos Flats ( G+3) under PM Avas Yojna (Urban) at Sec-15, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad . (Group-1य) | 0.00 | 409.30 14/02/2019 | 14/09/2021 14/09/2021 | 13/03/2023 | 14/09/2021 14/09/2021 | M/s Bhatiya Construction | RAHUL KUMAR,SARVESH KUMAR VERMA JE RAJ KUMAR AE YOGENDRA KUMAR GOEL XE | Circle 5 | In Progress |
198
| 14/EE/ED-III/20-21 | Circle Electrical | Supply of 01 No. 10 MVA & 01 No 5 MVA 33/11 KV Power Transformer at Sector-3 Jagrati Vihar (Extension) Scheme No.-11, Meerut. | 0.00 | 103.96 17/12/2020 | 05/03/2021 05/03/2021 | 04/07/2021 | 05/03/2021 05/03/2021 | Elecon Conductor 9837007408 | | Circle Electrical | In Progress |
199
| 01/EE/ED-III/21-22 | Circle Electrical | Shifting of 11 KV Line at 45 Meter wide Inner Ring Road Infront of PMAY Houses Jagrati Vihar (Ext.) Scheme No.-11, Meerut. | 0.00 | 10.00 25/08/2021 | 04/10/2021 04/10/2021 | 03/01/2022 | 04/10/2021 04/10/2021 | SPARKLE ENTERPRISES 9837394838 | | Circle Electrical | In Progress |
200
| 05/EE/ED-III/21-22 | Circle Electrical | Supply & Installation work at Campus of Multi Purpose Hall in Harcourt Butler Technical University, Kanpur. | 0.00 | 22.65 01/10/2021 | 13/10/2021 13/10/2021 | 12/11/2021 | 13/10/2021 13/10/2021 | SARA ENTERPRISES 9451176938 | | Circle Electrical | In Progress |
201
| 08/EE/ED-III/20-21 | Circle Electrical | SITC of 01 No. 1500 LPM 58 Mtr. Head KSB make Submersible Pumping Plant for OHT Campus Tubewell at Sector-6, Jagrati Vihar (Ext.) Scheme No.-11 Meerut. | 0.00 | 10.00 31/08/2020 | 01/10/2020 01/10/2020 | 31/12/2020 | 01/10/2020 01/10/2020 | ADITYA ENTERPRISES | | Circle Electrical | In Progress |
202
| 09/EE/ED-III/20-21 | Circle Electrical | External Electrification (Transformation) work in OHT Campus Tubewell at Sector-6, jagrati Vihar (Ext.) Scheme No.-11, Meerut. | 0.00 | 9.50 31/08/2020 | 01/10/2020 01/10/2020 | 31/12/2020 | 01/10/2020 01/10/2020 | ADITYA ENTERPRISES | | Circle Electrical | In Progress |
203
| 07/EE/ED-III/21-22 | Circle Electrical | Street Lighting work (Remaining Part) on 45 Meter wide Road in front of 220/132/33 KV Sub-Station at Jagrati vihar (Ext.) Scheme No.-11, Meerut. | 0.00 | 9.91 07/09/2021 | 20/10/2021 20/10/2021 | 19/01/2022 | 20/10/2021 20/10/2021 | SINGH CONSTRUCTION 9794412774 | | Circle Electrical | In Progress |
204
| 03/SEBUNDELKHAND-CIRCLE/2021-22 | Project | CONSTRUCTION OF DRAIN AND CULVERT AT BHUMI VIKAS EVAM GRAH SATHAN YOJANA 3 JHANSI | 0.00 | 193.29 20/05/2021 | 18/08/2021 18/08/2021 | 17/08/2022 | 18/08/2021 18/08/2021 | Dharvi Associates 9140324815 | MANVENDRA DHAMANIYA JE SHARAD KUMAR AE SAMAR UPADHAYAY XE | Project | In Progress |
205
| 06/EE/CDR-3/2021-22 | Circle 5 | Internal Aluminium Partition Work in Office Complex Building (G+2) at Majhola Yojna No.-4, Phase-2, Moradabad | 0.00 | 78.80 24/06/2021 | 17/07/2021 17/07/2021 | 16/01/2022 | 17/07/2021 17/07/2021 | GAURAV ENTERPRISES | SATENDRA HYANKI JE SANJAY SHARMA AE FARAZ ASLAM XE | Circle 5 | In Progress |
206
| 05/EE/CDR-3/2021-22 | Circle 5 | Construction of Under Ground R.C.C. Water Tank, 02 Nos. (Fire) Stair Case, 01 Nos. Pump House and Civil work of Second Floor Guest House in Office Complex (G+2) Building at Majhola Yojna No.-4, Phase-2, Moradabad | 0.00 | 24.20 24/06/2021 | 16/07/2021 16/07/2021 | 15/01/2022 | 16/07/2021 16/07/2021 | M/s G.A. Enterprises 9548760117 | SATENDRA HYANKI JE SANJAY SHARMA AE FARAZ ASLAM XE | Circle 5 | In Progress |
207
| 06/EE/ED-III/21-22 | Circle Electrical | Supply & Installation of 250 KVA 11/0.433 KV CSS and Sub-Station Related work at Campus of Multi Purpose Hall in H.B.T.U. Kanpur. | 0.00 | 39.76 02/09/2021 | 20/10/2021 20/10/2021 | 03/12/2021 | 20/10/2021 20/10/2021 | PRAKASH ENGINEERS & CONSULTANT 9838656565 | | Circle Electrical | In Progress |
208
| 03/SE-Ruhelkhand/21-22 | Circle 5 | Construction of 48/96 nos Flats ( G+3) under PM Avas Yojna (Urban) at Sec-15, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad (Group-1र) | 0.00 | 204.66 14/02/2019 | 14/09/2021 14/09/2021 | 13/03/2023 | 14/09/2021 14/09/2021 | M/s Vipin Bhatiya | RAHUL KUMAR,SARVESH KUMAR VERMA JE RAJ KUMAR AE YOGENDRA KUMAR GOEL XE | Circle 5 | In Progress |
209
| 04/SE-Ruhelkhand/21-22 | Circle 5 | Construction of 96/144 nos Flats ( G+3) under PM Avas Yojna (Urban) at Sec-15, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad .(Group1द) | 0.00 | 409.30 14/02/2019 | 14/09/2021 14/09/2021 | 13/03/2023 | 14/09/2021 14/09/2021 | M/s Fair Builders | RAHUL KUMAR,SARVESH KUMAR VERMA JE RAJ KUMAR AE YOGENDRA KUMAR GOEL XE | Circle 5 | In Progress |
210
| 10/EE/ED-III/2020-21 | Circle Electrical | External Electrification Work in F-45 & F-70 Type (G+3) Storied in Sector-2A. Shakumbhari Vihar Yojna Saharanpur | 0.00 | 76.06 17/10/2020 | 24/12/2020 24/12/2020 | 02/06/2021 | 24/12/2020 24/12/2020 | OM ASSOCIATES 9312359633 | | Circle Electrical | In Progress |
211
| 11/EE/ED-III/2020-21 | Circle Electrical | Construction of 33/11 KV Sub-Station (Capacity Increasing) at Sector-3, Jagrati Vihar (Extension) Scheme No.-11, Meerut. | 0.00 | 113.38 28/10/2020 | 28/12/2020 28/12/2020 | 27/04/2021 | 28/12/2020 28/12/2020 | YASH ENTERPRISES | | Circle Electrical | In Progress |
212
| 12/EE/ED-III/20-21 | Circle Electrical | Shifting of 33 KV Line Passing Through Sector-2 and 3 On 24 Mtr. Wide Road at Jagrati Vihar (Extension) Scheme No.-11, Meerur. | 0.00 | 91.85 17/10/2020 | 31/12/2020 31/12/2020 | 30/03/2021 | 31/12/2020 31/12/2020 | OM ASSOCIATES 9312359633 | | Circle Electrical | In Progress |
213
| 02/EE/ED-III/21-22 | Circle Electrical | Shifting of 11 KV Line at 45 Meter wide Inner Ring Road Infront of STP Jagrati Vihar (Ext.) Scheme No.-11, Meerut. | 0.00 | 10.00 28/08/2021 | 04/10/2021 04/10/2021 | 03/01/2022 | 04/10/2021 04/10/2021 | SPARKLE ENTERPRISES 9837394838 | | Circle Electrical | In Progress |
214
| 03/EE/ED-III/21-22 | Circle Electrical | Supply Erection Testing & Commissioning of Audio Video System work in Multi Purpose Hall at Campus of Harcourt Butler Technical Univesity, Kanpur. | 0.00 | 99.83 08/09/2021 | 08/10/2021 08/10/2021 | 11/11/2021 | 08/10/2021 08/10/2021 | OPTITEL COMMUNICATION 9415023645 | | Circle Electrical | In Progress |
215
| 04/EE/ED-III/21-22 | Circle Electrical | Shifting of 11 KV H.T. Line on 45 Meter wide Passing Infront of Sector-8 Jagrati Vihar (Ext.) Scheme No.-11, Meerut | 0.00 | 9.86 07/09/2021 | 08/10/2021 08/10/2021 | 07/01/2022 | 08/10/2021 08/10/2021 | SPARKLE ENTERPRISES 9837394838 | | Circle Electrical | In Progress |
216
| 09/SE(ELECT)/ED-III/2021-22 | Circle Electrical | External Electrification work at Bhumi Vikas Evam Ghrah Sansthan Scheme No.-3, Jhansi | 0.00 | 377.70 05/10/2021 | 10/12/2021 10/12/2021 | 09/06/2022 | 10/12/2021 10/12/2021 | R K and Company 8171211222 | | Circle Electrical | In Progress |
217
| 10/SE(ELECT)/ED-III/2021-22 | Circle Electrical | Construction of 03 Nos 350 x 200 mm dia size Tubewell 200 Meter Below Ground Level & Related External Electrification work in Sector-2, 3 & 8 at Jagrati Vihar (Extension) Scheme No.-11, Meerut | 0.00 | 153.10 02/12/2021 | 07/01/2022 07/01/2022 | 06/07/2022 | 07/01/2022 07/01/2022 | M.A. Engineering works | | Circle Electrical | In Progress |
218
| 05/SE(E)/2021-22dated17-08-2021 | Circle Electrical | External Electrification Work at Kotdwar Road Bhoomi Vikas Evam Grahshan yojna No-1 Najibabad bijnor.( Work By Sparkle Enterprises)(05/SE(E)/ 2021-22 dated 17-08-2021) | 0.00 | 126.87 | 17/08/2021 17/08/2021 | 16/12/2021 | 17/08/2021 17/08/2021 | SPARKLE ENTERPRISES 9837394838 | | Circle Electrical | In Progress |
219
| 04/EE/CDBaghpat-03/2021-22 | Circle Mantola | Sewer & Water Connection for Plot Pocket in sec-15 | 0.00 | 10.64 31/07/2021 | 25/10/2021 25/10/2021 | 24/02/2022 | 25/10/2021 25/10/2021 | ANUJ ASSOCIATE 9411902544 | | Circle Mantola | In Progress |
220
| 01/SEGZBCIRCLE/2021-22DATE09-07-2021 | Circle 7 | Design, Construction, Supply, Installation, Testing and Commissioning of 43 MLD capacity Main Pumping Station & 21.5 MLD S.T.P. on Sequential Batch Reactor (SBR) Process including disposal of effluent from STP to Outfall Drain and O& M for 5 years Siddarth Vihar Yojna Ghaziabad (UP) | 0.00 | 441527000.00 18/06/2021 | 09/07/2021 09/07/2021 | 08/07/2023 | 09/07/2021 09/07/2021 | M/s Khilari Infrastructure Pvt. Ltd 9554957890 | RANDHIR SINGH JE RIYAZUDDIN AE UMA NATH SHUKLA XE | Circle 7 | In Progress |
221
| 03/EE/CDBAG02/2021-22 | Circle Mantola | Construction of Internal Drains & Culvert in Sector 4A( Plots Area ) at Mandola Vihar Gzb. | 0.00 | 0.00 | 01/09/2021 01/09/2021 | 30/01/2022 | 01/09/2021 01/09/2021 | Tahir Hussain Ansari 9990619560 | | Circle Mantola | In Progress |
222
| 08/EE/CDBaghpat-03/2021-22 | Circle Mantola | Construction of Parking in the campus of Samajwadi Houses (Gulmohar Enclave) in Sector-15 &16 B | 0.00 | 59.43 31/12/2021 | 07/01/2022 07/01/2022 | 06/05/2022 | 07/01/2022 07/01/2022 | SHIVAM CONTRACTOR 8755427501 | | Circle Mantola | In Progress |
223
| 06/EE/CDBaghpat-03/2021-22 | Circle Mantola | Construction of Ramp in Stilt Floor of 1 B.H.K. and 2 B.H.K. Flats at Gulmohar Enclave in Sector 15 & 16 B | 0.00 | 44.70 23/10/2021 | 31/12/2021 31/12/2021 | 30/03/2022 | 31/12/2021 31/12/2021 | SHIVAM CONTRACTOR 8755427501 | | Circle Mantola | In Progress |
224
| 07/EE/CDBaghpat-03/2021-22 | Circle Mantola | Construction of Internal Drain and culvert in Campus of Sec. 15 Plot Pocket | 0.00 | 38.43 03/12/2021 | 31/12/2021 31/12/2021 | 30/03/2022 | 31/12/2021 31/12/2021 | K.V. Chandraraj Const. Co. 9837451414 | | Circle Mantola | In Progress |
225
| 03/SE(E/M)/LKO/2021-22 | Circle Electrical | EXTERNAL ELECTRIFICATION WORK (UGS) FOR FLOTS AT SECTOR-4A MV YOJNA GZB. | 0.00 | 565.25 21/05/2021 | 09/08/2021 09/08/2021 | 08/02/2022 | 09/08/2021 09/08/2021 | M/S PRAKASH ENGINEERS 8527167618 | PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
226
| 02/SE(E/M)/LKO/2021-22 | Circle Electrical | CONSTRUCTION OF 33KV LINE FOR 33KV S/S AT SECTOR-9 FROM 220KV S/S SV YOJNA GZB. | 0.00 | 279.65 23/03/2021 | 14/07/2021 14/07/2021 | 13/10/2021 | 14/07/2021 14/07/2021 | M/S PRAKASH ENGINEERS 8527167618 | PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XE | Circle Electrical | In Progress |
227
| 01/EE/CDBaghpat02/2021-22 | Circle Mantola | Construction of parks & Footpath in Sector 4A at Mandola vihar Ghaziabad. | 0.00 | 20.00 08/06/2021 | 03/07/2021 03/07/2021 | 02/10/2021 | 03/07/2021 03/07/2021 | Tahir Hussain Ansari 9990619560 | | Circle Mantola | In Progress |
228
| 03/SEMeerut/2022-23 | Circle 2 | Construction of Service road of 45.00m wide road along node no. 21-22 at Jagriti Vihar (Ext.), Scheme No. 11, Meerut | 0.00 | 160.00 16/03/2022 | 20/05/2022 20/05/2022 | 19/11/2022 | 20/05/2022 20/05/2022 | M/s Mukesh Chandra Yadav | SH. SANDEEP KUMAR JE VIRENDRA KUMAR AE RAJEEV KUMAR XE | Circle 2 | In Progress |
229
| 02/SEMeerut/2022-23 | Circle 2 | Construction of Service road of 45.00m wide road along node no. 22-23 at Jagriti Vihar (Ext.), Scheme No. 11, Meerut | 0.00 | 153.00 16/03/2022 | 20/05/2022 20/05/2022 | 19/11/2022 | 20/05/2022 20/05/2022 | Smt. Urmila Yadav | SH. SANDEEP KUMAR JE VIRENDRA KUMAR AE RAJEEV KUMAR XE | Circle 2 | In Progress |
230
| 01/SEMeerut/2022-23 | Circle 2 | Construction of Service road of 45.00m wide road along node no. 26-27 at Jagriti Vihar (Ext.), Scheme No. 11, Meerut | 0.00 | 185.00 16/03/2022 | 17/05/2022 17/05/2022 | 16/11/2022 | 17/05/2022 17/05/2022 | M/s S.K. Singh 9837488572 | SH. SANDEEP KUMAR JE SAURAV KUMAR AE AFTAB AHMAD XE | Circle 2 | In Progress |
231
| 05/SE(E)/2022-23 | Circle Electrical | Street Light Work at Sector-7C Avadh Vihar Yojna, Lucknow | 0.00 | 107.29 18/06/2022 | 12/07/2022 12/07/2022 | 11/01/2023 | 12/07/2022 12/07/2022 | SRI SAI SUDHA ENTERPRISES | | Circle Electrical | In Progress |
232
| 01/EE/ED-III/22-23 | Circle Electrical | REMAINING STREET LIGHTING & A.C. INSTALLATION WORK IN CAMPUS OF MULTI PURPOSE HALL IN HARTCOURT BUTLER TECHNICAL UNIVERSITY, KANPUR | 0.00 | 24.21 14/07/2022 | 20/08/2022 20/08/2022 | 03/10/2022 | 20/08/2022 20/08/2022 | SARA ENTERPRISES 9451176938 | | Circle Electrical | In Progress |
233
| 09/EE/ED-III/21-22 | Circle Electrical | Maintenance & Repairing Work of Damaged 12 Meter Long Double Arm Street Light Pole, Bracket & 400W HPSV Fittings On 45 Meter Wide Road At Jagrati Vihar (Extension) Scheme No.-11, Meerut | 0.00 | 16.59 11/10/2021 | 22/11/2021 22/11/2021 | 21/12/2021 | 22/11/2021 22/11/2021 | SPARKLE ENTERPRISES 9837394838 | | Circle Electrical | In Progress |
234
| 03/S.E(E).2022-23dated27-05-2022 | Circle Electrical | Construction of 11 KV Feeder of 33/11 KV S/S at sector 3 Avadh Vihar Yojna Lucknow | 0.00 | 214.78 04/12/2021 | 27/05/2022 27/05/2022 | 26/09/2022 | 27/05/2022 27/05/2022 | PREETI ELECTRIC WORK 9150011801 | | Circle Electrical | In Progress |
235
| 01/SE(ELECT)LKO/ED-III/22-23 | Circle Electrical | Internal Electrification work in Type-III 40 Nos (S+5) and Type-IV 16 Nos (S+4) Faculty Residential Building at Govt. S.N. Medical College, Agra. | 0.00 | 225.82 07/01/2022 | 20/04/2022 20/04/2022 | 19/01/2023 | 20/04/2022 20/04/2022 | SINGH ELECTRICALS 9451248514 | | Circle Electrical | In Progress |
236
| 07/SE(E)/2022-23dated13-12-2022 | Circle Electrical | Electrical/Mechnical work in 50 beded eye hospital at Ramai patti Tehsil-Sadar, District-Mirzapur.(Work By M/s Aditya Enterprises) | 0.00 | 188.51 20/05/2022 | 13/12/2022 13/12/2022 | 12/12/2023 | 13/12/2022 13/12/2022 | ADITYA ENTERPRISES | | Circle Electrical | In Progress |
237
| 08/SE(E)/2022-23Dated24-12-2022 | Circle Electrical | Electrical and Mechnical related work for under constructed 33/11 KV substation at sector-5 Avadh Vihar Yojna Lucknow.(Work by M/s Eagle Construction) | 0.00 | 455.28 03/08/2022 | 24/12/2022 24/12/2022 | 23/06/2023 | 24/12/2022 24/12/2022 | EAGLE CONSTRUCTION 9415103222 | | Circle Electrical | In Progress |
238
| 08/EE/2022-23Dated26-07-2022 | Circle Electrical | Annual maintenance of Installed 02 Nos. Lift and 02 Nos. Escalator Johnosn lift at Avadh Shilp Gram in Avadh Vihar Yojna Lucknow.(Work By M/s Johnson Pvt. Ltd.) | 0.00 | 3.49 05/07/2022 | 26/07/2022 26/07/2022 | 25/07/2023 | 26/07/2022 26/07/2022 | Johnson Pvt. Ltd. | | Circle Electrical | In Progress |
239
| 23/EE/2022-23Dated22-11-2022 | Circle Electrical | Renovation of street light system in civil line Yojna Badayun.(Work By M/s Shri Bala Ji Electrical and mechanical) | 0.00 | 15.55 27/09/2022 | 22/11/2022 22/11/2022 | 21/12/2022 | 22/11/2022 22/11/2022 | Bala ji Electrical & Mechnical works | | Circle Electrical | In Progress |
240
| 02/EE/ED-III/22-23 | Circle Electrical | External Electrification work in New Development Pocket of Sector-3 and Street Lighting work in Development Area Sector-2 and Sector-3- at Scheme No.-1 Shikohabad. | 0.00 | 48.95 14/07/2022 | 23/08/2022 23/08/2022 | 22/11/2022 | 23/08/2022 23/08/2022 | ADITYA ENTERPRISES | | Circle Electrical | In Progress |
241
| 04/EE/2022-2023Date15.06.2022 | Circle 5 | सिविल लाइन्स योजना संख्या 02 भाग-02 बदायॅू में 500 क0िली0 क्षमता एवं 26 मी0 स्टेजिंग आर0सी0सी0 ओ0एच0टी0 के निर्माण कार्य के सम्बन्ध में। | 0.00 | 0.00 | 15/06/2022 15/06/2022 | 12/09/2022 | 15/06/2022 15/06/2022 | Lalit Kishore 8400020921 | | Circle 5 | In Progress |
242
| 08/SEMeerut/2022-23 | Circle 2 | Construction of 240 Nos PMAY Houses (Group-A) in Sector-8A, at Jagriti Vihar (Ext.), Scheme No. 11, Meerut. | 0.00 | 1038.08 28/12/2022 | 22/02/2023 22/02/2023 | 21/08/2024 | 22/02/2023 22/02/2023 | Hindutan Steel | AJAB SINGH JE S.P. SINGH AE RAJEEV KUMAR XE | Circle 2 | In Progress |
243
| 06/SEMeerut/2022-23 | Circle 2 | Construction of 240 Nos PMAY Houses (Group-B) in Sector-8A, at Jagriti Vihar (Ext.), Scheme No. 11, Meerut. | 0.00 | 1038.08 28/12/2022 | 22/02/2023 22/02/2023 | 21/08/2024 | 22/02/2023 22/02/2023 | Kumar Builders 9358403917 | SH. SANDEEP KUMAR JE SAURAV KUMAR AE RAJEEV KUMAR XE | Circle 2 | In Progress |
244
| 07/SEMeerut/2022-23 | Circle 2 | Construction of 192 Nos PMAY Houses (Group-C) in Sector-8A, at Jagriti Vihar (Ext.), Scheme No. 11, Meerut. | 0.00 | 830.47 28/12/2022 | 22/02/2023 22/02/2023 | 21/08/2024 | 22/02/2023 22/02/2023 | Kumar Builders 9358403917 | SH. SANDEEP KUMAR JE SAURAV KUMAR AE RAJEEV KUMAR XE | Circle 2 | In Progress |
245
| 10/SE(ELect.)ED-III//21-22 | Circle Electrical | Construction of 03 Nos 350x200 MM Dia Size Tubewell 200 Meter Below Ground Level & Related External Electrification Work in Sector-2, 3 & 8 At Jagrati Vihar Extension Scheme No.-11, Meerut. | 0.00 | 133.34 02/12/2021 | 07/01/2022 07/01/2022 | 06/07/2022 | 07/01/2022 07/01/2022 | M.A. Engineering works | | Circle Electrical | In Progress |
246
| 01/EE/ED-2/2022-23 | Circle Electrical | Street Light on Central Verge of 50 Mtr. Wide Road from L&T Crossing at Sector-7 to 220/33 KV S/S at Siddharth Vihar Yojna, Ghaziabd. | 0.00 | 45.00 16/08/2022 | 25/01/2023 25/01/2023 | 24/04/2023 | 25/01/2023 25/01/2023 | K. ELECTRIC WORKS PVT. LTD | | Circle Electrical | In Progress |
247
| 28/EE/22-23 | Circle Electrical | Drilling of 02 Nos. T/W and its Development related work at Bhoomi vikas and grah sthan yojna Gonda Faizabad road Gonda | 0.00 | 79.40 28/12/2022 | 20/02/2023 20/02/2023 | 19/04/2023 | 20/02/2023 20/02/2023 | M.A. Engineering works | | Circle Electrical | In Progress |
248
| 03/SE(ELECT)/LKO/2023-24 | Circle Electrical | Construction of 33/11 KV Sub-Station and 11 KV Networking with 11/0.433 LT Substation at LPS Cardiology Institute, Kanpur | 0.00 | 823.43 31/03/2023 | 19/08/2023 19/08/2023 | 18/02/2024 | 19/08/2023 19/08/2023 | EAGLE CONSTRUCTION 9415103222 | JE MANOJ PANDEY AE AVESH XE | Circle Electrical | In Progress |
249
| 02/EE/ED-III/2023-24 | Circle Electrical | External Electrification/Mechanical Work in New
Constructed Chemical Engineering Building At
Harcourt Butler Technical University, Kanpur. | 0.00 | 54.20 03/01/2024 | 15/02/2024 15/02/2024 | 14/05/2024 | 15/02/2024 15/02/2024 | Bala ji Electrical & Mechnical works | JE MANOJ PANDEY AE AVESH XE | Circle Electrical | In Progress |
250
| 05/SE(E)/2022-23Dated12-07-2022 | Circle Electrical | Street light Work at sector 7 C Awadh Vihar Yojna Lucknow.(05/SE(E)/2022-23 dated 12-07-2022)(Work By Sri Sai Sudha Enterprises) | 0.00 | 107.00 23/05/2022 | 12/07/2022 12/07/2022 | 11/01/2023 | 12/07/2022 12/07/2022 | Sai Sudha Enterprises | | Circle Electrical | In Progress |
251
| 10/SE(E)/2022-23Dated19-01-2023 | Circle Electrical | SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND OPERATION, MAINTENANCE FOR 5 YEARS OF THE FACADE LIGHT WORK AT AWADH SHILP GRAM, AWADH VIHAR YOJNA LUCKNOW (U.P.). | 0.00 | 333.74 19/12/2022 | 19/01/2023 19/01/2023 | 02/02/2023 | 19/01/2023 19/01/2023 | EAGLE ENTERPRISES 09752100976 | | Circle Electrical | In Progress |
252
| 29/EE/22-23 | Circle Electrical | Construction Drilling and related development work for 01 nos. new 210 mtr. Deep Tubewell at Civil line yojna-02 part-01 Badaun | 0.00 | 28.26 03/02/2023 | 29/03/2023 29/03/2023 | 28/05/2023 | 29/03/2023 29/03/2023 | Bala Ji Trading And Engineering Company 9415575163 | | Circle Electrical | In Progress |
253
| 01/EE/ED-III/2023-24 | Circle Electrical | EXTERNAL ELECTRIFICATION WORK (BALANCE) IN SEC.-1 & 3B AT SCHEME NO.-2, HANSPURAM KANPUR | 0.00 | 49.91 18/11/2023 | 22/12/2023 22/12/2023 | 21/03/2024 | 22/12/2023 22/12/2023 | Bala ji Electrical & Mechnical works | JE MANOJ PANDEY AE AVESH XE | Circle Electrical | In Progress |
254
| 03/SEMeerut/2023-24 | Circle 2 | Development works, Road, Drain, Sewer, Water Supply and Park in sector-2(Part), Scheme No. 11, Jagriti Vihar (Ext.), Meerut. | 0.00 | 328.55 30/01/2024 | 14/03/2024 14/03/2024 | 13/09/2024 | 14/03/2024 14/03/2024 | M/S R.S. Builders 9837058948 | SH. SANDEEP KUMAR JE SAURAV KUMAR AE RAJEEV KUMAR XE | Circle 2 | In Progress |
255
| 04/SEMeerut/2023-14 | Circle 2 | Development works, Road, Drain, Sewer, Water Supply and Park in sector-3(Part), Scheme No. 11, Jagriti Vihar (Ext.), Meerut. | 0.00 | 398.96 30/01/2024 | 14/03/2024 14/03/2024 | 13/09/2024 | 14/03/2024 14/03/2024 | M/S R.S. Builders 9837058948 | | Circle 2 | In Progress |
256
| 04/SE(E)/2022-23Dated24-06-2022 | Circle Electrical | External Electrification (Transformation & LT) work sector 7C at awadh vihar Yojna Lucknow.(04/SE(E)/2022-23 Dated 24-06-2022)( Work By M/s Yash Enterprises) | 0.00 | 346.00 22/03/2022 | 24/06/2022 24/06/2022 | 23/10/2022 | 24/06/2022 24/06/2022 | YASH ENTERPRISES | | Circle Electrical | In Progress |
257
| 06/SE(E)/2022-23Dated18-08-2022 | Circle Electrical | 06/SE(E)/2022-23 Dated 18-08-2022 | 0.00 | 380.00 16/06/2022 | 18/08/2022 18/08/2022 | 17/02/2023 | 18/08/2022 18/08/2022 | SPARKLE ENTERPRISES 9837394838 | | Circle Electrical | In Progress |
258
| CBNO.-11/SE(ELECT)/2023-24 | Circle Electrical | ELECTRICAL/MECHANICAL WORK IN 02 STORIED UNDER CONSTRUCTION CENTRAL EVALUATION BUILDING AT CHAUDHARY CHARAN SINGH UNIVERSITY, MEERUT. | 0.00 | 12637595.86 19/12/2023 | 15/03/2024 15/03/2024 | 14/09/2024 | 15/03/2024 15/03/2024 | SPARKLE ENTERPRISES 9837394838 | | Circle Electrical | In Progress |
259
| CBNO.-03/EE/ED-III/2023-24 | Circle Electrical | EXTERNAL ELECTRIFICATION IN PMAY (4 BLOCK) G+3 TYPE 192 NOS HOUSES AT KATAI MILL CAMPUS ETAWAH. (CB NO.-03/
EE/ED-III/2023-24 DATE-29/02/2024) M/s SAI SUDHA ENTERPRISES, LUCKNOW. | 0.00 | 4480857.66 10/01/2024 | 29/02/2024 29/02/2024 | 28/06/2024 | 29/02/2024 29/02/2024 | Sai Sudha Enterprises | | Circle Electrical | In Progress |
260
| 14/EE/2022-23Dated23-08-2022 | Circle Electrical | External Electrification work of 11/0.4KV(63KVA) LT Substation and related Work at Munnu Khera Gokul Gram Yojna, Lucknow. ( Work By M/s Sri Sai Sudha Enterprises)(14/EE/2022-23 Dated 23-08-2022) | 0.00 | 5.29 30/06/2022 | 23/08/2022 23/08/2022 | 22/09/2022 | 23/08/2022 23/08/2022 | SRI SAI SUDHA ENTERPRISES | | Circle Electrical | In Progress |
261
| 05/SE-VthRuhelkhand/21-22Dt14.12.2021 | Circle 5 | Construction of 12.00 M and 9.00/7.50M internal Roads at Civil Lines Yojna No 2 Phase-2 Badaun | 0.00 | 0.00 | 14/12/2021 | 13/06/2022 | 14/12/2021 | Mukesh Chandra Yadav | | Circle 5 | In Progress |
262
| 09/S.E.(E)/2022-23dated16-01-2023 | Circle Electrical | HIGH MAST LIGHT FITTING WORK AT WORK SITE OF PROPOSED U.P. GLOBAL INVESTORS SUMMIT-2023 AND PARTIALLY STREET LIGHT WORK OF SIDE ROAD OF CANAL AT SECTOR-15 VRINDAVAN YOJNA-4 LUCKNOW.( Work By M/s YASH ENTERPRISES)(09/S.E.(E)/2022-23 dated 16-01-2023) | 0.00 | 153.00 09/12/2022 | 16/01/2023 16/01/2023 | 04/02/2023 | 16/01/2023 16/01/2023 | YASH ENTERPRISES | | Circle Electrical | In Progress |
263
| 09/SE(ELect.)ED-III//21-22 | Circle Electrical | External Electrification Work at Bhumi Vikas Evam Grah Sansthan Scheme No.-3, Jhansi | 0.00 | 438.96 05/10/2021 | 10/12/2021 10/12/2021 | 09/06/2022 | 10/12/2021 10/12/2021 | R K and Company 8171211222 | | Circle Electrical | In Progress |