SrNoWORK ORDER NOCIRCLEWORK NAMEESTIMATE COST & DATETENDER AMOUNT & DATEAGREEMENT DATE & ACTUAL WORK START DATETarget date of Work CompletionAgreement date & ACTUAL work start DATE1CONTRACTOR NAME & PHONE NO.ENG. NAME AND PHONE NOcircle1Physical Progress
1 11/EE/2017-18PARISHAD PROJECT FUNDS/I of CCTV & its related work in banquet hall & Admin Block at Avadh shilp Gram Avadh Vihar Yojna Lucknow. 0.00 37.25 06/07/2017 06/07/201705/09/201706/07/2017 06/07/2017m/s triflex solution JAY JAY RAM 8795810656JE D.C SHUKLA 8795810096AE AVESH 8795810240XECircle 5Completed
2 12/EE/2018-19AWASTHAPNA FUNDStreet light work at the central verge of the road from Anchal ganj Chauraha to Gagan Khera Chauraha In Unnao City From Infrastructure fund (Goup-A) 0.00 56.78 21/02/201814/08/2018 13/11/201814/08/2018 Preeti Electric works BHOOPLAL 91493206628JE V.V TRIPATHI 8795810607AE AVESH 8795810240XECircle ElectricalCompleted
3 01/EE/2018-19PARISHAD PROJECT FUNDS/I of Bus Bar pannel & Meetring Pannel at Sector-8 (Basera 1& 2 ) Avadh Vihar Yojna Lucknow 0.00 30.05 20/01/201824/04/2018 24/04/201823/05/201824/04/2018 24/04/2018m/s electro builder JAY JAY RAM 8795810656JE D.C SHUKLA 8795810096AE AVESH 8795810240XECircle ElectricalCompleted
4 08/EE/2018-19PARISHAD PROJECT FUNDConstruction of 02 No. Tubewell and Its related work at Lohramau Yojna Sultanpur. 0.00 30.54 27/12/201728/06/2018 28/06/201827/08/201828/06/2018 28/06/2018m/s m.a engineering works JAY JAY RAM 8795810656JE D.C SHUKLA 8795810096AE AVESH 8795810240XECircle ElectricalCompleted
5 13/EE/2018-19AWASTHAPNA FUNDStreet light wrok at the Central Verge of the road from Anchalganj Chauraha To Gagand Khera Chauraha in Unnao city from Infrastructure fund(Group-B) 0.00 55.85 21/02/201814/08/2018 14/08/201813/11/201814/08/2018 14/08/2018Preeti Electric works BHOOPLAL 91493206628JE D.C SHUKLA 8795810096AE AVESH 8795810240XECircle ElectricalCompleted
6 09/EE/2018-19PARISHAD PROJECT FUNDConstruction of HT Line for Electric Supply Basera 1 & 2 Sector-8 At Avadh Vihar Yojna Lucknow. 0.00 10.87 20/01/201806/07/2018 06/07/201805/08/201806/07/2018 06/07/2018m/s durgeh enterprises JAY JAY RAM 8795810656JE D.C SHUKLA 8795810096AE AVESH 8795810240XECircle ElectricalCompleted
7 21/EE/2017-18PARISHAD PROJECT FUNDS/I of pre-paid electric meter (Gangotri Enclave) sector-8 Avadh Vihar Yojna Lucknow. 0.00 83.01 08/11/201716/01/2018 16/01/201815/05/201816/01/2018 16/01/2018m/s sjs system and solution JAY JAY RAM 8795810656JE D.C SHUKLA 8795810096AE AVESH 8795810240XECircle ElectricalCompleted
8 02/SE(V)/CD-3/2017-2018PARISHAD PROJECT FUND64 NOS HOUSES (G+3) LIG 0.00 643.84 24/05/201721/09/2017 21/09/201720/09/201921/09/2017 21/09/2017SHAIL BUILDERS & CONTRACTOR 9415029218KAMAL DEO PRASAD 8795810262JE SHARAD KUMAR T 8795810558AE PANKAJ VERMA 8795810066XECircle VrindavanIn Progress
9 05/SE(V)/CD-3/2017-2018PARISHAD PROJECT FUND64 NOS HOUSES (G+3) LIG 0.00 643.84 21/06/201719/09/2017 19/09/201719/09/201919/09/2017 19/09/2017SINGH ASSOCIATE KAMAL DEO PRASAD 8795810294JE U. V. SINGH 8795810363AE PANKAJ VERMA 8795810066XECircle VrindavanIn Progress
10 06/SE(V)/CD-3/2017-2018PARISHAD PROJECT FUND96 NOS HOUSES(G+3) LIG 0.00 965.76 21/06/201723/09/2017 23/09/201722/09/201723/09/2017 23/09/2017T Y TRADERS 9004537987ANOOP JAISWAL 8795810262JE U. V. SINGH 8795810558AE PANKAJ VERMA 8795810066XECircle VrindavanIn Progress
11 08/SE(V)/CD-3/2017-2018PARISHAD PROJECT FUND96 HOUSES(G+3) LIG 0.00 965.76 21/06/201727/09/2017 27/09/201726/09/201927/09/2017 27/09/2017RAJAWAT ASSOCIATE 9415523037ANOOP JAISWAL 8795810564JE UDAIVEER SINGH 8795810363AE PANKAJ VERMA 8795810066XECircle VrindavanIn Progress
12 10/SE(V)/CD-3/2017-2018PARISHAD PROJECT FUND64 NOS HOUSES(G+3) LIG 0.00 643.84 14/09/201715/01/2018 15/01/201814/01/202015/01/2018 15/01/2018INDIA STONE COMPANY 9648555666NARAYAN PRASHAD 8795810262JE R.P. GUPTA 8795810289AE PANKAJ VERMA 8795810066XECircle VrindavanIn Progress
13 11/SE(V)/CD-3/2017-2018PARISHAD PROJECT FUND96 NOS HOUSES (G+3) LIG 0.00 965.76 14/09/201715/01/2018 15/01/201814/01/202015/01/2018 15/01/2018INDIA STONE COMPANY 9648555666NARAYAN PRASHAD 8795810262JE R.P. GUPTA 8795810289AE PANKAJ VERMA 8795810066XECircle VrindavanIn Progress
14 03/SE(V)/CD-3/2017-2018PARISHAD PROJECT FUND64 NOS HOUSES(G+3) EWS 0.00 425.60 21/06/201721/09/2017 21/09/201720/09/201921/09/2017 21/09/2017SHARIK MIYA 9412710500KAMAL DEO PRASAD 8795810294JE U. V. SINGH 8795810363AE PANKAJ VERMA 8795810066XECircle VrindavanIn Progress
15 04/SE(V)/CD-3/2017-2018PARISHAD PROJECT FUND96 NOS HOUSES(G+3) EWS 0.00 638.40 21/06/201727/09/2017 27/09/201726/09/201927/09/2017 27/09/2017GOPI CHAND RANGLINI 9956510351KAMAL DEO PRASAD 8795810262JE SHARAD KUMAR 8795810558AE PANKAJ VERMA 8795810066XECircle VrindavanIn Progress
16 07/SE(V)/CD-3/2017-2018PARISHAD PROJECT FUND64 NOS HOUSES (G+3) EWS 0.00 425.60 21/06/201727/09/2017 27/09/201726/09/201927/09/2017 27/09/2017S. P. & COMPANY 9935586687ANOOP JAISWAL 8795810564JE UDAIVEER SINGH 8795810363AE PANKAJ VERMA 8795810066XECircle VrindavanIn Progress
17 02/SE-V/2016-17PARISHAD PROJECT FUNDConstruction of 61 Nos. 72/162 Type Semi Finished Houses in Sector-7A at Majhola Yojna No.-4, Phase-II, Moradabad under Self Financing Scheme-2016 0.00 517.11 29/08/201628/10/2016 28/10/201602/03/201828/10/2016 28/10/2016M/s S.S. Solanki 9235889931ANOOP KUMAR SHRIVASTAV,GYAN PRAKASH,SURENDRA PRASAD JE DEVENDRA PAL SINGH AE SHOBHIT KUMAR PATHAK XECircle 5Completed
18 05/SE-III/CD-19/2018-19CENTRAL AND STATE FUNDConstruction of 192 Nos., EWS Flat under PMAY (Shahari) Sector-7A, Part-I, Avadh Vihar Yojna, Lucknow 0.00 752.00 02/04/201828/07/2018 28/07/201827/01/202028/07/2018 28/07/2018M/S Neel Constructions 9415117988HEM SINGH JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XECircle 3In Progress
19 04/SE-III/CD-19/2018-19CENTRAL AND STATE FUNDConstruction of 192 Nos. EWS Houses Under PMAY (Sahari) at Sector-7A, Awadh Vihar Yojna, Lucknow 0.00 752.00 02/04/201828/07/2018 28/07/201827/01/202028/07/2018 28/07/2018M/S Apex Construction Company 9839098580HEM SINGH JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XECircle 3In Progress
20 03/SE-III/CD-19/2018-19PARISHAD PROJECT FUNDConstruction of Remaining Work of Multi storied residential houses in Himalaya Enclave, Phase-II, Sector-17, Vrindavan Yojna, Lucknow 0.00 2000.00 06/03/201815/05/2018 15/05/201814/10/201815/05/2018 15/05/2018M/S A.K. Builders & Suppliers 9935596863AJAY KUMAR,JAY PRAKASH MAURYA JE ER. SURENDRA NATH AE ER. RAMESH CHANDRA YADAV XECircle 3Completed
21 07/SEHQ/CD-7/18-19CENTRAL AND STATE FUNDCONSTRUCTION OF 288 NOS FOUR STORIED (G+3) FLATS AT SECTOR 10B, AWADH VIHAR YOJNA LUCKNOW 0.00 1128.00 04/04/201808/08/2018 08/08/201807/02/202008/08/2018 08/08/2018R.S.CONSTRUCTION J.N. MISHRA,PARMOD KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XECircle HQIn Progress
22 .1.01/SEHQ/CD15/2013-14PARISHAD PROJECT FUNDCONSTRUCTION OF MULTISTORY (S+7) RESIDENTIAL FLATS GANGOTRI ENCLAVE 784 NOS. F-84 & F-64 TYPES 0.00 11541.20 17/01/201403/03/2014 03/03/201402/03/201603/03/2014 03/03/2014K.P.C. PROJECT LTD 09956298822KAMTA PRASAD,MANUDEV JE Circle HQCompleted
23 .3.12/SEHQ/CD-7/2013-14PARISHAD PROJECT FUNDCONSTRUCTION OF MULTI STORED-BHAGIRATHI (B+S+16) RESIDENTIAL FLATS IN BHAGIRATHI ENCLAVE 03BHJ+3BHK+SERVANT 0.00 30030.00 12/07/201316/09/2013 06/11/201305/02/201616/09/2013 06/11/2013N.C.C.LIMITED 09952301417A.B.SINGH,J.N. MISHRA,LALIT KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XECircle HQCompleted
24 N/APARISHAD PROJECT FUND64 Nos EWS (G+3) Flats at Lohramau Yojna, Sultarnpu 0.00 335.90 15/09/201630/12/2016 30/12/201631/01/201930/12/2016 30/12/2016SINGH ASSOCIATE MANOJ KUMAR JE R.C. SRIVASTAVA,S.P.S. AGARWAL AE D.K. SRIVASTAVA XECircle HQCompleted
25 04/SEHQ/CD-15/15-16PARISHAD PROJECT FUNDCONSTRUCTION OF 60 NO. (G+2) SPECIAL TYPE EWS HOUSES AT SECTOR 5D 0.00 207.21 15/11/201419/12/2015 19/12/201518/03/201719/12/2015 19/12/2015S.S CONSTRUCTION AMARJEET YADAV JE D.K.GOYAL AE D.B.YADAV XECircle HQCompleted
26 01/SE-III/CD-19/2019-20PARISHAD PROJECT FUNDUpgradation/Beautification work of Existing 45M wide road between sector-14 & 19 0.00 512.31 12/03/201928/06/2019 28/06/201927/12/201928/06/2019 28/06/2019M/S Ram Singh Agarwal 7348688888DINESH KUMAR VISHAWAKARMA JE ER. RAM PRATAP AE ER. RAMESH CHANDRA YADAV XECircle 3Completed
27 08/SEHQ/CD-7/18-19CENTRAL AND STATE FUNDCONSTRUCTION OF 288 NOS FOUR STORIED (G+3) FLATS AT SECTOR 10B, AWADH VIHAR YOJNA LUCKNOW 0.00 1128.00 04/04/201808/08/2018 08/08/201807/02/202008/08/2018 08/08/2018R.S.CONSTRUCTION J.N. MISHRA,PARMOD KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XECircle HQIn Progress
28 09/SEHQ/CD-7/18-19CENTRAL AND STATE FUNDCONSTRUCTION OF 288 NOS FOUR STORIED (G+3) FLATS AT SECTOR 10B, AWADH VIHAR YOJNA LUCKNOW 0.00 1128.00 04/04/201808/08/2018 08/08/201807/02/202008/08/2018 08/08/2018R.S.CONSTRUCTION A.B.SINGH,J.N. MISHRA JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XECircle HQIn Progress
29 .4.09/SEHQ/CD15/2015-16PARISHAD PROJECT FUNDCONSTRUCTION OF 1680 MULTISTORY IN RESIDENTIAL FLATS IN SAMAJWADI AVAS YOJNA & 448 NOS SEMIFINISHED MULTISTORY RESIDENTIAL FLATS IN GOMTI ENCLAVE SECTOR-8 0.00 27010.00 06/11/201527/01/2016 27/01/201628/02/202027/01/2016 27/01/2016LARSEN & TOUBRO LIMITED 09450000009AMARJEET YADAV,KAMTA PRASAD,MANUDEV JE A.K.SHAHU,D.K.GOYAL AE D.B.YADAV XECircle HQIn Progress
30 20/SEHQ/CD-14PARISHAD PROJECT FUNDCONST. OF MULTISTORY (B+S+14) RESIDENTIAL FLATS AVADH VIHAR YOJNA LKO 0.00 18381.02 02/09/201320/02/2014 20/02/201419/05/201620/02/2014 20/02/2014N.C.C.LIMITED 09952301417SUGENDRA KUMAR VISHWAKARMA,S. K. SINGH BHADAURIYA,SUBEDAR NAVIK,RAMESH CHANDRA CHAURASIYA,RAM PRATAP JE ABHISHEK NATH TIWARI AE PRAMOD KUMAR SINGH XECircle HQCompleted
31 08/SEHQ/CD-7/15-16PARISHAD PROJECT FUNDENGINEERING PROCUREMENT AND CONSTRUCTION OF MULTI-STOREYED RESIDENTIAL FLATS IN SARYU ENCLAVE 0.00 52529.33 08/11/201525/01/2016 25/01/201614/08/202025/01/2016 25/01/2016N.C.C.LIMITED 09952301417A.B.SINGH,J.N. MISHRA,LALIT KUMAR,MOH. KHURSHEED,PRAMOD KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XECircle HQIn Progress
32 10/SE(HQ)/CD-31/18-19dt.29-8-18CENTRAL AND STATE FUNDConstt. of 96 No. EWS (G+3) Houses under PMAY at Sultanpur 0.00 378.34 28/02/201829/08/2018 29/08/201820/02/202029/08/2018 29/08/2018M/S Shiv Giri Traders 9984854111MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XECircle HQIn Progress
33 NAPARISHAD PROJECT FUNDConstruction of Community Center at Sector-10B, Vrindavan Yojan no-2, Lucknow 0.00 294.78 10/07/201526/09/2015 26/09/201526/06/201626/09/2015 26/09/2015M/S Dream Construction 8765392315AJEET KUMAR DWIVEDI,MANOJ KUMAR JE R.C. SRIVASTAVA,S.P.S. AGARWAL AE D.K. SRIVASTAVA XECircle HQCompleted
34 06/SE-1/CD-31/15-16EXTERNAL DEVELOPMENT FUNDConstruction of Multistoryed (S+8) 688 Nos 2BHK & 576 No. 3BHK Flats (kailash Enclave) at Sector-18, Vrindavan yojna, Lucknow 0.00 28611.00 19/03/201502/07/2015 02/07/201530/06/201902/07/2015 02/07/2015M/S Vascon Engineers Ltd. 7525046101AJEET KUMAR DWIVEDI,ANIL KUMAR SHUKLA,D.S. MEHRA,J.P.MISHRA,MANOJ KUMAR JE R.C. SRIVASTAVA,S.P.S. AGARWAL AE D.K. SRIVASTAVA,K.P.TRIPATHI XECircle HQCompleted
35 4130/A-4/96PARISHAD PROJECT FUNDConstruction of 50 Nos A-72 type Semi Finished houses at Spinning Mill Campus Etawah 0.00 373.67 16/12/201612/10/2017 12/10/201711/07/201812/10/2017 12/10/2017RAJAWAT ASSOCIATE 9415523037SRI ARUN KUMAR PATEL,SRI ARVIND KUMAR JE NAGENDRA KUMAR,NAVJOT SINGH VERMA,SRI ABHISHEK VERMA AE PRADEEP KUMAR XECircle 4In Progress
36 4131/A-4/96PARISHAD PROJECT FUNDConstruction of 32 Nos A-72 type Finished houses at Spinning Mill Campus Etawah 0.00 392.00 06/10/201725/01/2018 25/01/201824/01/201925/01/2018 25/01/2018Gun-Gun Construction & Electricals 9410487559SRI DEVENDRA YADAV JE ARVIND KUMAR,NAGENDRA KUMAR,NAVJOT SINGH VERMA,SRI ABHISHEK VERMA AE PRADEEP KUMAR XECircle 4In Progress
37 .6.04/SEHQ/CD15/18-19CENTRAL AND STATE FUNDConstruction of 288 Nos. (G+3) Flats under PMAY at Sector-10B, Avadh Vihar Yojna, Lucknow. 0.00 1095.88 05/04/201825/07/2018 25/07/201824/01/202025/07/2018 25/07/2018T Y TRADERS 9004537987AMARJEET YADAV JE D.K.GOYAL AE D.B.YADAV XECircle HQIn Progress
38 05/SEHQ/CD15/18-19CENTRAL AND STATE FUNDConstruction of 224 Nos. (G+3) Flats under PMAY, at Sector-10 Avadh Vihar Yojna, Lucknow 0.00 851.86 05/04/201825/07/2018 25/07/201824/01/202025/07/2018 25/07/2018GOPI CHAND RANGLINI 9956510351MANUDEV JE A.K.SHAHU AE D.B.YADAV XECircle HQIn Progress
39 N.A.PARISHAD PROJECT FUNDConstruction of Community Center at Sector-16, Vrindavan Yojan no-4, Lucknow 0.00 192.28 02/02/201619/03/2016 19/03/201618/12/201619/03/2016 19/03/2016M/S S.S. Solanki Constrauction 8765392315AJEET KUMAR DWIVEDI JE R.C. SRIVASTAVA AE D.K. SRIVASTAVA,K.P.TRIPATHI XECircle HQCompleted
40 11/SEHQ/CD-7/18-19CENTRAL AND STATE FUNDCONSTRUCTION OF 240 NOS FOUR STORIED (G+3) FLATS AT SECTOR 10B, AWADH VIHAR YOJNA LUCKNOW 0.00 846.63 20/07/201809/10/2018 09/10/201808/04/202009/10/2018 09/10/2018SHAKTI CONSTRUCTION CO. 09121900191A.B.SINGH,LALIT KUMAR JE A.K.AGRAWAL AE PRAMOD KUMAR SINGH XECircle HQIn Progress
41 06/SEHQ/CD15/18-19CENTRAL AND STATE FUNDConstruction of 224 Nos. (G+3) Flats under PMAY at Sector-10B, Avadh Vihar Yojna, Lucknow. 0.00 851.86 05/04/201825/07/2018 25/07/201824/01/202025/07/2018 25/07/2018SHARIK MIYA 9412710500MANUDEV JE A.K.SHAHU AE D.B.YADAV XECircle HQIn Progress
42 05/SE-III/CD13/13-14PARISHAD PROJECT FUNDConst. of Multi Storeyed (S+13) Flats Residential Flats ( Everest Enclave) in Sect-18, Vrindavan Yojna No.4 Lucknow 0.00 13362.38 26/12/201305/03/2014 26/02/201425/02/201705/03/2014 26/02/2014Vascon Engineers Ltd 7525046101MEWALAL JE SAMRAJ AE BRIJEDRA PRATAP XECircle 3In Progress
43 01/SE-III/CD-19/2012-13PARISHAD PROJECT FUNDEngineering, procurement and construction of multi storeyed residential finished houses including basement, based on RCC monolithic shear wall concept using aluminum form work in Himalaya Enclave in Sector-17, Vrindavan Yojna, Lucknow including soil testing, structural design, construction of boundary wall and all site internal development complete in all respect ready to move in for living condition. 0.00 19000.00 17/01/201218/06/2012 18/06/201217/09/201418/06/2012 18/06/2012M/S Larsen & Toubro Limited 7338144299AJAY KUMAR,DINESH KUMAR VISHAWAKARMA,HEM SINGH,JAY PRAKASH MAURYA JE ER. RAM PRATAP,ER. SURENDRA NATH AE ER. RAMESH CHANDRA YADAV XECircle 3Completed
44 04/SE-III/CD-31/13-14PARISHAD PROJECT FUNDDesign, Construction, Supply, Installation, Testing and Commissioning of 37.50 MLD Capacity Sewage Treatment Plant 0.00 5392.21 03/01/2014 03/01/201402/07/202003/01/2014 03/01/2014S.N. ENVIRO TECH PVT LTD 9818210108ANIL KUMAR SHUKLA,D.S. MEHRA,MANOJ KUMAR JE AE D.K. SRIVASTAVA,K.P.TRIPATHI XECircle HQCompleted
45 17/SE(HQ)/CD-7/13-14PARISHAD PROJECT FUNDconstruction of 700 nos flats 0.00 24393.06 16/07/201318/01/2014 18/01/201417/04/201718/01/2014 18/01/2014M/S N.C.C. Ltd 9936457615ADITYA KUMAR TRIPATHI JE RAJ KAMAL SAXENA AE JAGDISH KUMAR XECircle HQCompleted
46 18/SE-1/CD-31/16-17PARISHAD PROJECT FUNDConstruction of 48 Nos (G+3) LIG at Lohramau Yojna, Sultanpur 0.00 399.81 15/09/201630/12/2016 30/12/201631/01/201930/12/2016 30/12/2016SINGH ASSOCIATE MANOJ KUMAR JE R.C. SRIVASTAVA,S.P.S. AGARWAL AE D.K. SRIVASTAVA,K. P. TRIPATHI XECircle HQCompleted
47 01/S.E-2/2018-19PARISHAD PROJECT FUNDConst. of 144 Nos Houses (G+3) under PMAY at Sector-4 Jagriti Vihar (Ext.) Scheme No-11, Meerut 0.00 563.21 16/04/201824/08/2018 24/08/201823/02/202024/08/2018 24/08/2018M/s Kumar Builders 9358403917S.P. SINGH JE SANJEEV KUMAR TIWARI AE SHRI RAJEEV KUMAR XECircle 2In Progress
48 17/EE/CD-12/2016-17PARISHAD PROJECT FUNDConstruction of 19 Nos. 45/75 Type SFS Houses at Shahabad Yojna, Hardoi. 0.00 98.52 13/09/201617/12/2016 17/12/201616/09/201717/12/2016 17/12/2016M/S Aditya Engineers & Builders 9415149007NARENDRA KUMAR JE SRI D.N. PANDEY AE SRI H.S. SHARMA XECircle VrindavanCompleted
49 01/SE-V/2016-17PARISHAD PROJECT FUNDCONTSTRUCTION OF 30 mtr and 24 mtr TRUNK ROADS IN MAJHOLA YOJNA NO-4 PH-2 VISTAR MORADABAD. 0.00 404.00 31/05/201617/08/2016 17/08/201616/11/201617/08/2016 17/08/2016M/s R.G, Buildwell Engineers Ltd 9837391824RAHUL KUMAR JE RAJ KUMAR AE PAWAN KUMAR VERMA XECircle 5In Progress
50 31/EE/CD-12/2016-17PARISHAD PROJECT FUNDConstruction of 13 Nos. 53/127 Type SFS Houses at Shahabad Yojna, Hardoi. 0.00 97.52 13/09/201629/12/2016 29/12/201628/09/201729/12/2016 29/12/2016M/S RAJA CONSTRUCTION 7651903756NARENDRA KUMAR JE SRI D.N. PANDEY AE SRI H.S. SHARMA XECircle VrindavanCompleted
51 29/EE/2018-19ED-1PARISHAD PROJECT FUNDConstruction of 1 No. tubewell 200 mtr deep & its related work in sec-7 A Awadh Vihar Yojna Lucknow. 0.00 16.69 22/02/201827/02/2019 07/02/201926/05/201927/02/2019 07/02/2019M.A. Engineering works Circle ElectricalCompleted
52 04/EE/CD-8/2018-19PARISHAD PROJECT FUNDInternal Water Supply Distribution in Sector-3 at Scheme-11, Jagriti Vihar (Ext.), Meerut 0.00 11.00 24/07/201825/10/2018 25/10/201824/01/201925/10/2018 25/10/2018M/s Manpal 9719316437SH. SANDEEP KUMAR JE SH. RAVINDRA KUMAR AE M.B. KAUSHIK XECircle 2Completed
53 02/SE(M)/CD-38/2018-19PARISHAD PROJECT FUNDConst of Ineternal Road in Campus of Gulmohar Enclave in sec-15 0.00 115.00 23/02/201801/06/2018 01/06/201830/11/201801/06/2018 01/06/2018SHIVAM CONTRACTOR 8755427501ABHISHEK KUMAR MISHRA JE ALOKSHEEL DWIVEDI,NARESH GUPTA,SATYENDRA SINGH AE BISHEMBER SINGH,S.K. SIRVASTAVA,SHOBHIT KUMAR PATHAK XECircle MantolaCompleted
54 08/EE(GKP)2020-21AWASTHAPNA FUNDConstruction of Interlocking & Drain at ( Dr. S.P. Chaudhari Clinic To Office Zila Krishi Adhikari) At Basti 0.00 45.00 28/03/202004/06/2020 04/06/202003/10/202004/06/2020 04/06/2020M/S TIGER ELECTRICAL & CONSTRUCTION COMPANY RAVINDRA NATH JE ASHOK KUMAR AE J K KAUSHAL XECircle 1Completed
55 01/SE-3/CD-2/2018-19Dt04.05.2018PARISHAD PROJECT FUNDConstruction of 128 Nos EWS houses in Sec-13 VVy-4 Lucknow 0.00 708.96 15/12/201704/05/2018 04/05/201803/05/202004/05/2018 04/05/2018M/s Harihar contractor & suppliers 9984427700ADIL BEG,HEMANT KUMAR JE M.M.SRIVASTAVA AE A.K.MITTAL XECircle 3In Progress
56 14/EE/2018-19INFRAStrengthening of road construction of Toilet Block and Tinshade at Naurangilal Inter Collage Campus Aligarh 0.00 46.69 27/06/201801/11/2018 01/11/201831/01/201901/11/2018 01/11/2018S.K. Engineering 9457193428MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE XECircle 6Completed
57 01/EE/CD-1/2019-20PARISHAD PROJECT FUNDConstruction of 06 Nos. Kuda Ghar in differt. Sectors of Siddharth Vihar Yojna Ghaziabad. 0.00 34.40 02/03/2019 26/06/201925/12/2019 26/06/2019M/s Shri Ram Construction Co. 9412469569NARENDRA PAL JE YOGENDRA KUMAR VERMA AE ATUL KUMAR SINGH XECircle 7In Progress
58 07/SE-II/2019-20AWASTHAPNA FUNDRe-construction of Road from CO mandi thana Residance to end towards Railway Station Muzaffarnagar 0.00 119.00 28/05/201921/09/2019 21/09/201920/02/202021/09/2019 21/09/2019M/s Om Shiv Construction 9837085092SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XECircle 2In Progress
59 18/SE(M)/CD-36/2015-16PARISHAD PROJECT FUNDconst. 384 Nos. 2BHK (S+4) flats in Mandola Vihar Ghaziabad 0.00 3376.76 30/09/201511/02/2016 11/02/201610/08/201711/02/2016 11/02/2016KASHYAPI INFRASTRUCTURE PVT. LTD. 9971799850BHARAT SINGH CD36,NANDA BALLABH CD36 JE SANJEEV SHUKLA,VIRENDRA KUMAR AE AMAN TYAGI XECircle MantolaCompleted
60 05/SE(M)/2018-19PARISHAD PROJECT FUNDConstruction of Balance Part of 24 M Road along scheme boundary 0.00 308.16 28/08/201828/01/2019 28/01/201912/09/201928/01/2019 28/01/2019Shree Ji Infraproject P Ltd ABHISHEK KUMAR MISHRA,RADHESHYAM JE ALOKSHEEL DWIVEDI,NARESH GUPTA AE AMAN TYAGI,SHOBHIT KUMAR PATHAK,UMA NATH SHUKLA XECircle MantolaCompleted
61 03/SE(M)/CD-38/2018-19PARISHAD PROJECT FUNDConst of 12M, 6M, & 6M set back Road in sec-16B 0.00 186.00 28/04/201828/08/2018 20/08/201819/02/201928/08/2018 20/08/2018ANUJ ASSOCIATE 9411902544VEER SINGH,VIVEK KUMAR MAURYA JE ALOKSHEEL DWIVEDI,RAVINDRA BHATT,SATYENDRA SINGH AE AMAN TYAGI,BISHEMBER SINGH,SHOBHIT KUMAR PATHAK,UMA NATH SHUKLA XECircle MantolaCompleted
62 09/EE/19-20ED-1PARISHAD PROJECT FUNDSITC of 02 no. 1000 LPM 60 mtr. head KSB make Submersible pumping plant at Lohramau Yojna Sultanpur. 0.00 11.68 18/03/201913/08/2019 12/09/201913/08/2019 Preeti Electric works Circle ElectricalCompleted
63 06/EE/CD-8/2017-18PARISHAD PROJECT FUNDLaying of Sectorial Sewer in Sector-2 at Jagriti Vihar, Yojna-11, Meerut. 0.00 50.90 23/09/201720/12/2017 20/12/201719/03/201820/12/2017 20/12/2017Rakesh Singh Nursery 9810117408SH. RAVINDRA KUMAR JE M BKAUSHIK AE M.B. KAUSHIK XECircle 2Completed
64 01/EE/CD-8/2017-18PARISHAD PROJECT FUNDSupply & Fixing of 1000 Tree Guard at Scheme No. 11, Jagriti Vihar (Ext.), Meerut 0.00 14.00 14/06/201714/06/2017 14/06/201713/09/201714/06/2017 14/06/2017Rajkanwar Enterprises 9927876456SH. RAVINDRA KUMAR JE VIRENDRA KUMAR AE M.B. KAUSHIK XECircle 2Completed
65 03/EE/CD-8/2018-19PARISHAD PROJECT FUNDInternal Water Supply Distribution System in Sector-2 (Part) at Scheme-11, Jagriti Vihar (Ext.), Meerut. 0.00 11.00 11/07/201825/10/2018 25/10/201824/01/201925/10/2018 25/10/2018Manpal 9917316437 JE M BKAUSHIK AE M.B. KAUSHIK XECircle 2Completed
66 02/E.E./C.D.-6/19-20PARISHAD PROJECT FUNDConst. internal drain culvert in sec. - 4 (Part) 0.00 13.82 07/03/201902/07/2019 02/07/201901/10/201902/07/2019 02/07/2019M/S GURU CONSTRUCTION CO. 9997628189KHUSHALI JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
67 06/EE/CD-38/2016-17PARISHAD PROJECT FUNDConst. of 9M Wide Road in sec-19 0.00 66.00 26/09/201622/12/2016 22/12/201621/04/201722/12/2016 22/12/2016SHIVAM CONTRACTOR 8755427501MUNNA LAL,RADHESHYAM JE ALOKSHEEL DWIVEDI,NARESH GUPTA,SATYENDRA SINGH AE BISHEMBER SINGH,D.V.SINGH,SHOBHIT KUMAR PATHAK XECircle MantolaCompleted
68 02/SE-7/GZB/2011-12PARISHAD PROJECT FUNDConstruction of Multi Storied (S+9) 108 Nos. (2BHK 36 and 3 BHK 72) 0.00 1900.00 10/06/201103/08/2011 03/08/201102/02/201303/08/2011 03/08/2011SAI CONSTRUCTION COMPEY 9311189551 Circle 7Completed
69 03/EE/CD-1GZB/2018-19DATE07-03-2019PARISHAD PROJECT FUNDPlantation work supply and fixing R.C.C. Pannel Tree Guards, Barbed wire fencing & MS gate in green belt of sec-7 Siddharth Vihar Yojna, Gzb. 0.00 17.03 18/12/201807/03/2019 07/09/201906/07/201907/03/2019 07/09/2019M/S D.B.GARDEN TRADERS 9761410176YOGENDRA KUMAR GUPTA JE NARENDRA KUMAR,YOGENDRA KUMAR VERMA AE ATUL KUMAR SINGH XECircle 7In Progress
70 11/EE/19-20ED-1PARISHAD PROJECT FUNDConst. of 235 mtr. deep 02 nos. tubewell boring by D.C. Rig matchine at Rawali Road Yojna Bijnor 0.00 39.14 10/07/201926/08/2019 26/08/201925/10/201926/08/2019 26/08/2019Gopal Engineering works Circle ElectricalCompleted
71 01/EE/2019-20CD-28AWASTHAPNA FUNDConstruction of C.C. Road & Drains in Rammohan Nagar, Shastri Puram Road, Sikandra, Agra 0.00 89.98 12/02/201902/09/2019 02/09/201901/12/201902/09/2019 02/09/2019R. N. Agarwal 9319062251RAMSHANKAR JE ASHOK KUMAR SHARMA AE GIRISH CHANDRA XECircle 6Completed
72 01/EE/CD-27/2018-19GEN. FUNDGrill Fixing Work at 30m Road (G-A) Ajantapuram Yojna Ghaziabad 0.00 10.00 08/02/201915/02/2019 16/02/201925/02/201915/02/2019 16/02/2019M/s Ramesh Chand & Co. 9213288266MONAJ KUMAR RAO JE RIYAZUDDIN AE BHOLA NATH XECircle 7Completed
73 14/SE(HQ)/CD-31CENTRAL AND STATE FUNDConstt. of 96 No. EWS (G+3) Houses (Group-A) under PMAY at Sultanpur 0.00 378.34 28/02/201802/08/2019 02/08/201901/02/202102/08/2019 02/08/2019M/S Navneet Enterprises 9918381889MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XECircle HQIn Progress
74 17/EE/19-20ED-1PARISHAD PROJECT FUNDMts. of Street light at scheeme no. 4 Vrindavan Yojna Lucknow. 0.00 9.10 16/09/201911/11/2019 11/11/201910/12/201911/11/2019 11/11/20193D CREATION Circle ElectricalCompleted
75 18/EE/19-20ED-1PARISHAD PROJECT FUNDMaintenance of street Light at Amarpali Yojna Hardoi Road Lucknow. 0.00 8.46 16/09/201920/11/2019 20/11/201919/12/201920/11/2019 20/11/20193D CREATION Circle ElectricalCompleted
76 03/EE/CD-27/2018-19PARISHAD PROJECT FUNDConst. of Surface Trunk Drain and Culvert at sect-3 (Part) 0.00 40.32 29/01/201905/03/2019 05/03/201904/07/201905/03/2019 05/03/2019SHREE RAM CONSTRUCTION A.D. SHANDILYA JE RIYAZUDDIN AE BHOLA NATH XECircle 7Completed
77 03/SE-7/GZB/2013-14PARISHAD PROJECT FUNDConst. of four storied 576 nos LIG Houses in Brahmputra Enclave 0.00 3870.00 10/02/201403/03/2014 03/03/201402/09/201503/03/2014 03/03/2014GAUTAM BUILDERS 7055008855AKHILESH DATT SANDILYE,MONAJ KUMAR RAO JE MONAJ KUMAR RAO,RIYAZUDDIN AE BHOLA NATH,RAJESH RANJAN XECircle 7Completed
78 04/SE-7/GZB/2013-14PARISHAD PROJECT FUNDConst. of Four Storied 480 nos LIG Houses in Brahmputra Enclave sect-7 0.00 3672.38 06/02/201403/03/2014 03/03/201402/09/201503/03/2014 03/03/2014ANAND BUILDERS DINESH PAL SINGH JE MONAJ KUMAR RAO,RIYAZUDDIN AE BHOLA NATH,RAJESH RANJAN XECircle 7Completed
79 05/SE-7/GZB/2013-14PARISHAD PROJECT FUNDConst. of Multi storied 512 Nos LIG Houses in Brahmputra Enclave in sect- 7 0.00 3440.00 06/02/201403/03/2014 03/03/201402/09/201503/03/2014 03/03/2014Pandit Realtor Pvt Ltd 8929977910DINESH PAL SINGH JE MONAJ KUMAR RAO,RIYAZUDDIN AE BHOLA NATH,RAJESH RANJAN XECircle 7Completed
80 02/SE-7/2013-14PARISHAD PROJECT FUNDConst. of Four Storyed (G+3) 448 Nos LIG House at Sector-7 Siddharth Vihar GHAZIABAD 0.00 2448.26 06/02/201403/03/2014 03/03/201402/09/201503/03/2014 03/03/2014ANAND BUILDTECH PVT LTD 9810300761A.B. ANSARI,ALOK GUPTA,D.K. SRIVASTAVA,PREM PRAKASH,RADHEY SHYAM JE ASHOK KUMAR AGARWAL,S.K. VERMA AE LALIT MOHAN PANDEY,MOHD ALI SAFDAR XECircle 7Completed
81 01/SE-7/2017-18PARISHAD PROJECT FUNDLaying of Rising Water Main Line From Pump Houses to CWR and CWR Sector-8 to OHT Situated at Sector-7, Siddharth Vihar, GZB 0.00 245.38 24/07/201716/09/2017 16/09/201715/01/201816/09/2017 16/09/2017HMS INFRATECH PVT LTD 9837500055PREM PRAKASH,RADHEY SHYAM JE ASHOK KUMAR AGARWAL,S.K. VERMA AE MOHD ALI SAFDAR XECircle 7Completed
82 01/SE-7/2018-19PARISHAD PROJECT FUNDConst. of Community Centre in Sector-9, Siddharh Vihar, Ghaziabad 0.00 192.10 12/03/201827/07/2018 27/07/201826/07/201927/07/2018 27/07/2018Mohan Infradevelopers Pvt Ltd 9675411111ARUN KUMAR SINGH VISHAN JE ASHOK KUMAR AGARWAL AE LALIT MOHAN PANDEY XECircle 7Completed
83 02/SE-7/2012-13PARISHAD PROJECT FUNDConst. of Multi storyed Building (Ganga, yamuna & Hindon Enclave) in Sector-7, Siddharth Vihar GZB. 0.00 35000.00 27/12/201112/07/2012 12/07/201211/01/201512/07/2012 12/07/2012LARSEN & TOUBRO LIMITED 09450000009LOKESH KUMAR,RAJEEV SARSWAT,SUDHIR KUMAR JE ASHOK KUMAR AGARWAL,BHUVNESHWAR SINGH,SHOBHIT KUMAR PATHAK AE LALIT MOHAN PANDEY,MOHD ALI SAFDAR XECircle 7Completed
84 12/EE/19-20ED-1PARISHAD PROJECT FUNDAnnual Mts. of 4 Nos. Otis lift in office complex sector-09 at Vrindavan Yojna No. 2 Phase-2 Lucnow. 0.00 8.74 01/06/201901/10/2019 01/10/201930/09/202001/10/2019 01/10/2019OTIS ELEVATOR CO.(INDIA) LTD. Circle ElectricalCompleted
85 13/EE/19-20ED-1PARISHAD PROJECT FUNDConstruction of 220 mtr. deep 01 No. Tubewell Boring By D.G. Rig machine at Sector-15 Vrindavan Yojna No. 4 Lucknow 0.00 23.36 19/09/201924/10/2019 24/10/201923/12/201924/10/2019 24/10/2019GOPAL ELECTRICALS Circle ElectricalCompleted
86 14/EE/19-20ED-1PARISHAD PROJECT FUNDMts. of Street light at Manjhola Yojna No. 4 Phase-2 Moradabad. 0.00 8.18 16/09/201930/10/2019 29/11/201930/10/2019 Swastikk Electricals Circle ElectricalCompleted
87 02/EE/CD-38/2018-19PARISHAD PROJECT FUNDConst. of Internal 18 M wide Road In sec-1B 0.00 124.00 28/03/201828/05/2018 28/05/201827/09/201828/05/2018 28/05/2018ANUJ ASSOCIATE 9411902544MUNNA LAL,RADHESHYAM JE SATYENDRA SINGH AE BISHEMBER SINGH,D.V.SINGH,S.K. SIRVASTAVA,SHOBHIT KUMAR PATHAK XECircle MantolaCompleted
88 04/EE/CD-38/2018-19PARISHAD PROJECT FUNDLaying of Water Supply line sec 15 (Plot Pocket) & 16 B Rising Main sec-17 0.00 61.00 26/09/201819/12/2018 19/12/201818/03/201919/12/2018 19/12/2018RAMAXE CONSTRUCTION 9811554477JEET SINGH,VEER SINGH JE ALOKSHEEL DWIVEDI,RAVINDRA BHATT,SATYENDRA SINGH AE AMAN TYAGI,BISHEMBER SINGH,SHOBHIT KUMAR PATHAK,UMA NATH SHUKLA XECircle MantolaCompleted
89 06/SE(M)/2015-16PARISHAD PROJECT FUNDConstruction of 1856 No Multistory Houses in sec-7 0.00 45000.00 18/04/201503/07/2015 03/07/201502/07/202003/07/2015 03/07/2015N.C.C.LIMITED 09952301417ABHISHEK KUMAR MISHRA,AJAY KUMAR AGNIHOTRI,H.S.TIWARI,JEET SINGH,LOKENDRA KUMAR,NARESH KUMAR GUPTA,U.S.CHAURASIYA,VEER SINGH,VIVEK KUMAR MAURYA JE ALOKSHEEL DWIVEDI,AMAN TYAGI,NAVEEN KUMAR JAIN,O.P. VERMA,RAM AVTAR MITTAL,SATYENDRA SINGH AE AKHILESHWAR SINGH,BISHEMBER SINGH,D.V.SINGH,K.P.TRIPATHI,LALTA PRASAD,MANEESH KUMAR PATHAK,S.K. SIRVASTAVA,SHOBHIT KUMAR PATHAK XECircle MantolaIn Progress
90 15/EE/19-20ED-1PARISHAD PROJECT FUNDBalance Ext. Electrification work of EWS & LIG Flats at sector-13 in Vrindavan yojna Lucknow 0.00 119.05 22/10/201905/11/2019 05/11/201904/02/202005/11/2019 05/11/2019Electro Builders Circle ElectricalCompleted
91 16/EE/19-20ED-1PARISHAD PROJECT FUNDConstruction of 33 KV Line for Connecting 33/11 KV S/S Switcheted in various sector of vrindavan yojna to 220/132 KV S/S Switcheted in Avadh Vihar Yojna Lucknow. by Crossing Railway Line 0.00 185.64 03/10/201911/11/2019 11/11/201910/02/202011/11/2019 11/11/2019Preeti Electric works Circle ElectricalCompleted
92 02/EE2019-20AWASTHAPNA FUNDConstruction of Inter Locking Road, Drains & Culvert at Behind ATV upto Railway Line, Mathura. 0.00 65.66 18/02/201930/09/2019 30/09/201929/12/201930/09/2019 30/09/2019TRIMURTI ENTERPRISES SANTOSH KUMAR JE R.K. GANGWAR AE SRI H.S. SHARMA XECircle 6In Progress
93 03/EE2019-20AWASTHAPNA FUNDConstruction of Inter Locking Road, Drains & Culvert at Shakti Dhaam Colony Aurangabad, Mathura. 0.00 56.93 18/02/201930/09/2019 30/09/201929/12/201930/09/2019 30/09/2019TRIMURTI ENTERPRISES SANTOSH KUMAR JE R.K. GANGWAR AE SRI H.S. SHARMA XECircle 6In Progress
94 20/EE/19-20PARISHAD PROJECT FUNDConstruction of 11 KV Feeder of 33/11 KV Sub Staion in Vrindavan Yojna No-4 Lucknow Group-B 0.00 41.67 14/11/201927/11/2019 27/11/201926/01/202027/11/2019 27/11/2019PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
95 02/EE/CD38/2019-20PARISHAD PROJECT FUNDConstruction of 2 No Parks in Sec-15 0.00 15.50 14/10/201931/12/2019 31/12/201931/03/202031/12/2019 31/12/2019SNG Enterprises RADHESHYAM JE NARESH GUPTA AE AMAN TYAGI,SHOBHIT KUMAR PATHAK,UMA NATH SHUKLA XECircle MantolaCompleted
96 3268/A-4/511PARISHAD PROJECT FUNDConstruction of drain and culvert in spining mill awasiya yojna Etawah 0.00 77.50 27/09/201826/11/2019 26/11/201925/05/202026/11/2019 26/11/2019M/s Siwansi Concrete Product 9412183483SRI ANIL KUMAR CHAUDHARY JE ARVIND KUMAR AE PRADEEP KUMAR XECircle 4In Progress
97 01/EE/CD-12/2019-20PARISHAD PROJECT FUNDExternal Painting work of EWS Blocks at Gokul Gram Yojna No -1, Munnu Khera, Lucknow 0.00 0.00 21/11/2019 21/11/201920/02/2020 21/11/2019M/S Shivrudram Construction 9838308833HIMANSHU SINGH JE A.K.SINHA AE SHASHANK PANDEY XECircle VrindavanCompleted
98 28/EE/19-20ED-1PARISHAD PROJECT FUNDConstruction of 11 KV line and shifting of old 11 KV line crossing over the proposed light house project plot at sector-5 Avadh Vihar Yojna Lucknow.(Group-A) 0.00 7.83 27/12/201910/01/2020 10/01/202024/01/202010/01/2020 10/01/2020PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
99 01/EE/CD11/2018-19PARISHAD PROJECT FUNDRenovation of Millennium Club V.Yo 2 Part 1 Lko 0.00 30.22 04/09/201816/11/2018 16/11/201815/03/201916/11/2018 16/11/2018JAINENDRA SINGH RAJIV RASTOGI JE RAJIV SRIVASTAVA AE ANIL KUMAR MISHRA XECircle VrindavanCompleted
100 32/EE/19-20ED-1PARISHAD PROJECT FUNDMaintenance of Electric Equipment at Office complex Vrindavan Yojna Lucknow 0.00 8.04 25/10/201915/01/2020 15/01/202014/02/202015/01/2020 15/01/2020Preeti Electric works Circle ElectricalCompleted
101 33/EE/19-20ED-1PARISHAD PROJECT FUNDElectrification work of Office complex Sector-9 Vrindavan Yojna 2 Phase-2 Lucknow. 0.00 8.09 25/10/201920/01/2020 20/01/202019/03/202020/01/2020 20/01/2020Preeti Electric works Circle ElectricalCompleted
102 21/EE/19-20PARISHAD PROJECT FUNDConstruction of Balance 11 KV Feeder of 33/11 KV Sub Staion in Vrindavan Yojna No-4 Lucknow Group-A 0.00 53.57 16/11/201927/11/2019 27/11/201926/01/202027/11/2019 27/11/2019Preeti Electric works Circle ElectricalCompleted
103 22/EE/19-20PARISHAD PROJECT FUNDConstruction of Balance 11 KV Feeder of 33/11 KV Sub Staion in Vrindavan Yojna No-4 Lucknow Group-B 0.00 44.43 14/11/201927/11/2019 27/11/201926/01/202027/11/2019 27/11/2019PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
104 01/EE(GKP)/2019-20AWASTHAPNA FUNDConstruction of Interlocking Road & drain Under Infrastructure from house of Ram prakash Gupta to House of Pramod Srivastav at Belwadadi in Basti 0.00 20.00 02/07/201903/10/2019 30/10/201902/04/202003/10/2019 30/10/2019M/S TIGER ELECTRICAL & CONSTRUCTION COMPANY RAVINDRA NATH JE ASHOK KUMAR AE J K KAUSHAL XECircle 1Completed
105 02/EE(GKP)2019-20AWASTHAPNA FUNDConstruction of Interlocking Road & Drain Under Infrastructure from house of Kallu Dhobi to Pal bhawan in Rameshwarpuri Distt Basti 0.00 40.00 02/07/201911/10/2019 11/10/201910/04/202011/10/2019 11/10/2019M/S TIGER ELECTRICAL & CONSTRUCTION COMPANY RAVINDRA NATH JE ASHOK KUMAR AE J K KAUSHAL XECircle 1Completed
106 01/EE/CD-8/2019-20PARISHAD PROJECT FUNDConstruction of Drain and Culvert in Sector-2(Part), at Scheme-11, Jagriti Vihar (Ext.), Meerut 0.00 23.50 14/08/201929/11/2019 29/11/201928/03/202029/11/2019 29/11/2019Guru Kripa Construction 9517580363SH. RAVINDRA KUMAR JE M BKAUSHIK AE M.B. KAUSHIK XECircle 2Completed
107 27/EE/19-20ED-1PARISHAD PROJECT FUNDConstruction of 11 kv feeder line for Energisation of Tubewell Situated in Secotr-10 Avadh Vihar Yojna Lucknow. 0.00 61.86 18/12/201903/01/2020 03/01/202017/01/202003/01/2020 03/01/2020PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
108 02/EE/CD-12/2019-20PARISHAD PROJECT FUNDConstruction of 33/11 KVA, Electric Sub-station, Staff Room Office, at Sector-14(Part), Vrindavan Yojna, Lucknow 0.00 0.00 25/06/201905/12/2019 05/12/201904/09/202005/12/2019 05/12/2019SINGH CONSTRUCTION COMPANY 09355402572MUHAR SINGH JE A.K.SINHA AE SHASHANK PANDEY XECircle VrindavanCompleted
109 29/EE/2019-20ED-1PARISHAD PROJECT FUNDConstruction of 11 KV line and shifting of old 11 KV line crossing over the proposed light house project plot at sector-5 Avadh Vihar Yojna Lucknow.(Group-C) 0.00 9.21 27/12/201910/01/2020 10/01/202024/01/202010/01/2020 10/01/2020PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
110 30/EE/19-20ED-1PARISHAD PROJECT FUNDConstruction of 11 KV line Feeder of 33/11 KV S/S Sector-8 at Avadh Vihar Yojna Luxknow 0.00 722.91 28/09/201910/01/2020 10/01/202009/05/202010/01/2020 10/01/2020PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
111 31/EE/19-20ED-1PARISHAD PROJECT FUNDConstruction of 11 KV line and shifting of old 11 KV line crossing over the proposed light house project plot at sector-5 Avadh Vihar Yojna Lucknow.(Group-B) 0.00 9.21 27/12/201913/01/2020 13/01/202027/01/202013/01/2020 13/01/2020Swastikk Electricals Circle ElectricalCompleted
112 01/EE/CD11/2019-20PARISHAD PROJECT FUNDLaying of rising main of Tube Well No 2 at Sector 17 Vrindan Yo 4 Lko 0.00 14.58 13/12/201824/07/2019 24/07/201923/10/201924/07/2019 24/07/2019SAILANI RAJIV RASTOGI JE RAJIV SRIVASTAVA AE NAVJOT SINGH VERMA XECircle VrindavanCompleted
113 07/EE/GKP/19-20PARISHAD PROJECT FUNDConst. of Estate Manager Office in Office Complex(Basement Shop 05 Nos) Shahpur Yojna No 2/3, Gorakhpur 0.00 12.00 12/12/201927/01/2020 27/01/202026/03/202027/01/2020 27/01/2020M/s Diya Swaroop Panday 9919990823JEYOTI NARAYAN JE ASHOK KUMAR AE J K KAUSHAL XECircle 1Completed
114 04/EE/CD-12/2019-20PARISHAD PROJECT FUNDConstruction /Renovation of 12.00 Mt. wide road, at Sector-11A, VVY-3, Lucknow. 0.00 17.73 13/09/201916/12/2019 16/12/201915/03/202016/12/2019 16/12/2019GAYANTI CONSTRUCTION, B-366, Sidharth Enclave, MUHAR SINGH JE DINESH CHANDRA RAI AE SHASHANK PANDEY XECircle VrindavanCompleted
115 01/EE/ED-2GZB/19-20PARISHAD PROJECT FUNDEXTERNAL ELECTRIFICATION WORK AT 33/11 KV S/S FOR GIVING ELECTRICAL SUPPLY TO BRAMHAPUTRA ENCLAVE SEC-10 SIDDHARTHA VIHAR YOJNA, GZB 0.00 12.02 23/02/201901/06/2019 01/06/201930/06/201901/06/2019 01/06/2019RAJ ASSOCIATES 09650027361SUDHAKAR PATHAK JE TEAJBIR SINGH AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
116 25/EE/19-20PARISHAD PROJECT FUNDSupply and Fixing of caging for Bas Bar and metering Panel at Gokul gram Yojna Munnu khera Lucknow 0.00 16.51 22/08/201917/12/2019 17/12/201916/02/202017/12/2019 17/12/2019M.A. Engineering works Circle ElectricalCompleted
117 03/EE/CD-12/2019-20PARISHAD PROJECT FUNDConstruction of Pump House and Operator Room at Gokul Gram Yojna No-1, Munnu Khera, Lucknow 0.00 0.00 30/09/201916/12/2019 16/12/201915/06/202016/12/2019 16/12/2019M/S Shivrudram Construction 9838308833HIMANSHU SINGH JE A.K.SINHA AE SHASHANK PANDEY XECircle VrindavanIn Progress
118 02/EE/CD11/2019-20PARISHAD PROJECT FUNDPatch Work of 7 mtr wide road along sharda canal from shani temple at Rai Barelly Road to 45mtr wide road towards pgi 0.00 7.96 11/12/201915/01/2020 15/01/202029/01/202015/01/2020 15/01/2020G.ENTERPRISES RAKESH KUMAR SAXENA JE HARISHANKAR SINGH AE NAVJOT SINGH VERMA XECircle VrindavanCompleted
119 02/EE/CD11/2018-19PARISHAD PROJECT FUNDConstruction of Boundry Wall rear side of Neelgiri Enclave Campus Sec 17 Vri. Yo 4 Lko 0.00 18.00 13/12/201825/01/2019 25/01/201924/04/201925/01/2019 25/01/2019DEV CONSTRUCTION CO. RAJIV RASTOGI JE RAJIV SRIVASTAVA AE NAVJOT SINGH VERMA XECircle VrindavanCompleted
120 01/SE-1/VNS/CD-37/2019-20AWASTHAPNA FUNDConst. & Strengthing of Internal Road At Avas Vikas Colony Vikas Nagar, Gorakhpur In Infrastructure Fund (Group 2(B)) 0.00 152.21 26/11/201912/02/2020 12/02/202031/10/202012/02/2020 12/02/2020M/s K.K. Enterprises 9415743560RAJNEESH SRIVASTAV JE ASHOK KUMAR SINGH AE J K KAUSHAL XECircle 1Completed
121 03/SE-1/VNS/CD-37/2019-20AWASTHAPNA FUNDConst. & strengthing of Internal Road At Avas Vikas Colony Vikas Nagar, Gorakhpur in Infrastructure Fund(Group-2(A)) 0.00 99.82 26/11/201912/02/2020 12/02/202031/10/202012/02/2020 12/02/2020M/S SAI ASSOCIATES 9005000013RAJNEESH SRIVASTAV JE ASHOK KUMAR SINGH AE J K KAUSHAL XECircle 1Completed
122 02/SE-1/VNS/CD-37/2019-20AWASTHAPNA FUNDConst. & strengthing of Internal Road at Avas Vikas Colony, Surajkund Gorakhpur In Infrastructure Fund(Group-1(B)) 0.00 99.97 26/11/201912/02/2020 12/02/202031/10/202012/02/2020 12/02/2020M/S SHIVAM ENTERPRISES 9670328000RAJNEESH SRIVASTAV JE ASHOK KUMAR SINGH AE J K KAUSHAL XECircle 1In Progress
123 02/EE/CD-19/2019-20STATE FUNDPatch work/Strengthening of roads of setcor-17/18 and Peripherial Road for DEFEXPO-2020 at Vrindavan Yojna, Lucknow 0.00 56.00 05/12/201926/12/2019 26/12/201909/01/202026/12/2019 26/12/2019M/S Ram Singh Agarwal 7348688888JAY PRAKASH MAURYA JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XECircle 3Completed
124 05/EE(GKP)/2019-20AWASTHAPNA FUNDRenewing and Development of Open space at Avas Vikas Colony Vikas Nagar Gorakhpur In Infrastructure Fund(Group-2(C)) 0.00 37.44 12/12/201909/01/2020 09/01/202031/10/202009/01/2020 09/01/2020M/S AJAY CONSTRUCTION AND SUPPLIERS 9935621811RAJNEESH SRIVASTAV JE ASHOK KUMAR SINGH AE J K KAUSHAL XECircle 1Completed
125 06/EE(GKP)2019-20AWASTHAPNA FUNDConstruction and Strengthing of Main Road At Avas Vikas colony Surajkund, Gorakhpur In Infrastructure Fund(Group-1(A)) 0.00 45.40 11/12/201910/01/2020 10/01/202031/10/202010/01/2020 10/01/2020M/S Sai Baba Construction 8608608660RAJNEESH SRIVASTAV JE ASHOK KUMAR SINGH AE J K KAUSHAL XECircle 1Completed
126 38/EE/19-20PARISHAD PROJECT FUNDExternal Electrification work for Energization of constructed tubewell No-2 at sec-15 in Vrindavan Yojna No-4 Lucknow 0.00 6.92 30/11/201928/02/2020 28/02/202008/03/202028/02/2020 28/02/2020PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
127 03/SE-III/CD-19/2019-20STATE FUNDRecerfacing (Bituminous concrete) of existing 30/45M wide road three entry point (shanidev mandir,O.P. chaudhary dental college & kalindi park) to sector-15 at vrindavan yojna lucknow 0.00 414.00 05/10/201915/11/2019 15/11/2019 15/11/2019 15/11/2019M/S Suryansh Infradevelopers Pvt. Ltd. 9415002704DINESH KUMAR VISHAWAKARMA JE ER. RAM PRATAP AE ER. RAMESH CHANDRA YADAV XECircle 3Completed
128 04/SE-III/CD-19/2019-20STATE FUNDStrengthening of 30M wide road in setcor-18/20 and sector-17/18 at Vrindavan Yojna No.-4 Lucknow 0.00 273.00 05/12/201926/12/2019 26/12/201909/01/202026/12/2019 26/12/2019M/S Ram Singh Agarwal 7348688888J.P. MAURYA JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XECircle 3Completed
129 02/EE.CD-4/2019-20PARISHAD PROJECT FUNDLaying of Rising Main in Bahraich Bhinga Marg yojna, Bahraich 0.00 12.12 17/07/201902/11/2019 02/11/201901/03/202002/11/2019 02/11/2019M/S Savitri Associate CHANDAN KUMAR JE K.K ACHARYA AE PRASHANT VARDHAN XECircle 3In Progress
130 34/EE/19-20ED-1PARISHAD PROJECT FUNDShifting of 11 KV line at Partial area sector-3 Avadh Vihar Yojna Lucknow 0.00 8.11 25/10/201920/01/2020 20/01/202019/03/202020/01/2020 20/01/2020Preeti Electric works Circle ElectricalCompleted
131 02/SE-III/CD-19/2019-20STATE FUNDRecerfecing (Bituminous Concrete) of existing 45M wide VVIP road of Raibarelly Road to Shaheed Path at Vrindavan Yojna No.-4, Lucknow 0.00 538.00 05/10/201915/11/2019 15/11/201914/02/202015/11/2019 15/11/2019M/S Suryansh Infradevelopers Pvt. Ltd. 9415002704DINESH KUMAR VISHAWAKARMA JE ER. RAM PRATAP AE ER. RAMESH CHANDRA YADAV XECircle 3Completed
132 06/EE/2019-20DT13-11-2019AWASTHAPNA FUNDFABRICATION & FIXING OF 6MM THICK POLYCARBONATE SHEET IN M.S. STRUCTURE AT BOUNDARY WALL OF SWIMMING POOL AT GANDHI STADIUM, DISTT.: PILIBHIT [U.P.] 0.00 89.28 30/07/201913/11/2019 13/11/201910/02/202013/11/2019 13/11/2019B.D Gaurav Circle 5In Progress
133 07/EE(GKP)/2020-21AWASTHAPNA FUNDConst. of Interlocking & Drain in Ward No 09 pikaura Shiv Gulam vishkarma Shop to Babbu Yadav and yadav House to Panna Lal House In Infrastructure 0.00 22.00 28/03/202020/05/2020 20/05/202031/10/202020/05/2020 20/05/2020M/S TIGER ELECTRICAL & CONSTRUCTION COMPANY RAVINDRA NATH JE ASHOK KUMAR AE J K KAUSHAL XECircle 1Completed
134 24/EE/19-20PARISHAD PROJECT FUNDSupply and Installation of 400KVA Transformer at Sec-6 A Vrindavan Yojna no-1 Lucknow 0.00 7.29 16/09/201912/12/2019 12/12/201911/02/202012/12/2019 12/12/2019Preeti Electric works Circle ElectricalCompleted
135 03/EE.CD-4/2019-20PARISHAD PROJECT FUNDConstruction of boundary Wall around 400KL Over Head Tank in Bahraich Bhinga Marg Yojna,Bahraich 0.00 10.07 06/09/201907/12/2019 07/12/201906/03/202007/12/2019 07/12/2019M/S Imam Ali Contractor 8840934493CHANDAN KUMAR JE K.K ACHARYA AE PRASHANT VARDHAN XECircle 3In Progress
136 18/SE-HQ/2019-20CENTRAL AND STATE FUNDCONSTRUCTION OF 192 NOS HOUSES UNDER PMAY 0.00 883.45 12/09/201925/02/2020 25/02/202020/12/202125/02/2020 25/02/2020Mahesh Infracon Pvt. Ltd. 9456607152SHAILENDRA SINGH JE A.K.SINHA AE JAGDISH KUMAR XECircle VrindavanIn Progress
137 19/SE-HQ/2019-20CENTRAL AND STATE FUNDCONSTRUCTION OF 144 NOS HOUSES UNDER PMAY 0.00 662.59 12/09/201925/02/2020 25/02/202020/12/202125/02/2020 25/02/2020Mahesh Infracon Pvt. Ltd. 9456607152ANIL KUMAR JE A.K.SINHA AE JAGDISH KUMAR XECircle VrindavanIn Progress
138 02/EE/ED-2GZB/19-20PARISHAD PROJECT FUNDEXTERNAL ELECTRIFICATION WORK FOR CONNECTING 11 KV FEEDERS FROM 33/11 KV S/S AT SEC-7 TO EXISTING PVVNL 11 KV FEEDER VASUNDHARA YOJNA GZB 0.00 14.20 07/12/201801/06/2019 01/06/201930/06/201901/06/2019 01/06/2019K. ELECTRIC WORKS PVT. LTD SUDHAKAR PATHAK JE TEAJBIR SINGH AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
139 03/EE/ED-2GZB/19-20PARISHAD PROJECT FUNDAMC OF KONE MAKE LIFT AT SIKHAR ENCLAVE BLOCK A,B SEC-15 VASUNDHARA GZB 0.00 3.07 01/05/201926/06/2019 26/06/201925/06/202026/06/2019 26/06/2019KONE ALIVETOR INDIA PVT. LTD. 9560361414ER. U C MISHRA JE TEAJBIR SINGH AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
140 04/EE/ED-2GZB/19-20PARISHAD PROJECT FUNDS/I OF 02 NO PUMPING PLANT AT CWR SEC-8 SIDDHARTHA VIHAR YOJNA GZB 0.00 120.92 11/10/201906/01/2020 06/01/202005/04/202006/01/2020 06/01/2020Sai Sudha Enterprises SUDHAKAR PATHAK JE TEAJBIR SINGH AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
141 05/EE/ED-2GZB/19-20PARISHAD PROJECT FUNDSITC OF LT PANNEL AND XLPE CABLE FOR COMMON AREA AND POWER BACKUP AT GYH ENCLAVE SIDDHARTHA VIHAR YOJNA GZB 0.00 34.00 11/11/202009/01/2020 09/01/202023/01/202009/01/2020 09/01/2020OM ASSOCIATES 9312359633ER. U C MISHRA JE TEAJBIR SINGH AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
142 02/SE(E)LKO/19-20PARISHAD PROJECT FUNDINTERNAL ELECTRIFICATION, EXTERNAL LIGHTING, DG SET, T/W AND AC WORK OF COMMUNITY CENTRE SEC-9 SIDDHARTA VIHAR YOJNA GZB 0.00 121.07 29/09/201903/01/2020 03/01/202002/03/202003/01/2020 03/01/2020KRISHNA REFRIGRATION 09652303229SUDHAKAR PATHAK JE TEAJBIR SINGH AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
143 20/SE-HQ/2019-20CENTRAL AND STATE FUNDCONSTRUCTION OF 144 NOS HOUSES UNDER PMAY 0.00 662.58 12/09/201925/02/2020 25/02/202020/12/202125/02/2020 25/02/2020Mahesh Infracon Pvt. Ltd. 9456607152ANIL KUMAR JE A.K.SINHA AE JAGDISH KUMAR XECircle VrindavanIn Progress
144 06/EE/CD-21/2019-20PARISHAD PROJECT FUNDRENOVATION WORK OF KSS PARK 0.00 27.35 07/01/202020/03/2020 20/03/202019/05/202020/03/2020 20/03/2020AK TRADERS 9415125278SHAILENDRA SINGH JE A.K.SINHA AE JAGDISH KUMAR XECircle VrindavanCompleted
145 02/EE/CD-1GZB/2019-20PARISHAD PROJECT FUNDConstruction of 12.00M and 7.50 M Wide Road Service 0.00 53.13 13/12/201910/01/2020 10/01/202009/07/202010/01/2020 10/01/2020M/s Ramesh Chand & Co. 9213288266RANDHIR SINGH JE NARENDRA PAL AE ATUL KUMAR SINGH XECircle 7In Progress
146 06/SE-III/CD-19/2019-20CENTRAL AND STATE FUNDConst. of 144Nos. G+3 Flats under PMAY (Urban) at Village Anura, Tehsil-Sadar, Distt-Lucknow 0.00 586.35 25/06/201911/03/2020 11/03/202010/09/202111/03/2020 11/03/2020M/S SKY LARK ENTERPRISES 9838937027J.P. MAURYA JE ER. SURENDRA NATH AE ER. RAMESH CHANDRA YADAV XECircle 3In Progress
147 07/SE-III/CD-19/2019-20CENTRAL AND STATE FUNDConst. of 144Nos. G+3 Flats under PMAY (Urban) at Village Anura, Tehsil-Sadar, Distt-Lucknow (Group-1B) 0.00 586.35 25/06/201911/03/2020 11/03/202010/09/202111/03/2020 11/03/2020M/S SKY LARK ENTERPRISES 9838937027J.P. MAURYA JE ER. SURENDRA NATH AE ER. RAMESH CHANDRA YADAV XECircle 3In Progress
148 02/SE(V)/CD-12/2019-20PARISHAD PROJECT FUNDRenovation of 12.00 Mt., 9.00 mt. and 7.50 mt. wide road at Sector-11, Vrindavan Yojna, Lucknow. 0.00 0.00 30/09/201927/12/2019 27/12/201926/03/202027/12/2019 27/12/2019Bajrang Nirman Pvt. Ltd, LDA Colony, Lucknow 7607525708MUHAR SINGH JE DINESH CHANDRA RAI AE SHASHANK PANDEY XECircle VrindavanCompleted
149 08/SE-III/CD-19/2019-20CENTRAL AND STATE FUNDConst. of 96Nos. G+3 Flats under PMAY (Urban) at Village Anura, Tehsil-Sadar, Distt-Lucknow 0.00 390.90 25/06/201911/03/2020 11/03/202010/09/202111/03/2020 11/03/2020M/S Kashi Vishwanath & Co. 9005341633J.P. MAURYA JE ER. SURENDRA NATH AE ER. RAMESH CHANDRA YADAV XECircle 3In Progress
150 02/EE/2019-20CD-28AWASTHAPNA FUNDCONSTRUCTION OF ROAD AND DRAIN IN HOUSE NO 508 TO 520 538 TO 538 AND 487 TO 350 AT SECTOR-15 SIKANDRA YOJNA AGAR 0.00 19.68 27/06/201920/02/2020 20/02/202019/04/202020/02/2020 20/02/2020SRASHTI INFRASTRUCTURE 9410251960MAHAVEER SINGH JE ASHOK KUMAR SHARMA AE GIRISH CHANDRA XECircle 6Completed
151 02/SE-VI/19-20INFRAConstruction of Inter Locking Road, Drains & Culvert at Mayapuram Colony, Goverdhan Road, Mathura. 0.00 150.88 18/09/201929/01/2020 29/01/202028/04/202029/01/2020 29/01/2020Sirohi Const. Comp. 9412303326SANTOSH KUMAR JE R.K. GANGWAR AE SRI H.S. SHARMA XECircle 6In Progress
152 26/EE/19-20PARISHAD PROJECT FUNDSupply and installation of 400 KVA transformer at sec-5 D Vrindavan Yojna No-1 Lucknow. 0.00 9.52 22/08/201921/12/2019 21/12/201920/01/202021/12/2019 21/12/2019Swastikk Electricals Circle ElectricalCompleted
153 03/EE/CD-1/GZB/2019-20PARISHAD PROJECT FUNDLaying and Jointing Sewer Line in Commercial Area of Sec-7, Siddhartha Vihar Yojna, GZB. 0.00 13.97 16/11/201910/01/2020 10/01/202009/04/202010/01/2020 10/01/2020M/s Ramesh Chand & Co. 9213288266RAM KRISHAN GUPTA JE NARENDRA PAL AE ATUL KUMAR SINGH XECircle 7In Progress
154 01/SE-VI/19-20INFRAConstruction of Inter Locking Road, Drains & Culvert in Moti Nagar, Ram Nagar, Gyatri Kunj & B-Block at Balajipuram, Mathura. 0.00 151.74 18/09/201929/01/2020 29/01/202028/04/202029/01/2020 29/01/2020R. N. Agarwal 9319062251SANTOSH KUMAR JE R.K. GANGWAR AE SRI H.S. SHARMA XECircle 6In Progress
155 03/SE-VI/19-20INFRAConstruction of Inter Locking Road, Drains & Culvert at Balajipuram Tantura Ward-53, Mathura. 0.00 137.49 18/09/201929/01/2020 29/01/202028/04/202029/01/2020 29/01/2020AMIT CONSTRUCTION SANTOSH KUMAR JE R.K. GANGWAR AE SRI H.S. SHARMA XECircle 6In Progress
156 07/EE/2019-20INFRAConstruction of Inter Locking Road, Drains & Culvert at Raj Vihar Colony NH-2, Ward No.-16, Mathura. 0.00 86.22 18/09/201927/01/2020 26/04/202027/01/2020 Ganpati Construction Co. 9811513000SANTOSH KUMAR JE R.K. GANGWAR AE SRI H.S. SHARMA XECircle 6In Progress
157 04/SE-VI/19-20INFRAConstruction of Inter Locking Road, Drains & Culvert at Moti Nagar Navada, Mathura. 0.00 128.25 18/09/201914/02/2020 14/02/202013/05/202014/02/2020 14/02/2020ANULATA CONSTRUCTION COMP. 9568001575SANTOSH KUMAR JE R.K. GANGWAR AE SRI H.S. SHARMA XECircle 6In Progress
158 07/EE/CD-21/2019-20PARISHAD PROJECT FUNDINSTALATION OF CHATRI IN KSS PARK MINERALS 0.00 8.00 07/01/202020/03/2020 20/03/202019/04/202020/03/2020 20/03/2020AKANSHA CONSTRUCTION SHAILENDRA SINGH JE A.K.SINHA AE JAGDISH KUMAR XECircle VrindavanCompleted
159 03/EE/CD-21/2019-20PARISHAD PROJECT FUNDCONSTRUCTION OF RCC CULVERT IN FRONT OF PLOT NO-E-2/COM-2 AMRAPALI YOJNA LKO 0.00 17.70 12/09/201925/11/2019 25/11/201924/01/202025/11/2019 25/11/2019ARTI CONSTRUCTION SHAILENDRA SINGH JE A.K.SINHA AE JAGDISH KUMAR XECircle VrindavanCompleted
160 DEPARTMENTALTHROUGHM.R.PARISHAD PROJECT FUNDPLANTATION WORK LONG ROAD AND GREEN BELT PARK, AMRAPALI YOJNA HARDOI ROAD LUCKNOW 0.00 8.95 01/08/201901/08/2019 01/08/201909/08/201901/08/2019 01/08/2019Departmental (Self) SHAILENDRA SINGH JE A.K.SINHA AE JAGDISH KUMAR XECircle VrindavanCompleted
161 11/SE-2/CD-6/2019-20PARISHAD PROJECT FUNDConstruction of remaining 45.00 mt. wide road (Node No.-25-26-27), Scheme No.-11, Jagriti Vihar (Ext.), Meerut. 0.00 395.00 18/08/201901/02/2020 01/02/202031/07/202001/02/2020 01/02/2020M/s S.K. Singh 9837488572AJAB SINGH,NAVRATAN SINGH JE M BKAUSHIK AE SHRI RAJEEV KUMAR XECircle 2In Progress
162 02/EE/2015-16AWASTHAPNA FUNDStrengthening of Remaining Roads & Reparing of Drains in Yojna No.-2, Amroha Under Infrastructure Work 0.00 23.90 09/06/201527/06/2015 27/06/201526/08/201527/06/2015 27/06/2015M/S BHAVYA TRADERS 0937019037GYAN PRAKASH JE DEVENDRA PAL SINGH AE PRADEEP KUMAR XECircle 5Completed
163 03ee19-20PARISHAD PROJECT FUNDRestoration work of 12mt. Wide road and 9mt wide road no 31, 40, 46, 48, 56, and 67 near Community center at sector-16A & 16B in Vrindavan Yojana No.4, Lucknow 0.00 44.16 13/01/202031/01/2020 31/01/202015/02/202031/01/2020 31/01/2020Dev Construction 9690017262MANOJ KUMAR JE KAILASH NATH AE D.K. SRIVASTAVA XECircle HQCompleted
164 05/EE/2015-16AWASTHAPNA FUNDStrengthening of Road and Repairing of Drains along Road Joining Nawab Chowk Byepass to Haji Building Material Shop in Mohalla Chhebra in Amroha Under Infrastructure Work (Group-B) 0.00 55.27 21/08/201508/09/2015 08/09/201507/12/201508/09/2015 08/09/2015M/s Ganga Traders 9412241889GYAN PRAKASH JE DEVENDRA PAL SINGH AE PRADEEP KUMAR XECircle 5Completed
165 06/EE/2015-16AWASTHAPNA FUNDStrengthening of Road and Repairing of Drains along Road Joining Nawab Chowk Byepass to Haji Building Material Shop in Mohalla Chhebra in Amroha Under Infrastructure Work (Group-A) 0.00 27.77 18/08/201508/09/2015 08/09/201507/12/201508/09/2015 08/09/2015M/S BHAVYA TRADERS 0937019037GYAN PRAKASH JE DEVENDRA PAL SINGH AE PRADEEP KUMAR XECircle 5Completed
166 07/EE/2015-16PARISHAD PROJECT FUNDConstruction of Internal Roads in Sambhal Gate Yojna No.-1 Chandausi (Part) 0.00 4.60 22/12/201510/03/2016 10/03/201609/05/201610/03/2016 10/03/2016SHRI DHARAMPAL SINGH SURENDRA PRASAD JE DEVENDRA PAL SINGH AE SHOBHIT KUMAR PATHAK XECircle 5Completed
167 09/SE-II/2019-20AWASTHAPNA FUNDWATER DISPOSAL WORK BY RCC HUME PIPE LINE FROM C.O. MANDI THANA RESIDENCE TO RAILWAY STATION MUZAFFARNAGAR 0.00 165.00 06/02/201916/01/2020 16/01/202015/05/202016/01/2020 16/01/2020M/S PROGRESSIVE CONSTRUCTION COM. 9810846441SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XECircle 2In Progress
168 01/EE/GKP/2020-21PARISHAD PROJECT FUNDRestoration/Construction of 30.00 Meter Wide Road At Shahpur Yojna No 2/3, Gorakhpur. 0.00 20.22 17/10/201914/05/2020 14/05/202031/10/202014/05/2020 14/05/2020M/s Diya Swaroop Panday 9919990823RAVINDRA NATH JE ASHOK KUMAR AE J K KAUSHAL XECircle 1Completed
169 02/SE(M)/2016-17PARISHAD PROJECT FUNDConst of Flyover across SH 57 0.00 5312.82 23/04/2016 23/04/201622/04/201823/04/2016 23/04/2016U.P.STATE BRIDGE CORPORATION LIMITED NARESH KUMAR GUPTA JE ALOKSHEEL DWIVEDI,RAVINDRA BHATT,SATYENDRA SINGH AE BISHEMBER SINGH,S.K. SIRVASTAVA,S.K.PATHAK,SH. D.V. SINGH XECircle MantolaIn Progress
170 03/SE(M)/2016-17PARISHAD PROJECT FUNDCons. of 24 M wide Road between sec-14 (B) & 15 0.00 398.00 09/03/201623/04/2016 23/04/201611/11/201623/04/2016 23/04/2016A.S CONSRTUCTION 8273230008RADHEY SHYAM JE NARESH GUPTA,SATYENDRA SINGH AE BISHEMBER SINGH,S.K. SIRVASTAVA,S.K.PATHAK,SH. D.V. SINGH XECircle MantolaCompleted
171 05/EE/2016-17PARISHAD PROJECT FUNDConst of 33/11 KV Sub station in sec 17 0.00 46.00 31/05/201611/12/2016 11/12/201610/11/201711/12/2016 11/12/2016CHOUDHARY CONSTRUCTION CO 9811009115JEET SINGH JE AMAN TYAGI,RAVINDRA BHATT,SATYENDRA SINGH AE BISHEMBER SINGH,S.K. SIRVASTAVA,S.K.PATHAK,SH. D.V. SINGH XECircle MantolaCompleted
172 05/EECD26/2017-18PARISHAD PROJECT FUNDTop Coat & Mix Seal Surfacing work on Internal Road In Sector-7A at Majhola Yojna No.-4, Phase-2, Moradabad 0.00 47.00 11/10/201707/12/2017 07/12/201720/02/201807/12/2017 07/12/2017M/s M.A. Associates SURENDRA PRASAD JE DEVENDRA PAL SINGH AE SHOBHIT KUMAR PATHAK XECircle 5Completed
173 03/EE/2016-17PARISHAD PROJECT FUNDInternal Road in Sec 18 0.00 86.00 06/07/201607/10/2016 07/10/201606/02/201707/10/2016 07/10/2016M/s Ramesh Chand & Co. 9213288266ABHISHEK KUMAR MISHRA JE ALOKSHEEL DWIVEDI,AMAN TYAGI,RAVINDRA BHATT,SATYENDRA SINGH AE BISHEMBER SINGH,S.K. SIRVASTAVA,S.K.PATHAK,SH. D.V. SINGH XECircle MantolaCompleted
174 04/SE(M)/2016-17PARISHAD PROJECT FUNDConst of Internal Road in sec 15 (Farmer Plot Pocket) 0.00 140.00 16/09/201626/12/2016 26/12/201625/06/201726/12/2016 26/12/2016A.S CONSRTUCTION 8273230008MUNNA LAL,RADHESHYAM JE NARESH GUPTA,SATYENDRA SINGH AE AMAN TYAGI,BISHEMBER SINGH,S.K. SIRVASTAVA,S.K.PATHAK,UMA NATH SHUKLA XECircle MantolaIn Progress
175 01ee19-20PARISHAD PROJECT FUNDRestoration work of Service road (STP to Amrita Vidhalyam) at Sector 10 in Vrindavan Yojana No.2, Lucknow. 0.00 18.15 22/11/201918/12/2019 18/12/201902/01/202018/12/2019 18/12/2019M/S Lallu Singh & sons MANOJ KUMAR JE R.C. SRIVASTAVA AE D.K. SRIVASTAVA XECircle HQCompleted
176 199026PARISHAD PROJECT FUNDPlantation work of Lohramau Yojna Sultanpur 0.00 8.75 31/07/2019 31/07/201930/09/201931/07/2019 31/07/2019CD-31 UPAVP, LKO MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XECircle HQCompleted
177 03/EE/2015-16PARISHAD PROJECT FUNDConstruction of Internal Road In Amroha Yojna No.-2 Amroha 0.00 15.00 24/07/201501/08/2015 31/10/201501/08/2015 M/S BHAVYA TRADERS 0937019037GYAN PRAKASH JE DEVENDRA PAL SINGH AE PRADEEP KUMAR XECircle 5Not Started
178 04/EE/2015-16AWASTHAPNA FUNDStrengthening of roads and Repairing of Drains in Front of House No.-309 to House No.-74 in Yojna No.-2, Amroha under Infrastructure Work. 0.00 53.96 08/09/201508/09/2015 08/09/201507/12/201508/09/2015 08/09/2015M/s Ram Kishore 9389001795GYAN PRAKASH JE DEVENDRA PAL SINGH AE PRADEEP KUMAR XECircle 5Completed
179 01/EE/CD-36/2016-17INFRAConst. of Nala at Charan Vihar Yojna, Baraut 0.00 21.65 25/02/2017 25/02/201724/05/201725/02/2017 25/02/2017M/s Ishwar Builders 9310917513PUSKAR SINGH JE L.D. PANDEY AE ASHOK KUMAR XECircle MantolaCompleted
180 01/EE/CD-36/2017-18INFRAConst. of 12 M wide Road at Charan Vihar Yojna Baraut 0.00 38.99 20/05/2017 20/05/201718/08/201720/05/2017 20/05/2017M/s Ishwar Builders 9310917513PUSKAR SINGH JE L.D. PANDEY AE ASHOK KUMAR XECircle MantolaCompleted
181 10/EE/2015-16PARISHAD PROJECT FUNDConst of Central Verge in 24 M Road 0.00 98.00 28/12/201504/03/2016 03/09/201604/03/2016 K.S. Construction co ABHISHEK KUMAR MISHRA,MUNNA LAL,RADHEY SHYAM JE AMAN TYAGI,NARESH GUPTA,SATYENDRA SINGH AE BISHEMBER SINGH,S.K. SIRVASTAVA,SH. D.V. SINGH XECircle MantolaCompleted
182 02/EECD26/2017-18PARISHAD PROJECT FUNDRoof Treatment work in 61 Nos. 72/162 Type Semi Finished Houses in Sector-7A at Majhola Yojna No.-4, Phase-2, Moradabad 0.00 29.70 25/05/201714/06/2017 14/06/201713/09/201714/06/2017 14/06/2017M/S TECHNO ENGINEERS GYAN PRAKASH JE DEVENDRA PAL SINGH AE SHOBHIT KUMAR PATHAK XECircle 5Completed
183 09/EE/2015-16PARISHAD PROJECT FUNDConst of Central Verge in 24 M Road 0.00 98.00 28/12/201504/03/2016 04/03/201603/09/201604/03/2016 04/03/2016D.P. ULTRA ENGINEERS PVT. LTD. 9871533996ABHISHEK KUMAR MISHRA,RADHEY SHYAM JE ALOKSHEEL DWIVEDI,AMAN TYAGI,NARESH GUPTA,SATYENDRA SINGH AE BISHEMBER SINGH,S.K. SIRVASTAVA,S.K.PATHAK,SH. D.V. SINGH XECircle MantolaCompleted
184 044399PARISHAD PROJECT FUNDVIP parking for Diffence expo site office at sec-16 VVY-4, Lucknow 0.00 16.92 01/11/2019 01/11/201920/12/201901/11/2019 01/11/2019CD-31 UPAVP, LKO MANOJ KUMAR JE R.C. SRIVASTAVA AE D.K. SRIVASTAVA XECircle HQCompleted
185 10/SE-II/19-20PARISHAD PROJECT FUNDConstruction of 12.00m & 18.00m wide roads in Sector-2 at Scheme No. 11, Jagriti Vihar (Ext.), Meerut. 0.00 183.07 04/09/201922/01/2020 22/01/202021/07/202022/01/2020 22/01/2020G.K. Constructions 9997294280SH. RAVINDRA KUMAR JE M BKAUSHIK AE M.B. KAUSHIK XECircle 2Completed
186 03/EE/CD-8/2019-20PARISHAD PROJECT FUNDConstruction of 9.00m and 12.00m wide road (Balance work) and Parks in Sector-3 at Scheme-11, Jagriti Vihar (Ext.), Meerut. 0.00 69.43 04/09/201922/01/2020 22/01/202021/05/202022/01/2020 22/01/2020G.K. Constructions 9997294280SH. SANDEEP KUMAR JE SH. RAVINDRA KUMAR AE M.B. KAUSHIK XECircle 2Completed
187 02/E.E./C.D.-34/AWASTHPNANIDHI/2019-20AWASTHAPNA FUNDRenovation of Internal Road, K.C. Drain, Interlocking tiles in Patel Nagar, Varanasi 0.00 65.86 13/12/201905/02/2020 05/02/202004/05/202005/02/2020 05/02/2020JWALAMUKHI CONSTRUCTION 09648999945ARJUN VERMA JE AE AJIT KUMAR CHAUDHARY XECircle 1Completed
188 010/EE/2016-17INFRARenovation of Parikrma Marg Near shreeji baba Gora Ashram Gobardhan Mathura 0.00 63.39 03/05/201606/06/2016 06/06/201605/09/201606/06/2016 06/06/2016G.V. Const SANTOSH KUMAR JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
189 05/EE/CD-22/2019-20PARISHAD PROJECT FUNDSupply of Rising mains in sector-4A &5 Mandola 0.00 47.00 24/07/201907/11/2019 07/11/201906/02/202007/11/2019 07/11/2019M/s Ramesh Chand & Co. 9213288266U.S.CHAURASIYA JE HARI SHANKAR TIWARI AE UMA NATH SHUKLA XECircle MantolaCompleted
190 01/SE-06/2020-2021PARISHAD PROJECT FUNDGENREL EARTH WORK CUTTING AND FILLING AT BHUMI VIKASH EWAM GARHSTHAAN YOJNA -03 JHANSI 0.00 282.45 19/12/201912/05/2020 12/05/202011/11/202012/05/2020 12/05/2020SATYAM CONSTRUCTION 9415030154ANUP KUMAR,MANVENDRA DHAMANIYA JE DAYASAGAR AE EKHLAQUE AHMAD XECircle 6In Progress
191 03/EECD26/2017-18PARISHAD PROJECT FUNDInternal Electrification of (S+4) 48 Nos. 1 BHK Flats at Sector-9A in Majhola Yojna No.-4, Phase-2, Moradabad 0.00 16.62 24/05/201721/06/2017 21/06/201720/04/201821/06/2017 21/06/2017M/s Jain Power Construction 9412245572SURENDRA PRASAD JE DEVENDRA PAL SINGH AE SHOBHIT KUMAR PATHAK XECircle 5Completed
192 09/SE(E)LKO/2016-17PARISHAD PROJECT FUNDINT. ELE. WORK IN SAMAJWADI YOJNA 352 NOS 2 BHK TYPE HOUSES AT SEC-16 B, MANDOLA VIHAR YOJNA GZB. (GROUP-C) 0.00 175.00 14/03/201626/10/2016 26/10/201625/10/201726/10/2016 26/10/2016SPG INFRAPROJECT PVT. LTD. 9410030650ALOK KUMAR,PANKAJ KUMAR PUSHKAR,SUNILKUMAR JE D.C SHUKLA,D.K PANDEY AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
193 10/SE(E)LKO/2016-17PARISHAD PROJECT FUNDINT. ELE. WORK IN SAMAJWADI YOJNA 544 NOS 1 BHK TYPE HOUSES AT SEC-15, MANDOLA VIHAR YOJNA GZB. (GROUP-G) 0.00 160.00 05/07/201602/01/2017 02/01/201701/01/201802/01/2017 02/01/2017ARJUNVANSH INFRA STRUCTURE PVT. LTD. 9310125757PANKAJ KUMAR PUSHKAR,SANJEEV KUMAR SINGH JE D.K PANDEY AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
194 07/EE/CD-38/2015-16PARISHAD PROJECT FUNDPlantation work both side of 60 M Road (15000 Nos Trees) 0.00 28.30 07/12/2015 07/12/201506/02/201707/12/2015 07/12/2015M/S D.B.GARDEN TRADERS 9761410176VIVEK KUMAR MAURYA JE SATYENDRA SINGH AE S.K. SIRVASTAVA XECircle MantolaCompleted
195 11/SE(E)LKO/2016-17PARISHAD PROJECT FUNDEXT. ELE. WORK (UNDER GROUND SYSTEM) 11 KV LINE AND TRANSFORMATION WORK IN BRAHMAPUTRA ENCLAVE AT SEC-10, SIDDHARTH VIHAR YOJNA GZB. 0.00 307.00 27/09/201606/03/2017 06/03/201705/06/201706/03/2017 06/03/2017RAJ ASSOCIATES 09650027361BHOOPLAL JE D.C SHUKLA AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
196 02/EE/ED-III/20-21PARISHAD PROJECT FUND  0.00 12.32 23/07/202031/07/2020 31/07/202030/09/202031/07/2020 31/07/2020GYANTI CONSTRUCTION 9598461802VINOD KUMAR JE ER. D. R. MAURYA AE XECircle ElectricalIn Progress
197 01/SE-VIth/2020-21PARISHAD PROJECT FUNDConstruction of Trunk Road in Civil Lines Yojna No 2 Phase 2 Budaun 0.00 258.04 05/06/202016/07/2020 17/07/202016/11/202016/07/2020 17/07/2020MS J.P Bhatiya Circle 5Completed
198 04/SE(V)/CD-11/2020-21CENTRAL AND STATE FUNDConstruction of 144 Nos. Group (n) (G+3) EWS houses at Village Kankaha, Mohanlalganj, Lucknow. 0.00 586.05 04/02/2019 18/06/202017/12/2021 18/06/2020T Y TRADERS 9004537987NEERAJ KUMAR JE AKBAR ALI,RAJIV RASTOGI AE NAVJOT SINGH VERMA XECircle VrindavanIn Progress
199 01/EE/2017-18PARISHAD PROJECT FUNDPlay Ground in sec 16 B 0.00 21.87 21/08/201721/09/2017 21/09/2017 21/09/2017 21/09/2017VISHAL BUILDERS 9536606047JEET SINGH JE ALOKSHEEL DWIVEDI,RAVINDRA BHATT,SATYENDRA SINGH AE S.K. SIRVASTAVA,S.K.PATHAK,SH. D.V. SINGH XECircle MantolaCompleted
200 02/EE/CD-27/2018-19EXTERNAL DEVELOPMENT FUNDCerve Stone work & penting work at 30m Road (G-B) Ajantapuram Yojna Ghaziabad 0.00 10.00 08/02/201915/02/2019 16/02/201925/02/201915/02/2019 16/02/2019M/s Ramesh Chand & Co. 9213288266MONAJ KUMAR RAO JE RIYAZUDDIN AE BHOLA NATH XECircle 7Completed
201 02ee19-20PARISHAD PROJECT FUNDWater sewer connection in 76 nos houses at Lohramau yojna Sultanpur 0.00 13.90 25/10/201914/01/2020 26/05/202013/05/202014/01/2020 26/05/2020M/S KAILASH RAM 9651534882MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XECircle HQIn Progress
202 04/EE/CD-10/2016-17AWASTHAPNA FUNDConst. of Nala from Sanjay Vihar Yojna-2 to Asoda Road in Hapur. 0.00 89.50 31/05/201620/08/2016 20/08/201628/06/201720/08/2016 20/08/2016M/S Mahesh Chand Contractors 9350931122PRANVEER SINGH CD10 JE SUMIT KUMAR CD10 AE A.V. SINGH XECircle MantolaCompleted
203 07/SE(M)/CD-22/2016-17PARISHAD PROJECT FUNDEarthwork in sector 2 mandola vihar yojna 0.00 489.00 04/10/201604/01/2017 03/05/201704/01/2017 KRISHNA CONSTRUCTION COMPANY U.S.CHAURASIYA JE HAR PHOOL SINGH,HARI SHANKAR TIWARI,K.V.SINGH AE K.P.TRIPATHI XECircle MantolaCompleted
204 01/EE/CD-22/2016-17PARISHAD PROJECT FUNDplantation, maintenance and barbed wire fencing around pond in mandola vihar GROUP-A 0.00 30.00 05/05/201601/06/2016 01/06/201628/02/201901/06/2016 01/06/2016EVER GREEN HORTICULTURE & LANDSCAPE 9312407939U.S.CHAURASIYA JE NAVEEN KUMAR JAIN,RAM AVTAR MITTAL AE AKHILESHWAR SINGH,LALTA PRASAD XECircle MantolaCompleted
205 02/EE/CD-22/2016-17PARISHAD PROJECT FUNDplantation ,maintenance and barbed wire fencing around pond in mandola vihar GROUP-B 0.00 30.00 05/05/201601/06/2017 28/02/201901/06/2017 EVER GREEN HORTICULTURE & LANDSCAPE 9312407939U.S.CHAURASIYA JE NAVEEN KUMAR JAIN,RAM AVTAR MITTAL AE AKHILESHWAR SINGH,LALTA PRASAD XECircle MantolaCompleted
206 05/EE/2015-16Dt01-03-2016AWASTHAPNA FUNDupgrading of raod from main road near mazar near school rampur road swalenagar at bareilly 0.00 24.89 03/02/201601/03/2016 01/03/201630/04/201601/03/2016 01/03/2016Bhatia Construction Co. Circle 5Completed
207 01/EE/ED-2GZB/2016-17PARISHAD PROJECT FUNDSUPPLY OF 1 NO 10 MVA 33/11 KV POWER T/F FOR 33/11 KV S/S AT SEC-7, VASUNDHARA GHAZIABAD. 0.00 60.00 11/03/201626/04/2016 26/04/201625/06/201626/04/2016 26/04/2016Elecon Conductor 9837007408BHOOPLAL JE D.C SHUKLA AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
208 02/EE/ED-2GZB/2016-17PARISHAD PROJECT FUNDELE.WORK FOR T/W AT DIFFERENT SECTORS S V YOJNA GZB. 0.00 12.00 21/11/201507/05/2016 07/05/201606/07/201607/05/2016 07/05/2016K. ELECTRIC WORKS PVT. LTD SITARAM CHAUHAN JE D.C SHUKLA AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
209 01/EE/CD-1GZB/2015-16PARISHAD PROJECT FUNDConstruction of 24.00m wide Road in Sec-3, Siddharth Vihar Yojna, Gzb. 0.00 77.55 05/06/201510/08/2015 10/08/201509/12/201510/08/2015 10/08/2015M/s Quality Builders & Engineers 9312870962RAM KRISHAN GUPTA JE SUDHIR KUMAR SHUKLA AE S.C. RAI XECircle 7In Progress
210 03/EE/ED-2GZB/2016-17PARISHAD PROJECT FUNDS/I OF KSB MAKE SUBMERSIBLE PUMPING PLANT 02 NOS. 400 LPM 35 MTR. HEAD AT SHIKHAR ENCLAVE SEC-15 VASUNDHARA GZB. 0.00 6.50 23/02/201607/05/2016 07/05/201606/07/201607/05/2016 07/05/2016TOSHI ENGINEERS 981005734SITARAM CHAUHAN JE D.C SHUKLA AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
211 04/EE/ED-2GZB/2016-17PARISHAD PROJECT FUNDS/I OF KSB MAKE SUBMERSIBLE PUMPING PLANT 04 NOS. 1000 LPM 52 MTR. HEAD AT SIDDHARTH VIHAR YOJNA GZB. 0.00 17.50 23/02/201623/05/2016 23/05/201622/07/201623/05/2016 23/05/20163D CREATION SITARAM CHAUHAN JE D.C SHUKLA AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
212 02/EE/CD-1GZB/2016-17PARISHAD PROJECT FUNDConstruction/Strenghthing of 24.00m wide Road between Sec-3 & 5 & Proposed in Sec-3, Siddharth Vihar Yojna, Gzb. 0.00 98.00 20/02/201608/08/2016 08/08/201607/11/201608/08/2016 08/08/2016Akash Engineers and Builders 9810745357A.K. SINHA,RANDHIR SINGH JE YOGENDRA KUMAR VERMA AE S.C. RAI XECircle 7In Progress
213 05/EE/ED-2GZB/2016-17PARISHAD PROJECT FUNDS/I OF CUMMINS MAKE DG SET AT OFFICE COMPLEX VASUNDHARA YOJNA GZB. 0.00 43.48 30/03/201623/05/2016 23/05/201605/07/201623/05/2016 23/05/20163D CREATION SITARAM CHAUHAN JE D.C SHUKLA AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
214 02/SE-7GZB/2016-17Date27-12-2016PARISHAD PROJECT FUNDLaying & Jointing of Trunk Sewer Line at Siddharth Vihar Yojna, Gzb 0.00 572.00 20/06/201627/12/2016 27/12/201626/03/201827/12/2016 27/12/2016S S CONSTRUCTION 9999999645A.K. SINHA,SANJAY GUPTA JE ASHOK KUMAR SHARMA AE ATUL KUMAR SINGH XECircle 7In Progress
215 06/EE/CD-10/2016-17AWASTHAPNA FUNDConst. of road from Mela Kartik road to Madhaiya Kishan Singh in Garh, Hapur. 0.00 52.35 31/05/201603/09/2016 20/08/201627/07/201603/09/2016 20/08/2016M/S A-one Buildcon 9999491069PRANVEER SINGH CD10 JE SUMIT KUMAR CD10 AE A.V. SINGH XECircle MantolaCompleted
216 07/EE/ED-2GZB/2016-17PARISHAD PROJECT FUNDSUPPLY OF 63 KVA AND 400 KVA DISTRIBUTION STAR RATING T/F FOR MANDOLA VIHAR & SIDDHARTH VIHAR YOJNA GZB. 0.00 14.50 22/12/201514/07/2016 14/07/201613/08/201614/07/2016 14/07/2016Jayco Electrical SUNILKUMAR JE D.C SHUKLA AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
217 08/EE/ED-2GZB/2016-17PARISHAD PROJECT FUNDS/I OF PUMPING PLANT IN UGR AT SHIKHAR ENCLAVE SEC-15, VASUNDHARA YOJNA GZB. 0.00 16.00 06/07/201627/09/2016 27/09/201626/11/201627/09/2016 27/09/2016AAR BROTHERS 9415027508SITARAM CHAUHAN JE D.C SHUKLA AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
218 09/EE/ED-2GZB/2016-17PARISHAD PROJECT FUNDCONSTRUCTION OF 350X200 MM DIA 200 MTR. DEPTH 1 NO. T/W BY DC RIG MACHINE AT SEC-17 MANDOLA VIHAR YOJNA GZB. 0.00 18.00 14/10/201617/02/2017 17/02/201717/04/201717/02/2017 17/02/2017SUDHIR ENGINEERING WORKS 9810466565ALOK KUMAR JE D.C SHUKLA AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
219 01/EE/2018-19DT07-12-2018STATE AWASTHAPNA FUNDStrengthning of Road and Drain from House No B-541 to 556, B-460 to 588 in B-Block of Yojna No-2 Phase-1 Badaun 0.00 24.77 27/11/201807/12/2018 07/12/201820/01/201907/12/2018 07/12/2018M/S KAVERI ENTERPRISES 9412293360 Circle 5Completed
220 06/EE/2018-19DT25-02-2019STATE AWASTHAPNA FUNDStrengthning and Covering of open RCC Nala at Gandhi Auditorium District Pilibhit 0.00 13.95 28/12/201825/02/2019 25/02/201910/04/201925/02/2019 25/02/2019M/S B. D. GAURAV ENTERPRISES 9457336633 Circle 5Completed
221 02/EE/CD-27/2016-17GEN. FUNDMaintenance of Staff Quarters in Sector-16A, 16B & Sector-19 Vasundhara Ghaziabad 0.00 16.75 28/11/201614/12/2016 03/01/201725/03/201914/12/2016 03/01/2017Tahir Hussain Ansari 9990619560AKHILESH DATT SANDILYE JE MONAJ KUMAR RAO AE RAJESH RANJAN XECircle 7Completed
222 12/EE/2018-19DT06-03-2019STATE AWASTHAPNA FUNDConstruction of Road and Drain from house of Dr Ashok to Jitendra Kumar Fauji at Kandharpur Bareilly 0.00 23.13 17/01/201906/03/2019 06/03/201920/04/201906/03/2019 06/03/2019M/S KAVERI ENTERPRISES 9412293360 Circle 5Completed
223 01/EE/ED-2GZB/2015-16PARISHAD PROJECT FUNDCONSTRUCTION OF 05 NOS. PUMP HOUSE, OPERATOR ROOM AND BOUNDRY WALL AT SEC-4 & 5, MANDOLA VIHAR YOJNA GZB. 0.00 45.00 01/11/201430/04/2015 30/04/201529/08/201530/04/2015 30/04/2015SRISHTI CONSTRUCTION 9212861816SITARAM CHAUHAN JE D.C SHUKLA AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
224 MetroEXTERNAL DEVELOPMENT FUNDMatro Rail New Bas Stand Ghaziabad 0.00 3000.00 19/02/2020  19/02/2020 ghaziabad development authority Circle 7Completed
225 023/EE/2016-17INFRAConst. of Interlocking road, drain and culvart from Balvir singh to baccho singh house balajipuram Mathura 0.00 31.53 03/05/201622/06/2016 22/06/201621/09/201622/06/2016 22/06/2016Virendra Singh MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
226 03/SE-V/2020-21PARISHAD PROJECT FUNDConstruction of 12.0 M, 9 M 7.50, M and 3.0 M wide Internal Roads in Sec 15 Majhola Yojna No 4 Ph 2 Vistar Moradabad. (Excluding of PMAY Pocket) 0.00 216.50 24/06/202030/07/2020 30/07/202029/01/202130/07/2020 30/07/2020M/S Arora R.C.C. Works 9837391824SARVESH KUMAR VERMA JE RAJ KUMAR AE PAWAN KUMAR VERMA XECircle 5In Progress
227 02/SE-V/2020-21PARISHAD PROJECT FUNDConstruction of 12.0 M, 9.00 M, 6.0 M and 3.0 M wide Internal Roads in Sec 16 Majhola Yojna No 4 Ph 2 Vistar Moradabad. (Excluding PMAY pocket). 0.00 113.50 24/06/202030/07/2020 30/07/202029/01/202130/07/2020 30/07/2020M/s M.A. Associates RAHUL KUMAR JE RAJENDRA BAHADUR AE PAWAN KUMAR VERMA XECircle 5In Progress
228 07/EE/CD-22/2016-17PARISHAD PROJECT FUNDsupplying and fixing of signage board in mandola vihar GROUP-A 0.00 49.00 20/12/201626/12/2016 26/12/201625/01/201726/12/2016 26/12/2016DREAM INDIA INFRA DEVELOPERS PVT. LTD. JE HAR PHOOL SINGH AE LALTA PRASAD XECircle MantolaCompleted
229 08/EE/CD-22/2016-17PARISHAD PROJECT FUNDsupplying and fixing of signage boards in mandola vihar GROUP-B 0.00 21.00 20/12/201626/12/2016 26/12/201625/01/201726/12/2016 26/12/2016NIPON SIGMA INDIA PVT. LTD. JE HAR PHOOL SINGH AE LALTA PRASAD XECircle MantolaCompleted
230 02/EE/CD29/19-20AWASTHAPNA FUNDCONSTRUCTION OF BOUNDRYWALL IN PARK OF PASHCHIMPURI BETWEEN HOUSE NO-179 TO H.N-205 0.00 29.11 31/05/2019 30/11/201930/11/2019 30/11/2019SHYAM JI TRADERS 9917475285 Circle 6In Progress
231 30/SEHQ/CD14/2014-15PARISHAD PROJECT FUNDCONST.OF128NOS LIG(G+3)AFFORDABLE HOUSES 0.00 933.12 23/01/2015 23/01/2015 23/01/2015 23/01/2015A.N.BUILDERS RAM PRATAP,SUGENDRA KUMAR VISHWAKARMA,S. K. SINGH BHADAURIYA,SUBEDAR NAVIK,RAMESH CHANDRA CHAURASIYA JE ABHISHEK NATH TIWARI AE PRAMOD KUMAR SINGH XECircle HQCompleted
232 02/SE-3/CD-2/2018-19DT04.05.2018PARISHAD PROJECT FUNDConstruction of 128 Nos EWS Houses in Sec-13 VVY-4 Lucknow 0.00 708.96 15/12/201704/05/2018 04/05/201803/05/202004/05/2018 04/05/2018Dream Construction 9936086993A.B.SINGH,K.K.KATIYAR JE A.K.SAXENA AE A.K.MITTAL XECircle 3In Progress
233 01/S.E.-6/2014-15PARISHAD PROJECT FUNDConstruction of 96 No. 2BHK House Multistory (S+6) And Development work in sector-2C, Sikandra Yojna, Agra 0.00 2050.00 09/05/201407/06/2014 07/06/201406/12/201507/06/2014 07/06/2014GAUTAM BUILDERS 7055008855A.D. SHANDILYA JE AMIT RATHOR AE CHANDRAMA RAM XECircle 6Completed
234 32/EE/CD-12/2016-17PARISHAD PROJECT FUNDConstruction of 33 Nos. 18/40 Type SFS Houses at Shahabad Yojna, Hardoi. 0.00 93.50 13/09/201629/12/2016 29/12/201628/09/201729/12/2016 29/12/2016M/S Ram Sewak Hargovind Sahai 9415149653NARENDRA KUMAR JE SRI D.N. PANDEY AE SRI H.S. SHARMA XECircle VrindavanCompleted
235 03/SEHQ/CD15/18-19CENTRAL AND STATE FUNDConstruction of 288 Nos. (G+3) Flats under PMAY at Sector-10B, Avadh Vihar Yojna, Lucknow. 0.00 1095.88 05/04/201825/07/2018 25/07/201824/01/202025/07/2018 25/07/2018SINGHAL BROTHERS KAMTA PRASAD JE D.K.GOYAL AE D.B.YADAV XECircle HQIn Progress
236 06/SE-III/CD-13/18-19PARISHAD PROJECT FUNDConstruction of 192 Nos. EWS PMAY ( Shahri) Sector-7A Avadh Vihar Yojna Lucknow. 0.00 758.59 28/02/201825/08/2018 25/08/201824/02/202025/08/2018 25/08/2018SHAIL BUILDERS MEWALAL JE SAMRAJ AE BRIJEDRA PRATAP XECircle 3In Progress
237 03/SE-IV/16-17PARISHAD PROJECT FUNDConstruction of Community Center at sector-1B Y-02 Kanpur 0.00 154.85 24/02/201617/12/2016 17/12/201616/09/201717/12/2016 17/12/2016Tiwari Construction & Suppliers 9839190782MOHD. MUKHTAR KHAN JE NAGENDRA KUMAR AE PANKAJ VERMA XECircle 4Completed
238 25/SE(V)/2013-14PARISHAD PROJECT FUNDConstruction of 192 nos. F-82 Type G+3 Flats at Sector 17 VY 4 Lucknow 0.00 2302.33 16/09/201327/12/2013 27/12/201326/06/201527/12/2013 27/12/2013M/S ANIL KUMAR AND COMPANY 9810042333RAKESH KUMAR SAXENA,RAJESH KUMAR VERMA,ARUN KUMAR RAI JE Circle VrindavanCompleted
239 26/SE(V)/2013-14PARISHAD PROJECT FUNDConstruction of 64 Nos F-82 Type G+3 Plats at Sector 17 VY 4 Lko 0.00 771.78 16/09/201322/01/2014 22/01/201421/07/201522/01/2014 22/01/2014M/S SURAJ BUILDERS 05222782825AJAY KUMAR MISHRA,AKBAR ALI JE AKHILESHWAR SINGH AE ANIL KUMAR MISHRA,U.C. SINGH XECircle VrindavanCompleted
240 27/SE(V)/2013-147PARISHAD PROJECT FUNDConstruction of 128 Nos. F-82 Type G+3 Flats at Sector 17 VY4 Lko 0.00 1543.57 16/09/201322/01/2014 22/01/201421/07/201522/01/2014 22/01/2014M/S ALFA CONSTRUCTION 9415022888RAJIV RASTOGI JE AKHILESHWAR SINGH AE ANIL KUMAR MISHRA,U.C. SINGH XECircle VrindavanCompleted
241 11/EE/CU-ETAWAH/2015-16PARISHAD PROJECT FUNDSewer works for housing scheme in Spinning Mill Campus Etawah 0.00 87.00 19/01/201627/05/2016 15/03/201614/06/201627/05/2016 15/03/2016M/s Shelvi Traders 9458020057SRI ARUN KUMAR PATEL JE LAKHAN SINGH AE ARVIND KUMAR XECircle 4Completed
242 07/S.E-III/EE.CD-4/2018-19PARISHAD PROJECT FUNDConstruction of 176 Nos EWS PMAY(Shahri) Avas Yojna at Sec-7A Avadh Vihar Yojna Lucknow 0.00 779.89 29/06/201803/10/2018 03/10/201802/04/202003/10/2018 03/10/2018M/S Shagun Associates 9580328127CHANDAN KUMAR JE K.K ACHARYA AE PRASHANT VARDHAN XECircle 3In Progress
243 05/SE-V/2016-17PARISHAD PROJECT FUNDCONTSTRUCTION OF 96 Nos. (S+4) 2-BHK FLATS UNDER SELF FINANCE MAJHOLA YOJNA NO-4, PART-2 IN SECTOR-9A, MORADABAD. 0.00 907.00 21/11/201604/01/2017 04/01/201703/04/201804/01/2017 04/01/2017M/s R.K. & Company 8171211222RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XECircle 5Completed
244 08/EE/C.D-5/2018-19PARISHAD PROJECT FUNDConstruction of the 9.00 m wide road in Sector-5 at Jagriti Vihar (Extension) Scheme No.-11 Meerut. 0.00 63.74 16/11/201815/12/2018 15/12/201814/03/201915/12/2018 15/12/2018M/s Jitender Kumar Contractor 9012953595ER. MAHAVEER SINGH JE ER. D.K GOEL AE ER. PRAMOD KUMAR XECircle 2Completed
245 .5.02/SE(V)/CU3/2014-15PARISHAD PROJECT FUNDARAVALI ENCLAVE, CONSTRUCTION OF 560NOS. MULTISTORIED FLATS(B+S+10) 0.00 17600.00 20/02/2014 25/08/201424/08/2016 25/08/2014EKDANT INDIA LTD 07905208858ANIRUDDH PANDEY,MISHRI LAL,GANGA PRASAD,RAMASHANKAR RAM,MANOJ KUMAR KEWAT,TRILOKI RAM JE Circle HQIn Progress
246 02/EE/CD-24/17-18PARISHAD PROJECT FUNDConstruction of Trunk/Internal Road Work (Part-A) in Najibabad Scheme Bijnore 0.00 101.00 04/05/201712/06/2017 12/06/201711/12/201712/06/2017 12/06/2017ROYAL CONSTRUTION YOGESH KUMAR JE FARAZ ASLAM AE MOHAMMAD AZAM WARIS XECircle 5Completed
247 28/SE(V)/2013-14PARISHAD PROJECT FUNDConstruction of F-82 G+3 type 128 Nos. Flats at Sector 17 VY 4 Lko 0.00 1539.25 16/09/201305/02/2014 05/02/201404/08/201505/02/2014 05/02/2014M/S R.S. CONTRACTORS 9919919999AJAY KUMAR MISHRA JE AJAY KUMR MITTAL,AKHILESHWAR SINGH,RAJIV SRIVASTAVA AE U.C. SINGH,ANIL KUMAR MISHRA,NAVJOT SINGH VERMA XECircle VrindavanCompleted
248 14/EE/2017-18AWASTHAPNA FUNDStrengthning and widening at painth chauraha at Bulandshahar 0.00 115.18 08/01/201821/02/2018 21/02/201820/05/201821/02/2018 21/02/2018Sumanglam realtech (P) Ltd. 9312614747MAYANK KUMAR KAUSHIK,RAM KARISHAN GANGWAR JE SASMIT KATIYAR AE MUKESH YADAV XECircle 6Completed
249 31/SE(V)/2013-14PARISHAD PROJECT FUNDConstruction of 128 Nos F-82 G+3 Type Flats at Sector 17 VY 4 Lko 0.00 1552.33 16/09/201304/03/2014 04/03/201403/09/201504/03/2014 04/03/2014M/S PANDIT REALTER PVT LTD 9818098741ARUN KUMAR RAI,RAM PRATAP JE AKHILESHWAR SINGH AE ANIL KUMAR MISHRA,U.C. SINGH XECircle VrindavanCompleted
250 01/SE-IV/2013-14346.20 LACSConstruction of 30 Nos F-82 Type (G+3) Flats at sector-E(Part) Dr Ambedkarpurma Yojna no-3 Kalyanpur Kanpur 0.00 347.00 06/08/201325/10/2013 25/10/201324/01/201525/10/2013 25/10/2013subhash builders 9415126921SRI K. K KATIYAR JE SRI VIKAS GAUTAM AE SRI R.P GUPTA XECircle 4Completed
251 21/SEHQ/CD15/13-14PARISHAD PROJECT FUNDconstruction of 160 nos (G+3) basera-1 in sec-8 avadh vihar yojana lucknow 0.00 577.83 19/08/201320/02/2014 20/02/201417/04/201720/02/2014 20/02/2014ANIL KUMAR AMARJEET YADAV JE D.K.GOYAL AE V.B. SINGH XECircle HQCompleted
252 22/SEHQ/CD15/13-14PARISHAD PROJECT FUNDconstruction of 160 nos (G+3) houses in sec-8 avadh vihar yojana lucknow 0.00 577.83 19/08/201320/02/2014 20/02/201417/04/201720/02/2014 20/02/2014S.S.SOLANKI CONSTRUCTION SUDHAKAR SHAHI JE D.K.GOYAL AE V.B. SINGH XECircle HQCompleted
253 23/SEHQ/CD15/13-14PARISHAD PROJECT FUNDconstrution of 128+16 nos (G+3) hpuses in sec-8 avadh vihar yojana lucknow 0.00 718.81 19/08/201320/02/2014 20/02/201417/04/201720/02/2014 20/02/2014ALAKNANDA ASSOCIATES AMARJEET YADAV JE D.K.GOYAL AE V.B. SINGH XECircle HQCompleted
254 25/SEHQ/CD15/13-14PARISHAD PROJECT FUNDconstruction of 160 nos (G+3) houses in sec-8 avadh vihar yojana lucknow 0.00 799.66 19/08/201325/02/2014 25/02/201417/04/201725/02/2014 25/02/2014D.N.SINGAL KAMTA PRASAD JE D.K.GOYAL AE V.B. SINGH XECircle HQCompleted
255 15/EE/2017-18AWASTHAPNA FUNDStrengthening and widening of Shikarpur Tiraha at Bulandshahar 0.00 117.22 08/01/201820/03/2018 20/03/201819/06/201820/03/2018 20/03/2018ANULATA CONSTRUCTION COMP. 9568001575MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE MUKESH YADAV XECircle 6Completed
256 02/SE-5/2017-18DATED18.07.2017GEN. FUNDconstruction of 36 nos 57/128 type semi finished houses at sect.12 0.00 335.00 04/05/201718/07/2017 18/07/201717/03/201818/07/2017 18/07/2017M/S ANIL KUMAR 9415011392YOGESH KUMAR JE MANOJ KUMAR GUPTA AE PAWAN KUMAR VERMA XECircle 5Completed
257 20/SE(M)/CD36/2015-16PARISHAD PROJECT FUNDConst. of 544 Nos. 1BHK(S+4), Flats in Mandola Vihar Yojna, Ghaziabad 0.00 3186.79 20/10/201529/02/2016 29/02/201628/08/201729/02/2016 29/02/2016Bhati Associates Pvt. Ltd. 9810019394NANDA BALLABH CD36,SH. HAMENT KUMAR JE SANJEEV SHUKLA AE AMAN TYAGI XECircle MantolaCompleted
258 15/SE(M)/CD-10/15-16PARISHAD PROJECT FUNDConst. of 336 Nos. 2BHK (S+4) Flats in Mandola Vihar, Ghaziabad 0.00 2954.00 30/09/201504/02/2016 04/02/201603/08/201704/02/2016 04/02/2016M/s Mohan Infradevelopers Pvt. Ltd. 9675411111OMPRAKASH CD10,RADHEY SHYAM CD-10,SURAJ PAL CD10 JE RAM AVTAR MITTAL,RAVINDRA BHATT,SUMIT KUMAR CD10 AE A.V. SINGH,AMAN TYAGI,FARAZ ASLAM,RAJEEV KUMAR XECircle MantolaCompleted
259 16/SE(M)/CD-10/2015-16PARISHAD PROJECT FUNDConst. of 352 Nos. 2BHK (S+4) in Mandola vihar Yojna, Ghaziabad 0.00 3095.00 30/09/201504/02/2016 04/02/201603/08/201704/02/2016 04/02/2016M/s Subodh Construction Co. KAMLESH KUMAR CD10,PRANVEER SINGH CD10 JE SUMIT KUMAR CD10,T.K. BANERJEE AE A.V. SINGH,AMAN TYAGI,FARAZ ASLAM,RAJEEV KUMAR XECircle MantolaCompleted
260 01/SE-IV/2017Dt.30.08.2017PARISHAD PROJECT FUNDInternal Development Works in Community Centre, Sector-M, Kanpur 0.00 103.41 30/08/2017 30/08/201728/02/201830/08/2017 30/08/2017S. P. & COMPANY ER. SUGHAR SINGH JE ER. AIJAJ UDDIN AE ER. VINEET SINGHAL XECircle 4Completed
261 04/SE-IV/Kanpur/2015-16PARISHAD PROJECT FUNDConstruction of Community Centre at Sector-M, Scheme No. 1, Kanpur 0.00 341.96 26/05/201528/10/2015 28/10/201527/07/201628/10/2015 28/10/2015S. P. & COMPANY SUGHAR SINGH JE AIJAJ UDDIN AE ER. VINEET SINGHAL XECircle 4Completed
262 01/SE-5/2017-18Dated18.07.2017GEN. FUNDConstruction of 38 Nos. 75/200 Type Semifinished Houses at Sector-12 0.00 450.00 04/05/201718/07/2017 18/07/201717/03/201718/07/2017 18/07/2017M/S S.S. Solanki Constrauction 8765392315YOGESH KUMAR JE MANOJ KUMAR GUPTA AE PAWAN KUMAR VERMA XECircle 5Completed
263 01/SE-IV/2014-15827.57Construction of 42 Nos F-82 Type (G+3) Flats at Sector-E(Part) Dr Ambedkarpuram Yojna no-3 Kalyanpur kanpur 0.00 466.50 20/01/201407/04/2014 07/04/201406/07/201507/04/2014 07/04/2014subhash builders 9415126921SRI K. K KATIYAR,SRI PANKAJ KUMAR JE SRI VIKAS GAUTAM AE SRI R.P GUPTA XECircle 4Completed
264 06/SE-IV/2014-15827.57Construction of 28 Nos F-82 Type (G+3) Flats at sector-E (Part) Dr Ambedkarpuram Kalyanpur Kanpur 0.00 320.00 19/11/201423/03/2015 23/03/201522/06/201623/03/2015 23/03/2015subhash builders 9415126921SRI K. K KATIYAR,SRI MAHENDRA KUMAR JE SRI SHASHANK PANDEY AE SRI R.P GUPTA XECircle 4Completed
265 13/SE(M)/CD-36/2015-16PARISHAD PROJECT FUNDconst. of 256 Nos. 2BHK (S+4) Flats Mandola Vihar, Ghaziabad 0.00 2251.17 30/09/201514/01/2016 14/01/201613/07/201714/01/2016 14/01/2016SPG INFRAPROJECT PVT. LTD. 9410030650BHARAT SINGH CD36,NANDA BALLABH CD36 JE SANJEEV SHUKLA,VIRENDRA KUMAR AE AMAN TYAGI XECircle MantolaCompleted
266 19/SE(M)/CD-36/2015-16PARISHAD PROJECT FUNDConst. of 640 Nos. 1BHK (S+4) Flats in Mandola Vihar Yojna, Ghaziabad. 0.00 3843.08 30/10/201511/02/2016 11/02/201610/08/201711/02/2016 11/02/2016KASHYAPI INFRASTRUCTURE PVT. LTD. 9971799850BHARAT SINGH CD36,SH. HAMENT KUMAR JE SANJEEV SHUKLA AE AMAN TYAGI XECircle MantolaCompleted
267 02/SE-IV/Kanpur/2015-16PARISHAD PROJECT FUNDConstruction of 274 Nos. Multistoreyed Residential Flat in Sector-E, Scheme No. 3, Kanpur 0.00 8849.95 27/12/201412/05/2015 12/05/201511/11/201712/05/2015 12/05/2015M/S R.S. CONTRACTORS 9919919999ER VINAY CHAUHAN,ER. SUGHAR SINGH JE ER. VIKAS GAUTAM,KAILASH NATH AE ABHISHEK RAJ XECircle 4In Progress
268 01/EE/CD-20KANPUR/2018-19PARISHAD PROJECT FUNDSupply and Installation of Furniture 0.00 11.85 03/07/201828/09/2018 28/09/201827/11/201828/09/2018 28/09/2018Avinash Enterprises 9451220468ER. SUGHAR SINGH JE ER. AIJAJ UDDIN AE ER. VINEET SINGHAL XECircle 4Completed
269 03/EEC.D.-34/AwasthapnaNidhi/2018-19AWASTHAPNA FUNDRauja Trimuhani se Homiyopathic College tak Interlocking tiles Evam Tedwa Crossing Puliya tak dono Taraf R.C.C. Drain (Dhankan Sahit) ka Nirman 0.00 58.74 20/04/201801/06/2018 01/06/201830/09/201801/06/2018 01/06/2018PUJA ENTERPRISES 9653030053ARJUN VERMA JE SUMIT KUMAR AE RAM ACHAL VERMA XECircle 1Completed
270 02/EE/CD-35/2018-19AWASTHAPNA FUNDSTRENGTHING OF BITUMINOUS ROAD AND PROVIDING OF INTERLOCKING TILES H.No. C-16 to C-864, G.T.B. NAGAR YOJANA, PRAYAGRAJ. 0.00 61.00 10/04/201824/04/2018 24/04/201823/07/201824/04/2018 24/04/2018M/s Arun kumar agrawal & Co. 7355374124VINAY SRIVASTAV JE KAMALESHWAR NATH MISHRA AE SATENDRA KUMAR XECircle 1Completed
271 01/S.E.-1/C.D.-35/2018-19AWASTHAPNA FUNDProviding and laying of Interlocking Tiles on Both Patri at Nayay Marg, Allahabad 0.00 139.00 15/02/201805/04/2018 05/04/201804/07/201805/04/2018 05/04/2018M/s Malik Enterprises 9415648522HAWALDAR RAM,VINAY SRIVASTAV JE KAMALESHWAR NATH MISHRA AE SATENDRA KUMAR XECircle 1Completed
272 03/E.E./C.D-35/2018-19AWASTHAPNA FUNDSuplly and Instalation of Signage Board at Jhunsi Yojana-2 & 3, C.S.A. Nagar Yojana, G.T.B. Nagar Yojana and Dev Prayagam Yojana, Prayagraj. 0.00 56.46 10/04/201825/04/2018 24/04/201824/07/201825/04/2018 24/04/2018M/s Malik Enterprises 9415648522VINAY SRIVASTAV JE KAMALESHWAR NATH MISHRA AE SATENDRA KUMAR XECircle 1Completed
273 04/EE/2018-19AWASTHAPNA FUNDCONST. WORK OF INTERLOCKING ROAD & DRAIN FROM RAILWAY ROAD TO HOUSE OF HARENDRA SINGH VIA HOUSE OF RAKESH RAO IN PADRAUNA, KUSHINAGAR BY INFRASTRUCTURE FUND 0.00 39.94 29/12/201808/03/2019 08/03/201907/07/201908/03/2019 08/03/2019M/S RAJPOOT CONSTRUCTION RAVINDRA NATH,VIJAY BAHADUR JE AMIT KUMAR MALL AE J K KAUSHAL XECircle 1Completed
274 03/EE/2018-19AWASTHAPNA FUNDCONST. WORK OF INTERLOCKING ROAD & DRAIN FROM DR. VAIBHAV SRIVASTAV TO HOUSE OF MR. VERMA IN PADRAUNA KUSHINAGAR BY INFRASTRUCTURE 0.00 20.37 29/12/201808/03/2019 08/03/201907/07/201908/03/2019 08/03/2019M/S SANJEEV KUMAR SHAHI RAVINDRA NATH,VIJAY BAHADUR JE AMIT KUMAR MALL AE J K KAUSHAL XECircle 1Completed
275 08/SE-III/CD-13/18-19PARISHAD PROJECT FUNDConst. of 144 Nos EWS Flats under PMAY Sector-7 0.00 567.30 12/10/201807/01/2019 07/01/201906/07/202007/01/2019 07/01/2019PARWATI CONSTRUCTION 09950603874ROHAN RAJPUT JE RAGHUNANDAN PRASAD GUPTA AE BRIJEDRA PRATAP XECircle 3In Progress
276 09/SE-III/CD-13/18-19PARISHAD PROJECT FUNDConst. of 96 Nos EWS Houses (G+3) Under PMAY (Shahri) Sector-7 0.00 378.24 12/10/201807/01/2019 07/01/201906/07/202007/01/2019 07/01/2019M/s Bansal Traders 9450364731J.P. GAUTAM JE RAGHUNANDAN PRASAD GUPTA AE BRIJEDRA PRATAP XECircle 3In Progress
277 01/E.E/C.D-5/2018-19dt18-4-2018PARISHAD PROJECT FUNDLaying of Sewer Line in Sector-5 At Scheme No-11 Jagriti Vihar (Ext.) Meerut 0.00 41.80 05/01/201818/04/2018 18/04/201817/07/201818/04/2018 18/04/2018M/s Ganga and Componay 9412201897ER. OMPAL SINGH JE ER. DEVENDRA SINGH AE ER. PRAMOD KUMAR XECircle 2Completed
278 05/EE/CD-31PARISHAD PROJECT FUNDRenovation work of road and drain of pakri tree to sardar house to sri trithraj singh via little flower school at Om nagar, Disst. Sultanpur 0.00 58.35 02/03/2019 02/03/201901/06/201902/03/2019 02/03/2019S.S CONSTRUCTION MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XECircle HQCompleted
279 04/E.E/C.D-5/2018-19PARISHAD PROJECT FUNDConstruction of Boundray Wall & Gard Room of F-32 type Houses at sector-4 Scheme No-11 Jagriti Vihar (Ext.) Meerut. 0.00 55.00 14/08/201826/09/2018 26/09/201825/12/201826/09/2018 26/09/2018M/s Satish Kumar Contractor 9412705290ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XECircle 2Completed
280 01/EE/CD-35/2018-19DT.07/04/2018AWASTHAPNA FUNDSTRENGTHNING OF BITUMINOUS ROAD AND PROVIDING 0.00 70.00 15/02/201807/04/2018 07/04/201806/07/201807/04/2018 07/04/2018M/s Arun kumar agrawal & Co. 7355374124VINAY SRIVASTAV JE KAMALESHWAR NATH MISHRA AE SATENDRA KUMAR XECircle 1Completed
281 13/SE(HQ)/CD-31PARISHAD PROJECT FUNDConstruction of 42 Nos. 45/75 type house at Lohramau Yojna, Sultanpur 0.00 277.07 08/03/2019 08/03/201907/09/202008/03/2019 08/03/2019M/S Navneet Enterprises 9918381889MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XECircle HQIn Progress
282 12/SE(HQ)/CD-31PARISHAD PROJECT FUNDConstruction of 34 Nos 29/60 type finished houses at Lohramau Yojna Sultanpur 0.00 173.12 13/02/201905/03/2019 05/03/201904/09/202005/03/2019 05/03/2019M/S Lallu Singh & sons MANOJ KUMAR JE AE D.K. SRIVASTAVA XECircle HQCompleted
283 10/SE-2/2018-19PARISHAD PROJECT FUNDConst. of 240 No. Houses (G+3) under PMAY in Sec-2 Scheme No. 11 Meerut. Group A 0.00 927.70 21/01/201906/03/2019 06/03/201905/03/202106/03/2019 06/03/2019M/s Kumar Builders 9358403917S.P. SINGH JE SANJEEV KUMAR TIWARI AE SHRI RAJEEV KUMAR XECircle 2In Progress
284 11/SE-2/2018-19PARISHAD PROJECT FUNDConst. of 240 No. EWS Houses (G+3) under PMAY in Sec-2 0.00 927.70 21/01/201907/03/2019 07/03/201906/03/202107/03/2019 07/03/2019M/s Hindustan Steels 9415119201KHUSHALI JE MANOJ KUMAR SAXENA AE SHRI RAJEEV KUMAR XECircle 2In Progress
285 2/SE-7/2012-13PARISHAD PROJECT FUNDConstruction of Multi Storey Flats (Yamuna Apptt) 0.00 45440.00 24/12/201112/07/2012 12/07/201211/01/201512/07/2012 12/07/2012LARSEN & TOUBRO LIMITED 09450000009BHUVNESHWAR SINGH,NARENDRA PAL JE BHUVNESHWAR SINGH,ER. DEVENDRA SINGH,PRADEEP KUMAR AE ATUL KUMAR SINGH,S.C. RAI XECircle 7In Progress
286 06/EE/CD-31PARISHAD PROJECT FUNDSupply and laying of Rising main waterline from tubewell no 1 & 2 to water head tank at Lohramu yojna Sultanpur 0.00 12.16 08/03/2019 08/03/201907/05/201908/03/2019 08/03/2019M/S Gungun Trading Co. MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XECircle HQCompleted
287 05/EE/C.D-5/2018-19PARISHAD PROJECT FUNDLAYING & JOINTING INTERNAL WATER SUPPLY LINE IN SECTOR-5, AT SCHEME NO. 11, JAGRITI VIHAR (EXTENSION), MEERUT 0.00 12.38 15/09/201816/10/2018 16/10/201815/01/201916/10/2018 16/10/2018M/s Empire Construction Associates 9917701203ER. MAHAVEER SINGH JE ER. PINKU GAUTAM AE ER. PRAMOD KUMAR XECircle 2Completed
288 02/S.E.-I/LKO/AwasthpnaAWASTHAPNA FUNDअवस्थापना निधि के अन्तर्गत जनपद-वाराणसी नगर क्षेत्र के पाण्डेयपुर योजना (आवास विकास कालोनी) में स्थित विभिन्न पार्कों एवं पाथ वे का मिर्नाण कार्य 0.00 134.83 20/01/201728/06/2017 28/06/201727/10/201728/06/2017 28/06/2017Akhilesh Infra structure Pvt. Ltd. 9415202926ARJUN VERMA JE SUMIT KUMAR AE SAMAR UPADHAYAY XECircle 1Completed
289 02/EEC.D.-34/AwasthapnaNidhi/2018-19AWASTHAPNA FUNDTedwah crossing se majid tak C.C. Road Evam M.H. Inter college tak dono tarf R.C.C. Drain (Dhakan sahit) ka nirman 0.00 61.10 20/04/201801/06/2018 01/06/201830/09/201801/06/2018 01/06/2018PUJA ENTERPRISES 9653030053ARJUN VERMA JE SUMIT KUMAR AE SAMAR UPADHAYAY XECircle 1Completed
290 04/SE-5/2016-17PARISHAD PROJECT FUNDConstruction of 48 Nos. (S+4) 1BHK Flats in Sector-9A at Majhola Yojna No.-4, Phase-2, Moradabad 0.00 276.39 20/12/201604/01/2017 04/01/201703/04/201804/01/2017 04/01/2017M/S S.S. Solanki Constrauction 8765392315SURENDRA PRASAD JE DEVENDRA PAL SINGH AE SHOBHIT KUMAR PATHAK XECircle 5Completed
291 03/SE-5/2016-17PARISHAD PROJECT FUNDConstruction of Office Complex (G+2) in Sector-5 at Majhola Yojna No.-4, Phase-2, Moradabad 0.00 454.00 09/09/201608/12/2016 08/12/201602/03/201808/12/2016 08/12/2016M/S ANIL KUMAR 9415011392ANOOP KUMAR SHRIVASTAV,SATENDRA HYANKI JE ANIL KUMAR SAXENA,DEVENDRA PAL SINGH AE SASMIT KATIYAR,SHOBHIT KUMAR PATHAK XECircle 5In Progress
292 03/EE/C.D-5/2018-19PARISHAD PROJECT FUNDConstruction of 6.00 M, 9.00 M & 12.00 M Wide Road at Sector-5 in Scheme No.11 Jagtiri Vihar Extension Meerut 0.00 81.00 02/02/201818/04/2018 18/04/201817/06/201818/04/2018 18/04/2018M/s Jeet Construction Co. 9837021527ER. OMPAL SINGH JE ER. D.K GOEL AE ER. PRAMOD KUMAR XECircle 2Completed
293 02/EE/2019-20Dt09-08-2019AWASTHAPNA FUNDConstruction of Road and drain from 100 foota Road near Virsavaerkar Nagar to Kharanja of Viharmaan Nagla Vaya Holi Chauraha at Distt. Bareilly 0.00 99.63 11/06/201909/08/2019 07/11/201909/08/2019 Bhatia Construction Co. Circle 5In Progress
294 02/SE-7/2015-16PARISHAD PROJECT FUNDCONSTRUCTION OF 18.00MTR SERVICE ROAD 0.00 535.00 12/05/201528/08/2015 28/08/201527/05/201628/08/2015 28/08/2015S.S CONSTRUCTION SANJAY SHARMA JE SUDHIR KUMAR SHUKLA AE S.C. RAI XECircle 7Completed
295 05/EE/CD-6/2018-19PARISHAD PROJECT FUNDConst. of 01 No. park & 01 No. open space at Sec-4 (part) Scheme No. 11 Jagriti Vihar (Ext.) Meerut. 0.00 6.30 07/02/201908/03/2019 08/03/201907/06/201908/03/2019 08/03/2019M/S GURU CONSTRUCTION CO. 9997628189KHUSHALI JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
296 19/SE-2/2015-16PARISHAD PROJECT FUNDConst. of F-57 Type 64 No. Houses (G+3) under Samajvadi Awas Yojna. Group B 0.00 478.02 24/07/201524/09/2015 24/09/201523/03/201724/09/2015 24/09/2015M/s Hindustan Steels 9415119201NAVRATAN SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
297 20/SE-2/2015-16PARISHAD PROJECT FUNDConst. of F-57 Type 64 No. (G+3) Houses under Samajvadi Awas Yojna. Group C 0.00 478.02 24/07/201524/09/2015 24/09/201523/03/201724/09/2015 24/09/2015M/s Hindustan Steels 9415119201KHUSHALI JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
298 01/EE/2019-20DT01-07-2019AWASTHAPNA FUNDConstrucion of RCC Drain From Shri Kishan Honda to Khanna Furniture in Ward No 33 Swale Nagar Distt. Bareilly 0.00 92.59 01/03/201901/07/2019 01/07/201930/09/201901/07/2019 01/07/2019Vipin Bhatiya R.P TRIVEDI JE NAVEEN KUMAR VERMA AE RAJEEV KUMAR XECircle 5Not Started
299 10/E.E/C.D-5/2018-19PARISHAD PROJECT FUNDConstruction of 03 Nos Park in Sector5 at Scheme No11 Jagriti Vihar Ext Meerut 0.00 16.57 05/01/201905/02/2019 05/02/201904/05/201905/02/2019 05/02/2019M/ S SOHAN LAL CONTRACTOR 9808951209ER. DUJAI RAM JE ER. DEVENDRA SINGH AE ER. PRAMOD KUMAR XECircle 2Completed
300 21/SE-2/2015-16PARISHAD PROJECT FUNDConst. of F-57 Type 64 No. Houses (G+3) under Samajvadi Awas Yojna. Group D 0.00 478.02 24/07/201524/09/2015 24/09/201523/03/201724/09/2015 24/09/2015M/s Hindustan Steels 9415119201AJAB SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
301 10/EE/15-16INFRARenovation and widening of road from Champa Agrawal Bal Vidhya Mandir to Deen Dayal Park crossing & Mission School upto Sant Paul School Dampier Nagar Mathura. 0.00 53.30 04/09/201508/12/2015 08/12/201507/03/201608/12/2015 08/12/2015ARUN KUMAR AGARWAL & CO. 9759027944MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
302 22/SE-2/2015-16PARISHAD PROJECT FUNDConst. of F-57 Type 64 No. Houses (G+3) under Samajvadi Awas Yojna. Group E 0.00 478.02 24/07/201524/09/2015 24/09/201523/03/201724/09/2015 24/09/2015M/s Kumar Builders 9358403917S.P. SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
303 23/SE-2/2015-16PARISHAD PROJECT FUNDConst. of F-57 Type 64 No. Houses (G+3) under Samajvadi Awas Yojna. Group F 0.00 478.02 24/08/201524/09/2015 24/09/201523/03/201724/09/2015 24/09/2015M/s Kumar Builders 9358403917S.P. SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
304 30/EE/CD-12/2016-17PARISHAD PROJECT FUNDEarth Filling work in Gokul Gram Yojna-1, Munnu Khera, Lucknow. 0.00 40.64 06/08/201629/12/2016 29/12/201628/03/201729/12/2016 29/12/2016M/S Shivrudram Construction 9838308833KRISHNANAND JE ER. PANKAJ VERMA AE S.C. TRIPATHI XECircle VrindavanCompleted
305 24/SE-2/2015-16PARISHAD PROJECT FUNDConst. of F-57 Type 64 No. Houses (G+3) under Samjvadi Awas Yojna. Group G 0.00 478.02 24/07/201524/09/2015 24/09/201523/03/201724/09/2015 24/09/2015M/s Kumar Builders 9358403917AJAB SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
306 12/E.E/C.D-5/2018-19INFRAStrengthening of Roads in L Block at Scheme No3 Shastri Nagar Meerut 0.00 24.45 15/02/201908/03/2019 08/03/201907/05/201908/03/2019 08/03/2019ANUJ ASSOCIATE 9411902544ER. OMPAL SINGH JE ER. PINKU GAUTAM AE ER. PRAMOD KUMAR XECircle 2Completed
307 09/SEII/CD-6/2018-19PARISHAD PROJECT FUNDConst. of 7.5M, 9.0M & 12.0M with wide road in Sec-8 Jagriti Vihar (Ext.) Meerut. 0.00 162.25 14/12/201801/03/2019 01/03/201930/06/201901/03/2019 01/03/2019M/s Juneja Construction Pvt. Ltd. 9810787577S.P. SINGH JE SANJEEV KUMAR TIWARI AE SHRI RAJEEV KUMAR XECircle 2In Progress
308 01/SE-II/CD-8/14-15PARISHAD PROJECT FUNDConstruction of 16 Nos (One Block) F-64 Type Houses Four Story in Sector-4, Scheme-11, Meerut 0.00 174.67 15/01/201405/07/2014 05/07/201404/07/201505/07/2014 05/07/2014Jagdamba Construction 9412515396SH. SANDEEP KUMAR JE M BKAUSHIK AE M.B. KAUSHIK XECircle 2Completed
309 02/EE/2017-18PARISHAD PROJECT FUNDCONSTRUCTION OF INTERNAL DRAIN AND CULVERTS IN SECTOR-7 0.00 56.26 27/12/201723/02/2018 23/02/201822/06/201823/02/2018 23/02/2018M/s Mukesh Constructions 07017353650RAM KRISHAN GUPTA,SANJAY GUPTA JE SUDHIR KUMAR SHUKLA,YOGENDRA KUMAR VERMA AE ATUL KUMAR SINGH XECircle 7In Progress
310 06/EE/CD-6/2018-19PARISHAD PROJECT FUNDConst. of park in Sec-8 Scheme No. 11 Jagriti Vihar (Ext.) Meerut. 0.00 21.27 07/02/201908/03/2019 03/03/201907/07/201908/03/2019 03/03/2019M/S GURU CONSTRUCTION CO. 9997628189S.P. SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
311 03/SE-II/2017-18PARISHAD PROJECT FUNDConstruction of 7.50M, 9.00M & 12.00M wide Internal Roads at Sector-2, Jagriti Vihar (Ext.), Meerut 0.00 126.40 16/05/201701/01/2018 01/01/201830/04/201801/01/2018 01/01/2018G.K. Constructions 9997294280 JE M BKAUSHIK AE M.B. KAUSHIK XECircle 2Completed
312 03/SE-7/2016-17PARISHAD PROJECT FUNDLAYING & JOINTING OF INTERNAL SEWER LINE & CONSTRUCTION OF ROADS 0.00 244.00 14/12/201627/12/2016 27/12/201626/06/201727/12/2016 27/12/2016S.S.CONSTRUCTION RAM KRISHAN GUPTA,SANJAY SHARMA JE SUDHIR KUMAR SHUKLA AE ATUL KUMAR SINGH XECircle 7In Progress
313 05/EE/CD-8/2018-19PARISHAD PROJECT FUNDConstruction of Drain and Culvert in Sector-3 at Scheme-11, Jagriti Vihar (Ext.), Meerut 0.00 31.93 22/02/201908/03/2019 08/03/201907/09/201908/03/2019 08/03/2019Rajkamal Contractor 09358382054SH. HAMENT KUMAR JE SH. A.K. BANSAL AE SH. ARVIND KUMAR XECircle 2Completed
314 09/E.E/C.D-5/2018-19PARISHAD PROJECT FUNDConstruction of Sectorial Drain Culvert in Sector5 at Scheme No.11 Jagriti Vihar Ext Meerut 0.00 36.56 16/11/201826/12/2018 26/12/201825/03/201926/12/2018 26/12/2018M/S GURU CONSTRUCTION CO. 9997628189ER. DUJAI RAM JE ER. DEVENDRA SINGH AE ER. PRAMOD KUMAR XECircle 2Completed
315 02/SE-II/CD-8/14-15PARISHAD PROJECT FUNDConstruction of 16 Nos F-64 Type Houses Four Stories in Sector-4, Shceme-11, Jagriti Vihar (Ext.), Meerut 0.00 133.72 15/01/201405/07/2014 05/07/201404/07/201505/07/2014 05/07/2014Jagdamba Construction 9412515396SH. SANDEEP KUMAR JE M BKAUSHIK AE M.B. KAUSHIK XECircle 2Completed
316 01/EE/CD-1/2018-19PARISHAD PROJECT FUNDMAINTENANCE OF 24, 30, 50MTR WIDE ROAD 0.00 65.70 15/12/201806/03/2019 06/03/201905/05/201906/03/2019 06/03/2019M/s Juneja Construction Pvt. Ltd. 9810787577NARENDRA PAL JE YOGENDRA KUMAR VERMA AE ATUL KUMAR SINGH XECircle 7Completed
317 02/EE/CD-1/2018-19PARISHAD PROJECT FUNDSTRENGTHENING OF 50MTR WIDE ROAD (PART) 0.00 35.18 19/12/201806/03/2019 06/03/201905/06/201906/03/2019 06/03/2019M/s Shrijee Infraprojects Pvt. Ltd. NARENDRA PAL JE YOGENDRA KUMAR VERMA AE ATUL KUMAR SINGH XECircle 7Completed
318 18/SE-II/2015-16PARISHAD PROJECT FUNDConst. of F-57 Type 48 No. (G+3) Houses under Samajvadi Awas Yojna. Group A 0.00 358.51 24/07/201524/09/2015 24/09/201523/03/201724/09/2015 24/09/2015M/s Hindustan Steels 9415119201NAVRATAN SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
319 02/SE-II/CD-8/17-18PARISHAD PROJECT FUNDConstruction of 7.50M, 9.00M, 12.00M & 18.00M wide Internal Roads at Sector-3, Scheme-11, Jagriti Vihar (Ext.), Meerut 0.00 254.21 16/05/201726/10/2017 26/10/201725/02/201826/10/2017 26/10/2017M/S R.S. Builders 9837058948SH. SANDEEP KUMAR JE SH. RAVINDRA KUMAR AE M.B. KAUSHIK XECircle 2Completed
320 17/SE-II/2013-14PARISHAD PROJECT FUNDConstruction of 32 Nos F-64 Type Houses in Sector-4, Scheme-11, Jagriti Vihar (Ext.), Meerut 0.00 296.00 08/10/201328/01/2014 28/01/201427/01/201528/01/2014 28/01/2014Bankey Bihari Builder and Developers 9891225500SH. HAMENT KUMAR JE SH. A.K. BANSAL AE SH. ARVIND KUMAR XECircle 2Completed
321 04/EE/CD-1/2018-19PARISHAD PROJECT FUNDCONSTRUCTION OF ROADS, DRAINS & CULVERT IN COMMERCIAL AREA OF SECTOR-7 0.00 45.00 08/03/201909/03/2019 09/03/201931/03/202009/03/2019 09/03/2019M/s Ramesh Chand & Co. 9213288266NARENDRA PAL JE YOGENDRA KUMAR VERMA AE ATUL KUMAR SINGH XECircle 7In Progress
322 18/SE-II/2013-14PARISHAD PROJECT FUNDConstruction of 32 Nos F-64 Type Houses in Sector-4, Scheme-11, Jagriti Vihar (Ext.), Meerut 0.00 296.00 08/10/201328/01/2014 28/01/201427/01/201528/01/2014 28/01/2014Bankey Bihari Builder and Developers 9891225500SH. HAMENT KUMAR JE SH. A.K. BANSAL AE SH. ARVIND KUMAR XECircle 2Completed
323 08/EE/CD-6/2018-19PARISHAD PROJECT FUNDLaying of Internal Sewer Line at Sec-4 (part) Scheme No. 11 Jagriti Vihar (Ext.) Meerut. 0.00 12.65 07/02/201908/03/2019 08/03/201907/06/201908/03/2019 08/03/2019M/s Manpal 9719316437KHUSHALI JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
324 03/SE(P)CIRCLE/CD-21/2018-19CENTRAL AND STATE FUNDCONSTRUCTION OF 240 NOS FLATS (G+3) 0.00 1062.39 25/07/201806/09/2018 15/11/201805/12/202006/09/2018 15/11/2018SINGH ASSOCIATES 9450453113ADITYA KUMAR TRIPATHI JE A.K.SINHA AE JAGDISH KUMAR XECircle VrindavanIn Progress
325 03/EE/CD-6/2018-19PARISHAD PROJECT FUNDConst. of 3.00 m, 6.00, 7.50m & 9.00m wide internal road at Sec-4 part Scheme No. 11 Jagriti Vihar (Ext.) Meerut. 0.00 28.47 27/11/201809/01/2019 09/01/201908/04/201909/01/2019 09/01/2019M/s Mukesh Constructions 07017353650KHUSHALI JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
326 11/SE-II/2015-16PARISHAD PROJECT FUNDConstruction of 48 Nos F-64 Type (G+3) Houses in Sector-4, Scheme-11, Jagriti Vihar (Ext.), Meerut 0.00 450.00 24/06/201524/09/2015 24/09/201523/03/201724/09/2015 24/09/2015Bhatia Construction Co. SH. SANDEEP KUMAR JE SH. A.K. BANSAL AE SH. ARVIND KUMAR XECircle 2Completed
327 14/SE-II/2015-16PARISHAD PROJECT FUNDConstruction of 48 Nos F-64 Type (G+3) Houses in Sector-4, Scheme-11, Jagriti Vihar (Ext.), Meerut 0.00 450.00 24/06/201524/09/2015 24/09/201523/03/201724/09/2015 24/09/2015Fair Builders 9837059597SH. SANDEEP KUMAR JE SH. A.K. BANSAL AE SH. ARVIND KUMAR XECircle 2Completed
328 15/SE-II/2015-16PARISHAD PROJECT FUNDConstruction of 48 Nos F-64 Type (G+3) Houses in Sector-4, Scheme-11, Jagriti Vihar (Ext.), Meerut 0.00 450.00 24/06/201524/09/2015 24/09/201523/03/201724/09/2015 24/09/2015Fair Builders 9837059597SH. SANDEEP KUMAR JE SH. A.K. BANSAL AE SH. ARVIND KUMAR XECircle 2Completed
329 29/S.E-2/C.D-5/2015-16PARISHAD PROJECT FUNDConstruction of 48 nos Houses of F-32 Type in Sector -4 Jagriti Vihar Yojna No.-11 Meerut 0.00 170.00 24/07/201529/09/2015 29/09/201528/03/201729/09/2015 29/09/2015M/s Quality Builders & Engineers 9312870962ER. DUJAI RAM JE ER. DEVENDRA SINGH AE ER. PRAMOD KUMAR XECircle 2Completed
330 20/S.E-2/C.D-5/2013-14PARISHAD PROJECT FUNDConstruction of 64 nos Houses of F-32 Type in Sector -4 Jagriti Vihar Yojna No.-11 Meerut 0.00 229.00 12/11/201320/02/2014 20/02/201419/02/201420/02/2014 20/02/2014Bankey Bihari Builder and Developers 9891225500ER. DUJAI RAM JE ER. DEVENDRA SINGH AE ER. PRAMOD KUMAR XECircle 2Completed
331 21/S.E-2/C.D-5/2013-14PARISHAD PROJECT FUNDConstruction of 64 nos Houses of F-32 Type in Sector -4 Jagriti Vihar Yojna No.-11 Meerut 0.00 229.00 12/11/201320/02/2014 20/02/201419/02/201520/02/2014 20/02/2014Bankey Bihari Builder and Developers 9891225500ER. DUJAI RAM JE ER. DEVENDRA SINGH AE ER. PRAMOD KUMAR XECircle 2Completed
332 33/SE-II/2015-16PARISHAD PROJECT FUNDRemaining work of 16 Nos F-64 Type Houses in Scheme-11, Jagriti Vihar (Ext.), Meerut 0.00 90.00 16/09/201502/11/2015 02/11/201501/05/201602/11/2015 02/11/2015Rajkanwar Enterprises 9927876456SH. RAVINDRA KUMAR JE SH. A.K. BANSAL AE SH. ARVIND KUMAR XECircle 2Completed
333 34/SE-II/2015-16PARISHAD PROJECT FUNDRemaining Construction of 16 Nos F-64 Type Houses in Scheme-11, Jagriti Vihar (Ext.), Meerut 0.00 95.00 16/09/201502/11/2015 02/11/201501/05/201602/11/2015 02/11/2015Somya Buildtech 8439374674SH. RAVINDRA KUMAR JE SH. A.K. BANSAL AE SH. ARVIND KUMAR XECircle 2Completed
334 08/S.E-2/C.D-5/2014-15PARISHAD PROJECT FUNDConstruction of F-127 Type 40 Nos Houses at Sector-3 in Scheme No-11 Jagriti Vihar (Ext.) Meerut 0.00 1060.00 08/07/201401/09/2014 01/09/201428/02/201601/09/2014 01/09/2014M/s Garden Paradise 09810533337ER. DUJAI RAM JE ER. D.K GOEL,ER. PINKU GAUTAM AE ER. PRAMOD KUMAR XECircle 2Completed
335 04/SE(P)CIRCLE/CD-21/2018-19CENTRAL AND STATE FUNDCONSTRUCTION OF 240 NOS FLATS (G+3) 0.00 1062.39 25/07/201806/09/2018 15/11/201805/12/202006/09/2018 15/11/2018RAMSEVAK HARGOVIND SAHAI 9415149653ADITYA KUMAR TRIPATHI JE RAJ KAMAL SAXENA AE JAGDISH KUMAR XECircle VrindavanIn Progress
336 35/SE-II/2015-16PARISHAD PROJECT FUNDRemaining Construction work of 16 Nos F-64 Type Houses in Scheme-11, Jagriti Vihar (Ext.), Meerut 0.00 90.00 16/09/201503/11/2015 03/11/201502/05/201603/11/2015 03/11/2015Humi Construction Company 8267844228SH. SANDEEP KUMAR JE SH. A.K. BANSAL AE SH. ARVIND KUMAR XECircle 2Completed
337 36/SE-II/2015-16PARISHAD PROJECT FUNDRemaining Construction of 16 Nos F-64 Type Houses in Scheme-11, Jagriti Vihar (Ext.), Meerut 0.00 95.00 16/11/201503/11/2015 03/11/201502/05/201603/11/2015 03/11/2015Humi Construction Company 8267844228SH. SANDEEP KUMAR JE SH. A.K. BANSAL AE SH. ARVIND KUMAR XECircle 2Completed
338 09/SE-II/2015-16PARISHAD PROJECT FUNDConstruction of 48 Nos F-64 Type Houses in Sector-4, Scheme-11, Jagriti Vihar (Construction of 32 Nos F-64 Type Houses in Sector-4, Scheme-11, Jagriti Vihar (Ext.), MeerutExt.), Meerut 0.00 450.00 19/08/201523/09/2015 23/09/201522/03/201723/09/2015 23/09/2015M/s Gaurav Enterprises 9837408485SH. RAVINDRA KUMAR JE SH. A.K. BANSAL AE SH. ARVIND KUMAR XECircle 2Completed
339 12/SE-II/2015-16PARISHAD PROJECT FUNDConstruction of 48 Nos F-64 Type (G+3) Houses in Sector-4, Scheme-11, Jagriti Vihar (Ext.), Meerut 0.00 450.00 24/06/201524/09/2015 24/09/201523/03/201724/09/2015 24/09/2015Bhatia Construction Co. SH. HAMENT KUMAR JE SH. A.K. BANSAL AE SH. ARVIND KUMAR XECircle 2Completed
340 13/SE-II/2015-16PARISHAD PROJECT FUNDConstruction of 32 Nos F-64 Type (G+3) Houses in Sector-4, Scheme-11, Jagriti Vihar (Ext.), Meerut 0.00 300.00 24/06/201524/09/2015 24/09/201523/03/201724/09/2015 24/09/2015Fair Builders 9837059597SH. SANDEEP KUMAR JE SH. A.K. BANSAL AE SH. ARVIND KUMAR XECircle 2Completed
341 07/SE-II/2014-15PARISHAD PROJECT FUNDConstruction of 40 Nos F-100 Type (S+10) Houses in Sector-3, Scheme-11, Jagriti Vihar (Ext.), Meerut 0.00 670.00 15/01/201401/09/2014 01/09/201428/02/201601/09/2014 01/09/2014M/s Garden Paradise 09810533337SH. SANDEEP KUMAR JE M BKAUSHIK AE M.B. KAUSHIK XECircle 2Completed
342 16/S.E-2/C.D-5/2015-16PARISHAD PROJECT FUNDConstruction of 80 nos Houses of F-32 Type in 05 Nos. Block in Sector -4 Jagriti Vihar Yojna No.-11 Meerut 0.00 280.00 24/07/201524/09/2015 24/09/201523/03/201724/09/2015 24/09/2015M/s B.M.G Infra Pvt. Ltd 01203296395ER. DUJAI RAM JE ER. DEVENDRA SINGH AE ER. PRAMOD KUMAR XECircle 2Completed
343 17/S.E-2/C.D-5/2015-16PARISHAD PROJECT FUNDConstruction of 96 nos Houses of F-32 Type in 06 Nos. Block in Sector -4 Jagriti Vihar Yojna No.-11 Meerut 0.00 338.00 24/07/201524/09/2015 24/09/201523/03/201724/09/2015 24/09/2015M/s B.M.G Infra Pvt. Ltd 01203296395ER. DUJAI RAM JE ER. DEVENDRA SINGH AE ER. PRAMOD KUMAR XECircle 2Completed
344 25/S.E-2/C.D-5/2015-16PARISHAD PROJECT FUNDConstruction of 128 nos Houses of F-32 Type in Sector -4 Jagriti Vihar Yojna No.-11 Meerut 0.00 450.00 24/07/201524/09/2015 24/09/201523/03/201724/09/2015 24/09/2015AMIT CONSTRUCTION ER. OMPAL SINGH JE ER. DEVENDRA SINGH AE ER. PRAMOD KUMAR XECircle 2Completed
345 26/S.E-2C.D-5/2015-16PARISHAD PROJECT FUNDConstruction of 64 nos Houses of F-32 Type in Sector -4 Jagriti Vihar Yojna No.-11 Meerut 0.00 225.00 24/07/201524/09/2015 23/09/201523/03/201724/09/2015 23/09/2015AMIT CONSTRUCTION ER. OMPAL SINGH JE ER. DEVENDRA SINGH AE ER. PRAMOD KUMAR XECircle 2Completed
346 07/SE-II/2018-19PARISHAD PROJECT FUNDCONSTRUCTION OF 48 NOS F-45 TYPE (G+3) STOREY FLAT AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR (GROUP-A) 0.00 342.00 31/01/201830/07/2018 30/07/201829/01/202030/07/2018 30/07/2018M/S MOHAN INFRA DEVELOPERS PVT LTD 9412293363SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XECircle 2In Progress
347 08/SE-II/2018-19PARISHAD PROJECT FUNDCONSTRUCTION OF 32 NO. F-45 TYPE (G+3) HOUSES AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR (GROUP-B) 0.00 228.00 31/01/201830/07/2018 30/07/201829/01/202030/07/2018 30/07/2018M/s Mohan Infradevelopers Pvt. Ltd. 9675411111SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XECircle 2In Progress
348 27/S.E-2/C.D-5/2015-16PARISHAD PROJECT FUNDConstruction of 48 nos Houses of F-32 Type in Sector -4 Jagriti Vihar Yojna No.-11 Meerut 0.00 170.00 24/07/201529/09/2015 29/09/201528/03/201729/09/2015 29/09/2015A.S CONSRTUCTION 8273230008ER. OMPAL SINGH JE ER. PINKU GAUTAM AE ER. PRAMOD KUMAR XECircle 2Completed
349 28/S.E-2/C.D-5/2015-16PARISHAD PROJECT FUNDConstruction of 48 nos Houses of F-32 Type in Sector -4 Jagriti Vihar Yojna No.-11 Meerut 0.00 170.00 24/07/201529/09/2015 29/09/201528/03/201729/09/2015 29/09/2015A.S CONSRTUCTION 8273230008ER. OMPAL SINGH JE ER. DEVENDRA SINGH AE ER. PRAMOD KUMAR XECircle 2Completed
350 02/SE-II/2018-19PARISHAD PROJECT FUNDCONSTRUCTION OF 32 NO. F-70 TYPE (G+3) HOUSES AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR 0.00 394.00 31/01/201830/07/2018 30/07/201829/01/202030/07/2018 30/07/2018M/s Subodh Construction Co. INDERSAIN JE YOGENDRA KUMAR VERMA AE MUKESH YADAV XECircle 2In Progress
351 03/SE-II/2018-19PARISHAD PROJECT FUNDCONSTRUCTION OF 32 NO. F-70 TYPE (G+3) HOUSES AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR 0.00 394.00 31/01/201830/07/2018 30/07/201829/01/202030/07/2018 30/07/2018M/s Subodh Construction Co. INDERSAIN JE YOGENDRA KUMAR VERMA AE MUKESH YADAV XECircle 2In Progress
352 04/SE-II/2018-19PARISHAD PROJECT FUNDCONSTRUCTION OF 32 NO. F-70 TYPE (G+3) HOUSES AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR 0.00 394.00 31/01/201830/07/2018 30/07/201829/01/202030/07/2018 30/07/2018M/s Subodh Construction Co. INDERSAIN JE YOGENDRA KUMAR VERMA AE MUKESH YADAV XECircle 2In Progress
353 05/SE-II/2018-19PARISHAD PROJECT FUNDCONSTRUCTION OF 32 NO. F-70 TYPE (G+3) HOUSES AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR 0.00 394.00 31/01/201830/07/2018 30/07/201829/01/202030/07/2018 30/07/2018M/s Subodh Construction Co. INDERSAIN JE YOGENDRA KUMAR VERMA AE MUKESH YADAV XECircle 2In Progress
354 06/SE-II/2018-19PARISHAD PROJECT FUNDCONSTRUCTION OF 32 NO. F-70 TYPE (G+3) HOUSES AT SHAKUMBHARI VIHAR YOJNA, SAHARANPUR 0.00 394.00 31/01/201830/07/2018 30/07/201829/01/202030/07/2018 30/07/2018M/s Subodh Construction Co. INDERSAIN JE YOGENDRA KUMAR VERMA AE MUKESH YADAV XECircle 2In Progress
355 30/S.E-2/C.D-5/2015-16PARISHAD PROJECT FUNDConstruction of 128 nos Houses of F-32 Type in Sector -4 Jagriti Vihar Yojna No.-11 Meerut 0.00 450.00 14/08/201529/09/2015 29/09/201528/03/201729/09/2015 29/09/2015Sumanglam realtech (P) Ltd. 9312614747ER. DUJAI RAM JE ER. DEVENDRA SINGH AE ER. PRAMOD KUMAR XECircle 2Completed
356 31/S.E-2/C.D-5/2015-16PARISHAD PROJECT FUNDConstruction of 128 nos Houses of F-32 Type in Sector -4 Jagriti Vihar Yojna No.-11 Meerut 0.00 450.00 14/08/201529/09/2015 29/09/201528/03/201729/09/2015 29/09/2015MAYA SHEEL CONSTRUCTION 9910109866ER. OMPAL SINGH JE ER. PINKU GAUTAM AE ER. PRAMOD KUMAR XECircle 2Completed
357 32/S.E-2/C.D-5/2015-16PARISHAD PROJECT FUNDConstruction of 64 nos Houses of F-32 Type in Sector -4 Jagriti Vihar Yojna No.-11 Meerut 0.00 225.00 14/08/201529/09/2015 29/09/201528/03/201729/09/2015 29/09/2015MAYA SHEEL CONSTRUCTION 9910109866ER. OMPAL SINGH JE ER. DEVENDRA SINGH AE ER. PRAMOD KUMAR XECircle 2Completed
358 03/EE/ED-III/2018-19INFRADevelopment work related to beautification of different park/Crossing situated different sectors of Keshavpuram, Awas Vikas Scheme No. 1(Phase-II & III) Kanpur (High Mast Lightingh work) Group-C 0.00 33.25 21/02/201822/06/2018 21/09/201821/09/201822/06/2018 21/09/2018OM ASSOCIATES 9312359633ER. GHANSHYAM LAL JE ER. J S RAI AE ER. RAJENDRA SINGH XECircle ElectricalCompleted
359 04/E.E/C.D-5/2015-16PARISHAD PROJECT FUNDConstruction of 32 nos Houses of F-32 Type in Sector -4 Jagriti Vihar Yojna No.-11 Meerut 0.00 80.00 24/09/201505/11/2015 05/11/201504/05/201605/11/2015 05/11/2015Sumanglam realtech (P) Ltd. 9312614747ER. DUJAI RAM JE ER. DEVENDRA SINGH AE ER. PRAMOD KUMAR XECircle 2Completed
360 04/EE/ED-III/18-19INFRADevelopment work related to beautification of different park/Crossing situated different sectors of Keshavpuram, Awas Vikas Scheme No. 1(Phase-II & III) Kanpur (High Mast Lightingh work) Group-A 0.00 33.15 21/02/201830/07/2018 30/07/201829/10/201830/07/2018 30/07/2018DURGESH ENTERPIRSES 9415133227ER. GHANSHYAM LAL JE ER. J S RAI AE ER. RAJENDRA SINGH XECircle ElectricalCompleted
361 02/EE/ED-III/2018-19PARISHAD PROJECT FUNDStreet Lighting work in 28 Nos Houses area at Sector 13 Sikandara Yojna, Agra 0.00 5.25 21/02/201805/06/2018 05/06/201804/07/201805/06/2018 05/06/2018GAURAV CONSTRUCTION 9335088825ER. U C MISHRA JE ER. J S RAI AE ER. RAJENDRA SINGH XECircle ElectricalCompleted
362 21/EE/2018-19PARISHAD PROJECT FUNDExternal Electrification work (Transformation work) of Group housing Flates (G+3) Lohramau Yojna Sultanpur 0.00 21.43 01/11/201810/12/2018 10/12/201809/03/201910/12/2018 10/12/2018K. ELECTRIC WORKS PVT. LTD Circle ElectricalCompleted
363 12/SE(V)/CD-12/2014-15PARISHAD PROJECT FUNDConstruction of 224 Nos.(G+3) LIG Houses at Gokul Gram Yojna-I, Munnu Khera, Lucknow 0.00 1245.44 28/06/201420/11/2014 20/11/201419/05/201620/11/2014 20/11/2014SINGHAL BROTHERS KRISHNANAND JE O.P. PANDEY AE GYANESHWAR PRASHAD XECircle VrindavanCompleted
364 14/S.E-2/C.D-5/2013-14PARISHAD PROJECT FUNDConstruction of 96 nos Houses of F-32 Type in Sector -4 Jagriti Vihar Yojna No.-11 Meerut 0.00 344.00 12/11/201317/01/2014 17/01/201416/01/201517/01/2014 17/01/2014M/S RANA ENTERPRISESS 9837054788ER. OMPAL SINGH JE ER. PINKU GAUTAM AE ER. PRAMOD KUMAR XECircle 2Completed
365 05/E.E/C.D-5/2015-16PARISHAD PROJECT FUNDConstruction of 32 nos Houses of F-32 Type in Sector -4 Jagriti Vihar Yojna No.-11 Meerut 0.00 70.00 24/09/201505/11/2015 05/11/201504/05/201605/11/2015 05/11/2015Somya Buildtech 8439374674ER. DUJAI RAM JE ER. DEVENDRA SINGH AE ER. PRAMOD KUMAR XECircle 2Completed
366 06/E.E/C.D-5/2015-16PARISHAD PROJECT FUNDConstruction of 32 nos Houses of F-32 Type in Sector -4 Jagriti Vihar Yojna No.-11 Meerut 0.00 70.00 24/09/201505/11/2015 05/11/201504/05/201605/11/2015 05/11/2015Somya Buildtech 8439374674ER. OMPAL SINGH JE ER. PINKU GAUTAM AE ER. PRAMOD KUMAR XECircle 2Completed
367 07/E.E/C.D-5/2015-16PARISHAD PROJECT FUNDConstruction of 32 nos Houses of F-32 Type in Sector -4 Jagriti Vihar Yojna No.-11 Meerut 0.00 80.00 24/09/201505/11/2015 05/11/201504/05/201605/11/2015 05/11/2015Somya Buildtech 8439374674ER. DUJAI RAM JE ER. DEVENDRA SINGH AE ER. PRAMOD KUMAR XECircle 2Completed
368 08/E.E/C.D-5/2015-16PARISHAD PROJECT FUNDConstruction of 32 nos Houses of F-32 Type in Sector -4 Jagriti Vihar Yojna No.-11 Meerut 0.00 80.00 24/09/201505/11/2015 05/11/201504/05/201605/11/2015 05/11/2015Somya Buildtech 8439374674ER. OMPAL SINGH JE ER. PINKU GAUTAM AE ER. PRAMOD KUMAR XECircle 2Completed
369 04/SE(E)/LKO/18-19PARISHAD PROJECT FUNDEXT. ELECT. SEC-15, 1 BHK TYPE HOUSES AT MANDOLA VIHAR YOJNA GHAZIABAD 0.00 419.57 14/02/201910/03/2019 10/03/201909/09/201910/03/2019 10/03/2019M/S PRAKASH ENGINEERS 8527167618PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
370 05/EE/ED-III/2018-19INFRADevelopment work related to beautification of different park/Crossing situated different sectors of Keshavpuram, Awas Vikas Scheme No. 1(Phase-II & III) Kanpur (High Mast Lightingh work) Group-B 0.00 33.22 21/02/201830/07/2018 30/07/201829/10/201830/07/2018 30/07/2018DURGESH ENTERPIRSES 9415133227ER. GHANSHYAM LAL JE ER. J S RAI AE ER. RAJENDRA SINGH XECircle ElectricalCompleted
371 06/EE/ED-III/2018-19PARISHAD PROJECT FUNDSupply of 33 KV 5 MVA Power Transformer at Katai Mill Campus Awasiya Yojna, Etawah 0.00 73.87 08/02/201816/10/2018 16/10/201815/02/201916/10/2018 16/10/2018PREETI ELECTRIC WORK 9150011801ER. GHANSHYAM LAL JE ER. D. R. MAURYA AE ER. RAJENDRA SINGH XECircle ElectricalCompleted
372 05/SE(E)LKO/18-19PARISHAD PROJECT FUNDEXT.ELECT. WORK IN 2 BHK HOUSES SEC-16 B AT MANDOLA VIHAR YOJNA GHAZIABAD 0.00 576.00 25/01/201910/03/2019 10/03/201909/09/201910/03/2019 10/03/2019M/S PRAKASH ENGINEERS 8527167618PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
373 03/SE(E)LKO/18-19PARISHAD PROJECT FUNDCONSTR. OF 33/11 KV S/S AND 33 KV LINE AT SEC-7 MANDOLA VIHAR YOJNA GHAZIABAD 0.00 323.57 07/12/201806/03/2019 06/03/201905/03/202006/03/2019 06/03/2019M/S PRAKASH ENGINEERS 8527167618PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalIn Progress
374 02/SE(E)LKO/18-19PARISHAD PROJECT FUNDCONSTR. OF 33/11 KV S/S & 33 KV LINE AT SEC-3 MANDOLA VIHAR YOJNA GHAZIANAD . 0.00 323.78 07/12/201806/03/2019 06/03/201905/03/202006/03/2019 06/03/2019M/S PRAKASH ENGINEERS 8527167618PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalIn Progress
375 03/SE-V/2018-19CENTRAL AND STATE FUNDConstruction of 96 nos Flats ( G+3) under PM Avas Yojna (Urban) at Sec-16, Majhola Yojna, No-4, Ph-2 (Vistar) Moradabad (Gr-1A) 0.00 398.81 09/10/201811/01/2019 11/01/201910/07/202011/01/2019 11/01/2019M/s Swaroop Construction 9634245710RAHUL KUMAR,RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XECircle 5In Progress
376 18/EE/2018-19PARISHAD PROJECT FUNDSupply of 33/11 KV 02 No. 10 MVA power transformer at Manjhola Yojna no. 4 Phase-2 Moradabad 0.00 1.13 07/07/201828/11/2018 28/11/201828/02/201928/11/2018 28/11/2018Elecon Conductor 9837007408 Circle ElectricalCompleted
377 19/EE/2018-19PARISHAD PROJECT FUNDSITC of 01 Nop. 1200 LPM 62 mtr. head KSB make submersible pumping plant at Sector-19 Vrindavan Yojna Lucknow 0.00 7.89 22/09/201806/12/2018 06/12/201805/01/201806/12/2018 06/12/2018Preeti Electric works Circle ElectricalCompleted
378 02/SE-V/2018-19CENTRAL AND STATE FUNDConstruction of 96 nos Flats ( G+3) under PM Avas Yojna (Urban) at Sec-16, Majhola Yojna, No-4, Ph-2 (Vistar) Moradabad (Gr-1B) 0.00 398.81 09/10/201811/01/2019 11/01/201910/07/202011/01/2019 11/01/2019M/s Swaroop Construction 9634245710RAJENDRA BAHADUR,SARVESH KUMAR VERMA JE RAJ KUMAR AE PAWAN KUMAR VERMA XECircle 5In Progress
379 20/EE/2018-19PARISHAD PROJECT FUNDSITC of 01 No. 1000 LPM 62 mtr. head KSB make submersible pumping plant at Sector-3 Avadh Vihar Yojna Lucknow 0.00 7.83 22/09/201806/12/2018 06/12/201805/01/201906/12/2018 06/12/2018Preeti Electric works Circle ElectricalCompleted
380 01/SE(E)LKO/18-19PARISHAD PROJECT FUNDPROVIDING OF STREET LIGHT WORK AT VARIOUS SECTORS AT SIDDHARTHA VIHAR YOJNA 0.00 383.37 04/04/201828/08/2018 28/08/201801/06/201928/08/2018 28/08/2018M/S PRAKASH ENGINEERS 8527167618PANKAJ KUMAR PUSHKAR,SANJEEV KUMAR SINGH JE D.C SHUKLA,D.K PANDEY AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
381 04/SE-V/2018-19CENTRAL AND STATE FUNDConstruction of 96 nos Flats ( G+3) under PM Avas Yojna (Urban) at Sec-16, Majhola Yojna, No-4, Ph-2 (Vistar) Moradabad (Gr-1C) 0.00 398.81 09/10/201801/03/2019 01/03/201931/08/202001/03/2019 01/03/2019M/s Swaroop Construction 9634245710RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XECircle 5In Progress
382 10/EE/19-20ED-1PARISHAD PROJECT FUNDConst. 01 No. T/W 200 mtr. deep and its related work at Bhinga Road Avasiy yojna Bahraich 0.00 20.09 10/07/201913/08/2019 12/11/201913/08/2019 Rajkaran tubewell Pvt. Ltd. Circle ElectricalCompleted
383 27/EE/2018-19PARISHAD PROJECT FUNDExternal Electrification work for providing of 11 KV Source to proposed multistorg building in sector-5 & PMAYT at sector-10 Avadh Vihar Yojna Lucknow 0.00 237.94 01/12/201831/01/2019 31/01/201930/04/201931/01/2019 31/01/2019Preeti Electric works Circle ElectricalCompleted
384 04/SEM/2018-19PARISHAD PROJECT FUNDConstruction of 9m & 12m wide road in sec 4A (Plot Portion) Mandola Vihar Yojana Ghaziabad 0.00 195.00 22/12/201815/01/2019 15/01/201914/07/201915/01/2019 15/01/2019Ms Ramaxe Construction Co 9811554477H.S.TIWARI,U.S.CHAURASIYA JE R.A.MITTAL AE K. P. TRIPATHI,UMA NATH SHUKLA XECircle MantolaIn Progress
385 23/EE/2018-19PARISHAD PROJECT FUNDSupply & Fixing of 63 KVA (L-2) 02 No. Transformers (as per latest specification approved by PVVNL) & its related work in various sectors at Manjhola Yojna No. 4 Phase-2 Moradabad. 0.00 5.33 06/10/201820/12/2018 05/03/201919/03/201920/12/2018 05/03/2019Preeti Electric works Circle ElectricalCompleted
386 04/EE/ED-2,GZB/18-19PARISHAD PROJECT FUNDBALANCE EXTR. ELECT. WORK (LT) AT GANGA YAMUNA HINDON ENCLAVE SEC-7 SIDDHARTHA VIHAR YOJNA GHAZIABAD 0.00 41.89 04/10/201803/12/2018 03/12/201801/05/201903/12/2018 03/12/2018M/S OM ASSOCIATES 9312388633C.L. MAURYA JE TEAJ BIR SINGH AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
387 15/EE/ED-III/2018-19PARISHAD PROJECT FUNDExternal Electrification work at Sector-5 Jagrati Vihar Scheme No. 11, Meerut 0.00 106.61 06/02/201912/03/2019 12/03/201911/09/201912/03/2019 12/03/2019S S CONSTRUCTION 9999999645ER. GHANSHYAM LAL,ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE ER. RAJENDRA SINGH XECircle ElectricalCompleted
388 16/EE/ED-III/2018-19PARISHAD PROJECT FUNDExternal Electrification work at Sector-8 Jagrati Vihar Scheme No. 11, Meerut. (Group-A) 0.00 148.71 09/01/201912/03/2019 12/03/201911/07/201912/03/2019 12/03/2019S S CONSTRUCTION 9999999645ER. GHANSHYAM LAL,ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE ER. RAJENDRA SINGH XECircle ElectricalCompleted
389 17/EE/ED-III/2018-19PARISHAD PROJECT FUNDExternal Electrification work at Sector-8 Jagrati Vihar Scheme No. 11, Meerut. (Group-B) 0.00 135.41 28/01/201912/03/2019 12/03/201911/07/201912/03/2019 12/03/2019S S CONSTRUCTION 9999999645ER. GHANSHYAM LAL,ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE ER. RAJENDRA SINGH XECircle ElectricalCompleted
390 25/SE(M)2013-14PARISHAD PROJECT FUNDConst of 160 No EWS Houses in sec-17 Mandola Vihar Yojna Ghaziabad. 0.00 450.00 21/12/201318/02/2014 18/02/201417/08/201518/02/2014 18/02/2014BHARDWAJ CONSTRUCTION CO 9368640323ABHISHEK KUMAR MISHRA,LOKENDRA KUMAR,VIVEK KUMAR MAURYA JE SATYENDRA SINGH AE BISHEMBER SINGH,S.K. SIRVASTAVA XECircle MantolaCompleted
391 05/EE/CD-10/2018-19PARISHAD PROJECT FUNDConst. of Boundary Wall of 1BHK Flats in Sec-15 at Manodla Vihar Yojana, Gzb. 0.00 55.45 19/11/201808/03/2019 08/03/201907/09/201908/03/2019 08/03/2019M/s Mavi Construction Company 9818664691PRANVEER SINGH CD10,RADHEY SHYAM JE RAVINDRA BHATT AE CD-10,SUMIT KUMAR CD10 AE A.V. SINGH,AMAN TYAGI,FARAZ ASLAM XECircle MantolaCompleted
392 1/SE-6/2016-17PARISHAD PROJECT FUNDConst. of 25 Nos 45/75 Semifinished Houses Bulandshahar 0.00 141.00 15/09/201603/01/2017 03/01/201702/08/201703/01/2017 03/01/2017Sumanglam realtech (P) Ltd. 9312614747MAYANK KUMAR KAUSHIK,RAM KARISHAN GANGWAR JE SASMIT KATIYAR AE MUKESH YADAV XECircle 6Completed
393 10/EE/2017-18PARISHAD PROJECT FUNDConst. of 03 Nos 106/162 Semifinished Houses Bulandshahar 0.00 41.32 19/05/201714/08/2017 14/08/201713/03/201814/08/2017 14/08/2017Adit Buildcon 9313468158MAYANK KUMAR KAUSHIK,RAM KARISHAN GANGWAR JE SASMIT KATIYAR AE MUKESH YADAV XECircle 6Completed
394 03/SE-7/GZB/2015-16PARISHAD PROJECT FUNDExternal Development Work in Shikar Enclave Sec-15 Vasundhara Ghaziabad 0.00 350.00 30/07/201323/01/2016 23/01/201622/04/201623/01/2016 23/01/2016SAI CONSTRUCTION COMPEY 9311189551 Circle 7Completed
395 04/SE-PC/2015-16PARISHAD PROJECT FUNDCONSTRUCTION OF FLATS AT SECTOR H-6 1BHK & 2BHK FLATS 1044 NOS AND 216 NOS SFS FLAT AT AMRAPALI YOJNA HARDOI 0.00 28089.88 23/10/201525/02/2016 25/02/201610/09/201925/02/2016 25/02/2016SHAPOORJI PALLONJI & COMPANY. PVT. LTD 7624001125ANIL KUMAR,SHAILENDRA SINGH JE A.K.SINHA AE JAGDISH KUMAR XECircle VrindavanIn Progress
396 19/SE(V)/CD-12/14-15PARISHAD PROJECT FUNDConstruction of 80 No. (F-30) Type Houses at GGY-2, Bibi Khera, Lucknow. 0.00 346.12 27/09/201402/03/2015 02/03/201501/09/201602/03/2015 02/03/2015Sultapurp Builders & Suppliers Pvt. Ltd 9838204257A.K. SINHA,SURAJ KUMAR JE O.P. PANDEY AE GYANESHWAR PRASHAD XECircle VrindavanCompleted
397 05/SE(V)/CD-12/2014-15PARISHAD PROJECT FUNDConstruction of 96 Nos. LIG Houses at Gokul Gram Yojna-I, Munnu Khera, Lucknow 0.00 533.76 28/06/201415/11/2014 15/11/201414/05/201615/11/2014 15/11/2014Rituraj Traders 9415180245R.P. TIWARI JE DINESH CHANDRA RAI AE GYANESHWAR PRASHAD XECircle VrindavanCompleted
398 07/SE(V)/CD-12/2014-15PARISHAD PROJECT FUNDConstruction of 128 Nos.(G+3) EWS Houses at Gokul Gram Yojna-I, Munnu Khera, Lucknow 0.00 506.91 28/06/201415/11/2014 15/11/201414/05/201615/11/2014 15/11/2014M/S Aditya Engineers & Builders 9415149007VIJAY SINGH JE O.P. PANDEY AE GYANESHWAR PRASHAD XECircle VrindavanCompleted
399 08/SE(V)/CD-12/2014-15PARISHAD PROJECT FUNDConstruction of 128 Nos.(G+3) EWS Houses at Gokul Gram Yojna-I, Munnu Khera, Lucknow 0.00 506.91 28/06/201420/11/2014 20/11/201414/05/201620/11/2014 20/11/2014R.P.M. Construction 9450397977A.K. SINHA,SURAJ KUMAR JE O.P. PANDEY AE S.C. TRIPATHI XECircle VrindavanCompleted
400 09/SE(V)/CD-12/2014-15PARISHAD PROJECT FUNDConstruction of 192 Nos.(G+3) EWS Houses at Gokul Gram Yojna-I, Munnu Khera, Lucknow 0.00 755.70 28/06/201420/11/2014 20/11/201419/05/201620/11/2014 20/11/2014SATYA CONSTRUCTION A.K. SINHA,SURAJ KUMAR JE O.P. PANDEY AE S.C. TRIPATHI XECircle VrindavanCompleted
401 10/SE(V)/CD-12/2014-15PARISHAD PROJECT FUNDConstruction of 128 Nos.(G+3) EWS Houses at Gokul Gram Yojna-I, Munnu Khera, Lucknow 0.00 506.91 28/06/201420/11/2014 20/11/201419/05/201620/11/2014 20/11/2014M/S Apex Construction Company 9839098580D.C. RAI,KRISHNANAND JE ER. PANKAJ VERMA AE GYANESHWAR PRASHAD XECircle VrindavanCompleted
402 31/EE/2018-19PARISHAD PROJECT FUNDConstruction of 01 No. Tubewell 200 mtr deep & its related wrok in sector-17 at Vrindavan Yojna no. 4 Lucknow. 0.00 18.70 22/12/201823/03/2019 23/03/201922/06/201923/03/2019 23/03/2019M.A. Engineering works Circle ElectricalCompleted
403 30/EE/2018-19PARISHAD PROJECT FUNDConstruction of 01 No. tubewell 200 mtr. deep & its related work in sector -5 at Avadh Vihar Yojna Lucknow 0.00 18.70 22/12/201827/02/2019 27/02/201926/05/201927/02/2019 27/02/2019M.A. Engineering works Circle ElectricalCompleted
404 29/EE/2018-19PARISHAD PROJECT FUNDConstruction of 01 No. Tubewell 200 mtr. deep & its related wrok in sector-7A at Avadh Viihar Yojna Lucknow 0.00 18.70 22/12/201822/02/2019 27/02/201926/05/201922/02/2019 27/02/2019Preeti Electric works Circle ElectricalCompleted
405 03/EE/ED-2,GZB/18-19PARISHAD PROJECT FUNDEXTR. ELECT. WORK LT RINGMAIN (UGS) AT VISTHAPIT AREA SEC-7 SIDDHARTHA VIHAR YOJNA GHAZIABAD 0.00 9.88 04/10/201803/12/2018 03/12/201801/05/201903/12/2018 03/12/2018M/S K ELECTRIC WORK PRIVATE LIMITED 9451446898C.L. MAURYA JE TEAJ BIR SINGH AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
406 28/EE/2018-19PARISHAD PROJECT FUNDExternal Electrification work for providing 11 KV source to proposed multistory building in sector-5 PMAY at sector-10, Avadh Vihar Yojna Lucknow. (Group-B) 0.00 164.12 01/12/201831/01/2019 31/01/201930/04/201931/01/2019 31/01/2019Preeti Electric works Circle ElectricalCompleted
407 01/EE/ED-2GZB/18-19PARISHAD PROJECT FUNDSITC OF MAIN LT PANNEL AT GANGA YAMUNA HINDON AT SIDDHARTHA VIHAR YOJNA. 0.00 76.70 04/05/201814/06/2018 14/06/201831/12/201814/06/2018 14/06/2018EAGLE CONSTRUCTION 9415103222C.L. MAURYA JE TEAJ BIR SINGH AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
408 04/EE/2016-17PARISHAD PROJECT FUNDConst of Shamshan Ghat in sec-13 mandola vihar yojna ghaziabad 0.00 72.00 16/07/201615/10/2016 15/10/201614/07/201715/10/2016 15/10/2016D.P. ULTRA ENGINEERS PVT. LTD. 9871533996ABHISHEK KUMAR MISHRA,NARESH KUMAR GUPTA JE SATYENDRA SINGH AE BISHEMBER SINGH,D.V.SINGH,SHOBHIT KUMAR PATHAK XECircle MantolaCompleted
409 15/EE/2018-19PARISHAD PROJECT FUNDExternal Electrification work (LT work) of Labourers sahkari Awas Samiti Ltd. in sector-5 Manjhola Yojna No. 4 Phase-2 Moradabad 0.00 54.24 07/08/201819/09/2018 19/09/201818/12/201819/09/2018 19/09/2018Preeti Electric works Circle ElectricalCompleted
410 08/EE/ED-2GZB/18-19PARISHAD PROJECT FUNDPREPRATION OF SURVEY REPORT AND OBTAINING FROM CGWA FOR BORING WATER AT MANDOLA VIHAR YOJNA GHAZIABAD 0.00 15.34 07/12/201809/03/2019 09/03/201908/05/201909/03/2019 09/03/2019M/S THINK GREEN ENVIRO SYSTEMS 8468919498PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalIn Progress
411 22/EE/2018-19PARISHAD PROJECT FUNDConstruction of 02 No. pump operator room at Lohramau Yojna Sultanpur 0.00 16.87 07/07/201810/12/2018 10/12/201809/02/201910/12/2018 10/12/2018J.P.TRADERS Circle ElectricalCompleted
412 05/SE(V)/CD-3/2018-19CENTRAL AND STATE FUNDप्रधानमंत्री आवास योजना 240 नग भवन (ग्रुप-अ) 0.00 940.00 28/02/201806/09/2018 06/09/201805/03/202006/09/2018 06/09/2018Mahesh Infracon Pvt. Ltd. 9456607152ANOOP JAISWAL JE UDAIVEER SINGH AE PANKAJ VERMA XECircle VrindavanIn Progress
413 01/SEM/2018-19PARISHAD PROJECT FUNDROAD WORKS IN SEC- 4A (ASRA 1 & 2) MANDOLA VIHAR GHAZIABAD 0.00 145.00 13/03/201830/05/2018 30/05/201829/09/201830/05/2018 30/05/2018M/S Yava Prefab Pvt Ltd 9810117488H.S.TIWARI,U.S.CHAURASIYA JE R.A.MITTAL AE K. P. TRIPATHI,UMA NATH SHUKLA XECircle MantolaCompleted
414 03/SE(V)/CD-3/2018-19CENTRAL AND STATE FUNDप्रधानमंत्री आवास योजना 240 नग भवन (ग्रुप-बी) 0.00 940.00 28/02/201816/08/2018 16/08/201815/02/202016/08/2018 16/08/2018Mahesh Infracon Pvt. Ltd. 9456607152NARAYAN PRASHAD JE R.P. GUPTA AE PANKAJ VERMA XECircle VrindavanIn Progress
415 04/SE(V)/CD-3/2018-19CENTRAL AND STATE FUNDप्रधानमंत्री आवास योजना 192 नग भवन (ग्रुप-सी) 0.00 752.00 28/02/201823/08/2018 23/08/201822/02/202023/08/2018 23/08/2018Mahesh Infracon Pvt. Ltd. 9456607152KAMAL DEO PRASAD JE UDAIVEER SINGH AE PANKAJ VERMA XECircle VrindavanIn Progress
416 01/SE(V)/CD-3/2018-19CENTRAL AND STATE FUNDप्रधानमंत्री आवास योजना 144 नग (ग्रुप-डी) 0.00 564.00 28/02/201823/07/2018 23/07/201822/01/202023/07/2018 23/07/2018M/S Aditya Engineers & Builders 9415149007KAMAL DEO PRASAD JE SHARAD KUMAR AE PANKAJ VERMA XECircle VrindavanIn Progress
417 02/SE(V)/CD-3/2018-19CENTRAL AND STATE FUNDप्रधानमंत्री आवास योजना 144 नग भवन (ग्रुप-ई) 0.00 564.00 28/02/201827/07/2018 27/07/201826/01/202027/07/2018 27/07/2018Ahmad Builders 7905820562KAMAL DEO PRASAD JE SHARAD KUMAR AE PANKAJ VERMA XECircle VrindavanIn Progress
418 22/SE(M)/2013/14PARISHAD PROJECT FUNDconstruction of 256 nos Ews houses in sec 17 mandola vihar yojna ghaziabad. 0.00 720.00 21/12/201318/02/2014 18/02/201417/08/201518/02/2014 18/02/2014M/S PANDIT REALTER PVT LTD 9818098741VEER SINGH JE SATYENDRA SINGH AE BISHEMBER SINGH,S.K. SIRVASTAVA XECircle MantolaCompleted
419 11/EE/ED-III/2018-19PARISHAD PROJECT FUNDExternal Electrification work of Balance Pocket in Sector-3 and 4 at Shakumbhari Vihar Yojna Saharanpur. 0.00 56.14 11/02/201901/03/2019 01/03/201930/06/201901/03/2019 01/03/2019R K and Company 8171211222ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE ER. RAJENDRA SINGH XECircle ElectricalCompleted
420 01/SE(M)/CD-10/2017-18PARISHAD PROJECT FUNDConst. of 1150 KL. Capacity & 29 M. Staging OHT at Sec-17, Mandola Vihar, Gzb. 0.00 148.52 20/09/201706/01/2018 06/01/201805/04/201906/01/2018 06/01/2018M/S Arora R.C.C. Works 9837391824OMPRAKASH CD10,RADHEY SHYAM CD-10,SURAJ PAL CD10 JE SUMIT KUMAR CD10 AE A.V. SINGH XECircle MantolaCompleted
421 02/EE/CD-10/2015-16PARISHAD PROJECT FUNDConst. of 16 Nos. Asra Type-1 Residential Flats (G+3) in Sec-4A, Mandola Vihar Yojana, Gzb. 0.00 61.20 06/07/201521/11/2015 21/11/201520/05/201721/11/2015 21/11/2015M/S MOHAN INFRA DEVELOPERS PVT LTD 9412293363OMPRAKASH CD10 JE SUMIT KUMAR CD10,T.K. BANERJEE AE A.V. SINGH,RAJEEV KUMAR XECircle MantolaCompleted
422 21/SE(M)/CD-10/2015-16PARISHAD PROJECT FUNDConst. of 16 Nos. Asra Type-2 Residental Flats (G+3) in Sec-4A, Mandola Vihar Yojana, Gzb. 0.00 98.80 06/07/201529/02/2016 29/02/201628/08/201729/02/2016 29/02/2016M/S MOHAN INFRA DEVELOPERS PVT LTD 9412293363RADHEY SHYAM CD-10,SURAJ PAL CD10 JE SUMIT KUMAR CD10,T.K. BANERJEE AE A.V. SINGH,RAJEEV KUMAR XECircle MantolaCompleted
423 23/SE(M)/2013/14PARISHAD PROJECT FUNDConst of 224 Nos EWS Houses in sec-17 Mandola vihar yojna Ghaziabad 0.00 625.00 21/12/201318/02/2014 18/02/201417/08/201518/02/2014 18/02/2014RANA ENTERPRISES 9837054788JEET SINGH JE SATYENDRA SINGH AE BISHEMBER SINGH,S.K. SIRVASTAVA XECircle MantolaCompleted
424 04/EE/CD-10/2018-19PARISHAD PROJECT FUNDConst. of Boundary Wall of 2BHK Flats in Sec-16B, Mandola Vihar Yojana, Gzb. 0.00 85.86 19/11/201808/03/2019 08/03/201907/09/201908/03/2019 08/03/2019M/s Mavi Construction Company 9818664691OMPRAKASH CD10,RADHEY SHYAM CD-10 JE T.K. BANERJEE AE A.V. SINGH,AMAN TYAGI,FARAZ ASLAM XECircle MantolaCompleted
425 24/SE(M)/2013/14PARISHAD PROJECT FUNDConst of 160 No EWS Houses in sec-17 Mandola Vihar Yojna Ghaziabad. 0.00 450.00 21/12/201318/02/2014 18/02/201417/08/201518/02/2014 18/02/2014CHOUDHARY CONSTRUCTION CO 9811009115JEET SINGH JE SATYENDRA SINGH AE BISHEMBER SINGH,S.K. SIRVASTAVA XECircle MantolaCompleted
426 11/SE(V)/CD-12/2014-15PARISHAD PROJECT FUNDConstruction of 96 Nos.(G+3) EWS Houses at Gokul Gram Yojna-I, Munnu Khera, Lucknow 0.00 382.52 28/06/201420/11/2014 20/11/201419/05/201620/11/2014 20/11/2014SKYLARK ENTERPRISES 9838937027D.C. RAI,KRISHNANAND JE ER. PANKAJ VERMA AE GYANESHWAR PRASHAD XECircle VrindavanCompleted
427 07/SE(M)/CD-10/2015-16PARISHAD PROJECT FUNDConst. of Community Centre in Sec-4A, Mandola Vihar Yojana, Delhi Saharanpur Road, Gzb. 0.00 216.98 03/03/201508/07/2015 08/07/201507/07/201608/07/2015 08/07/2015M/s Subodh Construction Co. KAMLESH KUMAR CD10 JE SUMIT KUMAR CD10 AE A.V. SINGH,RAJEEV KUMAR XECircle MantolaCompleted
428 02/EE/CD-10/2018-19PARISHAD PROJECT FUNDConstruction of Boundary wall of OHT Campus Sec-17, at Mandola Vihar Yojana , Gzb. 0.00 12.33 31/07/201819/11/2018 19/11/201818/02/201919/11/2018 19/11/2018M/s Lakshman Buildcon 9911124786KAMLESH KUMAR CD10 JE SUMIT KUMAR CD10,T.K. BANERJEE AE A.V. SINGH,AMAN TYAGI,FARAZ ASLAM XECircle MantolaCompleted
429 06/SE(V)/CD-12/2014-15PARISHAD PROJECT FUNDConstruction of 128 LIG (G+3) Houses at Gokul Gram Yojna-I, Munnu Khera, Lucknow. 0.00 711.68 28/06/201415/11/2014 15/11/201414/05/201615/11/2014 15/11/2014RAMSEVAK HARGOVIND SAHAI 9415149653D.C. RAI,LAL BAHADUR SHARMA JE ER. PANKAJ VERMA AE GYANESHWAR PRASHAD XECircle VrindavanCompleted
430 30/EE/2016-17PARISHAD PROJECT FUNDConst. of 02 Nos 80/122 Semifinished Houses Bulandshahar 0.00 20.82 02/06/201629/08/2016 29/08/201630/03/201729/08/2016 29/08/2016JITENDRA SINGH MAYANK KUMAR KAUSHIK,RAM KARISHAN GANGWAR JE SASMIT KATIYAR AE MUKESH YADAV XECircle 6Completed
431 05/EE/CD-36/2017-18PARISHAD PROJECT FUNDDevelopment of Commercial Plot in Sector-4A at Mandola Vihar, Ghaziabad 0.00 16.87 19/08/201709/11/2017 09/11/201708/05/201809/11/2017 09/11/2017M/s Lakshman Buildcon 9911124786BHARAT SINGH CD36,NANDA BALLABH CD36 JE RAJKAMAL SAXENA CD36,VIRENDRA KUMAR AE AMAN TYAGI XECircle MantolaCompleted
432 31/EE/2016-17PARISHAD PROJECT FUNDConst. of 24 Nos 18/40 Semifinished Houses Bulandshahar 0.00 63.35 30/04/201629/08/2016 29/08/201628/03/201729/08/2016 29/08/2016N.S. Const. 9897041950MAYANK KUMAR KAUSHIK,RAM KARISHAN GANGWAR JE SASMIT KATIYAR AE MUKESH YADAV XECircle 6Completed
433 04/EE/CD-36/2017-18PARISHAD PROJECT FUNDConstruction of 24m Wide Road F6-F7 in Sec-4A & 4B at Mandola Vihar Yojna, Ghaziabad 0.00 60.17 19/08/201727/10/2017 27/10/201726/01/201827/10/2017 27/10/2017Ms Ramaxe Construction Co 9811554477BHARAT SINGH CD36,NANDA BALLABH CD36 JE RAJKAMAL SAXENA CD36 AE AMAN TYAGI XECircle MantolaCompleted
434 29/EE/2016-17PARISHAD PROJECT FUNDConst. of 21 Nos 29/60 Semifinished Houses Bulandshahar 0.00 98.43 02/06/201602/08/2016 02/08/201601/03/201702/08/2016 02/08/2016Sirohi Const. Comp. 9412303326MAYANK KUMAR KAUSHIK,RAM KARISHAN GANGWAR JE SASMIT KATIYAR AE MUKESH YADAV XECircle 6Completed
435 13/SE(V)/CD-12/2014-15PARISHAD PROJECT FUNDConstruction of 224 Nos.(G+3) LIG Houses at Gokul Gram Yojna-I, Munnu Khera, Lucknow 0.00 1245.44 28/06/201420/11/2014 20/11/201419/05/201620/11/2014 20/11/2014SARVESH RAI 8707238089SURAJ KUMAR JE O.P. PANDEY AE GYANESHWAR PRASHAD XECircle VrindavanCompleted
436 2/EE/16-17PARISHAD PROJECT FUNDConstruction of 11 KV linw work from 33/11 KV S/S to mandakani Enclave/Bhagirathi Enclave & Avadh shilp gram at Sector-3 in Avadh Vihar Yojna Lucknow 0.00 99.91 23/02/201606/04/2016 06/04/201605/06/201606/04/2016 06/04/2016EASTE CONSTRUCTIONS Circle ElectricalCompleted
437 01/EE/CD-6/2018-19PARISHAD PROJECT FUNDLaying & Jointing of internal water supply line Sec-8. 0.00 14.63 26/04/2018 26/04/201825/07/201826/04/2018 26/04/2018J.P.TRADERS NAVRATAN SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
438 12/EE/2017-18PARISHAD PROJECT FUNDConst. of Internal drains & culverts at Sec-3 A & 4 0.00 84.00 16/10/201727/10/2017 27/10/201726/04/201827/10/2017 27/10/2017M/s Krishna Associates 8630210491NAVRATAN SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
439 3/EE/16-17PARISHAD PROJECT FUNDS/I of 1000 LPM 52 mtr. head capacity KSB make submersible pumping plant for T/W at sector-4 in Avadh Vihar Yojna Lucknow 0.00 5.39 11/04/201601/05/2016 11/05/201610/06/201601/05/2016 11/05/2016M.A. Engineering works Circle ElectricalCompleted
440 4/EE/16-17PARISHAD PROJECT FUNDS/I of 1000 Lpm 52 mtr. head capacity KSB make submersible pumping plant for T/W at Sector-10 in Vrindavan Yojna no. 2 phase-2 Lucknow. 0.00 5.39 11/04/201611/05/2016 11/05/201610/06/201611/05/2016 11/05/2016M.A. Engineering works Circle ElectricalCompleted
441 5/EE/16-17PARISHAD PROJECT FUNDS/F of Street light fittings at Amrpali Yojna Hardoi Road Lucknow 0.00 19.70 11/04/201611/05/2016 11/05/201610/06/201611/05/2016 11/05/2016Preeti Electric works Circle ElectricalCompleted
442 07/SE-2/2015-16PARISHAD PROJECT FUNDConst. of 48 No. F-64 Type (G+3) Houses. Group E 0.00 421.50 29/07/201523/09/2015 23/09/201522/03/201723/09/2015 23/09/2015AMIT CONSTRUCTION KHUSHALI JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
443 7/EE/16-17PARISHAD PROJECT FUNDExt. Elect. work for related to lighting work in Avadh Shilp Gram at Avadh Vihar Yojna Lucknow 0.00 98.48 21/09/201528/05/2016 28/05/201627/11/201628/05/2016 28/05/2016Preeti Electric works Circle ElectricalCompleted
444 01/SE-M/2015-16PARISHAD PROJECT FUNDInternal Development work (Sewer & Road) of Mandola Village, Ghaziabad 0.00 333.82 07/02/201501/05/2015 01/05/201531/01/201601/05/2015 01/05/2015M/s Apex Construction Co. 9412280150BHARAT SINGH CD36,NANDA BALLABH CD36 JE RAJKAMAL SAXENA CD36 AE AMAN TYAGI XECircle MantolaCompleted
445 28/EE/2016-17PARISHAD PROJECT FUNDConst. of 24 Nos 29/60 Semifinished Houses Khurja 0.00 95.34 02/06/201627/07/2016 27/07/201626/02/201727/07/2016 27/07/2016Lord Shiva Shiv Const. 8859503517MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE MUKESH YADAV XECircle 6Completed
446 02/SE-M/CD-36/2015-16PARISHAD PROJECT FUNDInternal Development work (Sewer & Road) of Mandola Vihar Ghaziabad 0.00 372.97 11/03/201501/05/2015 01/05/201531/01/201601/05/2015 01/05/2015M/s Apex Construction Co. 9412280150BHARAT SINGH CD36,NANDA BALLABH CD36 JE RAJKAMAL SAXENA CD36 AE AMAN TYAGI XECircle MantolaCompleted
447 14/SE(V)/CD-12/2014-15PARISHAD PROJECT FUNDConstruction of 96 Nos. EWS Houses at Gokul Gram Yojna-I, Munnu Khera, Lucknow. 0.00 382.52 28/06/2014 27/11/201426/05/2016 27/11/2014M/s Bansal Traders 9450364731D.C. RAI JE ER. PANKAJ VERMA AE GYANESHWAR PRASHAD XECircle VrindavanCompleted
448 8/EE/2018-19INFRAStrenghening of road & drain Avanti Nagar Y-1 Bulandshahr 0.00 13.00 07/03/201823/05/2018 23/05/201822/07/201823/05/2018 23/05/2018Sirohi Const. Comp. 9412303326MAYANK KUMAR KAUSHIK,RAM KARISHAN GANGWAR JE SASMIT KATIYAR AE MUKESH YADAV XECircle 6Completed
449 15/SE(V)/CD-12/2014-15PARISHAD PROJECT FUNDConstruction of 96 Nos.(G+3) EWS Houses at Gokul Gram Yojna-I, Munnu Khera, Lucknow 0.00 382.52 28/06/201427/11/2014 27/11/201415/06/201627/11/2014 27/11/2014Singh Associates Prop(R) Mr. A.N. Singh 9415003757KRISHNANAND JE ER. PANKAJ VERMA AE GYANESHWAR PRASHAD XECircle VrindavanCompleted
450 11/EE/2018-19INFRAConstruction of Main Gate for Ahiliyabai Holkar Stadium Aligarh 0.00 8.93 07/03/201808/06/2018 08/06/201807/08/201808/06/2018 08/06/2018Adit Buildcon 9313468158MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE MUKESH YADAV XECircle 6Completed
451 20/SE(V)/CD-12/2014-15PARISHAD PROJECT FUNDConstruction of 160 Nos.(G+3) LIG Houses at Gokul Gram Yojna-I, Munnu Khera, Lucknow 0.00 889.60 27/09/201409/03/2015 09/03/201508/09/201609/03/2015 09/03/2015R.S. Contractors D.C. RAI JE ER. PANKAJ VERMA AE S.C. TRIPATHI XECircle VrindavanCompleted
452 21/SE(V)/CD-12/2014-15PARISHAD PROJECT FUNDConstruction of 320 Nos.(G+3) LIG Houses at Gokul Gram Yojna-I, Munnu Khera, Lucknow 0.00 1779.20 27/09/201409/03/2015 09/03/201508/09/201609/03/2015 09/03/2015R.S. Contractors KRISHNANAND,NARENDRA KUMAR JE SRI D.N. PANDEY AE S.C. TRIPATHI XECircle VrindavanCompleted
453 09/EE/2016-17PARISHAD PROJECT FUNDSupply of 11/0.433 KV Transformar as 63 KVA 100 KVA (Three star) & 400 KBA (Star rating in divisional store Sector-17 Indira Nagar Lucknow 0.00 83.48 05/11/201503/06/2016 03/06/201602/01/201603/06/2016 03/06/2016Jayco Electrical MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle ElectricalCompleted
454 01/EE/CD-36/2018-19PARISHAD PROJECT FUNDProviding & Installation of Equipment for outdoor play ground in premisses of Asra-1 type houses in sec-4A at Mandola Vihar, Ghaziabad 0.00 10.00 20/01/201821/05/2018 21/05/201820/07/201821/05/2018 21/05/2018M/s ACE Construction Co. 9999178600NANDA BALLABH CD36 JE RAJKAMAL SAXENA CD36 AE AMAN TYAGI XECircle MantolaCompleted
455 02/EE/CD-36/2017-18PARISHAD PROJECT FUNDConstruction of central Verz on trunk Road E8-F6 To F6-F7 at Mandola Vihar Ghaziabad 0.00 16.26 19/08/201727/10/2017 27/10/201726/01/201827/10/2017 27/10/2017M/s Adit Buildcon 9958502577BHARAT SINGH CD36,NANDA BALLABH CD36 JE RAJKAMAL SAXENA CD36 AE AMAN TYAGI XECircle MantolaCompleted
456 10/EE/16-17PARISHAD PROJECT FUNDExt. Elect. wrok for T/W sector 3 & 4 at Avadh Vihar Yojna Luckow 0.00 91.38 23/04/201604/06/2016 04/06/201603/07/201604/06/2016 04/06/2016Preeti Electric works Circle ElectricalCompleted
457 11/EE/16-17PARISHAD PROJECT FUNDS/F of street light fittings for Ext. Elect work for construction of Avadh Shilp Gram in AC Craft shop & craft shop make ambilla /etc. to construction of Avadh Shilp Gram At Avadh Vihar Yojna Lucknow. 0.00 177.75 16/03/201615/06/2016 15/06/201615/08/201615/06/2016 15/06/2016Preeti Electric works Circle ElectricalCompleted
458 12/EE/16-17PARISHAD PROJECT FUNDExt. Elect. work at Sector-7 in Vrindavan Yojna no. 2 Phase-2 Lucknow 0.00 9.98 07/05/201615/06/2016 15/06/201614/07/201615/06/2016 15/06/2016YASH ENTERPRISES Circle ElectricalCompleted
459 13/EE/16-17PARISHAD PROJECT FUNDConstruction of 11 KV line work from construction of 33/11 KV S/S to group housing plot no. 4 at sector-3 at Avadh Vihar Yojna Lucknow 0.00 64.90 07/05/201615/06/2016 15/06/201614/08/201615/06/2016 15/06/2016YASH ENTERPRISES Circle ElectricalCompleted
460 01/SE-6/2017-18INFRAConst. of C.C. Road Drain & Culvert inside Gate of Narshi Vihar to Nagla Amra Sonkh Road, Mathura 0.00 197.89 26/04/201715/06/2017 15/06/201714/09/201715/06/2017 15/06/2017ANULATA CONSTRUCTION COMP. 9568001575MAHAVIR SINGH JE GAUR SHANKAR DWIVEDI AE MUKESH YADAV XECircle 6Completed
461 2/EE/2018-19INFRAStrengthening of Road & Drain Nagla Dalchandra in B.S. Tent House at Aligarh 0.00 20.23 07/03/201821/05/2018 21/05/201820/07/201821/05/2018 21/05/2018TRIMURTI ENTERPRISES MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE MUKESH YADAV XECircle 6Completed
462 3/EE/2018-19INFRAStrengthening of Road & Drain from shri Bhagwan Singh House to Shyam Sundar Sharma House in Guru Ramdas nagar at Aligarh 0.00 17.33 07/03/201821/05/2018 21/05/201820/07/201821/05/2018 21/05/2018TRIMURTI ENTERPRISES MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE MUKESH YADAV XECircle 6Completed
463 4/EE/2018-19INFRAStrengthening of Road & Drain Avtar Nagar Gali No.-1 in smt. Resma Devi House to smt. Chameli Devi House at Aligarh 0.00 13.26 07/03/201821/05/2018 21/05/201820/07/201821/05/2018 21/05/2018TRIMURTI ENTERPRISES MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE MUKESH YADAV XECircle 6Completed
464 08/SE-2/2015-16PARISHAD PROJECT FUNDConst. of 48 No. F-64 Type Houses (G+3). Group F 0.00 421.50 29/07/201523/09/2015 23/09/201522/03/201723/09/2015 23/09/2015AMIT CONSTRUCTION S.P. SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
465 8/EE/16-17PARISHAD PROJECT FUNDExt. Elect. work for lighting work in Avadh Shilp Gram at Avadh Vihar Yojna Lucknow 0.00 97.20 17/10/201528/05/2016 28/05/201627/09/201628/05/2016 28/05/2016Preeti Electric works Circle ElectricalCompleted
466 08/EE/CD-6/2016-17PARISHAD PROJECT FUNDConst. of 6 mt. wide Road in Sec-4 Yojna No. 11 Jagriti Vihar (est.) Meerut. 0.00 80.10 08/11/201631/12/2016 31/12/201630/03/201731/12/2016 31/12/2016M/s Vijay Laxmi Associates S.P. SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
467 03/EE/CD-36/2017-18PARISHAD PROJECT FUNDConstruction of Internal Drain & culvert in Mandola Village, Ghaziabad 0.00 58.81 19/08/201727/10/2017 27/10/201726/07/201827/10/2017 27/10/2017Ms Ramaxe Construction Co 9811554477BHARAT SINGH CD36,NANDA BALLABH CD36 JE RAJKAMAL SAXENA CD36 AE AMAN TYAGI XECircle MantolaCompleted
468 02/SE-6/2017-18INFRAConst. of Interlocking Road Drain & Culvert at Aurangabad Road N.H.-2 Mathura 0.00 221.11 19/04/201702/09/2017 02/09/201701/12/201702/09/2017 02/09/2017ANULATA CONSTRUCTION COMP. 9568001575SANTOSH KUMAR JE SASMIT KATIYAR AE MUKESH YADAV XECircle 6Completed
469 02/EE/2018-19AWASTHAPNA FUNDCONSTRUCTION OF BOUNDRYWALL (PART) AT SHAKUNTLAM YOJNA MUZAFFARNAGAR 0.00 15.00 31/01/201906/03/2019 06/03/201905/06/201906/03/2019 06/03/2019M/S VICTORIOUS INFRASTRUCTURE PVT LTD 9891814935SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XECircle 2In Progress
470 03/EECD32/2018-19AWASTHAPNA FUNDINTERLOCKING TILES WORK NEAR DISTRICT HOSPITAL CROSSING MUZZAFFARNAGAR 0.00 28.90 31/01/201906/03/2019 06/03/201905/06/201906/03/2019 06/03/2019M/S VICTORIOUS INFRASTRUCTURE PVT LTD 9891814935SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XECircle 2Completed
471 04/EECD32/2018-19AWASTHAPNA FUNDCONSTRUCTION AND SHIFTING OF GOOL AT ASHOK VIHAR YOJNA KHATAULI 0.00 8.00 31/01/201906/03/2019 06/03/201905/06/201906/03/2019 06/03/2019M/S ARVIND KUMAR CONTRACTOR 8445157509SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XECircle 2Completed
472 05/EECD32/2018-19AWASTHAPNA FUNDMAINTENANCE OF 02 NOS PARK IN SHAKUNTLAM YOJNA MUZZAFFARNAGAR 0.00 9.00 31/01/201906/03/2019 06/03/201905/06/201906/03/2019 06/03/2019M/S VICTORIOUS INFRASTRUCTURE PVT LTD 9891814935SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XECircle 2Completed
473 06/EECD32/2018-19AWASTHAPNA FUNDMAINTENANCE OF PARK IN ASHOK VIHAR YOJNA, KHATAULI 0.00 8.50 31/01/201906/03/2019 06/03/201905/06/201906/03/2019 06/03/2019BHARTI BUILLDER 9319081073SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XECircle 2Completed
474 07/EECD32/2018-19AWASTHAPNA FUNDINTERLOCKING TILES WORK IN SECTOR-A, B, C & D IN ASHOK VIHAR YOJNA, KHATAULI 0.00 94.00 06/02/201908/03/2019 08/03/201907/06/201908/03/2019 08/03/2019M/S SHREEJI INFRA PROJECT PRIVATE LTD. 9999303023SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XECircle 2Completed
475 08/EECD32/2018-19AWASTHAPNA FUNDINTERLOCKING TILE WORK IN SEC. E & F AT ASHOK VIHAR YOJNA, KHATAULI 0.00 64.00 06/02/201908/03/2019 08/03/201907/06/201908/03/2019 08/03/2019M/S PROGRESSIVE CONSTRUCTION COM. 9810846441SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XECircle 2Completed
476 1/EE/2018-19INFRAStrengthening of Road & Drain from smt. Suman Sharma House to Pushpa Devi House in Gururamdas Nagar at Aligarh 0.00 21.18 07/03/201821/05/2018 21/05/201820/07/201821/05/2018 21/05/2018TRIMURTI ENTERPRISES MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE MUKESH YADAV XECircle 6Completed
477 06/EE/CD-22/2017-18PARISHAD PROJECT FUNDPlantation & Maintenance of Trunk Road (Part) & 52m wide green belt along SH-57 in Mandola Vihar Yojana Ghaziabad 0.00 91.77 16/05/201722/09/2017 22/09/201721/06/202022/09/2017 22/09/2017M/S D.B.GARDEN TRADERS 9761410176U.S.CHAURASIYA JE NAVEEN KUMAR JAIN,R.A.MITTAL AE AKHILESHWAR SINGH,H.P. SINGH,K.P.TRIPATHI,LALTA PRASAD,UMA NATH SHUKLA XECircle MantolaCompleted
478 02/EE/CD-22/2018-19PARISHAD PROJECT FUNDEarth work in Sec-4A (Plot Area) at Mandola vihar Ghaziabad 0.00 55.50 02/04/201812/04/2018 12/04/201620/02/201912/04/2018 12/04/2016M/S Virendra Kumar Project Pvt Ltd 9811604673H.S.TIWARI,U.S.CHAURASIYA JE NAVEEN KUMAR JAIN,RAM AVTAR MITTAL AE LALTA PRASAD XECircle MantolaCompleted
479 11/EE/CD-22/2018-19PARISHAD PROJECT FUNDPlantation and maintenance work in Sec-4A, 5, 5A, 9A, 9B, 9C, 10 and 11 in mandola vihar Yojana Ghaziabad 0.00 40.00 22/12/201825/01/2019 25/01/201924/07/201925/01/2019 25/01/2019EVER GREEN HORTICULTURE & LANDSCAPE 9312407939U.S.CHAURASIYA JE R.A.MITTAL AE K.P.TRIPATHI XECircle MantolaCompleted
480 09/EE/2018-19CD-28AWASTHAPNA FUNDConst. of Road, Drain, Park & Sewer Line in Sector-4, Firozabad 0.00 64.64 27/06/201826/10/2018 26/10/201825/01/201926/10/2018 26/10/2018Maa Chandrawati Construction 9412652907RAKESH KUMAR VERMA,SUDHIR KUMAR JE ALOKSHEEL DWIVEDI,ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XECircle 6In Progress
481 13/EE/2018-19CD-28AWASTHAPNA FUNDStregthening of Road, Drain at Sikandra Yojna, Agra From Sec.-14 to Sec.-15 0.00 55.21 27/06/201826/10/2018 26/10/201825/12/201826/10/2018 26/10/2018Siddarth Associates 9457000613RAKESH KUMAR VERMA,SANJAY SHARMA JE ALOKSHEEL DWIVEDI,ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XECircle 6In Progress
482 13/EE/2015-16/CD-28AWASTHAPNA FUNDSTRENGTHENING OF ROAD AND DRAIN FROM LAXMI PALACE-II SH. HARIOM LAWANIA HOUSE TO SH. DABAR SINGH HOUSE AND SH. RAM PRASAD HOUSE TO GREECE SHARMA HOUSE AT TAJGANG ZONE 38 AGRA 0.00 76.76 03/07/201518/01/2016 18/01/201617/04/201618/01/2016 18/01/2016VISHNU DUTT GARG 9927082915YOGENDRA KUMAR GUPTA JE PRAMOD GOEL AE NAGESH CHANDRA XECircle 6Completed
483 14/EE/16-17PARISHAD PROJECT FUNDExt. Elect. work (Balance) for construction of Avadh Shilp Gram at Avadh Vihar Yojna Lucknow 0.00 99.31 31/08/201520/06/2016 20/06/201619/06/201620/06/2016 20/06/2016Preeti Electric works Circle ElectricalCompleted
484 15/EE/16-17PARISHAD PROJECT FUNDS/F of External light fittings for construction of Avadh Shilpa Gram in Kids zone & Derormetory at Avadh Vihar Yojna Lucknow 0.00 96.17 07/05/201620/06/2016 20/06/201619/07/201620/06/2016 20/06/2016Preeti Electric works Circle ElectricalCompleted
485 16/EE/16-17PARISHAD PROJECT FUNDS/F of Street light fittings work for construction of Avadh Shilp Gram in Admin Block & Exhivition at Avadh Vihar yojna Lucknow 0.00 93.19 23/04/201620/06/2016 20/06/201619/07/201620/06/2016 20/06/2016Preeti Electric works Circle ElectricalCompleted
486 17/EE/16-17PARISHAD PROJECT FUNDExt. Elect. work of sector-6 Akash Enclave at Vrindavan Yojna Lucknow. 0.00 4.95 07/05/201620/06/2016 20/06/201619/07/201620/06/2016 20/06/2016Preeti Electric works Circle ElectricalCompleted
487 18/EE/16-17PARISHAD PROJECT FUNDExt. Elect. work for lighting for construction of Avadh Shilp Gram in Avadh Vihar Yojna Lucknow 0.00 98.07 10/09/201520/06/2016 20/06/201619/12/201620/06/2016 20/06/2016Preeti Electric works Circle ElectricalCompleted
488 19/EE/16-17PARISHAD PROJECT FUNDSupply of 1000 LPM, 52 mtr. head capacity spare submersible motor pump set for Various T/W at Vrindavan Yojna Lucknow. 0.00 5.64 23/04/201620/06/2016 20/06/201619/07/201620/06/2016 20/06/2016Preeti Electric works Circle ElectricalCompleted
489 20/EE/16-17PARISHAD PROJECT FUNDConstruction of 33 KV (Double feeder) Line work (Ballance) on 30 mtr. wide road between sector-10 & 12 at Vrindavan Yojna Lucknow 0.00 81.62 01/06/201616/07/2016 16/07/201615/08/201616/07/2016 16/07/2016YASH ENTERPRISES Circle ElectricalCompleted
490 21/EE/16-17PARISHAD PROJECT FUNDFixing of light fittings work for Ext. Elect. work for construction of Avadh Shilp Gram at Avadh Vihar Yojna Lucknow 0.00 70.79 06/06/201601/08/2016 01/08/201631/08/201601/08/2016 01/08/2016Preeti Electric works Circle ElectricalCompleted
491 22/EE/16-17PARISHAD PROJECT FUNDS/E of (Ballance) light fitting work for construction of Avadh Shilp Gram in Admin Block , Exbhition Hall, Kids zone & Dormetory at Avadh Vihar Yojna Lucknow 0.00 98.66 01/06/201601/08/2016 01/08/201631/08/201601/08/2016 01/08/2016Preeti Electric works Circle ElectricalCompleted
492 23/EE/16-17PARISHAD PROJECT FUNDConstruction of 11 KV Line work from construction of 33/11 KV S/S to Nandini Enclave at Sector-3 Avadh Vihar Yojna Lucknow 0.00 99.76 08/07/201604/08/2016 04/08/201603/09/201604/08/2016 04/08/2016Preeti Electric works Circle ElectricalCompleted
493 24/EE/16-17PARISHAD PROJECT FUNDS/I of CCTV Camera for Construction of Avadh Shilp Gram At Avadh Vihar Yojna Lucknow 0.00 96.21 11/04/201608/08/2016 08/08/201607/09/201608/08/2016 08/08/2016Triflex Solution Circle ElectricalCompleted
494 25/EE/2016-17PARISHAD PROJECT FUNDS/I of Fire Alarm & P.A. Systems for construction of Avadh Shilp Gram At Avadh Vihar Yojna Lucknow 0.00 56.84 11/04/201612/08/2016 12/08/201611/09/201612/08/2016 12/08/2016Triflex Solution Circle ElectricalCompleted
495 26/EE/2016-17PARISHAD PROJECT FUNDExt. Elect. work for providing of Electric supply to T/W at Sector-5 in Vrindavan Yojna No. 1 Lucknow 0.00 12.18 23/02/201612/08/2016 12/08/201611/10/201612/08/2016 12/08/2016Bala ji Electrical & Mechnical works Circle ElectricalCompleted
496 03/SE(P)/CU-3/2018-19Dated27/07/2018CENTRAL AND STATE FUNDConstruction of 192 Nos EWS Flats under P.M.A.Y. at Sector- 3, part-1, Avadh Vihar Yojna, Lucknow. - Group-5C 0.00 736.36 28/02/201827/07/2018 15/11/201826/01/202027/07/2018 15/11/2018R.P.M. Construction 9450397977ANIRUDDH PANDEY,TRILOKI RAM JE AJAY GOEL AE RAHUL YADAV XECircle HQIn Progress
497 07/EE/2017-18PARISHAD PROJECT FUNDConst. of switch room cum S.D.O. office in 33/11 KV substations at Sec-3A. 0.00 38.01 20/06/201717/08/2017 17/08/201716/05/201817/08/2017 17/08/2017M/s Gaurav Enterprises 9837408485AJAB SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
498 12/EE/CD-22/2018-19INFRAMaking cultural theme Painting on U.P. GATE Bridge Piers & Metro Pillers (Near Kaushambi Metro Station Ghaziabad 0.00 23.00 18/12/201808/03/2019 08/03/201907/05/201908/03/2019 08/03/2019csDISHAA FOUNDATION 9873929690H.S.TIWARI,U.S.CHAURASIYA JE R.A.MITTAL AE K.P.TRIPATHI XECircle MantolaCompleted
499 04/SE-2/2016-17PARISHAD PROJECT FUNDConst. of RCC Nala along 24mt. wide road from node 17-16 and 17-14 in Sec-4. 0.00 92.96 21/06/201614/03/2017 14/03/201713/09/201714/03/2017 14/03/2017M/s Ganga and Componay 9412201897S.P. SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
500 11/EE/2018-19CD-28AWASTHAPNA FUNDConst. of Road From NH-2 to Zila Panchyat Office, Civil Lines in Firozabad 0.00 58.39 27/06/201826/10/2018 26/10/201825/01/201926/10/2018 26/10/2018Siddarth Associates 9457000613RAKESH KUMAR VERMA,SUDHIR KUMAR JE ALOKSHEEL DWIVEDI,ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XECircle 6In Progress
501 14/EE/2018-19CD-28AWASTHAPNA FUNDConst. of Drain & Road At Yojna No.-1, Shikohabad 0.00 25.68 27/06/201813/12/2018 13/12/201812/02/201913/12/2018 13/12/2018Maa Chandrawati Construction 9412652907RAKESH KUMAR VERMA,SUDHIR KUMAR JE ALOKSHEEL DWIVEDI,ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XECircle 6In Progress
502 12/EE/2018-19CD-28AWASTHAPNA FUNDConst. of Road and Drain in Premanand Kunj Colony, Brij Vihar, Kamla Nagar, Agra 0.00 70.78 02/06/201826/10/2018 26/10/201825/01/201926/10/2018 26/10/2018Siddarth Associates 9457000613RAMSHANKAR JE ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XECircle 6In Progress
503 32/EE/2016-17/ED-1PARISHAD PROJECT FUNDS/I of solar plant & designing for cont. of Avadh Shilp Gram at Avadh Vihar Yojna Lucknow 0.00 93.99 11/04/201627/08/2016 27/08/201626/09/201627/08/2016 27/08/2016SAKSHI BUILDERS Circle ElectricalCompleted
504 03/EE/2018-19CD-28AWASTHAPNA FUNDStrengthening of Road, Drain & Park in Sec.-3 & 5, Yojna No.-1, Hathrash 0.00 24.95 06/02/201801/05/2018 01/05/201830/06/201801/05/2018 01/05/2018Manpal 9917316437BRIJKISHOR SINGH,RAMSHANKAR JE ASHOK KUMAR SHARMA AE GIRISH CHANDRA,PREETI VISHWAKARMA XECircle 6Completed
505 33/EE/2016-17/ED-1PARISHAD PROJECT FUNDS/I of (Ballance) Aircon ditioning work for construction of Avadh Shilp Gram in A.C. craft shop food const Admin blode & exhivition hall at Avadh Vihar Yojna Lucknow 0.00 64.83 08/07/201627/08/2016 27/08/201926/09/201627/08/2016 27/08/2019KRISHNA REFRIGRATION 09652303229 Circle ElectricalCompleted
506 34/EE/2016-17/ED-1PARISHAD PROJECT FUNDS/L of Rising main line of size 200 mm dia class K-9 Dia pipe for construction of Avadh Shilp Gram at Avadh Vihar Yojna Lucknow. 0.00 25.15 30/07/201605/09/2016 05/09/201604/11/201605/09/2016 05/09/2016M.A. Engineering works Circle ElectricalCompleted
507 35/EE/2016-17/ED-1PARISHAD PROJECT FUNDConstruction of 33 KV line work from shaheed path to construction of 33/11 KV S/S at Avadh Vihar Yojna Lucknow 0.00 99.51 30/07/201626/09/2016 26/09/201625/11/201626/09/2016 26/09/2016Preeti Electric works Circle ElectricalCompleted
508 04/EE/CD-6/2017-18PARISHAD PROJECT FUNDConst. of 7.50 mt, 9.00 mt & 12.00 mt wide road in Sec-8. 0.00 91.17 05/05/201720/07/2017 20/07/201719/10/201720/07/2017 20/07/2017M/s Vijay Laxmi Associates S.P. SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
509 13/EE/2017-18PARISHAD PROJECT FUNDBituminous work on 24 mt wide road from node 14-17 & 17-16 in Sec-4. 0.00 33.89 20/12/201708/03/2018 08/03/201807/05/201808/03/2018 08/03/2018M/S R.S. Builders 9837058948S.P. SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
510 04/EE/2018-19/CD-28AWASTHAPNA FUNDConst. of Boundrywall at Sect. 3 Yojna No.-1, Shikohabad 0.00 17.58 07/03/201824/05/2018 24/05/201823/07/201824/05/2018 24/05/2018R. U. Construction 8630037006RAKESH KUMAR VERMA,SUDHIR KUMAR,YOGENDRA KUMAR GUPTA JE ALOKSHEEL DWIVEDI,ASHOK KUMAR SHARMA AE GIRISH CHANDRA,PREETI VISHWAKARMA XECircle 6Completed
511 01/EE/CD-6/2017-18PARISHAD PROJECT FUNDLaying of Internal Sewer line in Sec-8. 0.00 60.78 05/05/201717/06/2017 17/06/201716/09/201717/06/2017 17/06/2017M/s Gaurav Enterprises 9837408485S.P. SINGH JE SANJEEV KUMAR TIWARI AE SHRI RAJEEV KUMAR XECircle 2In Progress
512 31/EE/2016-17/ED-1PARISHAD PROJECT FUNDExt. Elect. work in Neelgiri Enclave at sector-17 in Vrindavan Yojna no. 4 Lucknow 0.00 281.08 10/06/201627/08/2016 27/08/201626/11/201627/08/2016 27/08/2016EAGLE CONSTRUCTION Circle ElectricalCompleted
513 49/EE/2016-17/ED-1PARISHAD PROJECT FUNDS/I of solar lighting work (under construction wrok) at Various Crossing sultanpur) 0.00 15.78 03/12/201631/12/2016 31/12/201628/02/201731/12/2016 31/12/2016We & You Consultancy Circle ElectricalCompleted
514 50/EE/2016-17/ED-1PARISHAD PROJECT FUNDMts. & Deep of 20 HP pullon make sewage submersible motor pump set pannel & starter at sector-10 at Vrindavan yojna no. 2 phase-2 Lucknow 0.00 11.89 18/10/201631/12/2016 31/12/201630/01/201731/12/2016 31/12/2016M.A. Engineering works Circle ElectricalCompleted
515 51/EE/2016-17/ED-1PARISHAD PROJECT FUNDS/I of 1000 KVA 11/0.433 KV Transformer at Avadh Shilp Gram, Avadh Vihar Yojna Lucknow. 0.00 40.24 08/07/201604/01/2017 04/01/201703/03/201704/01/2017 04/01/2017Preeti Electric works Circle ElectricalCompleted
516 05/EE/CD29/17-18AWASTHAPNA FUNDStrengthening of road in sector-8, Sikandra Yojna under Infrastructure Project (Part-B) 0.00 86.49 31/08/201719/01/2018 19/01/201818/04/201819/01/2018 19/01/2018R.N. Agarwal 9319052251MUKESH PAL SINGH,SURESH CHANDRA JE AMIT RATHOR AE CHANDRAMA RAM XECircle 6Completed
517 136/E.E.C.D.-34/CampPARISHAD PROJECT FUNDFixing of M.S. Tree Guard and Plantation at Different Places of Yojna, Pandeypur Yojna, Varanasi 0.00 2.07 29/05/202005/06/2020 05/06/2020 05/06/2020 05/06/2020RUDRA CONSTRUCTION ARJUN VERMA JE V. P. MISHRA AE AJIT KUMAR CHAUDHARY XECircle 1Completed
518 01/EE/CD-29/17-18AWASTHAPNA FUNDStrengthening of road in sector-8, Sikandra Yojna under Infrastructure Project (Part-A) 0.00 96.39 31/08/201725/10/2017 25/10/201724/01/201825/10/2017 25/10/2017R.N. Agarwal 9319052251MUKESH PAL SINGH JE A.P. AGRAWAL AE CHANDRAMA RAM XECircle 6Completed
519 02/EE/CD29/2017-18AWASTHAPNA FUNDStrengthening of road in sector-1, Sikandra Yojna under Infrastructure Project (Part-A) 0.00 88.12 31/08/201725/10/2017 25/10/201724/01/201825/10/2017 25/10/2017R.N. Agarwal 9319052251A.D. SHANDILYA JE A.P. AGRAWAL AE CHANDRAMA RAM XECircle 6Completed
520 659/A.C.-4/INFRAConstruction of B.M.+S.D.B.C and Interlocking Tiles at Jhunsi-3, Prayagraj 0.00 61.17 21/04/201721/04/2017 21/04/201720/07/201721/04/2017 21/04/2017Departmental (Self) J.P. MAURYA JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
521 36/EE/2016-17/ED-1PARISHAD PROJECT FUNDConstruction of 11 KV line work from construction of 33/11 KV S/S to group hosing plot no. 3 G.H. 2&3 at Avadh Vihar Yojna Lucknow 0.00 70.07 30/07/201628/09/2016 28/09/201627/11/201628/09/2016 28/09/2016Bala ji Electrical & Mechnical works Circle ElectricalCompleted
522 37/EE/2016-17/ED-1PARISHAD PROJECT FUNDConstruction of plinth for transformer & Ganrator set at Avadh Shilp Gram Avadh Vihar Yojna Lucknow. 0.00 18.41 30/07/201903/10/2016 03/10/201602/12/201603/10/2016 03/10/2016J.P.TRADERS Circle ElectricalCompleted
523 07/EE/2016-17PARISHAD PROJECT FUNDConst. of 9.00 mt & 12.00 mt wide road in sec-4 0.00 74.04 08/11/201627/12/2016 27/12/201626/03/201727/12/2016 27/12/2016M/s Preeti Bildcon Pvt. Ltd. S.P. SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
524 27/EE/2016-17PARISHAD PROJECT FUNDS/L of rising main line from T/W sector-4 to CWR at Avadh Shilpa Gram Avadh Vihar yojna Lucknow 0.00 40.12 11/04/201612/08/2016 12/08/201611/09/201612/08/2016 12/08/2016M.A. Engineering works Circle ElectricalCompleted
525 01/EE/CD-38/2018-19PARISHAD PROJECT FUNDLaying & Jointing of Internal Sewer Line in sec 15 & 16B 0.00 70.00 28/03/201828/05/2018 28/05/201827/11/201828/05/2018 28/05/2018RAMAXE CONSTRUCTION 9811554477MUNNA LAL,RADHESHYAM,VEER SINGH JE AMAN TYAGI,SATYENDRA SINGH AE BISHEMBER SINGH,D.V.SINGH,S.K. SIRVASTAVA,SHOBHIT KUMAR PATHAK XECircle MantolaCompleted
526 28/EE/2016-17/ED-1PARISHAD PROJECT FUNDExt. Elect. Work(Ballance work) at Sector-19 in Vrindavan Yojna no.4 Lucknow 0.00 39.19 08/07/201612/08/2016 12/08/201611/09/201612/08/2016 12/08/2016Preeti Electric works Circle ElectricalCompleted
527 02/EE/CD-6/2018-19PARISHAD PROJECT FUNDConst. of Internal drains & culverts in Sec-8. 0.00 36.05 16/03/201802/06/2018 02/06/201801/10/201802/06/2018 02/06/2018M/s Ganga and Componay 9412201897KHUSHALI JE MANOJ KUMAR SAXENA AE SHRI RAJEEV KUMAR XECircle 2In Progress
528 29/EE/2016-17/ED-1PARISHAD PROJECT FUNDExt. Elect. Work(Ballance work) on 455 mtr wide road (Near Raibarelly road) at Vrindavan Yojna Lucknow 0.00 38.82 08/07/201612/08/2016 12/08/201611/09/201612/08/2016 12/08/2016Preeti Electric works Circle ElectricalCompleted
529 38/EE/2016-17/ED-1PARISHAD PROJECT FUNDS/L of KSB make submersible pumping plant 1000 Lpm & 52 mtr. head capacity at Sector-8 B in Vrindavan Yojna no. 2 phase-2 Lucknow 0.00 5.81 30/07/201603/10/2016 03/10/201602/11/201603/10/2016 03/10/2016M.A. Engineering works Circle ElectricalCompleted
530 39/EE/2016-17/ED-1PARISHAD PROJECT FUNDConstruction of 33 KV line S/S to group housing plot no. 3 to GH 6 at sector-3 in Avadh Vihar Yojna Lucknow 0.00 95.18 30/07/201603/10/2016 03/10/201621/02/201603/10/2016 03/10/2016Preeti Electric works Circle ElectricalCompleted
531 30/EE/2016-17/ED-1PARISHAD PROJECT FUNDPainting of poles at Vrindavan Yojna Nno. 1, 2 & 3 Lucknow 0.00 14.54 08/07/201612/08/2016 12/08/201611/09/201612/08/2016 12/08/2016Preeti Electric works Circle ElectricalCompleted
532 07/EE/2018-19PARISHAD PROJECT FUNDLaying of rising main line from tubewell No. 2 to O.H.T. of Sec-4 0.00 13.96 22/02/201908/03/2019 08/03/201907/06/201908/03/2019 08/03/2019M/s Empire Construction Associates 9917701203AJAB SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
533 40/EE/2016-17/ED-1PARISHAD PROJECT FUNDConstruction of 33/11 KV S/S at Sector-8 in Avadh Vihar Yojna Lucknow 0.00 499.61 10/06/201602/11/2016 02/11/201601/03/201702/11/2016 02/11/2016EAGLE CONSTRUCTION 9415103222 Circle ElectricalCompleted
534 01/SE-II/CD-6/2017-18PARISHAD PROJECT FUNDLaying of Internal Sewer Line in Sec-3A & 4 0.00 136.01 08/05/201729/06/2017 29/06/201713/10/201729/06/2017 29/06/2017M/s Ganga and Componay 9412201897AJAB SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
535 41/EE/2016-17/ED-1PARISHAD PROJECT FUNDExt. Elect. work (HTat Lohramau Yojna Sultanpur 0.00 89.57 28/09/201619/11/2016 11/11/201618/03/201719/11/2016 11/11/2016YASH ENTERPRISES Circle ElectricalCompleted
536 42/EE/2016-17/ED-1PARISHAD PROJECT FUNDInstallation of 63 KVA Transformer for Ext. Elect. work at Manjhola Yojna No. 4 Moradabad 0.00 22.38 30/07/201628/11/2016 28/11/201627/01/201728/11/2016 28/11/2016Preeti Electric works Circle ElectricalCompleted
537 43/EE/2016-17/ED-1PARISHAD PROJECT FUNDExt. Elect. work (Transformation) at Lohramau Yojna Sultanpur 0.00 96.55 26/09/201606/12/2016 06/12/201605/04/201606/12/2016 06/12/2016Sai Sudha Enterprises Circle ElectricalCompleted
538 44/EE/2016-17/ED-1PARISHAD PROJECT FUNDExt. Elect. work of (LT) at Lohramau Yojna Sultanpur 0.00 41.84 28/09/201606/12/2016 06/12/201605/04/201706/12/2016 06/12/2016Sai Sudha Enterprises Circle ElectricalCompleted
539 3674/A-4/84INFRAStrengthening of road in Vivek Vihar Colony to Central Bank & Shanti Machinary Store to Avdesh Yadav House 0.00 58.94 31/03/201724/08/2017 24/08/201723/11/201724/08/2017 24/08/2017M/s Siwansi Concrete Product 9412183483SRI ANIL KUMAR CHAUDHARY JE NAVJOT SINGH VERMA AE PRADEEP KUMAR XECircle 4Completed
540 45/EE/2016-17/ED-1PARISHAD PROJECT FUNDExt. Elect wrok for shifting infront of H.No. 11/66 at Sector-11 Vrindavan Yojna Lucknow 0.00 8.28 18/10/201617/12/2016 17/12/201616/01/201717/12/2016 17/12/2016Preeti Electric works Circle ElectricalCompleted
541 03/EE/CD29/17-18AWASTHAPNA FUNDStrengthening of road in sector-3, Sikandra Yojna under Infrastructure Project 0.00 57.64 31/08/201726/10/2017 26/10/201725/01/201826/10/2017 26/10/2017R.K. Enterprisess 9760099926A.D. SHANDILYA JE AMIT RATHOR AE CHANDRAMA RAM XECircle 6Completed
542 05/EE/CD-6/2017-18PARISHAD PROJECT FUNDLaying & Jointing Internal water supply line in Sec-3A & 4 0.00 57.10 22/06/201728/07/2017 28/07/201727/11/201728/07/2017 28/07/2017J.P.TRADERS KHUSHALI JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
543 46/EE/2016-17/ED-1PARISHAD PROJECT FUNDS/L of 12.5 HP KSB make (KRTU) model sewage motor pump set for sewage pumping station at sector-4 in Vrindavan Yojna no. 2 Phase-1 Lucknow 0.00 3.46 18/10/201617/12/2016 17/12/201616/01/201717/12/2016 17/12/2016M.A. Engineering works Circle ElectricalCompleted
544 47/EE/2016-17/ED-1PARISHAD PROJECT FUNDExt. Elect. work (Ballance) at Avadh Shilp Gram Avadh Vihar yojna Lucknow 0.00 98.95 18/10/201620/12/2016 20/12/201619/02/201720/12/2016 20/12/2016Preeti Electric works Circle ElectricalCompleted
545 48/EE/2016-17/ED-1PARISHAD PROJECT FUNDS/I of Submersible pumping plant 52 mtr head capacity 1000 Lpm discharge for T/W no.3 at sector-8C in Vrindavan Yojna no. 2 Phase-2 Lucknow 0.00 5.79 18/10/201620/12/2016 20/12/201619/01/201720/12/2016 20/12/2016M.A. Engineering works Circle ElectricalCompleted
546 07/EE/18-19AWASTHAPNA FUNDREPAIRING/RENOVATION OF ROAD, DRAIN IN SECTOR E YONJAN NO 3 KANPUR 0.00 52.54 26/04/201818/07/2018 18/07/201817/10/201818/07/2018 18/07/2018M/S S.P & Company 9935586687SRI ANOOP KUMAR VIMAL,SRI KHELENDRA MUKHRAIYA JE SRI Y. K. GOEL AE SRI D. K. GUPTA XECircle 4Completed
547 03/EE/17-18PARISHAD PROJECT FUNDREPAIRING/RENOVATION WORK OF TRUNK ROAD AT SECTOR-7, 8 & 9 IN YOJNA NO 3 KANPUR 0.00 70.50 18/05/201702/06/2017 02/06/201701/07/201702/06/2017 02/06/2017M/S ABHESHEK ENTERPRISES 9451284990SRI K. K KATIYAR,SRI KHELENDRA MUKHRAIYA JE SRI SHASHANK PANDEY AE SRI R.P GUPTA XECircle 4Completed
548 08/EE/17-18AWASTHAPNA FUNDREPAIRING & RENOVATION WORK OF 30M WIDE ROAD AT SECTOR 7 YOJNA NO-3 KANPUR 0.00 82.00 19/11/201617/06/2017 17/06/201716/09/201717/06/2017 17/06/2017M/S INDIAN IFFRABUILT PVT LTD 9453045301SRI K. K KATIYAR,SRI KHELENDRA MUKHRAIYA JE SRI SHASHANK PANDEY AE SRI R.P GUPTA XECircle 4Completed
549 07/EE/17-18PARISHAD PROJECT FUNDREPAIRING/RENOVATION OF 12M WIDE ROAD AT SECTOR 9 YOJNA NO 3 KANPUR 0.00 8.18 05/05/201717/06/2017 17/06/201716/07/201717/06/2017 17/06/2017M/S MAA SHARDA TRADERS 9455921433SRI K. K KATIYAR,SRI KHELENDRA MUKHRAIYA JE SRI SHASHANK PANDEY AE SRI R.P GUPTA XECircle 4Completed
550 52/EE/2016-17/ED-1PARISHAD PROJECT FUNDShifting of 33 KV line from commercial plot no. 16 CP -201 at Sector-16 Vrindavan Yojna Lucknkow 0.00 70.61 23/11/201604/01/2017 04/01/201703/03/201704/01/2017 04/01/2017Preeti Electric works Circle ElectricalCompleted
551 04/EE/CD29/2018-19AWASTHAPNA FUNDConstruction of CC Road & drain & laying of Interlocking tiles in Vijay Nagar Colony from Kothi No. 58 to 71 0.00 94.18 12/10/201807/02/2019 07/02/201906/05/201907/02/2019 07/02/2019Ganpati Construction Co. 9811513000KAMAL SINGH,NAVRATAN SINGH,RAJIV KUMAR VERMA JE A.P. AGRAWAL,KAILASH NATH AE CHANDRAMA RAM XECircle 6Completed
552 12/SE(V)/2015-16PARISHAD PROJECT FUND2020 Nos. Multistoried Flats at Goverdhan Enclave 0.00 39278.32 19/10/201530/03/2016 30/03/201628/12/201930/03/2016 30/03/2016LARSEN & TOUBRO LIMITED 09450000009AJAY KUMAR MISHRA,AKBAR ALI,ARUN KUMAR RAI,RAJESH KUMAR VERMA,RAJIV RASTOGI,RAKESH KUMAR SAXENA JE AKHILESHWAR SINGH,HARISHANKAR SINGH,RAJIV SRIVASTAVA AE ANIL KUMAR MISHRA,NAVJOT SINGH VERMA,U.C. SINGH XECircle VrindavanIn Progress
553 1354/A-4/70PARISHAD PROJECT FUNDConstruction of 33/11 KVA Electrical Sub Station in Spining Mill Awasiya Yojna Etawah 0.00 73.47 12/08/201603/01/2017 03/01/201702/04/201703/01/2017 03/01/2017M/s Lal Singh Yadav 9412668253SRI ARVIND KUMAR JE NAVJOT SINGH VERMA AE PRADEEP KUMAR XECircle 4Completed
554 05/EE/CD29/2018-19AWASTHAPNA FUNDStrengthening of road & Interlocking tiles & construction of drain in Eklavya Stedium, Agra 0.00 30.51 11/01/201908/03/2019 08/03/201907/06/201908/03/2019 08/03/2019SHIVAM GROUPS 9837001873KAMAL SINGH,NAVRATAN SINGH JE KAILASH NATH AE CHANDRAMA RAM XECircle 6In Progress
555 02/EE/CD-2/2017-18STATE AWASTHAPNA FUNDRennovation of road from Shalimaar Chauraha to Amrapali chauraha in Indira Nagar Lucknow. 0.00 58.40 12/04/201726/05/2017 26/05/201725/08/201726/05/2017 26/05/2017SHAKTI CONSTRUCTION CO. 09121900191A.B.SINGH JE A.K.SAXENA AE A.K.MITTAL XECircle 3Completed
556 53/EE/2016-17/ED-1PARISHAD PROJECT FUNDConstruction of 33 KV line from group housing plot no. 3//GH-5 & 6 to proposed petrol pump at sector-3 Avadh Vihar Yojna Lucknow 0.00 98.41 23/11/201604/01/2017 04/01/201703/03/201704/01/2017 04/01/2017Preeti Electric works Circle ElectricalCompleted
557 08/EE/2017-18PARISHAD PROJECT FUNDConst. of 6 mt wide Internal road in F-32 type houses area at sec-4 0.00 55.98 01/08/201721/09/2017 21/09/201720/01/201821/09/2017 21/09/2017M/s Juneja Construction Pvt. Ltd. 9810787577AJAB SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
558 60/EE/2016-17/ED-1PARISHAD PROJECT FUNDShifting of 11 KV Capacity line in sector-8C at Vrindavan Yojna no. 2 Phase-2 Lucknow 0.00 9.04 18/10/201602/02/2017 02/02/201701/03/201702/02/2017 02/02/2017Bala ji Electrical & Mechnical works Circle ElectricalCompleted
559 05/EE/2018-19CD-28AWASTHAPNA FUNDConst. of RCC Nala From Seyal Balmiki Basti to Jaleshar Road, Hathras 0.00 59.50 06/02/201829/05/2018 29/05/201828/08/201829/05/2018 29/05/2018Maa Chandrawati Construction 9412652907BRIJKISHOR SINGH,RAMSHANKAR JE ASHOK KUMAR SHARMA AE GIRISH CHANDRA,PREETI VISHWAKARMA XECircle 6Completed
560 61/EE/16-17ED-1PARISHAD PROJECT FUNDConstruction of 33 KV Line at 33/11 KV S/S sector-8 at Vrindavan Yojna -2 Phase-2 Lucknow 0.00 38.10 16/12/201609/02/2017 09/02/201708/03/201709/02/2017 09/02/2017EAGLE CONSTRUCTION Circle ElectricalCompleted
561 01/EE/2018-19CD-28AWASTHAPNA FUNDBeautification of Kaka Hathrashi Smarti park at Hathras 0.00 22.24 06/02/201825/04/2018 25/04/201824/06/201825/04/2018 25/04/2018Ganpati Construction Co. 9811513000BRIJKISHOR SINGH,RAMSHANKAR JE ASHOK KUMAR SHARMA AE GIRISH CHANDRA,PREETI VISHWAKARMA XECircle 6Completed
562 07/EE/2018-19CD-28AWASTHAPNA FUNDInstallation of 4 Nos. Submersible Pump in 608 Houses Campes, Under BSUP Project Phase-II, TajNagri, Agra 0.00 7.37 02/06/201817/10/2018 17/10/201816/12/201817/10/2018 17/10/2018Maa Katyani Infratech 9760697733RAMSHANKAR JE ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XECircle 6Completed
563 02/EE/2018-19CD-28AWASTHAPNA FUNDBeautification of Dist. Stadium Hathras 0.00 3.43 06/02/201825/04/2018 25/04/201824/06/201825/04/2018 25/04/2018Dev Construction 9690017262BRIJKISHOR SINGH,RAMSHANKAR JE ASHOK KUMAR SHARMA AE GIRISH CHANDRA,PRITI VISWAKARMA XECircle 6Completed
564 04/EE/18-19AWASTHAPNA FUNDRepairing/Renovation of 6.00/7.50M wide CC road & park at Sector 3 yonan no-3 Kanpur 0.00 36.59 12/04/201815/06/2018 15/06/201814/09/201815/06/2018 15/06/2018M/s S.P. Singh 9455923183SRI MAHENDRA KUMAR JE SRI SHASHANK PANDEY,SRI Y. K. GOEL AE SRI D. K. GUPTA XECircle 4Completed
565 03/EE/CD-6/2017-18PARISHAD PROJECT FUNDConst. of 5 No. parks in Sec-3A & 4 0.00 32.27 05/05/201729/06/2017 29/06/201728/09/201729/06/2017 29/06/2017M/s Sun Shine Project 9760404505KHUSHALI JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
566 55/EE/2016-17/ED-1PARISHAD PROJECT FUNDWork related to fire fighting at office complex sect-9 at Vrindavan yojna Lucknow 0.00 3.34 08/07/201604/01/2017 04/01/201703/02/201704/01/2017 04/01/2017F Tech Enterprises Circle ElectricalCompleted
567 06/EE/2017-18PARISHAD PROJECT FUNDConst. of boundry wal in F-57 type Houses Area in Sec-3A & 4 0.00 40.87 20/06/201717/08/2017 17/08/201716/02/201817/08/2017 17/08/2017M/s Gaurav Enterprises 9837408485AJAB SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
568 09/EE/2017-18PARISHAD PROJECT FUNDLaying of interlocking tiles in F-57 type houses area at sec-3A &4 0.00 78.91 01/08/201727/09/2017 27/09/201726/01/201827/09/2017 27/09/2017M/s Krishna Associates 8630210491AJAB SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
569 56/EE/2016-17/ED-1PARISHAD PROJECT FUNDAir conditioning work in Banquet Hall (Under Construction) Avadh Shilp Gram at Avadh Vihar Yojna Lucknow 0.00 129.37 23/11/201606/01/2017 06/01/201705/03/201706/01/2017 06/01/2017KRISHNA REFRIGRATION 09652303229 Circle ElectricalCompleted
570 10/EE/CD-6.2017-18PARISHAD PROJECT FUNDConst. of 6.00 m, 7.50 m & 9.00 m wide internal roads in F-57 type houses area at sec-3A & 4 0.00 53.30 22/08/201728/09/2017 28/09/201727/01/201828/09/2017 28/09/2017M/s Jeet Construction Co. 9837021527KHUSHALI JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
571 57/EE/2016-17/ED-1PARISHAD PROJECT FUNDSITC of PLC controlled Automatic Bacterilogical treatment plant for drinking water treatment at T/W set 4 & 5 Vrindavan Yojna Lucknow 0.00 30.05 16/12/201619/01/2017 19/01/201718/03/201719/01/2017 19/01/2017Mercury (International ) PVT LTD Circle ElectricalCompleted
572 11/EE/CD-6/2017-18PARISHAD PROJECT FUNDwater connection work in F-57 type houses at sec-3A & 4 0.00 11.70 22/08/201706/10/2017 06/10/201705/12/201706/10/2017 06/10/2017M/s Gaurav Enterprises 9837408485S.P. SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
573 58/EE/2016-17/ED-1PARISHAD PROJECT FUNDBalance Airconditioning work in AC Craft shop Administrative block and Exhibition hall at Avadh Shilp Gram Avadh Vihar Yojna Lucknow 0.00 39.90 18/10/201619/01/2017 19/01/201718/02/201719/01/2017 19/01/2017KRISHNA REFRIGRATION 09652303229 Circle ElectricalCompleted
574 06/EE/CD29/17-18AWASTHAPNA FUNDStrengthening of road in sector-1, Sikandra Yojna under Infrastructure Project (Part-B) 0.00 97.69 31/08/201707/03/2018 07/03/201806/06/201807/03/2018 07/03/2018R.N. Agarwal 9319052251A.D. SHANDILYA,SURESH CHANDRA JE A.P. AGRAWAL AE CHANDRAMA RAM XECircle 6Completed
575 05/EE/2018-19AWASTHAPNA FUNDRepairing/Renovation work of 6.00/7.50M wide CC Road & Park in Sector 5 Yojna no-3 Kanpur 0.00 32.50 12/04/201815/06/2018 15/06/201814/09/201815/06/2018 15/06/2018M/S A.K Traders 9415125278SRI MAHENDRA KUMAR JE SRI SHASHANK PANDEY AE SRI D. K. GUPTA XECircle 4Completed
576 05/EE/17-18AWASTHAPNA FUNDREPAIRING/RENOVATION WORK OF 6.00/7.50M WIDE ROAD AND PARK IN SECTOR 5 YOJNA NO-3 KANPUR 0.00 65.00 19/11/201614/06/2017 14/06/201713/09/201714/06/2017 14/06/2017M/S S.P & Company 9935586687SRI MAHENDRA KUMAR JE SRI SHASHANK PANDEY AE SRI R.P GUPTA XECircle 4Completed
577 01/EE/18-19AWASTHAPNA FUNDRENOVATION/STRENGTHING OF 9.00/7.00/6.00M CC ROAD DRAIN CULVERT AT SECTOR 1 YOJNA NO 3 KANPUR 0.00 54.83 16/03/201802/04/2018 02/04/201801/07/201802/04/2018 02/04/2018M/S NATIONAL CONSTRUCTION CO. 9415737202SRI MAHENDRA KUMAR,SRI PANKAJ KUMAR JE SRI VIKAS GAUTAM,SRI Y. K. GOEL AE SRI D. K. GUPTA XECircle 4Completed
578 02/EE/17-18AWASTHAPNA FUNDREPAIRING/RENOVATION OF WORK 7.50/6.00M WIDE ROAD AND PARK AT SECTOR 5 YOJNA NO 3 KANPUR 0.00 65.00 19/11/201618/05/2017 18/05/201717/08/201718/05/2017 18/05/2017M/s S.P. Singh 9455923183SRI MAHENDRA KUMAR JE SRI SHASHANK PANDEY AE SRI R.P GUPTA XECircle 4Completed
579 05/EE/ED-2GZB/18-19PARISHAD PROJECT FUNDS/I/T/C OF 1 NO 40 KVA TROLLY MOUNTED DIESEL E/A SET FOR TUBEWELL SIDDHARTH VIHAR YOJNA GZB 0.00 14.16 04/10/201804/10/2018 03/12/201802/02/201904/10/2018 03/12/2018M/S OM ASSOCIATES 9312388633C.L. MAURYA JE TEAJ BIR SINGH AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
580 10/EE/ED-2GZB/17-18PARISHAD PROJECT FUNDSUPPLY OF 1 NO. 10 MVA 33/11 KV POWER T/F FOR 33/11 KV S/S SEC-7 VASUNDHARA YOJNA GZB 0.00 60.00 01/04/201705/08/2017 05/08/201704/10/201705/08/2017 05/08/2017Elecon Conductor 9837007408V.K. RAI JE V.V TRIPATHI AE MANEESH KUMAR PATHAK XECircle ElectricalIn Progress
581 59/EE/2016-17/ED-1PARISHAD PROJECT FUNDExt. Elect. Work (Shifting) in sect-6 & 14 at Vrindavan Yojna Lucknow 0.00 20.66 23/11/201627/01/2017 27/01/201726/03/201727/01/2017 27/01/2017Preeti Electric works Circle ElectricalCompleted
582 10/EE/2018-19CD-28AWASTHAPNA FUNDConst. of Balance RCC Nala from H.No. 14/727 to Sec.-15 Sikandra Agra 0.00 16.54 02/06/201826/10/2018 26/10/201825/12/201826/10/2018 26/10/2018Mahaveer Singh & Comp. 9536490321RAKESH KUMAR VERMA,SANJAY SHARMA JE ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XECircle 6Completed
583 08/EE/2018-19CD-28AWASTHAPNA FUNDStrengthening of Road & Drain in Sec.-15, Excies Colony, Sikandra Agra 0.00 12.38 02/06/201826/10/2018 26/10/201825/12/201826/10/2018 26/10/2018R. K. Enterprises 9760099926RAKESH KUMAR VERMA,SANJAY SHARMA JE ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XECircle 6Completed
584 04/EE/CD29/17-18AWASTHAPNA FUNDCONSTRUCTION OF PARK IN SECTOR-6A, SIKANDRA YOJNA, AGRA 0.00 11.75 31/08/201727/10/2017 27/10/201726/10/201827/10/2017 27/10/2017PEMPER PETS 7906702954A.D. SHANDILYA JE AMIT RATHOR AE CHANDRAMA RAM XECircle 6Not Started
585 01/EE/17-18AWASTHAPNA FUNDREPAIRING/RENOVATION WORK OF 30.00 M WIDE ROAD AT SECTOR 7 IN YOJNA NO 3 KANPUR 0.00 82.00 19/11/201618/05/2017 18/05/2017 18/05/2017 18/05/2017M/S ABHESHEK ENTERPRISES 9451284990SRI K. K KATIYAR,SRI KHELENDRA MUKHRAIYA JE SRI SHASHANK PANDEY AE SRI R.P GUPTA XECircle 4Completed
586 08/EE/18-19AWASTHAPNA FUNDMaintenance of 9.00/7.50M wide road & park at sector 4 in yojna no 3 kanpur 0.00 44.08 24/05/201810/09/2018 10/09/201809/12/201810/09/2018 10/09/2018M/s S.P. Singh 9455923183SRI ANOOP KUMAR VIMAL JE SRI Y. K. GOEL AE SRI D. K. GUPTA XECircle 4Completed
587 10/EE/17-18PARISHAD PROJECT FUNDALUMINIUM PARTATION WORK & SUPPLY OF FURNITURE & 01 NOS AC, INVERTER AT A & P, UNIT-7 KANPUR NAGAR 0.00 8.55 15/12/201723/01/2018 01/01/201822/03/201823/01/2018 01/01/2018M/S S K ENTERPRISES 9452000858SRI ANOOP KUMAR VIMAL JE SRI Y. K. GOEL AE SRI R.P GUPTA XECircle 4Completed
588 04/EE/17-18AWASTHAPNA FUNDREPAIRING/RENOVATION WORK OF ROAD AT SECTOR J, K, L, N & O IN YOJNA NO-1 KANPUR 0.00 8.03 05/05/201702/06/2017 02/06/201701/07/201702/06/2017 02/06/2017M/S MAA SHARDA TRADERS 9455921433SRI ANOOP KUMAR VIMAL JE SRI C.K DIXIT AE SRI R.P GUPTA XECircle 4Completed
589 06/EE/2018-19CD-28AWASTHAPNA FUNDInstallation of CC TV Camera on Roadways Bus Stand, DRB Triaha, Bagla Hospital, Talab Choraha & Sasni Choraha in Hathras City 0.00 8.71 02/06/201817/10/2018 17/10/201816/12/201817/10/2018 17/10/2018Radix Solutions 9759455599RAMSHANKAR JE ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XECircle 6Completed
590 06/EE/17-18AWASTHAPNA FUNDREPAIRING & PATCH WORK OF 18M/45M WIDE ROAD IN YOJNA NO-1 & 3 KANPUR 0.00 5.05 31/05/201714/06/2017 14/06/201728/06/201714/06/2017 14/06/2017M/S A A ENTERPRISES 7081810109SRI ANOOP KUMAR VIMAL JE SRI C.K DIXIT AE SRI R.P GUPTA XECircle 4Completed
591 06/EE/2018-19AWASTHAPNA FUNDREPAIRING/RENOVATION WORK OF ROAD AND DRAIN SECTRO-E YOJNA NO 3 KANPUR 0.00 22.98 26/04/201818/07/2018 18/07/201817/10/201818/07/2018 18/07/2018M/S NATIONAL CONSTRUCTION CO. 9415737202SRI ANOOP KUMAR VIMAL,SRI KHELENDRA MUKHRAIYA JE SRI Y. K. GOEL AE SRI D. K. GUPTA XECircle 4Completed
592 01/EE/ED-III/2018-19PARISHAD PROJECT FUNDSupply of 11 KV Switch Gear Panel for 33/11 KV Substation at Katai Mill Campus Awasiya Yojna Etawah. 0.00 46.69 08/02/201818/04/2018 18/04/201817/08/201818/04/2018 18/04/2018PREETI ELECTRIC WORK 9150011801ER. GHANSHYAM LAL JE ER. D. R. MAURYA AE AVESH XECircle ElectricalCompleted
593 02/EE/ED-2GZB/18-19PARISHAD PROJECT FUNDS/I OF OUT DOOR TYPE 11/.433 KV 63 KVA T/F (L-2) AND RELATED WORK AT SECTOR 5,8,9,10 TUBEWELL SIDDHARTHA VIHAR YOJNA GHAZIABAD 0.00 7.47 05/07/201822/10/2018 22/10/201821/11/201822/10/2018 22/10/2018M/S OM ASSOCIATES 9312388633C.L. MAURYA JE TEAJ BIR SINGH AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
594 02/PM/17-18AWASTHAPNA FUNDCONSTRUCTION OF RENOVATION OF ROAD AND DRAIN 0.00 27.50 03/04/201701/07/2017 01/07/201731/08/201701/07/2017 01/07/2017ASHISH CONSTRUCTION 9838693000R.K. SONKAR JE ATUL CHANDRA SRIVASTAVA AE RAMASHRAY RAM XECircle 1Completed
595 01/EE/CD-/2017-18STATE AWASTHAPNA FUNDInterlocking tiles work on raod and drain const./renno. work from Infra Fund from Chandrashekhar marg to Atul memorial School in Thakurganj Ward, Lucknow. 0.00 24.69 12/04/201726/05/2017 26/05/201725/08/201726/05/2017 26/05/2017SINGH ASSOCIATES 9450453113ADIL BEG JE A.K.SAXENA AE A.K.MITTAL XECircle 3Completed
596 06/EE/CD/2018-19AWASTHAPNA FUNDLAYING OF INTERLOCKING TILES & CONSTRUCTION DRAIN IN SULTANGANJ FROM 25/6 TO 26/30 JANAKPURI MAHOTSAV 0.00 12.97 12/10/201808/03/2019 08/03/201907/06/201908/03/2019 08/03/2019SHIVAM GROUPS 9837001873NAVRATAN SINGH JE KAILASH NATH AE CHANDRAMA RAM XECircle 6In Progress
597 3339/A-4/80PARISHAD PROJECT FUNDEarth Filling work in Spining Mill Awasiya Yojna Etawah 0.00 227.30 16/12/201612/09/2017 12/09/2017 12/09/2017 12/09/2017M/s Shelvi Traders 9458020057SRI ARVIND KUMAR JE NAVJOT SINGH VERMA AE PRADEEP KUMAR XECircle 4Completed
598 08/EE/CD29/2018-19AWASTHAPNA FUNDWIDENING AND CONSTRUCTION OF CULVERT AT MUGHAL ROAD NEAR SULTANGANJ CHAURAHA 0.00 64.48 11/01/201908/03/2019 08/03/201907/06/201908/03/2019 08/03/2019SUSHIL SINGHAL 9412255916NAVRATAN SINGH,RAJIV KUMAR VERMA JE A.P. AGRAWAL AE CHANDRAMA RAM XECircle 6In Progress
599 02/SE-7/2017-18PARISHAD PROJECT FUNDLaying Water Supply Distribution system from CWR of Zone-I & Zone-II to Plots and rising main from CWR Sector-3 to CWR Sector-8 in Siddharth Vihar, GHAZIABAD 0.00 413.70 12/10/201727/10/2017 27/10/201726/02/201827/10/2017 27/10/2017RAHUL BUILDERS 9818231535PREM PRAKASH,RADHESHYAM JE ASHOK KUMAR AGARWAL,S.K. VERMA AE LALIT MOHAN PANDEY,MOHD ALI SAFDAR XECircle 7Completed
600 08/SE-II/2019-20PARISHAD PROJECT FUNDConstruction of Service roads of 24m, 36m, 30m & 30m HT Line wide trunk road at Jagriti Vihar (Ext.), Scheme-11, Meerut 0.00 477.25 14/08/201925/10/2019 25/10/201924/02/202025/10/2019 25/10/2019M/s Jeet Construction Co. 9837021527SH. RAVINDRA KUMAR JE M BKAUSHIK AE M.B. KAUSHIK XECircle 2Completed
601 01/EE/CD29/2018-19PARISHAD PROJECT FUNDLaying of sewer line for 96 No. Houses multistory, in Sector-2C, Sikandra Yojna, Agra 0.00 17.44 31/03/201811/12/2018 11/12/201813/03/201811/12/2018 11/12/2018ARUN KUMAR AGARWAL & CO. 9759027944KAMAL SINGH JE KAILASH NATH AE CHANDRAMA RAM XECircle 6Completed
602 07/EE/ED-2GZB/17-18PARISHAD PROJECT FUNDEXT. ELECT. & T/F WORK FOR CAMPUS OF GANGA, YAMUNA, HINDON ENCLAVE SEC-7 SIDDHARTHA VIHAR YOJNA GZB 0.00 101.00 28/10/201627/06/2017 27/06/201726/08/201727/06/2017 27/06/2017M/S OM ASSOCIATES 9312388633C.L. MAURYA JE TEAJ BIR SINGH AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
603 19/EE/19-20ED-1PARISHAD PROJECT FUNDConstruction of 11 KV Feeder of 33/11 KV Sub Staion in Vrindavan Yojna No-4 Lucknow Group-A 0.00 43.89 14/11/201927/11/2019 27/11/201926/01/202027/11/2019 27/11/2019PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
604 03/EE/CD29/2018-19AWASTHAPNA FUNDLAYING OF INTERLOCKING TILES & DRAIN AT MAIN ROAD JAIN BAGEECHI TO NAGLA SHOLA, BHOLA BANGALIYA AND JAIN BAGEECHI 0.00 27.51 12/12/201815/01/2019 15/01/201912/10/201915/01/2019 15/01/2019SHYAM JI TRADERS 9917475285KAMAL SINGH,NAVRATAN SINGH,RAJIV KUMAR VERMA JE A.P. AGRAWAL,KAILASH NATH AE CHANDRAMA RAM XECircle 6In Progress
605 01/EE/CD-1GZB/2017-18DATE18-09-2017PARISHAD PROJECT FUNDLaying of Internal water supply Line in Sec-7, Part & Sec-8 Part in Siddharth Vihar Yojna, Gzb. 0.00 37.10 17/06/201718/09/2017 18/09/201717/11/201718/09/2017 18/09/2017M/S S.p Singh 9455923183 JE YOGENDRA KUMAR VERMA AE ATUL KUMAR SINGH XECircle 7In Progress
606 27/SEHQ/CD-14/2014-15PARISHAD PROJECT FUNDconstruction fo 160 nos. Ews affordable houses (G+3) in sect-5 0.00 846.00 24/09/201423/01/2015 23/01/201523/07/201623/01/2015 23/01/2015RAJAWAT ASSOCIATE 9415523037SUBEDAR NAVIK JE YOUGESH KUMAR AE PRAMOD KUMAR SINGH XECircle HQCompleted
607 11/EE/ED-2GZB/17-18PARISHAD PROJECT FUNDSUPPLY OF 01 NO. 10 MVA 33/11 KVA POWER T/F FOR 33/11 KVA S/S AT SEC-8 VASUNDHARA YOJNA GZB 0.00 60.00 01/04/201705/08/2017 05/08/201704/10/201705/08/2017 05/08/2017Elecon Conductor 9837007408PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
608 02/EE/CD29/2018-19CENTRAL AND STATE FUNDConstruction of Septic Tank, Soakpit, and Rising mainline work in campus of 360 Nos. Houses under project BSUP 0.00 44.99 11/01/201911/01/2019 11/01/201910/04/201911/01/2019 11/01/2019Ganpati Construction Co. 9811513000NAVRATAN SINGH JE KAILASH NATH AE CHANDRAMA RAM XECircle 6Completed
609 19/EE/ED-III/17-18PARISHAD PROJECT FUNDConstrutction of Pump House at Sector-4 P-2 Park Jagrati Vihar Scheme No. 11, Meerut. 0.00 5.59 28/12/201712/03/2018 12/03/201811/06/201812/03/2018 12/03/2018Rajkanwar Enterprises 9927876456ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE AVESH XECircle ElectricalIn Progress
610 06/EE/CD-25/2017-18INFRAConstruction work at community center by Infrastructure fund in Moradabad city village mau 0.00 60.00 13/04/201727/05/2017 26/01/201826/01/201827/05/2017 26/01/2018M/s Imran Arif Construction 9917007828RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XECircle 5In Progress
611 01/EE/ED-2GZB/17-18PARISHAD PROJECT FUNDSUPPLY OF OUT DOOR TYPE 400 KVA 3 STAR T/F 18 NO GANGA, YAMUNA, HINDON APPARTMENT SECTOR-7 SHIDHARTHA VIHAR YOJNA GZB 0.00 108.00 08/12/201601/04/2017 01/04/201730/05/201701/04/2017 01/04/2017SAI ELECTRICALS 9927006827SITARAM CHAUHAN JE V.V TRIPATHI AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
612 02/PMCUJHS/DATE20-05-2017INFRASTREGTHING OF ROAD ASHOK HOTEL TIRAHA TO RAILWAY STATION AREA JHANSI 0.00 80.00 24/11/201620/05/2017 20/05/201719/11/201720/05/2017 20/05/2017SATYAM CONSTRUCTION 9415030154MANVENDRA DHAMANIYA JE G S DWIVEDI AE RAKESH CHANDRA XECircle 6Completed
613 07/EE/CD/2018-19AWASTHAPNA FUNDLAYING OF INTERLOCKING TILES IN POLICE LINE CAMPUS 0.00 49.49 11/01/201908/03/2019 08/03/201907/06/201908/03/2019 08/03/2019R.K. Enterprisess 9760099926KAMAL SINGH,NAVRATAN SINGH JE A.P. AGRAWAL AE CHANDRAMA RAM XECircle 6Completed
614 09/EE/CD29/2018-19AWASTHAPNA FUNDPROVIDING AND LAYING OF INTERLOCKING TILES BELOW N.H. OVER BRIDGE AT BHAGWAN TALKIES AGRA 0.00 99.14 16/01/201908/03/2019 08/03/201907/06/201908/03/2019 08/03/2019SUSHIL SINGHAL 9412255916KAMAL SINGH,RAJIV KUMAR VERMA JE KAILASH NATH AE CHANDRAMA RAM XECircle 6Completed
615 06/SE-II/2019-20AWASTHAPNA FUNDMaintenance of Road at Shakuntlam Yojna, Muzaffarnagar 0.00 190.42 28/05/201921/09/2019 21/09/201920/02/202021/09/2019 21/09/2019M/s Om Shiv Construction 9837085092SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XECircle 2In Progress
616 04/EE2019-20AWASTHAPNA FUNDConstruction of Inter Locking Road, Drains & Culvert at Krishna Vihar & Karshni Complex, Mathura. 0.00 62.78 18/02/201910/10/2019 10/10/201909/01/202010/10/2019 10/10/2019S.K. Engineering 9457193428SANTOSH KUMAR JE R.K. GANGWAR AE SRI H.S. SHARMA XECircle 6In Progress
617 01/EE/CD-38/2019-20PARISHAD PROJECT FUNDConstruction of 33/11 KV Sub Station Building in sec -7 0.00 46.50 02/07/2019 02/07/201901/04/202002/07/2019 02/07/2019Arsh Contractor 9410497498VEER SINGH JE ALOKSHEEL DWIVEDI,RAVINDRA BHATT AE SHOBHIT KUMAR PATHAK XECircle MantolaIn Progress
618 05/EE2019-20AWASTHAPNA FUNDConstruction of Inter Locking Road, Drains & Culvert at Puspanjali Colony, NH-2, Mathura. 0.00 115.53 18/02/201922/10/2019 22/10/201921/01/202022/10/2019 22/10/2019Siddarth Associates 9457000613SANTOSH KUMAR JE R.K. GANGWAR AE SRI H.S. SHARMA XECircle 6In Progress
619 06/EE2019-20AWASTHAPNA FUNDConstruction of Inter Locking Road, Drains & Culvert at Krishnapuram Vrindavan, Mathura. 0.00 137.68 18/02/201924/10/2019 24/10/201923/01/202024/10/2019 24/10/2019M/s MAA DURGA CONSTRUCTION CO. 975904169SANTOSH KUMAR JE R.K. GANGWAR AE SRI H.S. SHARMA XECircle 6In Progress
620 3678/A-4/82INFRAStrengthening of road at Jai Hanuman Nursery to Vantu Rajpoot house 0.00 50.44 31/03/201724/08/2017 24/08/201723/11/201724/08/2017 24/08/2017M/s Siwansi Concrete Product 9412183483SRI ARVIND KUMAR JE NAVJOT SINGH VERMA AE PRADEEP KUMAR XECircle 4Completed
621 11/EE/CD-12/2015-16AWASTHAPNA FUNDConstruction and Strenthing of Road at Rajajipuram, lucknow under Infrastructur fund (Group-2) 0.00 63.00 16/07/201502/11/2015 02/11/201501/02/201602/11/2015 02/11/2015Angad Upadhyay, 7/67, Vikas Nagar, Lucknow. 9415088235 Circle VrindavanCompleted
622 3557/A-4/87PARISHAD PROJECT FUNDConstruction of Park in Spining Mill Awasiya Yojna Etawah 0.00 91.50 16/12/201713/07/2017 13/07/201712/11/201713/07/2017 13/07/2017M/s Siwansi Concrete Product 9412183483SRI DEVENDRA YADAV JE NAGENDRA KUMAR,NAVJOT SINGH VERMA,SRI ABHISHEK VERMA AE PRADEEP KUMAR XECircle 4In Progress
623 3679/A-4/83INFRAStrengthening of road at Shiv Vihar Colony to Tulsi Adda 0.00 55.72 31/03/201723/08/2017 23/08/201722/11/201723/08/2017 23/08/2017M/s Siwansi Concrete Product 9412183483SRI ANIL KUMAR CHAUDHARY JE NAGENDRA KUMAR,NAVJOT SINGH VERMA,SRI ABHISHEK VERMA AE PRADEEP KUMAR XECircle 4Completed
624 05/EE/CD-24/16-17AWASTHAPNA FUNDCONSTRUCTION OF CC ROAD 0.00 66.00 27/06/201615/09/2016 15/09/201614/12/201615/09/2016 15/09/2016Shree Gyanendra Chaudhary ER. OMPAL SINGH JE FARAZ ASLAM AE J.P. DIWEDI XECircle 5Completed
625 07/EE/CD-24/16-17AWASTHAPNA FUNDLAYING OF STORM WATER DRAIN LINE IN BIJNORE FROM INFRASTRUCTURE WORKS 0.00 70.00 12/07/201629/09/2016 29/09/201628/12/201629/09/2016 29/09/2016M/S Balram Sharma Constructions ER. OMPAL SINGH JE FARAZ ASLAM AE J.P. DIWEDI XECircle 5Completed
626 03/EE.CD-4/2017-18PARISHAD PROJECT FUNDconstuction of 400 K.L capacity Over Head Tank and 26.00m Staging in Bahraich Bhinga Marg Bhoomi Vikas Evam Grihsthan Yojna, Bahraich. 0.00 58.92 21/04/201727/10/2017 27/10/201726/08/201827/10/2017 27/10/2017Bandhu Enterprises 9936939786CHANDAN KUMAR JE K.K ACHARYA AE PRASHANT VARDHAN XECircle 3Completed
627 06/EE/CD-2/2017-18STATE AWASTHAPNA FUNDInterlocking tiles work on raod and drain const./renno. work from Infra Fund in Defence Colony Telibagh, Lucknow. 0.00 27.30 12/04/201715/06/2017 15/06/201714/09/201715/06/2017 15/06/2017SHIV SHAKTI CONSTRUCTION HEMANT KUMAR JE M.M.SRIVASTAVA AE A.K.MITTAL XECircle 3Completed
628 01/EE2019-20AWASTHAPNA FUNDConstruction of C.C. Road & Inter Locking Road, Drains & Culvert at Baldevpuram Colony Aurangabad & Daamodarpura, Mathura. 0.00 127.14 18/02/201930/09/2019 30/09/201929/12/201930/09/2019 30/09/2019Ganpati Construction Co. 9811513000SANTOSH KUMAR JE R.K. GANGWAR AE SRI H.S. SHARMA XECircle 6In Progress
629 3676/A-4/89INFRAConstruction of jogging track & laying of Interlocking tiles at Avas vikas parishad Yojna No-1 0.00 56.98 31/03/201725/08/2017 25/08/201724/11/201725/08/2017 25/08/2017M/s Siwansi Concrete Product 9412183483SRI ARUN KUMAR PATEL JE NAVJOT SINGH VERMA AE PRADEEP KUMAR XECircle 4Completed
630 3675/A-4/88INFRAConstruction of Park & jogging track in Dharam Nagar Etawah 0.00 56.98 31/03/201725/08/2017 25/08/201724/11/201725/08/2017 25/08/2017M/s Siwansi Concrete Product 9412183483SRI ARUN KUMAR PATEL JE NAVJOT SINGH VERMA AE PRADEEP KUMAR XECircle 4Completed
631 04/EE/CD-2/2017-18STATE AWASTHAPNA FUNDInterlocking tiles work on raod and drain const./renno. work from Infra Fund in Shanti nagar Thakurganj Ward, Lucknow. 0.00 26.84 12/04/201703/06/2017 03/06/201702/09/201703/06/2017 03/06/2017ASA Enterprises ADIL BEG JE M.M.SRIVASTAVA,SRI Y. K. GOEL AE A.K.MITTAL XECircle 3Completed
632 06/EE/2017-2018INFRAConst. of Interlocking Road, Drain And Culvert at Shripath Balaji Puram House of Ramesh to Ranveer Singh, Mathura 0.00 97.34 26/04/201702/08/2017 02/08/201701/11/201702/08/2017 02/08/2017AGARWAL COMPANY SANTOSH KUMAR JE GAUR SHANKAR DWIVEDI AE MUKESH YADAV,N.H. FAZLI XECircle 6Completed
633 396/PR-3/INFRAStrengthing of Road from Ho.No. C-307/16 to 333/2 at G.T.B.Nagar Yojana, Prayagraj 0.00 30.38 10/04/201710/04/2017 10/04/201730/06/201710/04/2017 10/04/2017Departmental (Self) J.P. MAURYA JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
634 05/EE/2017-18INFRAConst of Interlocking Road, Drain & Culvert at Natver Nagar Dholi Payau House of Prakash Chaudhary from Vijaypal Chaudhary, Mathura 0.00 74.50 26/04/201702/08/2017 02/08/201701/11/201702/08/2017 02/08/2017AGARWAL COMPANY SANTOSH KUMAR JE GAUR SHANKAR DWIVEDI AE MUKESH YADAV XECircle 6Completed
635 03/EE/CD-24/17-18PARISHAD PROJECT FUNDConstruction of Trunk/Internal Road Work (Part B) in Najibabad Scheme Bijnore 0.00 101.00 04/05/201712/06/2017 12/06/201711/12/201712/06/2017 12/06/2017ROYAL CONSTRUTION YOGESH KUMAR JE FARAZ ASLAM AE MOHAMMAD AZAM WARIS XECircle 5Completed
636 3680/A-4/85INFRAStrengthening of road at Etawah Agra main Road to Saray Dayanat 0.00 57.72 31/03/201723/08/2017 23/08/201722/11/201723/08/2017 23/08/2017M/s Siwansi Concrete Product 9412183483SRI ANIL KUMAR CHAUDHARY JE NAVJOT SINGH VERMA AE PRADEEP KUMAR XECircle 4Completed
637 03/EE/CD-2/2017-18STATE AWASTHAPNA FUNDInterlocking tiles work on raod and drain const./renno. work from Infra Fund from Chandrashekhar marg to Musahibganj nala via pumping station in Thakurganj Ward, Lucknow. 0.00 82.95 12/04/201730/05/2017 30/05/201728/08/201730/05/2017 30/05/2017Ahmed Builders A.B.SINGH JE A.K.SAXENA,SRI Y. K. GOEL AE A.K.MITTAL XECircle 3Completed
638 04/EE/CD-24/16-17AWASTHAPNA FUNDLaying of INTERNALSewer Line in Rawli Road Yojana Bijnore 0.00 65.00 27/06/201630/08/2016 29/09/201629/11/201630/08/2016 29/09/2016M/S Balram Sharma Constructions ER. OMPAL SINGH JE FARAZ ASLAM AE J.P. DIWEDI XECircle 5Completed
639 656/A.C-4/INFRAConstruction of C.C. Road and Interlocking at G.T.B.Nagar, Prayagraj 0.00 90.48 21/04/201721/04/2017 21/04/201720/07/201721/04/2017 21/04/2017Departmental (Self) RAM PRATAP JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
640 05/EE/CD-2/2017-18STATE AWASTHAPNA FUNDInterlocking tiles work on raod and drain const./renno. work from Infra Fund around Nehru park and nearby house no 107 in Vijay Nagar in chitragupt Ward Lucknow. 0.00 55.57 12/04/201712/06/2017 12/06/201711/09/201712/06/2017 12/06/2017J.S.Construction HEMANT KUMAR JE M.M.SRIVASTAVA AE A.K.MITTAL XECircle 3Completed
641 652/A.C.-4/INFRAConstruction of B.M.+S.D.B.C and Interlocking Tiles at Jhunsi-3, Prayagraj 0.00 36.71 21/04/201721/04/2017 21/04/201720/07/201721/04/2017 21/04/2017Departmental (Self) J.P. MAURYA JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
642 05/EEC.D.-34/AWASTHPANA/2017-18AWASTHAPNA FUNDAWASTHPANA NIDHI KE ANTRARGAT JANPAD JAUNPUR MAIN SADBHAWANA PUL KE DONO TARAF SADAK CHAUDIKARAN EVAM RENOVATION WORK 0.00 56.78 04/12/201725/01/2018 25/01/201824/05/201825/01/2018 25/01/2018M/S NANDAN CONSTRUCTION 9935453962LALLAN PRASAD JE SHIV PRASAD AE SAMAR UPADHAYAY XECircle 1Completed
643 02/EEC.D.-34/AwasthapnaNidhi/2017-18AWASTHAPNA FUNDAwasthapna Nidhi ke Antargat Varanasi Nagar Kshetra Pt. Deendyal Upadhayay Hospital Mein Male & Female Toilets ke Renovation work. 0.00 13.23 27/05/201729/06/2017 29/06/201728/09/201729/06/2017 29/06/2017M/S Sai Enterprises 9653091241ARJUN VERMA JE SUMIT KUMAR AE SAMAR UPADHAYAY XECircle 1Completed
644 09/EE/CD-24/16-17AWASTHAPNA FUNDREPAIRING WORKS OF ROADS IN RAWLI ROAD YOJANA BIJNORE 0.00 85.00 13/12/201606/01/2017 06/01/201705/04/201706/01/2017 06/01/2017VINAYAK CONSTRUCTION A.K.SAXENA JE FARAZ ASLAM AE J.P. DIWEDI XECircle 5Completed
645 02/EE/CD-2/2018-19PARISHAD PROJECT FUNDBarbed wire fencing work in gonda-Faizabaad Marg Yojna Gonda in gonda. 0.00 9.21 15/05/201817/07/2018 17/07/201816/08/201817/07/2018 17/07/2018Izhar Ali Contractor HEMANT KUMAR JE M.M.SRIVASTAVA AE A.K.MITTAL XECircle 3Completed
646 03/EE/2017-18INFRAConst. of C.C. Interlocking Road Krishna Nagar to madhuvan Enclav Mathura 0.00 40.22 30/03/201723/06/2017 23/06/201722/09/201723/06/2017 23/06/2017UJJAWAL INFRATECH PVT. LTD. 9412277775SANTOSH KUMAR JE GAUR SHANKAR DWIVEDI AE MUKESH YADAV,N.H. FAZLI XECircle 6Completed
647 651/A.C.-4/INFRAConstruction of C.C. Road and Interlocking at G.T.B.Nagar Yojana, Prayagraj 0.00 70.55 21/04/201721/04/2017 21/04/201720/07/201721/04/2017 21/04/2017Departmental (Self) RAM PRATAP JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
648 01/EE/CD-24/18-19PARISHAD PROJECT FUNDCONSTRUCTION OF 330 KL OHT IN NAJIBABAD YOJANA BIJNORE 0.00 45.00 20/12/201807/02/2019 08/02/201906/11/201907/02/2019 08/02/2019M/S Arora R.C.C. Works 9837391824A.K.SAXENA JE FARAZ ASLAM AE PAWAN KUMAR VERMA XECircle 5Completed
649 04/EE/2017-18INFRAConst. of C.C. Interlocking Road at Trivani Complex Gate No.-2 & infront of Karshni Complex, Goverdhan Road, Mathura 0.00 62.14 30/03/201723/06/2017 23/06/201722/09/201723/06/2017 23/06/2017UJJAWAL INFRATECH PVT. LTD. 9412277775SANTOSH KUMAR JE GAUR SHANKAR DWIVEDI AE MUKESH YADAV,N.H. FAZLI XECircle 6Completed
650 62/EE/16-17ED-1PARISHAD PROJECT FUNDConstruction of 33 KV line at 33/11 KV S/S sector-8 at Vrindavan Yojna No. 2 Phase-2 Lucknow 0.00 84.91 18/10/201604/03/2017 04/03/201703/05/201704/03/2017 04/03/2017Siddharetha Construction Circle ElectricalCompleted
651 63/EE/16-17ED-1PARISHAD PROJECT FUNDExt. Elect. work at Vrindavan Yojna no. 4 Sector-18 (C & D) Lucknow 0.00 44.56 16/12/201621/03/2017 21/03/201720/06/201721/03/2017 21/03/2017YASH ENTERPRISES Circle ElectricalCompleted
652 7/EE/2017-18INFRAConst. Of Interlocking Road, Drain & Culvert Sarang Vihar Balaji Puram Mathura 0.00 79.54 30/03/201702/08/2017 02/08/201701/11/201702/08/2017 02/08/20173D CREATION SANTOSH KUMAR JE GAUR SHANKAR DWIVEDI AE MUKESH YADAV,N.H. FAZLI XECircle 6Completed
653 64/EE/16-17ED-1PARISHAD PROJECT FUNDS/I of submersible pumping plant of 52 mtr. head and 1000 LPM discharge for T/W at sector-3 Avadh Vihar Yojna Lucknow 0.00 5.68 16/12/201623/03/2017 23/03/201722/04/201723/03/2017 23/03/2017M.A. Engineering works Circle ElectricalCompleted
654 02/SE-1/CD-2/2014-15PARISHAD PROJECT FUNDConstruction of Trunk Drain (RCC) in Sector 18-20 in VVY-04, Lucknow. 0.00 142.55 24/09/201403/12/2014 03/06/201418/11/201803/12/2014 03/06/2014Raunak Interprises A.B.SINGH JE A.K.SAXENA,SRI Y. K. GOEL AE A.K.MITTAL XECircle 3Completed
655 02/EE/17-18ED-1PARISHAD PROJECT FUNDAir conditioning work at Banquet Hall Avadh Shilp Gram Avadh Vihar Yojna Lucknow 0.00 98.50 18/03/201720/05/2017 20/05/201719/07/201720/05/2017 20/05/2017KRISHNA REFRIGRATION 09652303229 Circle ElectricalCompleted
656 01/EE/2019-2020PARISHAD PROJECT FUNDInternal Development work in Pocket of Office Complex (G+2) at Majhola Yojna No.-4, Sector-5, Phase-2, Moradabad 0.00 39.26 13/12/201924/01/2020 24/01/202023/04/202024/01/2020 24/01/2020M/s Vision Builders & Developers 7055036555SATENDRA HYANKI JE ANIL KUMAR SAXENA AE SASMIT KATIYAR XECircle 5Completed
657 1/EE/2017-18INFRAConst. of C.C. Interlocking Road ar shreepathpuram Balaji puram House of Navratn to D.K. Mishra, Mathura 0.00 66.41 30/03/201723/06/2017 23/06/201722/09/201723/06/2017 23/06/2017Siddarth Associates 9457000613SANTOSH KUMAR JE GAUR SHANKAR DWIVEDI AE MUKESH YADAV,N.H. FAZLI XECircle 6Completed
658 03/EE/17-18ED-1PARISHAD PROJECT FUNDExt. Elect. work at Sector-2 Obri Yojna Barabanki 0.00 60.70 18/03/201720/05/2017 20/05/201719/07/201720/05/2017 20/05/2017Bala ji Electrical & Mechnical works Circle ElectricalCompleted
659 05/EE/CD-2/2016-17STATE AWASTHAPNA FUNDRennovation of Road and drain and interlocking work from infra structure fund from IIM road to Heerakunj house in Faizullah Ganj ward lko. 0.00 40.00 07/04/201629/05/2016 29/05/201628/08/201629/05/2016 29/05/2016MUKESH CONSTRUCTION ADIL BEG JE M.M.SRIVASTAVA,SRI Y. K. GOEL AE A.K.MITTAL XECircle 3Completed
660 2/EE/2017-18INFRAConst. of C.C. Interlocking Road at Indupuram House of Dalveer to Kishan Singh, Mathura 0.00 57.60 30/03/201723/06/2017 23/06/201727/09/201723/06/2017 23/06/2017Siddarth Associates 9457000613SANTOSH KUMAR JE GAUR SHANKAR DWIVEDI AE MUKESH YADAV,N.H. FAZLI XECircle 6Completed
661 04/EE/17-18ED-1PARISHAD PROJECT FUNDConstruction of 11 KV line from 33/11 KV S/S at sector-3 to Mandakni Enclave , Avadh Vihar Yojna Lucknow 0.00 97.99 18/03/201720/05/2017 20/05/201719/07/201720/05/2017 20/05/2017EAGLE CONSTRUCTION Circle ElectricalCompleted
662 649/A.C.-4/INFRAConstruction of C.C. Road and culvert at Ashok Nagar, Prayagraj 0.00 40.70 21/04/201721/04/2017 21/04/201720/07/201721/04/2017 21/04/2017Departmental (Self) J.P. MAURYA JE LAL JI YADAV AE SATENDRA KUMAR XECircle 1Completed
663 05/EE/17-18ED-1PARISHAD PROJECT FUNDExt. Elect. work at sector-3 Basera-1 Avadh Vihar Yojna Lucknow 0.00 96.00 18/03/201726/05/2017 26/05/201725/07/201726/05/2017 26/05/2017Preeti Electric works Circle ElectricalCompleted
664 06/EE/17-18ED-1PARISHAD PROJECT FUNDConstruction of T/W in Sector-7A & 8 at Avadh Vihar Yojna Lucknow 0.00 45.84 18/03/201726/05/2017 26/05/201725/07/201726/05/2017 26/05/2017M.A. Engineering works Circle ElectricalCompleted
665 07/EE/17-18ED-1PARISHAD PROJECT FUNDExternal Elect. work of Himalaya Enclave Phase-1 at Sector-17 Vrindavan Yojna No. 4 Lucknow 0.00 82.45 05/12/201612/06/2017 12/06/201708/05/201712/06/2017 12/06/2017ELECTROMAC ENGINEERING ENTERPRISES Circle ElectricalCompleted
666 654/A.C.-4/INFRAStrength of Road at at G.T.B.Nagar Yajana, Prayagraj 0.00 70.16 21/04/201721/04/2017 21/04/201720/07/201721/04/2017 21/04/2017Departmental (Self) RAM PRATAP JE LAL JI YADAV AE SATENDRA KUMAR XECircle 1Completed
667 7/EE/17-18ED-1PARISHAD PROJECT FUNDExt. Elect. work of Himalaya Enclave Phase-1 At sector-17 Vrindavan Yojna Lucknow 0.00 131.11 05/12/201612/06/2017 12/06/201711/10/201712/06/2017 12/06/2017Electro Builders Circle ElectricalCompleted
668 655/A.C.-4/INFRAConstruction of C.C. Road and Interlocking at G.T.B.Nagar Yajana, Prayagraj 0.00 75.86 21/04/201721/04/2017 21/04/201720/07/201721/04/2017 21/04/2017Departmental (Self) J.P. MAURYA JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
669 8/EE/17-18ED-1PARISHAD PROJECT FUNDExt. Elect. work Himalaya Enclave phase-3 at Sector-18 Vrindavan Yojna no. 4 Lucknow 0.00 225.82 05/12/201612/06/2017 12/06/201711/10/201712/06/2017 12/06/2017Electro Builders Circle ElectricalCompleted
670 03/EE.CD.-34/AWASTHAPNA/2017-18PARISHAD PROJECT FUNDPARISHAD KI PANDEYPUR YOJNA VARANASI MEIN RISING MAIN DALNE KA KARYA 0.00 16.53 27/05/201706/07/2017 06/07/201705/10/201706/07/2017 06/07/2017M/S SAHYOG CONSTRUCTION CO. 9795367750ARJUN VERMA JE SUMIT KUMAR AE SAMAR UPADHAYAY XECircle 1Completed
671 650/A.C.-4/INFRAConstruction of C.C. Road and Interlocking at G.T.B.Nagar Yajana, Prayagraj 0.00 72.54 21/04/201721/04/2017 21/04/201720/07/201721/04/2017 21/04/2017Departmental (Self) RAM PRATAP JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
672 9/EE/17-18ED-1PARISHAD PROJECT FUNDExt. Elect. work of phase-1 EWS & LIG flats Gokul Gram Yojna Munnu Khera Lucknow 0.00 96.01 05/05/201719/06/2017 19/06/201718/08/201719/06/2017 19/06/2017Preeti Electric works Circle ElectricalCompleted
673 657/A.C.-4/INFRAConstruction of CC Road, Jhunsi-3, Prayagraj 0.00 50.94 21/04/201721/04/2017 21/04/201720/07/201721/04/2017 21/04/2017Departmental (Self) J.P. MAURYA JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
674 10/EE/17-18ED-1PARISHAD PROJECT FUNDExt. Elect. woek for giving Electrical supply to flats being construction at Ecerest Enclave sector-18 Vrindavan Yojna No. 4 Lucknow 0.00 97.39 05/05/201701/07/2017 01/07/201731/10/201701/07/2017 01/07/2017Preeti Electric works Circle ElectricalCompleted
675 04/EEC.D.-34/AWASTHPANA/2017-18AWASTHAPNA FUNDAWASHTHPNA NIDHI KE ANTRGAT JANPAD JAUNPUR KE CHAHRASHU CHAURHA SE SHAHI KILA TAK SADAK CHAUDIKARAN EVAM RENOVATION WORK 0.00 28.89 04/12/201725/01/2018 25/01/201824/05/201825/01/2018 25/01/2018M/S NANDAN CONSTRUCTION 9935453962LALLAN PRASAD JE SHIV PRASAD AE SAMAR UPADHAYAY XECircle 1Completed
676 11/EE/17-18ED-1PARISHAD PROJECT FUNDSupply & Installation on CCTV & its related work in Banquet Hall & Admin Block at Avdh Vihar Yojna Lucknow 0.00 37.25 18/03/201706/07/2017 06/07/201705/09/201706/07/2017 06/07/2017Triflex Solution Circle ElectricalCompleted
677 14/EE/17-18ED-1PARISHAD PROJECT FUNDSITC of pre-paid meter (Secure/ L&T make) and its related work for giving servic connection in first phase for 364 flats at Bhagirathi Enclave Sector-2 Avadh Vihar Yojna Lucknow 0.00 94.00 05/08/201713/11/2017 13/11/201712/03/201813/11/2017 13/11/2017S.J.S. System & Solution Circle ElectricalIn Progress
678 8/EE/2017-18INFRAConst. of C.C. Road Drain & Culvert at Vashu Enclave, Balajipuram, Mathura 0.00 52.08 30/03/201704/08/2017 04/08/201703/11/201704/08/2017 04/08/2017Siddarth Associates 9457000613SANTOSH KUMAR JE GAUR SHANKAR DWIVEDI AE MUKESH YADAV,N.H. FAZLI XECircle 6Completed
679 661/A.C.-1/INFRAConstruction of Bitumainous Road and Interlockingtiles at Rajapur, Prayagraj 0.00 82.93 21/04/201721/04/2017 21/04/201720/07/201721/04/2017 21/04/2017Departmental (Self) RAM PRATAP JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
680 9/EE/2017-18INFRAConst. of C.C. Road Drain & Culvert from house of Udal Singh Adv. to House of Raghunat Singh at Shastri Nagar, Mathura 0.00 75.30 30/03/201704/08/2017 04/08/201703/11/201704/08/2017 04/08/2017UJJAWAL INFRATECH PVT. LTD. 9412277775SANTOSH KUMAR JE GAUR SHANKAR DWIVEDI AE MUKESH YADAV,N.H. FAZLI XECircle 6Completed
681 658/A.C.-4/INFRAConstruction of C.C. Road and Interlocking at C.S.A. Nagar Yajana, Prayagraj. 0.00 68.18 21/04/201721/04/2017 21/04/201720/07/201721/04/2017 21/04/2017Departmental (Self) J.P. MAURYA JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
682 15/EE/17-18ED-1PARISHAD PROJECT FUNDS/L of 150 mm dia raising main from T/W no. 2 to 350 mm dia unlet pipe of over head tank sector-18 at Vrindavan Yojna Lucknow 0.00 27.55 05/08/201713/11/2017 13/11/201712/01/201813/11/2017 13/11/2017Upendra Kumar Circle ElectricalCompleted
683 16/EE/17-18ED-1PARISHAD PROJECT FUNDConstruction of pump house at sector-3, 7A & 8 Avadh Vihar Yojna Lucknow 0.00 23.55 13/09/201707/12/2017 07/12/201706/02/201707/12/2017 07/12/2017SAI CONSTRUCTION COMPEY 9311189551 Circle ElectricalCompleted
684 653/A.C.-4/INFRAConstruction of S.D.B.C. Road and Interlocking Tiles at Jhunsi-3, Prayagraj 0.00 55.68 21/04/201721/04/2017 21/04/201720/07/201721/04/2017 21/04/2017Departmental (Self) RAM PRATAP JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
685 12/EE/17-18ED-1PARISHAD PROJECT FUNDSupply & Installation of pre paid Electric meter (Service/L&T make) ad its related work for giving service connection to flats in Himalaya Enclave phase-1 Sector-18 Vrindavan Yojna No. 4 Lucknow 0.00 99.00 15/05/201714/07/2017 14/07/201713/10/201714/07/2017 14/07/2017S.M.CONSTRUCTION Circle ElectricalCompleted
686 02/SE-III/CD-4/2016-17PARISHAD PROJECT FUNDCONSTRUCTION OF 30.00M &18.00M WIDE ROAD IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA BAHRAICH. 0.00 365.95 22/10/201603/01/2017 03/01/201702/05/201703/01/2017 03/01/2017CHAUDHARY UBAID AHMAD 9452255879SRIRAM SAHU JE K.K ACHARYA AE PRASHANT VARDHAN XECircle 3Completed
687 09/EE/CD-2/2017-18PARISHAD PROJECT FUNDConstruction of 21 nos EWS in Obri Yojna Barabanki. 0.00 56.48 29/01/201815/03/2018 15/03/201814/11/201815/03/2018 15/03/2018Naaz Construction Company 9839590600ALEEM KHAN,ER. SUNIL KUMAR JE M.M.SRIVASTAVA AE A.K.MITTAL XECircle 3In Progress
688 25/EE/17-18ED-1PARISHAD PROJECT FUNDSupply of 11/0.433 KV Distribution Transformer at Divisional store Indira Nagar Luckow 0.00 79.71 04/09/201705/02/2018 05/02/201804/04/201805/02/2018 05/02/2018Jayco Electrical Circle ElectricalCompleted
689 05/EE.CD-4/2017-18PARISHAD PROJECT FUNDCONSTRUCTION OF 9.00M WIDE ROAD IN BAHRAICH BHINGA MARG HOOMI VIKAS EVAM GRIHSTHAN YOJNA BAHRAICH 0.00 94.03 22/10/201620/03/2018 20/03/201819/07/201820/03/2018 20/03/2018MISHRA CONSTRUCTIONS 9450463847SRIRAM SAHU JE RAJESH MISRA AE PRASHANT VARDHAN XECircle 3Completed
690 12/EE/2016-17INFRAConstruction of RCC Nala at Ganesh Vihar Yojna No-01 Fatehpur 0.00 60.25 15/12/201604/01/2017 04/01/201703/04/201704/01/2017 04/01/2017S.R. Construction 9335011393VINOD KUMAR JE GANGACHARAN,NAGENDRA KUMAR,PRADEEP KUMAR,SUNIL KUMAR SINGH AE ER. RAMESH CHANDRA YADAV,PANKAJ VERMA XECircle 4Completed
691 06/EEC.D.-34/AWASTHPANA/2017-18AWASTHAPNA FUNDAWASHTHPANA NIDHI KE ANTARAGAT JANPAD JAUNPUR MAIN OLANAND GANJ SE JOGIYAPUR TAK DONO TARAF SADAK CHAUDIKARAN & RENOVATION WORK 0.00 88.22 04/12/201725/01/2018 22/01/201824/05/201825/01/2018 22/01/2018M/S NANDAN CONSTRUCTION 9935453962LALLAN PRASAD JE SHIV PRASAD AE SAMAR UPADHAYAY XECircle 1Completed
692 660/A.C.-4/INFRAConstruction of B.M.+S.D.B.C and Interlocking Tiles at Jhunsi-3, Prayagraj 0.00 67.54 21/04/201721/04/2017 21/04/201720/07/201721/04/2017 21/04/2017Departmental (Self) J.P. MAURYA JE R.P. GUPTA AE SHRI SATYENDRA KUMAR XECircle 1Completed
693 01/EEC.D.-34/AWASTHPANA/2018-19AWASTHAPNA FUNDAWASHTHPANA NIDHI KE ANTARAGAT JANPAD JAUNPUR MAIN CHARSHU CHAURAHE SE SHAHI KILA EVAM OLANDGANJ CHURAHA SE JOGIYAPUR TAK DONO TARAF C.C. BLOCK, K.C. DRAIN KA KARYA 0.00 25.73 17/04/201817/05/2018 17/05/201816/08/201817/05/2018 17/05/2018M/S KAMTA PRASAD YADAV 9454834543RAKESH KUMAR JE SHIV PRASAD AE SAMAR UPADHAYAY XECircle 1Completed
694 394/PR-3/INFRAConstruction fo Road at G.T.B.Nagar Yajana, Prayagraj 0.00 17.86 10/04/201710/04/2017 10/04/201709/07/201710/04/2017 10/04/2017Departmental (Self) J.P. MAURYA JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
695 397/PR-3/INFRAConstruction of B.M.+S.D.B.C and Interlocking Tiles at Jhunsi-3, Prayagraj 0.00 25.98 10/04/201710/04/2017 10/04/201709/07/201710/04/2017 10/04/2017Departmental (Self) J.P. MAURYA JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
696 03/S.E.-I/LKO/AWASTHAPNANIDHI/2017-18AWASTHAPNA FUNDAWASTHAPANA NIDHI KE ANTARGAT VARANASI NAGAR KSHETRA PANDEYPUR YOJNA KE SADAKO KA RENOVATION KARYA 0.00 143.89 21/01/201714/08/2017 14/08/201713/12/201714/08/2017 14/08/2017Akhilesh Infra structure Pvt. Ltd. 9415202926NUTAN RAJ CHANDRSHEKHAR JE SHIV PRASAD AE SAMAR UPADHAYAY XECircle 1Completed
697 828/A.C.-4/INFRAConstruction of Park at Dev Prayagam Yojana, Prayagraj. 0.00 85.85 08/05/201708/05/2017 08/05/201707/08/201708/05/2017 08/05/2017Departmental (Self) RAM PRATAP JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
698 09/EE/16-17PARISHAD PROJECT FUNDConstruction of Internal Surface Drains Culvert and Parapet at Sector-6B Y-02 Kanpur 0.00 49.00 13/05/201604/11/2016 04/11/201603/05/201704/11/2016 04/11/2016Shree Bala Ji Enterprises 9170036250MOHD. MUKHTAR KHAN JE NAGENDRA KUMAR AE ER. RAMESH CHANDRA YADAV XECircle 4Completed
699 17/EE/17-18ED-1PARISHAD PROJECT FUNDExt. Elect. work related to LT & Street Light (Part-1) work at sector-8 Basera 1 & 2 Avadh Vihar Yojna Lucknow 0.00 81.39 04/09/201706/01/2018 06/01/201805/03/201806/01/2018 06/01/2018YASH ENTERPRISES Circle ElectricalCompleted
700 18/EE/17-18ED-1PARISHAD PROJECT FUNDExt. Elect. related to LT & Street light (Part-1) work at sector-7A Basera 1 & 2 Avadh Vihar Yojna Lucknow 0.00 92.55 04/09/201706/01/2018 06/01/201805/03/201806/01/2018 06/01/2018YASH ENTERPRISES Circle ElectricalCompleted
701 19/EE/17-18ED-1PARISHAD PROJECT FUNDConstruction of pump house at sector-18 B Vrindavan Yojna Lucknow 0.00 8.16 13/09/201708/01/2018 08/01/201807/03/201808/01/2018 08/01/2018SINGH CONSTRUCTION COMPANY 09355402572 Circle ElectricalCompleted
702 20/EE/17-18ED-1PARISHAD PROJECT FUNDExt. Elect. work related to HT & Transformer (Part-2) work at sector-7A Basera 1 & 2 Avadh Vihar Yojna Lucknow 0.00 180.15 04/09/201709/01/2018 09/01/201708/03/201809/01/2018 09/01/2017YASH ENTERPRISES Circle ElectricalCompleted
703 829/SE-4/INFRAConstruction of Interlockingh Tiles at Shobatityabagh, Prayagraj 0.00 71.50 08/05/201708/05/2017 08/05/201707/08/201708/05/2017 08/05/2017Departmental (Self) RAM PRATAP JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
704 01/SE-V/2018-19PARISHAD PROJECT FUNDLaying of trunk sewer line proposed in tender in Majhola Yojna No 4 Ph 2 vistar Moradabad 0.00 422.00 17/07/201803/01/2019 03/01/201902/07/201903/01/2019 03/01/2019M/s Ganga and Componay 9412201897RAHUL KUMAR,SARVESH KUMAR VERMA JE RAJ KUMAR AE PAWAN KUMAR VERMA XECircle 5In Progress
705 21/EE/17-18ED-1PARISHAD PROJECT FUNDS/I of Pre Paid electric meter Gangotri Enclave sector-8 Avadh Vihar Yojna Lucknow 0.00 94.33 18/10/201716/01/2018 16/01/201815/05/201816/01/2018 16/01/2018S.J.S. System & Solution Circle ElectricalCompleted
706 830/SE-4/INFRAConstruction of Interlocking Tiles and Drain at Beli Gawn, Prayagraj 0.00 40.08 08/05/201708/05/2017 08/05/201707/08/201708/05/2017 08/05/2017Departmental (Self) J.P. MAURYA JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
707 827/SE-4/INFRACons. of Interlocking Tles at Ganga Nagar, Prayagraj 0.00 56.93 08/05/201708/05/2017 08/05/201707/08/201708/05/2017 08/05/2017Departmental (Self) J.P. MAURYA JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
708 824/AC-4/INFRACont. Road and Drain at Om Gaytri Nagar, Prayagraj 0.00 43.86 08/05/201708/05/2017 08/05/201707/08/201708/05/2017 08/05/2017Departmental (Self) RAM PRATAP JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
709 817/AC-4/INFRAConst. of Divider at Jhunsi-3, Prayagraj 0.00 56.25 08/05/201708/05/2017 08/05/201707/08/201708/05/2017 08/05/2017Departmental (Self) J.P. MAURYA JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
710 825/AC-4INFRAConstruction of B.M.+S.D.B.C at Jhunsi-3, Prayagraj 0.00 70.93 08/05/201708/05/2017 08/05/201707/08/201708/05/2017 08/05/2017Departmental (Self) J.P. MAURYA JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
711 27/EE/17-18ED-1PARISHAD PROJECT FUNDBalance External Electrification work at (G+3 type houses) Gokul Gram Yojna Munnu Khera Lucknow 0.00 82.84 08/12/201708/03/2018 08/03/201807/05/201808/03/2018 08/03/20183D CREATION Circle ElectricalCompleted
712 04/EE/CD-2/2018-19PARISHAD PROJECT FUNDConstruction of Balance Trunk drain in Sec 17 & 18 in VVY4 Lko. 0.00 31.89 04/09/201826/10/2018 26/10/201825/02/201926/10/2018 26/10/2018SHAKTI CONSTRUCTION CO. 09121900191ADIL BEG JE M.M.SRIVASTAVA AE A.K.MITTAL XECircle 3In Progress
713 15/EE/CD-18/17-18PARISHAD PROJECT FUNDConstruction of 19 Nos 18/40 Type Houses at Sector-1A Y-02 Kanpur 0.00 44.05 15/12/201628/02/2017 28/02/201727/08/201728/02/2017 28/02/2017M/S S.p Singh 9455923183VINOD KUMAR JE GANGACHARAN,NAGENDRA KUMAR,SUNIL KUMAR SINGH AE ER. RAMESH CHANDRA YADAV,JAMUNA PRASHAD,PANKAJ VERMA,PRABODH KUMAR XECircle 4Completed
714 06/EE/CD-18/16-17PARISHAD PROJECT FUNDConstruction of Internal Road (Only G.S.B. Work) at Sector-6B Y-02 Kanpur 0.00 91.18 13/05/201602/09/2016 02/09/201601/03/201702/09/2016 02/09/2016M/S AlOk Enterprises 9415477357VINOD KUMAR JE NAGENDRA KUMAR AE ER. RAMESH CHANDRA YADAV,PANKAJ VERMA,PRABODH KUMAR XECircle 4Completed
715 07/EE/ED-III/2018-19PARISHAD PROJECT FUNDSupply Installation and Retaled work of 125 KVA 02 Nos DG Set at Greet Enclave Sector-2C Sikandara Yojna Agra. 0.00 19.58 14/11/201812/12/2018 12/12/201811/02/201912/12/2018 12/12/2018S.S.ASSOCIATES ER. GHANSHYAM LAL JE ER. J S RAI AE ER. RAJENDRA SINGH XECircle ElectricalCompleted
716 823/AC-4INFRAConst. of Intlocking Tiles, Mumfordgunj, prayagraj 0.00 43.13 08/05/201708/05/2017 08/05/201707/08/201708/05/2017 08/05/2017Departmental (Self) J.P. MAURYA JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
717 822/AC-4/INFRAConstruction of interlocking Tiles at Jhunsi-2, Prayagraj 0.00 56.22 08/05/201708/05/2017 08/05/201707/08/201708/05/2017 08/05/2017Departmental (Self) J.P. MAURYA JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
718 821/AC-1/INFRAConstruction of C.C. Road at Jhunsi-3, Prayagraj 0.00 55.87 08/05/201708/05/2017 08/05/201707/08/201708/05/2017 08/05/2017Departmental (Self) J.P. MAURYA JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
719 820/AC-4/INFRAConstruction of C.C. Road and Interlocking at Jhunsi-3, Prayagraj 0.00 41.08 08/05/201708/05/2017 08/05/201707/08/201708/05/2017 08/05/2017Departmental (Self) J.P. MAURYA JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
720 819/AC-4/INFRAConstruction of C.C. Road at Jhunsi-3, Prayagraj 0.00 52.45 08/05/201708/05/2017 08/05/201707/08/201708/05/2017 08/05/2017Departmental (Self) J.P. MAURYA JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
721 816/AC-4/INFRAConst. Divider at Jhunsi-3, Prayagraj 0.00 88.14 08/05/201708/05/2017 08/05/201707/08/201708/05/2017 08/05/2017Departmental (Self) J.P. MAURYA JE R.P. GUPTA AE SATENDRA KUMAR XECircle 1Completed
722 22/EE/17-18ED-1PARISHAD PROJECT FUNDS/I of pre- paid electric meter Nandani Enclave sector-8 Avadh Vihar Yojna Lucknow 0.00 69.25 18/10/201716/01/2018 16/01/201815/05/201816/01/2018 16/01/2018S.J.S. System & Solution Circle ElectricalCompleted
723 23/EE/17-18ED-1PARISHAD PROJECT FUNDStreet Light and its related work (on fire system ) for Lucknow mahotsav Avadh Shilp Gram Avadh Vihar Yojna Lucknow 0.00 37.64 08/01/201822/01/2018 22/01/201831/01/201822/01/2018 22/01/2018YASH ENTERPRISES Circle ElectricalCompleted
724 24/EE/17-18ED-1PARISHAD PROJECT FUNDBalance air Conditioning work in Banquet Hall at Avadh Shilp Gram Avadh Vihar Yojna Lucknow 0.00 147.62 18/10/201723/01/2018 23/01/201822/03/201823/01/2018 23/01/2018KRISHNA REFRIGRATION 09652303229 Circle ElectricalCompleted
725 26/EE/17-18ED-1PARISHAD PROJECT FUNDExt. Elect. related to HT & Transformation (Part-2) Work at Sector-8 Basera 1 & 2 Avadh Vihar Yojna Lucknow 0.00 83.26 04/09/201719/02/2018 19/12/201818/04/201819/02/2018 19/12/2018YASH ENTERPRISES Circle ElectricalCompleted
726 01/EEC.D.-34/2017-18AWASTHAPNA FUNDRenovation of Park No. 4 at Kabir Nagar Yojna, Varanasi 0.00 9.15 29/12/201609/06/2017 09/06/201708/08/201709/06/2017 09/06/2017M/S R.S. Construction 9935575557LALLAN PRASAD JE SHIV PRASAD AE SAMAR UPADHAYAY XECircle 1Completed
727 15/E.E.C.D.-34/AWASTHAPNA/2015-16AWASTHAPNA FUNDAWASTHAPNA NIDHI KE ANTARGAT VARANASI NAGAR KHSTRE MAIN N-15/139-1 KARI JIYAUL WASIR KE GHAR HOTE PANNALAL KE BAUNDARY WALL TAK VA A-15/139 F-64 ALHAR JAMAL LARI KE MAKAN SE SANJAY SONKAR MAKAN TAK GALI SEWER EVAM CHAUKA PATHAR KA KARYA 0.00 14.94 09/12/201509/03/2016 06/02/201608/06/201609/03/2016 06/02/2016M/S P.K. CONSTRUCTION 9452564777ARJUN VERMA JE SHIV PRASAD AE RAM ACHAL VERMA XECircle 1Completed
728 01/E.E.C.D.-34/AWASTHAPNANIDHI/2016-17AWASTHAPNA FUNDRENOVATION OF INTERNAL ROAD AT PATRAKARPURAM COLONY, VARANASI 0.00 47.08 02/07/201620/10/2016 20/10/201619/12/201620/10/2016 20/10/2016Akhilesh Infra structure Pvt. Ltd. 9415202926R.K. GUPTA JE SUMIT KUMAR AE RAM ACHAL VERMA XECircle 1Completed
729 17/E.E.CD-34/AWASTHAPNANIDHI/2016-17AWASTHAPNA FUNDINTERNAL DEVELOPMENT OF VISTHPIT KOTA BHUKHAND, PANDEYPUR YOJNA, VARANASI 0.00 70.52 15/01/201625/05/2016 25/05/201624/09/201625/05/2016 25/05/2016M/S KUMAR & COMPANY 9838819778ARJUN VERMA JE SHIV PRASAD AE RAM ACHAL VERMA XECircle 1Completed
730 02/E.E.C.D.-34/AWASTHAPNANIDHI/2016-17AWASTHAPNA FUNDRENOVATION OF ROAD AT PANDEYPUR FROM KALIJI MANDIR TO AZAMGARH ROAD, VARANASI 0.00 39.75 30/08/201620/10/2016 20/10/201619/12/201620/10/2016 20/10/2016Akhilesh Infra structure Pvt. Ltd. 9415202926R.K. GUPTA JE SHIV PRASAD AE RAM ACHAL VERMA XECircle 1Completed
731 04/E.E.CD-34/AWASTHAPNANIDHI/2016-17AWASTHAPNA FUNDCONSTRUCTION OF MINOR BRIDGE AT ASSI RIVER, VARANASI 0.00 104.15 19/01/201619/11/2016 19/11/201618/03/201719/11/2016 19/11/2016Akhilesh Infra structure Pvt. Ltd. 9415202926R.K. GUPTA JE SHIV PRASAD AE SAMAR UPADHAYAY XECircle 1Completed
732 02/EE/18-19ED-1PARISHAD PROJECT FUNDS/I of Bus Bar Pannel & Metering panel at sector-7A(Basera 1 & 2) Avadh vihar Yojna Lucknow 0.00 120.04 12/01/201829/04/2018 24/04/201823/05/201829/04/2018 24/04/2018Electro Builders Circle ElectricalCompleted
733 05/EE/18-19ED-1PARISHAD PROJECT FUNDSupply of Metering pannel and bus bar pannel at Divisional store Indira Nagar Lucknow 0.00 59.25 08/12/201703/05/2018 03/05/201802/06/201803/05/2018 03/05/2018Actech Engineers Circle ElectricalCompleted
734 06/EE/18-19ED-1PARISHAD PROJECT FUNDS/I of pre-paid electric meter Alakhnanda Enclave Sector-3 Avadh Vihar Yojna Lucknow 0.00 214.35 07/03/201805/05/2018 05/05/201804/09/201805/05/2018 05/05/2018S.J.S. System & Solution Circle ElectricalIn Progress
735 03/EE/2017/18PARISHAD PROJECT FUNDConstruction of Internal Road at Sector-6B Y-02 Kanpur 0.00 91.18 18/07/201701/01/2018 01/01/201831/03/201801/01/2018 01/01/2018Ansh Contruction 9450072493GANGACHARAN,VINOD KUMAR JE NAGENDRA KUMAR AE ER. RAMESH CHANDRA YADAV,PANKAJ VERMA XECircle 4Completed
736 07/EE/18-19ED-1PARISHAD PROJECT FUNDExt. Elect. work (Balance work) in Jhanavi Enclave at Sector-5 at Avadh Vihar Yojna Lucknow 0.00 135.06 03/04/201827/06/2018 27/06/201826/08/201827/06/2018 27/06/2018YASH ENTERPRISES Circle ElectricalCompleted
737 08/EE/18-19ED-1PARISHAD PROJECT FUND02 No. T/W and its related work at Lohramau Yojna Sultanpur 0.00 85.11 28/05/201814/08/2018 14/08/201813/12/201814/08/2018 14/08/2018S.J.S. System & Solution Circle ElectricalCompleted
738 01/SE-III/CD-4/2016-17PARISHAD PROJECT FUNDCONSTRUCTION OF 12.00M & 9.00M WIDE ROAD IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA BAHRAICH 0.00 163.12 26/09/201609/12/2016 09/12/201608/04/201709/12/2016 09/12/2016AMBUJ CONSTRUCTION 9415335222CHANDAN KUMAR JE K.K ACHARYA AE PRASHANT VARDHAN XECircle 3Completed
739 07/EE/CD-2/2018-19PARISHAD PROJECT FUNDInternal devlopment work in Sec4A Obri Yojna Barabanki. 0.00 13.72 28/12/2018 28/12/2018  28/12/2018Babu Ram Contractor ER. SUNIL KUMAR JE M.M.SRIVASTAVA AE A.K.MITTAL XECircle 3In Progress
740 16/EE/18-19ED-1PARISHAD PROJECT FUNDExt. Elect. work of Himalaya phase-2 at Sector-18 Vrindavan yojna Lucknow 0.00 209.35 10/09/201810/10/2018 10/10/201809/12/201810/10/2018 10/10/2018Preeti Electric works Circle ElectricalCompleted
741 17/EE/18-19ED-1PARISHAD PROJECT FUNDConstruction of 01 No. pump house cum operator room at Pandeypur Yojna Varanasi 0.00 5.60 10/09/201828/11/2018 28/11/201828/02/201928/11/2018 28/11/2018Lata Construction & Associates Circle ElectricalCompleted
742 11/EE/2016-17INFRAConstruction of RCC Nala at Ganesh Vihar Yojna Fatehpur 0.00 55.73 15/12/201604/01/2017 04/01/201703/04/201704/01/2017 04/01/2017S.R. Construction 9335011393VINOD KUMAR JE GANGACHARAN,NAGENDRA KUMAR,PRADEEP KUMAR,SUNIL KUMAR SINGH AE ER. RAMESH CHANDRA YADAV,PANKAJ VERMA XECircle 4Completed
743 08/EE/ED-III/2018-19PARISHAD PROJECT FUNDSupply Installation and Retaled work of 100 KVA 02 Nos DG Set for power Back-up of Himalaya Enclave at Jagrati Vihar (Ext.) Scheme No. 11, Meerut. 0.00 22.97 14/11/201828/12/2018 28/12/201827/02/201928/12/2018 28/12/2018OM ASSOCIATES 9312359633ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE ER. RAJENDRA SINGH XECircle ElectricalCompleted
744 09/EE/ED-III/18-19PARISHAD PROJECT FUNDConstruction of 33 KV Line for energisation of 33/11 KV Sub-Station at Sector-3A Jagrati Vihar (Ext.) Scheme No. 11, Meerut. 0.00 144.91 16/11/201802/01/2019 02/01/201901/05/201902/01/2019 02/01/2019Electro Builders ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE ER. RAJENDRA SINGH XECircle ElectricalCompleted
745 10/EE/ED-III/2018-19PARISHAD PROJECT FUNDExternal Electrification (Remaining) in Sector-E at Scheme No. 3 Ambedkarpuram, Kanpur 0.00 5.58 28/01/201928/02/2019 28/02/201929/03/201928/02/2019 28/02/2019m/s durgeh enterprises ER. SUNIL KUMAR JE ER. J S RAI AE ER. RAJENDRA SINGH XECircle ElectricalCompleted
746 12/EE/ED-III/2018-19PARISHAD PROJECT FUNDSupply of 11 KV Indoor type and 33 KV Out Door Type Breaker for 33/1 Sub-Station at Sector-3A Jagrati Vihar (Ext.) Meerut 0.00 60.11 25/01/201901/03/2019 01/03/201930/06/201901/03/2019 01/03/2019R K and Company 8171211222ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE ER. RAJENDRA SINGH XECircle ElectricalIn Progress
747 13/EE/ED-III/2018-19PARISHAD PROJECT FUNDExternal Electrification work at Sector-3 Jagrati Vihar Scheme No. 11, Meerut 0.00 153.30 28/02/201907/03/2019 07/03/201906/09/201907/03/2019 07/03/2019YASH ENTERPRISES ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE ER. RAJENDRA SINGH XECircle ElectricalIn Progress
748 14/EE/ED-III/2018-19PARISHAD PROJECT FUNDExternal Electrification work at Sector-2 Jagrati Vihar Scheme No. 11, Meerut 0.00 107.36 28/02/201907/03/2019 07/03/201906/09/201907/03/2019 07/03/2019R K and Company 8171211222ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE ER. RAJENDRA SINGH XECircle ElectricalIn Progress
749 25/EE/18-19ED-1PARISHAD PROJECT FUNDConstruction of 01 No. T/W 200 mtr. its related work at Yojna Munnu Khera Lucknow 0.00 22.77 01/11/201817/01/2019 17/01/201916/04/201917/01/2019 17/01/2019CIT DRILLERS & DEVELOPERS Circle ElectricalCompleted
750 02/EE/CD-18/17-18PARISHAD PROJECT FUNDConstruction of 19 Nos 18/40 Type Houses at Sector-1A Y-02 Kanpur 0.00 44.05 15/12/201606/05/2017 06/05/201705/11/201706/05/2017 06/05/2017M/S AlOk Enterprises 9415477357VINOD KUMAR JE GANGACHARAN,NAGENDRA KUMAR,SUNIL KUMAR SINGH AE ER. RAMESH CHANDRA YADAV,JAMUNA PRASHAD,PANKAJ VERMA,PRABODH KUMAR XECircle 4Completed
751 02/EE/ED-2GZB/17-18PARISHAD PROJECT FUNDSUUPLY OF 11 KV OUT DOOR TYPE RMU 4 NOS AT GANGA, YAMUNA & HINDON ENCLAVE AT SEC-7 SIDDHARTH VIHAR YOJNA GHAZIABAD 0.00 87.00 28/10/201620/05/2017 20/05/201719/07/201720/05/2017 20/05/2017M/S PRAKASH ENGINEERS 8527167618SITARAM CHAUHAN JE V.V TRIPATHI AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
752 01/EE/ED-III/17-18PARISHAD PROJECT FUNDInternal Electrification work Remaining at Sector-4, Yojna No. 11 Jagrati Vihar (Ext.) Meerut. 0.00 86.90 28/10/201621/04/2017 21/04/201720/07/201721/04/2017 21/04/2017R V BROS. & COMPANY 9415052258ER. U C MISHRA JE ER. D. R. MAURYA AE AVESH XECircle ElectricalIn Progress
753 09/EE/ED-III/17-18PARISHAD PROJECT FUNDSupply and Installation of 125 KVA D.G. Set in Office Complex Sector-13, Sikandara Yojna, Agra 0.00 14.56 19/05/201710/07/2017 10/07/201709/09/201710/07/2017 10/07/2017Electro Builders ER. U C MISHRA JE ER. J S RAI AE AVESH XECircle ElectricalCompleted
754 10/EE/ED-III/17-18PARISHAD PROJECT FUNDEarth filling work at Sector-4 under constructed 33/11 KV S/S at Scheme No. 8 Shakumbhari Vihar, Saharanpur 0.00 1.94 22/04/201712/07/2017 12/07/201726/07/201712/07/2017 12/07/2017A K CHAUDHARY 9758874747ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE AVESH XECircle ElectricalCompleted
755 02/EE.CD-4/2016-17PARISHAD PROJECT FUNDEARTH WORKS FOR 15.00M,12.00M WIDE TRUNK ROAD &9.00M WIDE ROAD IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA BAHRAICH 0.00 16.10 23/08/201605/10/2016 05/10/201604/12/201605/10/2016 05/10/2016Naaz Construction Company 9839590600SRIRAM SAHU JE RAJESH MISRA AE PRASHANT VARDHAN XECircle 3Completed
756 12/S.E.-1/LKO/Awasthapna/2015-16AWASTHAPNA FUNDConstruction of Trunk Drain at Daulatpur, from Prem Chand Nagar Colony Mod se Azamgarh road tak 0.00 123.13 09/12/201530/03/2016 30/03/201629/07/201630/03/2016 30/03/2016M/S MANOJ KUMAR 7275818369ARJUN VERMA JE SUMIT KUMAR AE SAMAR UPADHAYAY XECircle 1Completed
757 04/EE.CD-4/2016-17PARISHAD PROJECT FUNDCONSTRUCTION OF 15.00M & 9.00M WIDE ROAD IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA BAHRAICH 0.00 92.19 22/10/201616/03/2017 16/03/201715/07/201716/03/2017 16/03/2017AMIT KUMAR CONTRACTOR & SUPPLIER 9451303256SRIRAM SAHU JE RAJESH MISRA AE PRASHANT VARDHAN XECircle 3Completed
758 02/EE.CD-4/2017-18PARISHAD PROJECT FUNDCONSTRUCTION OF PARK AT BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA BAHRAICH 0.00 36.66 25/04/201725/08/2017 25/08/201724/02/201825/08/2017 25/08/2017ASA Enterprises 8423536122CHANDAN KUMAR JE K.K ACHARYA AE PRASHANT VARDHAN XECircle 3Completed
759 01/SE-6/2018-19CD-28AWASTHAPNA FUNDLaying and Jointing of Trunk Sewerline from Sect.-4, Sikandra Yojna, Agra to Bodla Choraha. 0.00 170.81 16/11/201826/02/2019 26/02/201925/06/201926/02/2019 26/02/2019Rakesh Singh Nursery 9810117408RAKESH KUMAR VERMA,SANJAY SHARMA JE ASHOK KUMAR SHARMA AE GIRISH CHANDRA,H. S. SHARMA,PREETI VISHWAKARMA XECircle 6In Progress
760 10/EE/2016-17INFRAConstruction of RCC Nala at Ganesg Vihar Yojna Fatehpur 0.00 56.90 15/12/201604/01/2017 04/01/201703/04/201704/01/2017 04/01/2017Avenindra Kumar & Brothers 9415033753VINOD KUMAR JE GANGACHARAN,NAGENDRA KUMAR,PRADEEP KUMAR,SUNIL KUMAR SINGH AE ER. RAMESH CHANDRA YADAV,PANKAJ VERMA XECircle 4Completed
761 05/EE.CD-4/2016-17PARISHAD PROJECT FUNDCONSTRUCTION OF 9.00M WIDE ROAD IN BAHRAICH BHINGA MARG BHOOMI VIKAS EVAM GRIHSTHAN YOJNA BAHRAICH 0.00 75.59 22/10/201616/03/2017 16/03/201715/07/201716/03/2017 16/03/2017SHAIL BUILDERS & CONTRACTOR 9415029218SRIRAM SAHU JE RAJESH MISRA AE PRASHANT VARDHAN XECircle 3Completed
762 18/EE/ED-III/2018-19PARISHAD PROJECT FUNDConstruction of one No. 350 x 200 mm Dia Size Tubewell Drilling by RC Rig machine To a depth of 420 Meter Below Ground Level at Ganga Enclave Scheme No. 3, Ambedkarpuram, Kanpur 0.00 46.60 04/01/201912/03/2019 12/03/201911/07/201912/03/2019 12/03/2019CENTRAL INDIA TUBEWELL CORPORATION 9839900466ER. SUNIL KUMAR JE ER. J S RAI AE ER. RAJENDRA SINGH XECircle ElectricalCompleted
763 04/EE/ED-2GZB/17-18PARISHAD PROJECT FUNDEXT. ELECT. WORK (UGS) FOR 11 KV LINE (FEEDER) AT YAMUNA ENCLAVE SEC-7 SIDDHARTH VIHAR YOJNA GHAZIABAD 0.00 200.00 29/12/201616/06/2017 16/06/201715/08/201716/06/2017 16/06/2017M/S PRAKASH ENGINEERS 8527167618BHOOPLAL,SITARAM CHAUHAN JE D.C SHUKLA,V.V TRIPATHI AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
764 04/SE-V/2020-21PARISHAD PROJECT FUNDConstruction of 162 Nos EWS 18/40 Type Semifinished Houses in Kotdwar Road Yojna, Najibabad, Bijnor 0.00 302.00 24/06/202030/07/2020 30/07/202029/04/202130/07/2020 30/07/2020M/s Vision Builders & Developers 7055036555SURESH CHANDRA JE A.K.SAXENA AE FARAZ ASLAM XECircle 5In Progress
765 04/EE/ED-III/17-18PARISHAD PROJECT FUNDConstrution of One No. Sumbersible pump set (4 " Boaring up to 250 Ft Depth ) in community centre Sector-M Scheme No. 1 at Kalyanpur kanpur 0.00 2.34 09/05/201714/06/2017 14/06/201713/08/201714/06/2017 14/06/2017M.A. Engineering works ER. U C MISHRA JE ER. J S RAI AE AVESH XECircle ElectricalCompleted
766 06/EE/ED-III/17-18PARISHAD PROJECT FUNDUntripted powe supply related work in (G+3) Bramhavart Enclave at Scheme No. 3, Sector-E, Ambedkarpuram, Kanpur 0.00 27.15 25/05/201714/06/2017 14/06/201713/08/201714/06/2017 14/06/2017K. ELECTRIC WORKS PVT. LTD PANKAJ KUMAR PUSHKAR JE ER. D. R. MAURYA AE AVESH XECircle ElectricalCompleted
767 12/EE/ED-2GZB/17-18PARISHAD PROJECT FUNDREMAINING EXT. ELECT. WORK RELATED TO 33 KV DOUBLE LINE FEEDER FROM MAHARAJPUR 220 KV S/S TO 33/11 KV S/S AT SECTOR -8 VASUNDHARA GZB. 0.00 11.04 16/09/201726/10/2017 26/10/201725/11/201726/10/2017 26/10/2017M/S OM ASSOCIATES 9312388633V.K. RAI JE V.V TRIPATHI AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
768 08/EE/ED-2GZB/17-18PARISHAD PROJECT FUNDINT. ELECT. AND STREET LIGHTING WORK IN SHAMSAN GHAT SEC-13 MANDOLA VIHAR YOJNA GZB 0.00 12.00 22/04/201727/06/2017 27/06/201726/09/201727/06/2017 27/06/2017R.V. BROS & CO 9415052258ER. SUNIL KUMAR,PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR,D.C SHUKLA,V.V TRIPATHI AE MANEESH KUMAR PATHAK XECircle ElectricalIn Progress
769 19/EE/ED-III/2018-19PARISHAD PROJECT FUNDSupply, Installation and Related work of Capacitor Panel at Office Complex Sikandara Yojna Agra 0.00 5.95 28/02/201918/03/2019 18/03/201918/04/201918/03/2019 18/03/2019Electro Builders ER. U C MISHRA JE ER. J S RAI AE ER. RAJENDRA SINGH XECircle ElectricalCompleted
770 20/EE/ED-III/2018-19PARISHAD PROJECT FUNDConstruction of 33 KV Line for 220/132/33 KV Substation Sector-3A Jagrati Vihar External Scheme No. 11, Meerut 0.00 107.67 28/02/201925/03/2019 25/03/201924/11/201925/03/2019 25/03/2019SPARKLE ENTERPRISES 9837394838ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE ER. RAJENDRA SINGH XECircle ElectricalIn Progress
771 21/EE/ED-III/2018-19PARISHAD PROJECT FUNDSite of 01 Nos 1500 LPM 60 Mtr Head KSB Make Submersible Pumping Plant and Its Related External Electrification work at Sector-4, Jagrati Vihar Extension, Meerut. 0.00 11.70 28/02/201925/03/2019 25/03/201924/04/201925/03/2019 25/03/2019SPARKLE ENTERPRISES 9837394838ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE ER. RAJENDRA SINGH XECircle ElectricalIn Progress
772 03/EE/ED-2GZB/17-18PARISHAD PROJECT FUNDEXT. ELECT. WORK (UGS) FOR 11 KV LINE (FEEDER) AT GANGA & HINDON ENCLAVE SEC-7 SIDDHARTH VIHAR YOJNA GHAZIABAD 0.00 140.00 29/12/201612/06/2017 12/06/201711/08/201712/06/2017 12/06/2017M/S PRAKASH ENGINEERS 8527167618BHOOPLAL,V.K. RAI JE V.V TRIPATHI AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
773 02/EE/ED-III/17-18PARISHAD PROJECT FUNDShifting of 11 KV Line on 45 M Wide Road at Sector - 1 B Shakumbhari Vihar Yojna No. 8, Saharanpur 0.00 5.85 12/06/201707/06/2017 07/06/201706/07/201707/06/2017 07/06/2017SPARKLE ENTERPRISES 9837394838ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE AVESH XECircle ElectricalCompleted
774 03/EE/ED-III/17-18PARISHAD PROJECT FUNDSITC of 63 KVA 11/0.4 KV Capacity 4 Star Rated Transformer at Shakumbhari Vihar Yojna No. 8 Saharanapur 0.00 20.72 12/05/201707/06/2017 07/06/201706/07/201707/06/2017 07/06/2017SPARKLE ENTERPRISES 9837394838ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE AVESH XECircle ElectricalCompleted
775 05/EE/ED-III/17-18PARISHAD PROJECT FUNDExternal Electrification work for Himalaya Enclave at Sector-3, Jagrati Vihar (Ext.) Scheme No. 11, Meerut 0.00 97.61 31/05/201714/06/2017 14/06/201713/08/201714/06/2017 14/06/2017SPARKLE ENTERPRISES 9837394838ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE AVESH XECircle ElectricalCompleted
776 08/EE/ED-III/17-18PARISHAD PROJECT FUNDInternal & External electrification work in community centre at Sector-B, Yojna No. 2 Hanspuram, Kanpur 0.00 28.10 17/05/201707/07/2017 07/07/201706/11/201707/07/2017 07/07/2017SHRI BALAJI ELECTRICAL AND MECHANICAL WORKS 9936028212ER. GHANSHYAM LAL JE ER. D. R. MAURYA AE AVESH XECircle ElectricalCompleted
777 16/EE/ED-2GZB/17-18PARISHAD PROJECT FUNDREMAINING BALANCE WORK OF INT.ELECT, FIRE FIGHTING & LIFT IN 108 NO. FLATS BLOCK A & B IN SHIKHAR ENCLAVE VASUNDHARA GZB 0.00 88.50 05/02/201822/03/2018 02/03/201821/04/201822/03/2018 02/03/2018M/S OM ASSOCIATES 9312388633PANKAJ KUMAR PUSHKAR,RAM KUMAR,V.K. RAI JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
778 11/EE/ED-III/17-18PARISHAD PROJECT FUNDSupply and Installation of 800 LPM and 62 Mtr Head KSB Pumping Plant in G+3 type house Yojna No. 3, Sector-E, Ambedkarpuram, Kanpur 0.00 5.06 09/05/201712/07/2017 12/07/201726/07/201712/07/2017 12/07/2017M.A. Engineering works PANKAJ KUMAR PUSHKAR JE ER. D. R. MAURYA AE AVESH XECircle ElectricalCompleted
779 09/EE/ED-2GZB/17-18PARISHAD PROJECT FUNDFENCING AND PIPING FOR CABLE WORK IN METERING PANEL'S AT SECTOR-7 & 10 BRAHAMAPUTRA ENCLAVE SIDDHARTHA VIHAR YOJNA GZB. 0.00 10.00 22/04/201727/06/2017 27/06/201726/07/201727/06/2017 27/06/2017R.V. BROS & CO 9415052258BHOOPLAL,V.K. RAI JE D.C SHUKLA,TEAJ BIR SINGH,V.V TRIPATHI AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
780 12/EE/ED-III/17-18AWASTHAPNA FUNDStreet Lighting work in cetral verge of Hamirpur Road, Naubasta Kanpur. (Group-B) 0.00 70.96 24/04/201712/07/2017 12/07/201711/11/201712/07/2017 12/07/2017SHRI BALAJI ELECTRICAL AND MECHANICAL WORKS 9936028212ER. GHANSHYAM LAL JE ER. D. R. MAURYA AE AVESH XECircle ElectricalCompleted
781 17/EE/ED-III/17-18PARISHAD PROJECT FUNDCleaning of sewage pumping plant and related work at Barhpur Yojna Fatehgarh 0.00 6.45 20/01/201827/02/2018 27/02/201828/03/201827/02/2018 27/02/2018M.A. Engineering works SUDHAKAR PATHAK JE ER. J S RAI AE AVESH XECircle ElectricalCompleted
782 01/PM/18-19AWASTHAPNA FUNDCONSTRUCTION OF RENOVATION OF ROAD AND DRAIN 0.00 104.90 03/04/201720/04/2018 20/04/201819/10/201820/04/2018 20/04/2018S.K.ENTERPRISES R.K. SONKAR JE ATUL CHANDRA SRIVASTAVA AE RAMASHRAY RAM XECircle 1Completed
783 05/PM/18-19AWASTHAPNA FUNDCONSTRUCTION OF RENOVATION OF ROAD AND DRAIN 0.00 24.06 23/05/201825/08/2018 25/08/201824/11/201825/08/2018 25/08/2018Astitva Construction 9455131100R.K. SONKAR JE ATUL CHANDRA SRIVASTAVA AE RAMASHRAY RAM XECircle 1Completed
784 13/EE/ED-III/17-18PARISHAD PROJECT FUNDConstruction of 33/11 KV Yard related work at Sector-3A Near Somdutt City Jagrati Vihar (Ext.) Scheme No. 11, Meerut. 0.00 146.85 31/05/201712/07/2017 12/07/201711/01/201812/07/2017 12/07/2017OM ASSOCIATES 9312359633ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE AVESH XECircle ElectricalCompleted
785 15/EE/ED-2GZB/17-18PARISHAD PROJECT FUNDREMAINING BALANCE OF INT. ELECT. L.A. & SERVICE CONNECTION IN BHRAMHAPUTRA ENCLAVE SEC-10 SIDHARTHA VIHAR YOJNA GHAZIABAD 0.00 88.50 05/02/201822/03/2018 22/03/201821/04/201822/03/2018 22/03/2018K.S. ELECTRICALS 9650148106PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
786 14/EE/ED-III/17-18AWASTHAPNA FUNDInfrastructure work for Removing Hindance of under construction new bridge at odean Nala Near RTO office Scheme No. 7, Shastri Nagar, Meerut 0.00 57.14 05/08/201707/09/2017 07/09/201706/12/201707/09/2017 07/09/2017SPARKLE ENTERPRISES 9837394838ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE AVESH XECircle ElectricalCompleted
787 15/EE/ED-III/17-18PARISHAD PROJECT FUNDConstruction of 200 Mtr Deep Tubewell Boaring and other related work at sector-4, Jagrati Vihar, (Ext.) Scheme No. 11, Meerut. 0.00 20.97 29/08/201721/11/2017 21/11/201720/02/201821/11/2017 21/11/2017P. L. GUPTA 9412085159ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE AVESH XECircle ElectricalCompleted
788 29/SEHQ/CD-14/14-15PARISHAD PROJECT FUNDCONST. OF 128 NOS. LIG G+3, SECTOR-5 LUCKNOW 0.00 894.00 24/09/201423/01/2015 23/01/201523/07/201623/01/2015 23/01/2015R.S. Contractors S. K. SINGH BHADAURIYA JE YOUGESH KUMAR AE PRAMOD KUMAR SINGH XECircle HQCompleted
789 16/EE/ED-III/17-18PARISHAD PROJECT FUNDCleaning of sewage pumping plant and related work at Scheme No. 3, Ambedkarpuram, Kanpur 0.00 7.49 13/10/201703/01/2018 03/01/201802/02/201803/01/2018 03/01/2018M.A. Engineering works ER. U C MISHRA JE ER. D. R. MAURYA AE AVESH XECircle ElectricalCompleted
790 06/EE/ED-2GZB/17-18PARISHAD PROJECT FUNDINT.ELECT. WORK IN CLUB HOUSE AT SECTOR-15 SHIKHAR ENCLAVE, VASUNDHARA GZB 0.00 5.00 22/04/201727/06/2017 27/06/201726/08/201727/06/2017 27/06/2017ELFIN ELECTRICALS 9415902755PANKAJ KUMAR PUSHKAR,V.K. RAI JE ASHOK KUMAR,D.C SHUKLA,V.V TRIPATHI AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
791 28/SEHQ/CD-14/14-15PARISHAD PROJECT FUNDCONST. OF 160 NOS. EWS (G+3) 0.00 846.00 29/09/201423/01/2015 23/01/201523/07/201623/01/2015 23/01/2015M/S Neel Constructions 9415117988RAM PRATAP JE YOUGESH KUMAR AE PRAMOD KUMAR SINGH XECircle HQCompleted
792 18/EE/ED-III/17-18PARISHAD PROJECT FUNDSupply, Installation, Testing, and Commissioning of 01 to 13 Passenger elevater on office complex at Sikandara Yojna Sector-13 Agra. 0.00 23.92 25/01/201809/03/2018 09/03/201808/06/201809/03/2018 09/03/2018Electro Builders ER. U C MISHRA JE ER. J S RAI AE AVESH XECircle ElectricalCompleted
793 18/EE/ED-2GZB/17-18PARISHAD PROJECT FUNDSUPPLY OF OUTDOOR TYPE 3 NO 11/0.433 KV, 63 KVA T/F AT MANDOLA VIHAR YOJNA GZB 0.00 4.72 05/02/201823/03/2018 23/03/201822/04/201823/03/2018 23/03/2018SAI ELECTRICALS 9927006827ALOK KUMAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
794 01/SE(E)LKO/17-18PARISHAD PROJECT FUNDCONST. OF 33 KV LINE FROM 220 KV S/S TRONICA CITY TO COMMON POINT OF SEC-3&7 MANDOLA VIHAR YOJNA GZB 0.00 242.00 31/03/201724/07/2017 24/07/201723/01/201824/07/2017 24/07/2017S S CONSTRUCTION 9999999645PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
795 07/EE/ED-III/17-18PARISHAD PROJECT FUNDStreet Lighting work in cetral verge of Hamirpur Road, Naubasta. (GROUP-A) 0.00 79.99 21/04/201701/07/2017 01/07/201730/11/201701/07/2017 01/07/2017PREETI ELECTRIC WORK 9150011801PANKAJ KUMAR PUSHKAR JE ER. D. R. MAURYA AE AVESH XECircle ElectricalCompleted
796 14/EE/ED-2GZB/17-18PARISHAD PROJECT FUNDCONST. OF 350X200 MM DIA 200 MT DEPTH 1 NO T/W BY D.C. RIG MACHINE AT SECTOR-17 T/W NO.-2 MANDOLA VIHAR YOJNA GZB 0.00 18.00 22/09/201717/02/2017 17/02/201816/05/201817/02/2017 17/02/2018SUDHIR ENGINEERING WORKS 9810466565PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
797 05/EE/ED-2GZB/17-18PARISHAD PROJECT FUNDFIRE ALARMING WORK FOR SHIKHAR ENCLAVE HOUSES AT SEC-15 VASUNDHARA GZB 0.00 18.00 02/04/201723/06/2017 23/06/201722/08/201723/06/2017 23/06/2017AQUACHEM ENGINEERS 9810458884BHOOPLAL,V.K. RAI JE ASHOK KUMAR,V.V TRIPATHI AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
798 02/E.E./2018-19PARISHAD PROJECT FUNDConstruction of Internal Drain & Culvert, Road, Sewer in 1BHK & 2BHK Cluster in Sector-9A at Majhola Yojna No.-4, Phase-2, Moradabad 0.00 74.55 26/10/201803/12/2018 07/12/201806/06/201903/12/2018 07/12/2018M/s M.A. Associates SURENDRA PRASAD JE DEVENDRA PAL SINGH AE SASMIT KATIYAR,SHOBHIT KUMAR PATHAK XECircle 5Completed
799 07/EE/ED-2GZB/18-19PARISHAD PROJECT FUNDAMC OF KONE MAKE LIFT AT SEC-15 SHIKHAR ENCLAVE BLOCK- C&D VASUNDHARA GZB 0.00 6.21 06/12/201824/12/2018 24/12/201823/12/201924/12/2018 24/12/2018KONE ALIVETOR INDIA PVT. LTD. 9560361414C.L. MAURYA,PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
800 03/EE/2018-19DT17-12-2018AWASTHAPNA FUNDSTRENGTHING OF ROAD FROM HOUSE NO B-50 TO 254, B-69 TO 107 AND B-93 TO 107 IN BLOCK B YOJNA NO 2 (PHASE-I) BUDAUN 0.00 25.50 27/11/201817/12/2018 17/12/201830/01/201917/12/2018 17/12/2018M/S KAILASH RAM 9651534882ER. ASHISHSHARMA JE ER. NAVEEN KUMAR VERMA AE ER. NEHA SINGH XECircle 5Completed
801 04/EE/2018-19DT.19-12-2018AWASTHAPNA FUNDSTRENGTHENING OF ROAD FROM HOUSE NO A-35 TO 145 , A-46 TO 153 , A-210 TO 216, B-289 TO 290 AND B-7 TO 23 IN BLOCK A &B AT YOJNA NO 2 (PHASE-I) BUDAUN 0.00 21.17 27/11/201819/12/2018 19/12/201801/02/201919/12/2018 19/12/2018M/S KAVERI ENTERPRISES 9412293360ER. ASHISHSHARMA JE ER. NAVEEN KUMAR VERMA AE ER. NEHA SINGH XECircle 5Completed
802 05/EE/2018-19DT19-12-2018AWASTHAPNA FUNDSTRENGTHENING OF ROAD AND DRAIN IN YOJNA NO-2 (PHASE-I) BUDAUN 0.00 44.94 27/11/201819/12/2018 19/12/201801/02/201919/12/2018 19/12/2018M/S CHANCHAL ENTERPRISES ER. ASHISHSHARMA JE ER. NAVEEN KUMAR VERMA AE ER. NEHA SINGH XECircle 5Completed
803 01/SEHQ/CD-14/2018-19PARISHAD PROJECT FUNDCONST. OF 32 NOS. 2BHK+32 NOS. 3BHK (S+8) FLATS 0.00 1882.00 24/02/201819/05/2018 19/05/201818/05/202019/05/2018 19/05/2018ANGELIC INFRACON PVT. LTD. 8052315129GAUTAM KUMAR,RAMESH CHANDRA CHAURASIYA,SUBEDAR NAVIK,SUGENDRA KUMAR VISHWAKARMA JE YOUGESH KUMAR AE D. K GUPTA XECircle HQIn Progress
804 01/EE/CD-31PARISHAD PROJECT FUNDConstruction of Culvert & Drain at Lohramau Yojna Sultanpur 0.00 51.87 27/04/201826/05/2018 26/05/201825/09/201826/05/2018 26/05/2018SHAKTI CONSTRUCTION CO. 09121900191MANOJ KUMAR JE AE D.K. SRIVASTAVA XECircle HQCompleted
805 02/EE/CD-31PARISHAD PROJECT FUNDConstruction of RCC Drain at Lohramau Yojna to Rahul chowk at Distt. Sultanpur 0.00 53.62 27/04/201826/05/2018 25/05/201825/09/201826/05/2018 25/05/2018SHAKTI CONSTRUCTION CO. 09121900191MANOJ KUMAR JE AE D.K. SRIVASTAVA XECircle HQCompleted
806 03/EE/18-19ED-1PARISHAD PROJECT FUNDAnnual Maintenance constructor for Air Conditioning work in Admin building Exhibition Hall food court kids zone and AC Craft shop at Avadh Shilp Gram Avadh Vihar yojna Lucknow 0.00 39.79 08/12/201726/04/2018 26/04/201825/04/201926/04/2018 26/04/2018KRISHNA REFRIGRATION 09652303229 Circle ElectricalCompleted
807 07/EE/2018-19DT.25-02-2019AWASTHAPNA FUNDPROVIDING AND LAYING INTERLOCKING TILES AT GANDHI AUDITORIUM , PILIBHIT 0.00 36.34 28/12/201825/02/2019 25/02/201910/04/201925/02/2019 25/02/2019M/S B. D. GAURAV ENTERPRISES 9457336633ER. RAVINDRA PRAKASH TRIVEDI JE N. SINGH AE ER. NEHA SINGH XECircle 5Completed
808 06/EE/ED-2GZB/18-19PARISHAD PROJECT FUNDAMC OF KONE MAKE LIFT AT OFFICE COMPLEX SEC-16 VASUNDHARA GZB 0.00 0.94 15/12/201819/12/2018 19/12/201818/12/201919/12/2018 19/12/2018KONE ALIVETOR INDIA PVT. LTD. 9560361414C.L. MAURYA JE TEAJ BIR SINGH AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
809 08/EE/2018-19DT.25-02-2019AWASTHAPNA FUNDCONSTRUCTION OF BOUNDRYWALL OF GANDHI AUDITORIUM , PILIBHIT 0.00 21.04 28/12/201825/02/2019 25/02/201910/04/201925/02/2019 25/02/2019M/S KAVERI ENTERPRISES 9412293360ER. RAVINDRA PRAKASH TRIVEDI JE N. SINGH AE ER. NEHA SINGH XECircle 5Completed
810 11/EE/2018-19DT01-03-2019AWASTHAPNA FUNDUPGRADING OF ROAD FROM ARYA SAMAJ MANDIR TO VIJAYA BAND AND KANYA DEGREE COLLEGE BAREILLY 0.00 13.64 17/01/201901/03/2019 01/03/201914/04/201901/03/2019 01/03/2019M/S Arora R.C.C. Works 9837391824ER JAI SHANKAR DIWEDI JE ER. NAVEEN KUMAR VERMA AE ER. NEHA SINGH XECircle 5Completed
811 09/EE/2018-19DT01-03-2019AWASTHAPNA FUNDUPGRADING OF ROAD AND DRAIN IN BANKE KI CHHAWANI NEAR SNOW FACTORY FROM HOUSE OF RAMPAL THROUGH TENPLE UPTO SHOP OF SUKHLAL DISTRICT BAREILLY 0.00 21.03 17/01/201901/03/2019 01/03/201914/04/201901/03/2019 01/03/2019M/S B. D. GAURAV ENTERPRISES 9457336633ER JAI SHANKAR DIWEDI JE ER. NAVEEN KUMAR VERMA AE ER. NEHA SINGH XECircle 5Completed
812 10/EE/2018-19DT01-03-2019AWASTHAPNA FUNDCONSTRUCTION OF ROAD AND DRAIN BEHIND DURGA NAGAR FROM MAIN ROAD TO KOTHI OF MANOJ, DISTRICT BAREILLY 0.00 31.89 17/01/201901/03/2019 01/03/201914/04/201901/03/2019 01/03/2019M/S B. D. GAURAV ENTERPRISES 9457336633ER JAI SHANKAR DIWEDI JE ER. NAVEEN KUMAR VERMA AE ER. NEHA SINGH XECircle 5Completed
813 11/EE/CD-25/2016-17AWASTHAPNA FUNDConst of aproach road from kanth road to forensic science lab of police line in mbd 0.00 45.50 21/11/201602/01/2017 02/01/201701/04/201702/01/2017 02/01/2017M/s Aparna Infrastructure 9837019057K K ACHARYA,RAHUL KUMAR,SRI ARVIND KUMAR JE PRASHANT VARDHAN AE A K MITTAL XECircle 5Completed
814 10/EE/ED-2GZB/2016-17PARISHAD PROJECT FUNDS/I OF 1 NO. ELEVATOR (LIFT) 8 PASSENGER WITHOUT MACHINE ROOM WITH ELECTRIC AND CIVIL WORK IN OFFICE COMPLEX SEC-16, VASUNDHARA YOJNA GZB. 0.00 35.00 06/07/201617/02/2017 17/02/201716/07/201717/02/2017 17/02/2017INSYNC TECHNOLOGIES 9910046728SITARAM CHAUHAN JE D.C SHUKLA AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
815 02/EE/2018-19DT14-12-2018AWASTHAPNA FUNDSTRENGTHENING OF ROADS FROM HOUSE NO B-123 TO B-137, B-184 TO 194 AND B-269 TO 300 IN BLOCK B YOJNA NO 2 (PHASE -I) BUDAUN 0.00 33.50 27/11/201814/12/2018 14/12/201827/01/201914/12/2018 14/12/2018M/S KAILASH RAM 9651534882ER. ASHISHSHARMA JE ER. NAVEEN KUMAR VERMA AE ER. NEHA SINGH XECircle 5Completed
816 54/EE/16-17ED-1PARISHAD PROJECT FUNDAnnual Maintenance related to Fire Fighting system sec-9 at Vrindavan Yojna no. 2, Phases-2 Lucknow 0.00 9.00 18/10/201604/01/2017 04/01/201730/06/201804/01/2017 04/01/2017F Tech Enterprises Circle ElectricalCompleted
817 06/EE/16-17ED-1PARISHAD PROJECT FUNDS/F of S/L & High Mast fittings in Various sector at Vrindavan Yojna Lucknow 0.00 39.85 11/04/201611/05/2016 11/05/201610/06/201611/05/2016 11/05/2016Preeti Electric works Circle ElectricalCompleted
818 02/EE/CD-25/2018-19PARISHAD PROJECT FUNDConstruction of under ground water storage tank for 2-BHK and 1-BHK flats in majhola yojna No-4 Part-2 in sector 9A Moradabad 0.00 14.99 05/03/201905/03/2019 05/03/201904/06/201905/03/2019 05/03/2019M/s R K and Company 8171211222RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XECircle 5Completed
819 04/EE/18-19ED-1PARISHAD PROJECT FUNDAnnual Maintenance contract for solar system, CCTV & Public Address system Installed at Avadh Shilp Gram Avadh Vihar Yojna Lucknow. 0.00 6.85 08/12/201728/04/2018 27/05/201928/04/2018 Triflex Solution Circle ElectricalCompleted
820 11/EE/18-19ED-1PARISHAD PROJECT FUNDAnnual Maintenance related to fire fightingn system sector-9 office complex at Vrindavan Yojna Lucknow 0.00 9.30 28/05/201803/08/2018 03/08/201802/08/201903/08/2018 03/08/2018AQUACHEM ENGINEERS 9810458884 Circle ElectricalCompleted
821 14/EE/18-19ED-1PARISHAD PROJECT FUNDSITC of pre paid meter (secure /L &T make) and its related work from giving service connection in first phase for 364 flats at Bhagirathi Enclave sector-2 Avadh Vihar Yojna Lucknow 0.00 85.12 28/05/201814/08/2018 14/08/201813/12/201814/08/2018 14/08/2018S.J.S. System & Solution Circle ElectricalIn Progress
822 29/EE/18-19ED-1PARISHAD PROJECT FUNDConstruction of 01 No. tubewell 200 mtr. deep & its related work in sector-7A at Avadh Vihar Yojna Lucknow 0.00 22.66 22/12/201827/12/2019 27/02/201926/05/201927/12/2019 27/02/2019M.A. Engineering works Circle ElectricalCompleted
823 24/EE/18-19ED-1PARISHAD PROJECT FUNDAnnual Mts. of installed 02 No. left and 02 no. Escalation in Avadh Shilp Gram at Avadh Vihar Yojna Lucknow 0.00 31.95 22/12/201817/01/2019 17/01/201916/01/202017/01/2019 17/01/2019Johnson Pvt. Ltd. Circle ElectricalCompleted
824 26/EE/18-19ED-1PARISHAD PROJECT FUNDDesign and estimation of Internal external electrification work of fire fighting system fire alarm system and PA system estimation and fire fighting NOC work of office complex at Moradabad 0.00 0.00 30/11/201817/01/2019 17/01/201916/02/201917/01/2019 17/01/2019TRIVENI BUILDERS & SUPPLIERS Circle ElectricalCompleted
825 10/EE/16-17ED-1PARISHAD PROJECT FUNDS/F of street light fittings for Int. Elect. work for construction of Avadh Shilp Gram in AC craft shop & craft shop make etc. syste4m to construction of Avadh Shilp gram at Avadh Vihar Yojna Lucknow. 0.00 91.37 23/04/201604/06/2016 04/06/201631/07/201604/06/2016 04/06/2016Preeti Electric works Circle ElectricalCompleted
826 01/EE/17-18ED-1PARISHAD PROJECT FUNDAnnual Maintenance of 04 No. Otic lift installed for office complex at sector-19 in Vrindavan Yojna no. 2 Phase-2 Lucknow 0.00 6.75 27/03/201701/04/2017 01/04/201731/03/201801/04/2017 01/04/2017OTIS ELEVATOR CO.(INDIA) LTD. Circle ElectricalCompleted
827 03/EE/16-17ED-1PARISHAD PROJECT FUNDS/I of 10000 LPM, 52 mtr. head capacity KSB make submersible pumping plant for T/W sector-4 in Avadh Vihar Yojna Lucknow 0.00 5.39 11/04/201611/05/2016 11/05/201610/06/201611/05/2016 11/05/2016M.A. Engineering works Circle ElectricalCompleted
828 08/EE/16-17ED-1PARISHAD PROJECT FUNDExt. Elect. work for lightining work in Avadh Shilp Gram at Avadh Vihar Yojna Lucknow 0.00 97.20 17/10/201528/05/2016 28/05/201627/09/201628/05/2016 28/05/2016Preeti Electric works Circle ElectricalCompleted
829 13/EE/17-18ED-1PARISHAD PROJECT FUNDMaintenance of pump house at sector 5 & 6 Vrindavan Yojna no. 1 Lucknow 0.00 8.97 15/05/201714/11/2017 14/11/201714/11/201714/11/2017 14/11/2017J.P.TRADERS Circle ElectricalCompleted
830 28/EE/17-18ED-1PARISHAD PROJECT FUNDAnnual Maintenance of 4 no. Otis lift Installed for Office complex at sector 9 in Vrindavan Yojna no. 2 Phase-2 Lucknow 0.00 9.17 23/01/201831/03/2018 31/03/201831/03/201931/03/2018 31/03/2018OTIS ELEVATOR CO.(INDIA) LTD. Circle ElectricalCompleted
831 01/EE/16-17ED-1PARISHAD PROJECT FUNDAnnual mts. of 04 nos otis lift Installed Office complex sector-9 in Vrindavan Yojna no. 2 Phase-2 Lucknow. 0.00 5.87 04/03/201601/04/2016 01/04/201631/03/201701/04/2016 01/04/2016OTIS ELEVATOR CO.(INDIA) LTD. Circle ElectricalCompleted
832 01/EE/2019-20INFRAStrenthning of roads in sec-2 & 4 scheme no. 10 Madhavpuram, Meerut 0.00 102.17 29/05/201906/06/2019 06/06/201905/09/201906/06/2019 06/06/2019M/s Juneja Construction Pvt. Ltd. 9810787577AJAB SINGH,KHUSHALI JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
833 259/CD-28/ENG-22/1AWASTHAPNA FUNDSupply of R.C.C. N.P.-3 Class S&S Pipe 1000 MM dia for the Laying and Jointing of sewer Line from sec.-4 Sikandra Yojna, Agra to Bodla Choraha. 0.00 42.68 14/11/201814/02/2019 14/02/201913/06/201914/02/2019 14/02/2019Agra Concrete Pipe Co. 9319103309SANJAY SHARMA JE ASHOK KUMAR SHARMA AE PRITI VISWAKARMA XECircle 6Completed
834 01/EE/CD/2017-18STATE FUNDRepair of Road Sector-3, 4 & 5 0.00 21.31 31/05/201706/06/2017 06/06/201706/06/201706/06/2017 06/06/2017M/s S.P. Singh 9455923183ADITYA KUMAR TRIPATHI,ER. MAHESH CHANDRA SHARMA,SUGHAR SINGH JE ER. AIJAJ UDDIN AE ER. VINEET SINGHAL XECircle 4Completed
835 01/SE-II/2019-20AWASTHAPNA FUNDStrengthening of Roads in Sector-13, Scheme No. 7, Shastri Nagar, Meerut. 0.00 122.00 11/04/201904/07/2019 04/07/201903/11/201904/07/2019 04/07/2019M/s Juneja Construction Pvt. Ltd. 9810787577SH. SANDEEP KUMAR JE SH. RAVINDRA KUMAR AE M.B. KAUSHIK XECircle 2Completed
836 03/EE/Cu-Etawah/2018-19PARISHAD PROJECT FUNDBituminous Road Work in Spining Mill Yojna Etawah 0.00 79.83 08/03/201908/03/2019 08/03/201901/06/201908/03/2019 08/03/2019M/s R.N. Agrawal 9319062251SRI ANIL KUMAR CHAUDHARY JE ARVIND KUMAR,NAGENDRA KUMAR,SRI ABHISHEK VERMA AE PRADEEP KUMAR XECircle 4In Progress
837 01/EE/2019-20ED-1PARISHAD PROJECT FUNDSITC of 1 No. 1000 LPM, 68 mtr Head KSB make submersible pumping plant at Sector-18, Vrindavan Yojna no. 4 Lucknow 0.00 6.36 16/03/201920/06/2019 20/06/201919/07/201920/06/2019 20/06/2019Industrial Traders Circle ElectricalCompleted
838 02/EE/2019-20ED-1PARISHAD PROJECT FUNDConstruction of 01 no. T/W 200 Mtr.Deep & Its related work sector-8 at avadh vihar yojna lucknow 0.00 20.33 06/06/201920/06/2019 20/06/201919/09/201920/06/2019 20/06/2019M.A. Engineering works Circle ElectricalCompleted
839 03/EE/2019-20ED-1PARISHAD PROJECT FUNDSITC of 01 No. 1000 LPM 62 mtr. head at Gokul Gram Yojna Munnu Khera Lucknow. 0.00 6.36 18/03/201920/06/2019 20/06/201919/09/201920/06/2019 20/06/2019M.A. Engineering works Circle ElectricalCompleted
840 03/S.E-2/C.D-5/2019-20PARISHAD PROJECT FUNDConstruction of 45/75 type 79 Nos Semi-Finished Houses at Sector 5 in Scheme No. 11 Jagriti Vihar (Extension) Meerut. Group-C 0.00 341.66 08/03/201908/07/2019 08/07/201907/04/202008/07/2019 08/07/2019M/s Kumar Builders 9358403917ER. SUNIL KUMAR BHUTANI JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XECircle 2Completed
841 04/S.E-2/C.D-5/2019-20PARISHAD PROJECT FUNDConstruction of 45/75 type 87 Nos Semi-Finished Houses at Sector 5 in Scheme No. 11 Jagriti Vihar (Extension) Meerut. Group-B 0.00 376.26 08/03/201908/07/2019 08/07/201907/04/202008/07/2019 08/07/2019M/s Kumar Builders 9358403917ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XECircle 2Completed
842 05/S.E-2/C.D-5/2019-20PARISHAD PROJECT FUNDConstruction of 31/63 type 88 Nos Semi-Finished Houses at Sector 5 in Scheme No. 11 Jagriti Vihar (Extension) Meerut. 0.00 256.31 01/06/201919/07/2019 19/07/201918/04/202019/07/2019 19/07/2019A.S CONSRTUCTION 8273230008ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XECircle 2Completed
843 04/EE/2019-20ED-1PARISHAD PROJECT FUNDS/F of Caging for Bus BAr & Meetring pannel at sector-7(in basera flat area) Avadh Vihar Yojna Lucknow 0.00 6.71 04/01/201928/06/2019 28/06/201927/07/201928/06/2019 28/06/2019M.A. Engineering works Circle ElectricalCompleted
844 05/EE/2019-20ED-1PARISHAD PROJECT FUNDS/F of caging for Bus Bar & Meetring pannel at sector-8 in Basera flat area) Avadh Vihar yojna Lucknow 0.00 5.15 04/05/201928/06/2019 27/09/201928/06/2019 M.A. Engineering works Circle ElectricalCompleted
845 06/EE/2019-20ED-1PARISHAD PROJECT FUNDS/F of caging for Bus Bar & Meetring pannel at sector-5 Janhavi Enclave, Avadh Vihar Yojna Lucknow 0.00 4.59 04/05/201928/06/2019 28/06/201927/09/201928/06/2019 28/06/2019M.A. Engineering works Circle ElectricalCompleted
846 07/EE/2019-20ED-1PARISHAD PROJECT FUNDExt. Elect.work for providing electrical source to PMAY at Sector-3 Avadh Vihar yojna Lucknow 0.00 85.17 28/06/201912/07/2019 12/07/201911/10/201912/07/2019 12/07/2019Preeti Electric works Circle ElectricalCompleted
847 01/pm/cu-jhs/19-20PARISHAD PROJECT FUNDCONSTRUCTION OF BOUNADRY WALL YOJNA NO-03/JHANSI 0.00 135.25 01/10/201417/06/2019 17/06/201916/12/201917/06/2019 17/06/2019muskaan enterprises 9415586688MANVENDRA DHAMANIYA JE DAYASAGAR AE EKHLAQUE AHMAD XECircle 6In Progress
848 01/EE.CD-4/2019-20PARISHAD PROJECT FUNDProviding and laying and internal water supply line in Bahraich Bhinga Marg Bhoomi Vikas Evam Grihsthan Yojna, Bahraich. 0.00 43.34 24/01/201913/06/2019 13/06/201912/10/201913/06/2019 13/06/2019M/S KAILASH RAM 9651534882CHANDAN KUMAR JE K.K ACHARYA AE PRASHANT VARDHAN XECircle 3In Progress
849 02/EE/CD-8/2017-18PARISHAD PROJECT FUNDInternal Development work (Sewer Line, Water Line, Road, Park) at Sector-12, Scheme-7, Shastri Nagar, Meerut 0.00 37.00 03/04/201714/06/2017 14/06/201713/10/201714/06/2017 14/06/2017Vishal Gupta SH. SANDEEP KUMAR JE SH. RAVINDRA KUMAR AE M.B. KAUSHIK XECircle 2Completed
850 01/EECD-32/2018-19PARISHAD PROJECT FUNDConstruction of Road in Shakumbhari Vihar Yojna, Saharanpur. 0.00 26.42 31/01/201807/06/2018 07/06/201806/09/201807/06/2018 07/06/2018A K CHAUDHARY 9758874747 Circle 2Completed
851 01/SE(ELect.)/2019-20PARISHAD PROJECT FUNDSupply of 02 Nos 33/11 KV 10 MVA Tower Transformer for 33/11 KV Sub-Station at Sector-3A Jagrati Vihar (Extension) Scheme No. 11, Meerut 0.00 121.12 25/01/201916/07/2019 16/07/201915/11/201916/07/2019 16/07/2019Elecon Conductor 9837007408ER. MERAJUDDIN AHMAD JE ER. D. R. MAURYA AE AVESH XECircle ElectricalCompleted
852 02/S.E-2/C..D-5/2019-20PARISHAD PROJECT FUNDConstruction of 45/75 type 86 Nos Semi-Finished Houses at Sector 5 in Scheme No. 11 Jagriti Vihar (Extension) Meerut. Group-A 0.00 371.93 08/03/201908/07/2019 08/07/201907/04/202008/07/2019 08/07/2019M/s Gaurav Enterprises 9837408485ER. SUNIL KUMAR BHUTANI JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XECircle 2Completed
853 01/SE-7/2019-20PARISHAD PROJECT FUNDEarth Filling and Repair of Development Service at Basement of Plot No-4/Com-1 at Sec-4C, Vasundhara, GZB 0.00 132.15 11/06/201926/06/2019 26/06/201925/10/201926/06/2019 26/06/2019SHREE RAM CONSTRUCTION DINESH PAL SINGH JE RIYAZUDDIN AE BHOLA NATH XECircle 7Completed
854 08/EE/19-20ED-1PARISHAD PROJECT FUNDSITC of 1 no. 1000 LPM 68 mtr. head KSB make Submersible pumping plant at Pandeypur Yojna Varanasi 0.00 4.92 18/03/201913/08/2019 13/08/201912/09/201913/08/2019 13/08/2019Preeti Electric works Circle ElectricalCompleted
855 06/EE/ED-2GZB/2016-17PARISHAD PROJECT FUNDEXT. ELE. WORK, SHIFTING OF 11 KV LINE IN SEC-15, 16 & 17 AT M V YOJNA GZB. 0.00 145.00 11/04/201618/06/2016 18/06/201617/08/201618/06/2016 18/06/2016M/S PRAKASH ENGINEERS 8527167618ALOK KUMAR JE ER. D. R. MAURYA AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
856 02/EE/ED-2GZB/2015-16PARISHAD PROJECT FUNDINT. ELE. IN COMMUNITY CENTRE AT SEC-4A, MANDOLA VIHAR YOJNA GZB. 0.00 28.00 21/09/201518/11/2015 18/11/201517/07/201618/11/2015 18/11/2015OM ASSOCIATES 9312359633SUNILKUMAR JE D.C SHUKLA AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
857 2/EE/ED2GZB/2015-16PARISHAD PROJECT FUNDELE.WORK OF T/W IN DIFFERENT SECTORS AT MANDOLA VIHAR YOJNA GZB. 0.00 12.00 21/11/201527/01/2016 27/01/201626/02/201627/01/2016 27/01/2016OM ASSOCIATES 9312359633SANJEEV KUMAR SINGH JE D.C SHUKLA AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
858 01ee20-21PARISHAD PROJECT FUNDInternal Development work (road, drain, sewer, water supply) in PMAY area at Lohramau Yojna sultanpur 0.00 50.09 14/01/202011/05/2020 10/11/202011/05/2020 DEV CONSTRUCTION CO. MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XECircle HQIn Progress
859 03/EE/ED-2GZB/2015-16PARISHAD PROJECT FUNDS/I OF 1000/1200/1500 LPM 60 MTR. HEAD KSB MAKE PUMPING PLANT (05 NOS.) AT MANDOLA VIHAR YOJNA GZB. 0.00 25.00 21/11/201520/02/2016 20/02/201619/04/201620/02/2016 20/02/2016SUDHIR ENGINEERING WORKS 9810466565SUNILKUMAR JE ER. D. R. MAURYA AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
860 59/Dt12.1.2018PARISHAD PROJECT FUNDLine shifting work for UPPCL 0.00 50.36 12/01/201812/01/2018  12/01/2018 UPPCL EUDD UPTRON NARESH KUMAR GUPTA JE SATYENDRA SINGH AE S.K. SIRVASTAVA XECircle MantolaCompleted
861 10/SE-2/2015-16PARISHAD PROJECT FUNDConstruction of 48 Nos. F-64 Type Houses (G+3) Samajwadi Awas Yojna in Scheme-11, Jagriti Vihar (Ext), Meerut 0.00 438.32 24/09/201524/09/2015 24/09/201523/03/201724/09/2015 24/09/2015Humi Construction Company 8267844228SH. SANDEEP KUMAR JE SH. A.K. BANSAL AE PRAMOD KUMAR XECircle 2Completed
862 04/EE/CD-1GZB/2019-20DATE21-03-2020PARISHAD PROJECT FUNDStrengthening of 50mtr wide Road (Part) at Siddharth Vihar Yojna, Gzb. 0.00 88.36 01/02/202021/03/2020 21/03/202020/09/202021/03/2020 21/03/2020M/s Ramesh Chand & Co. 9213288266RANDHIR SINGH JE NARENDRA PAL AE ATUL KUMAR SINGH XECircle 7In Progress
863 05/EE/CD-38/2017-18PARISHAD PROJECT FUNDBoundary wall of Power grid Corporation 0.00 17.00 08/02/201826/03/2018 26/03/201825/07/201826/03/2018 26/03/2018Laxman Buildcon NARESH KUMAR GUPTA JE SATYENDRA SINGH AE S.K. SIRVASTAVA XECircle MantolaCompleted
864 02/EE/CD-38/2017-18PARISHAD PROJECT FUNDLaying & Jointing of Sewer Line in Sector-15(Plot Pocket) 0.00 47.94 25/10/201720/01/2018 20/01/201819/10/201920/01/2018 20/01/2018Nanhe Thekedar 0ABHISHEK KUMAR MISHRA,NARESH KUMAR GUPTA JE SATYENDRA SINGH AE BISHEMBER SINGH,S.K. SIRVASTAVA,SH. D.V. SINGH,SHOBHIT KUMAR PATHAK XECircle MantolaCompleted
865 21/SE(M)2013-14PARISHAD PROJECT FUNDConst of 320 Nos EWS Houses in Sec 17 0.00 913.60 15/01/201418/02/2014 18/02/201417/08/201518/02/2014 18/02/2014M/S PANDIT REALTER PVT LTD 9818098741MUNNA LAL,RADHEY SHYAM JE AMAN TYAGI,SATYENDRA SINGH AE S.K. SIRVASTAVA XECircle MantolaCompleted
866 08/SE(M)/CD-22/2016-17PARISHAD PROJECT FUNDconstruction of internal raods on sector-2 mandola vihar yojna 0.00 468.00 04/10/201604/01/2017 03/07/201704/01/2017 KRISHNA CONSTRUCTION COMPANY K.V.SINGH,U.S.CHAURASIYA JE HARI SHANKAR TIWARI AE UMA NATH SHUKLA XECircle MantolaIn Progress
867 09/EE/CD-2/19-20PARISHAD PROJECT FUNDConstruction of 18.00M wide new Interlocking tiles road in Sec-15 VVY-4 Lucknow. 0.00 34.95 04/10/201914/11/2019 14/11/201913/12/201914/11/2019 14/11/2019M/S Gungun Trading Co. HEMANT KUMAR JE SUNIL KUMAR SINGH AE RAMAYAN SHARAN XECircle 3Completed
868 10/EE/CD-2/19-20PARISHAD PROJECT FUNDConstruction of rising main at Sec-15 Vrindavan Yojna-4 Lucknow. 0.00 9.60 04/10/201914/11/2019 14/11/201913/12/201914/11/2019 14/11/2019J.P.TRADERS HEMANT KUMAR JE SUNIL KUMAR SINGH AE RAMAYAN SHARAN XECircle 3Completed
869 11/EE/CD-2/19-20PARISHAD PROJECT FUNDConstruction of Pump house at Sec-15 VVY-4 Lucknow. 0.00 8.72 04/10/201914/11/2019 14/11/201913/12/201914/11/2019 14/11/2019J.P.TRADERS HEMANT KUMAR JE SUNIL KUMAR SINGH AE RAMAYAN SHARAN XECircle 3In Progress
870 12/EE/CD-2/19-20PARISHAD PROJECT FUNDRenovation of 18.00 M & 24.00 M wide road in Sec-15 VVY-04,Lucknow. 0.00 76.77 04/10/201916/11/2019 16/11/201915/12/201916/11/2019 16/11/2019SHIVANSH CONSTRUCTION A.B.SINGH JE SUNIL KUMAR SINGH AE RAMAYAN SHARAN XECircle 3Completed
871 03/E.E./C.D.-34/AWASTHPNANIDHI/2019-20AWASTHAPNA FUNDRenovation of Patri with Interlocking Tiles & K.C. Drain & Culvert at Patrakarpuram Colony, Shivpur, Varanasi. 0.00 70.12 13/12/201903/01/2020 05/02/202004/05/202003/01/2020 05/02/2020JWALAMUKHI CONSTRUCTION 09648999945TRIBHUVAN LAL JE AE AJIT KUMAR CHAUDHARY XECircle 1Completed
872 5/EE/2018-19INFRAStrengthening of road and drain from Mishri lal house to Keshav Mohania House in Nagala Dalchandra Aligarh 0.00 23.49 06/02/201821/05/2018 21/05/201820/07/201821/05/2018 21/05/2018TRIMURTI ENTERPRISES MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE XECircle 6Completed
873 6/EE/2018-19INFRAStrengthening of Park Avantika Colony Ramghat road Aligarh 0.00 22.36 06/02/201821/05/2018 21/05/201820/07/201821/05/2018 21/05/2018M/s MAA DURGA CONSTRUCTION CO. 975904169MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE XECircle 6Completed
874 01/SE(E)LKO/2015-16PARISHAD PROJECT FUNDCONSTRUCTION OF 11 KV FEEDER (06 NOS.) FROM 33/11 KV S/S AT SEC-8, VASUNDHARA YOJNA GZB. 0.00 350.00 24/12/201409/06/2015 09/06/201508/09/201509/06/2015 09/06/2015M/S PRAKASH ENGINEERS 8527167618PANKAJ KUMAR PUSHKAR,SANJEEV KUMAR SINGH,SUNILKUMAR JE D.C SHUKLA AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
875 02/SE(E)LKO/2015-16PARISHAD PROJECT FUNDCONSTRUCTION OF 11 KV FEEDER OF 33/11 KV S/S AT SEC-7, VASUNDHARA YOJNA GZB. 0.00 155.00 24/12/201409/06/2018 09/06/201508/09/201509/06/2018 09/06/2015K. ELECTRIC WORKS PVT. LTD BHOOPLAL,SANJEEV KUMAR SINGH,SUNILKUMAR JE D.C SHUKLA AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
876 7/EE/2018-19INFRAStrengthening of road and drain from Mahesh Chandra Sharma house to Ram khiladi House in Nagala Dalchandra Aligarh 0.00 12.00 06/02/201821/05/2018 21/05/201820/07/201821/05/2018 21/05/2018M/s MAA DURGA CONSTRUCTION CO. 975904169MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE XECircle 6Completed
877 012/EE/2018-19INFRAStrengthening of Drain and Foothpath in Gandhi Eye Hospital Aligarh 0.00 14.87 06/02/201814/06/2018 14/06/201813/08/201814/06/2018 14/06/2018Vishal Gupta Circle 6Completed
878 01/SE(E)LKO/2016-17PARISHAD PROJECT FUNDEXT. ELE. WORK (UNDER GROUND SYSTEM) AND STEET LIGHTING WORK IN 1120 NOS. EWS TYPE HOUSE AT SEC-17, MANDOLA VIHAR YOJNA GZB. 0.00 275.00 12/02/201613/06/2016 13/06/201612/09/201613/06/2016 13/06/2016Electro Builders PANKAJ KUMAR PUSHKAR,SANJEEV KUMAR SINGH JE D.C SHUKLA,D.K PANDEY AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
879 06/EE/2015-16Dt01-03-2016AWASTHAPNA FUNDBeautification work of park 1 2 3 yojana no 7-b Pilibhit bypass bareilly 0.00 15.95 03/02/201601/03/2016 01/03/2016 01/03/2016 01/03/2016shri banke bihar builder & supplayer Circle 5Completed
880 07/EE/2015-16Dt1-03-2016AWASTHAPNA FUNDupgrading of road around rani laxmi bai park and acharya dev park vivek vihar anakpuri bareilly. 0.00 22.16 03/02/201601/03/2016 01/03/2016 01/03/2016 01/03/2016Bhatia Construction Co. Circle 5Completed
881 08/EE/2015-16/Dt01-03-2016AWASTHAPNA FUNDupgrading of road of gali no 1 vihnu puri prem nagar bareilly 0.00 8.77 03/02/201601/03/2016 30/04/201601/03/2016 Bhatia Construction Co. Circle 5Completed
882 09/EE/2015-16/Dt01-03-2016AWASTHAPNA FUNDconstruction of Tin shed sport stadium swimming pool at bareilly 0.00 10.60 03/02/201601/03/2016 01/03/201630/04/201601/03/2016 01/03/2016Ms UK industries R.A VERMA JE ANIL KUMAR SAXENA AE SATENDRA KUMAR XECircle 5Completed
883 12/EE/2015-16Dt01-03-2016AWASTHAPNA FUNDupgrading of road from snajay nagar bypass via tirmoorti road at ravi kirana stor to rakesh patel house ward no 11 at Bareilly. 0.00 48.54 03/02/201601/03/2016 01/03/201630/04/201601/03/2016 01/03/2016kailash Construction co. Circle 5Completed
884 13/EE/2015-16Dt01.03.2016AWASTHAPNA FUNDupgrading of road from kamal dailry ot mourya photographer shop at shaheed pankaj Araora marg rajednra nagar at Bareilly 0.00 8.37 03/02/201601/03/2016 01/03/201630/04/201601/03/2016 01/03/2016kailash Construction co. Circle 5Completed
885 14/EE/2015-16/Dt01-03-2016AWASTHAPNA FUNDconstruciton of Auto stand at shahdana satelite choupla and delapeer chauraha at Bareilly. 0.00 38.94 03/02/201601/03/2016 01/03/201630/04/201601/03/2016 01/03/2016Riddhi Siddhi Realtak pvt ltd Circle 5Completed
886 013/EE/2018-19INFRAStrengthening of road and drain from Ambedakar Park to Shiv Mandir in Dhorra Mafi Aligarh 0.00 8.09 06/02/201815/06/2018 15/06/201814/08/201815/06/2018 15/06/2018Lord Shiva Shiv Const. 8859503517MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE MUKESH YADAV XECircle 6Completed
887 03/SE(E)LKO/2016-17PARISHAD PROJECT FUNDINT. ELE. WORK IN SAMAJWADI YOJNA 336 NOS. 2BHK TYPE HOUSES AT SEC-17, MANDOLA VIHAR YOJNA GZB. (GROUP-B) 0.00 170.00 14/03/201623/08/2016 23/08/201622/08/201723/08/2016 23/08/2016K.S. ELECTRICALS 9650148106ALOK KUMAR,PANKAJ KUMAR PUSHKAR,SUNILKUMAR JE D.C SHUKLA,D.K PANDEY AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
888 04/SE(E)LKO/2016-17PARISHAD PROJECT FUNDINT. ELE. WORK IN SAMAJWADI YOJNA 256 NOS 2 BHK TYPE HOUSES AT SEC-16B, MANDOLA VIHAR YOJNA GZB, (GROUP-F) 0.00 125.00 14/03/201623/08/2016 23/08/201622/08/201723/08/2016 23/08/2016K.S. ELECTRICALS 9650148106PANKAJ KUMAR PUSHKAR,SANJEEV KUMAR SINGH JE D.C SHUKLA AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
889 05/SE(E)LKO/2016-17PARISHAD PROJECT FUNDINT. ELE. WORK IN SAMAJWADI YOJNA IN 640 NOS. 1 BHK TYPE HOUSES AT SET-15, MANDOLA VIHAR YOJNA GZB. (GROUP-H) 0.00 190.00 14/03/201623/08/2016 23/08/201622/08/201723/08/2016 23/08/2016K.S. ELECTRICALS 9650148106ALOK KUMAR,PANKAJ KUMAR PUSHKAR JE D.C SHUKLA,D.K PANDEY AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
890 06/SE(E)LKO/2016-17PARISHAD PROJECT FUNDEXT. ELE. WORK (UNDER GROUND SYSTEM) LT WORK ANDT S/L WORK IN BRAHMAPUTRA ENCLAVE SEC-10, SIDDHARTH VIHAR YOJNA GZB. 0.00 300.00 27/04/201626/10/2016 26/10/201625/01/201726/10/2016 26/10/2016M/S PRAKASH ENGINEERS 8527167618BHOOPLAL,SITARAM CHAUHAN JE D.C SHUKLA AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
891 07/SE(E)LKO/2016-17PARISHAD PROJECT FUNDINT. ELE. WORK IN SAMAJWADI YOJNA 384 NOS 2 BHK TYPE HOUSES AT SEC-16 B, MANDOLA VIHAR YOJNA GZG. (GROUP-E) 0.00 190.00 14/03/201626/10/2016 26/10/201625/10/201726/10/2016 26/10/2016KASHYAPI INFRASTRUCTURE PVT. LTD. 9971799850ALOK KUMAR,PANKAJ KUMAR PUSHKAR JE D.C SHUKLA,D.K PANDEY AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
892 08/SE(E)LKO/2016-17PARISHAD PROJECT FUNDEXT. ELE. WORK (UNDER GROUND SYSTEM) 11 KV LINE AND TRANSFORMATION WORK IN BRAHAMAPUTRA ENCLAVE SEC-7, SIDDHARTH VIHAR YOJNA GZB. 0.00 311.00 27/04/201626/10/2016 26/10/201625/01/201726/10/2016 26/10/2016S S CONSTRUCTION 9999999645SITARAM CHAUHAN JE D.C SHUKLA AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
893 02/SE(E)LKO/2016-17PARISHAD PROJECT FUNDCONSTRUCTION OF 33/11 KV S/S AND 33 KV LINE AT SEC-15, MANDOLA VIHAR YOJNA GZB. 0.00 800.00 12/02/201613/06/2016 13/06/201612/03/201713/06/2016 13/06/2016Electro Builders ALOK KUMAR,PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR,D.C SHUKLA,D.K PANDEY AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
894 1/EE/2016-17INFRAStrengthening of road and drain at 6mtr and 9mtr in sec-3 and Park sec.-1 Kasganj 0.00 41.73 19/01/201601/04/2016 01/04/201630/06/201601/04/2016 01/04/2016Chetan Const. 9412181977SATENDRA HYANKI JE SUDAMA PRASHAD AE XECircle 6Completed
895 6/EE/2016-17INFRARenovation of road at P.L. Nagar Phatak Demper Nagar Mathura 0.00 89.67 04/09/201528/04/2016 28/04/201627/07/201628/04/2016 28/04/2016R.N. Agarwal 9319052251MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
896 07/EE/CD-22/2019-20PARISHAD PROJECT FUNDConstruction of 33/11 KVA Electric Sub-station in Sector-3 Mandola 0.00 46.22 14/10/201911/12/2019 11/12/201910/08/202011/12/2019 11/12/2019VISHAL BUILDERS 9536606047KAMAL SINGH JE RAM AVTAR MITTAL AE UMA NATH SHUKLA XECircle MantolaIn Progress
897 testPARISHAD PROJECT FUNDShifting of Electric Poll of Divisional Store & Main Approach Road at Satyawanpuri Katra Yojna Basti 0.00 1.38 28/10/201628/10/2016 28/10/201627/01/201728/10/2016 28/10/2016Departmental (Self) AMARJEET JE AMIT KUMAR MALL AE MOHD HASHIM IQBAL XECircle 1Completed
898 01/EE/CD-25/2020-21PARISHAD PROJECT FUNDPatch reparing work internal road sec 6A 7B 7C 9B and Trunk Road 0.00 11.35 26/06/202026/06/2020 26/06/202025/07/202026/06/2020 26/06/2020M/s Arif khan contractor 9760674305RAHUL KUMAR,SARVESH KUMAR VERMA JE RAJ KUMAR AE PAWAN KUMAR VERMA XECircle 5In Progress
899 02/SE(V)/CD-11/2020-21CENTRAL AND STATE FUNDConstruction of 96 Nos. Group (n) (G+3) EWS houses at Village Kankaha, Mohanlalganj, Lucknow. 0.00 390.70 04/02/2019 18/06/202017/12/2021 18/06/2020SINGH ASSOCIATES 9450453113NEERAJ KUMAR JE AKBAR ALI,RAJIV RASTOGI AE NAVJOT SINGH VERMA XECircle VrindavanIn Progress
900 01/EE/CD-1/2020-21PARISHAD PROJECT FUNDSupply and Fixing of RCC Pannels Tree Guards at sec-7 & Sec-8 Siddharth Vihar Yojna, Gzb 0.00 6.67 08/07/2020 08/07/202007/08/202008/07/2020 08/07/2020Manpal 9917316437YOGENDRA KUMAR GUPTA JE NARENDRA PAL,YOGENDRA KUMAR VERMA AE ATUL KUMAR SINGH XECircle 7In Progress
901 04/EE/CD-38/2020-21PARISHAD PROJECT FUNDLaying of Sewer Line in Sec-1B 0.00 28.25 15/01/202018/08/2020 18/08/202017/12/202018/08/2020 18/08/2020Jai Jagdamba Contractor & Engineers 9971688121ABHISHEK KUMAR MISHRA,RADHESHYAM JE NARESH GUPTA AE AMAN TYAGI XECircle MantolaCompleted
902 2/EE/2016-17INFRAStrengthening of road and drain at Sec-3, Kasganj 0.00 49.56 02/01/201601/04/2016 01/04/201630/06/201601/04/2016 01/04/2016B.S. Const. SATENDRA HYANKI JE SUDAMA PRASHAD AE XECircle 6Completed
903 4/EE/2016-17INFRAStrengthening of road and drain at Radhika Vihar Mathura 0.00 48.39 04/09/201518/04/2016 18/04/201617/07/201618/04/2016 18/04/2016SUSHIL SINGHAL 9412255916MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
904 5/EE/2016-17INFRAConst. of approach road at Radheshyam coloney Railway line Mathura 0.00 99.70 04/09/201528/04/2016 28/04/201627/07/201628/04/2016 28/04/2016SUSHIL SINGHAL 9412255916MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
905 04/SE-7GZB/2015-16DATE19-03-2016PARISHAD PROJECT FUNDInternal Development work of Sec-7A(Land Adjusted in Favour of Vishal Shakari Awas Samiti) Siddharth Vihar Yojna, Gzb 0.00 175.00 09/04/201519/03/2016 19/03/201618/12/201619/03/2016 19/03/2016M/S Mahesh Chand Contractors 9350931122R.K. GUPTA,RANDHIR SINGH,SANJAY SHARMA JE SUDHIR KUMAR SHUKLA,YOGENDRA KUMAR VERMA AE ATUL KUMAR SINGH XECircle 7In Progress
906 7/EE/2016-17INFRARenovation of road drain and boundray in Tahsil Chata Mathura 0.00 34.47 04/09/201525/05/2016 25/05/201624/08/201625/05/2016 25/05/2016UJJAWAL INFRATECH PVT. LTD. 9412277775SANTOSH KUMAR JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
907 8/EE/2016-17INFRAStrengthening of Park Sec-3 Kasganj 0.00 9.13 21/01/201603/06/2016 03/06/201602/08/201603/06/2016 03/06/2016Sanjesh Yadav SATENDRA HYANKI JE SASMIT KATIYAR AE XECircle 6Completed
908 9/EE/2016-17INFRAStrengthening of road and drain Hanuman Mandir Balaji Puram Mathura 0.00 98.70 03/05/201606/06/2016 06/06/201605/09/201606/06/2016 06/06/2016G.V. Const MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
909 01/EE/CD-22/2019-20PARISHAD PROJECT FUNDProviding and fixing R.C.C. post and barbed wire fencingaround green belt in sector-10 mandola 0.00 27.28 24/07/201927/09/2019 27/09/201926/01/202027/09/2019 27/09/2019ANUJ ASSOCIATE 9411902544U.S.CHAURASIYA JE RAM AVTAR MITTAL AE UMA NATH SHUKLA XECircle MantolaCompleted
910 011/EE/2016-17INFRARenovation of road and drain at baldevpuram sarang vihar Mathura 0.00 79.11 03/05/201606/06/2016 06/06/201605/09/201606/06/2016 06/06/2016Govind Singh MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
911 04/EE/CU-Etawah/2017-18AWASTHAPNA FUNDStrengthening of road from jay hanuman nurserry to vantu rajpoot house saray dayanat Etawah 0.00 67.00 31/03/201724/08/2017 24/08/201723/11/201724/08/2017 24/08/2017M/s Siwansi Concrete Product 9412183483SRI ARVIND KUMAR JE NAVJOT SINGH VERMA AE PRADEEP KUMAR XECircle 4Completed
912 012/EE/2016-17INFRARenovation of Parikrma marg near Kusum sarovar Mathura 0.00 62.74 03/05/201606/06/2016 06/06/201605/09/201606/06/2016 06/06/2016Raj Const. Comp. SANTOSH KUMAR JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
913 013/EE/2016-17INFRAStrengthening of C.C. Road at badi parikrma marg near teerth vikas trust govrdhan Mathura 0.00 94.79 03/05/201606/06/2016 06/06/201605/09/201606/06/2016 06/06/2016ANULATA CONSTRUCTION COMP. 9568001575SANTOSH KUMAR JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
914 01/EE/CD-27/2016-17EXTERNAL DEVELOPMENT FUNDDevelopment Work of plots for shops at Sector - 4C Vasundhara Ghaziabad 0.00 21.70 07/04/201614/07/2016 14/07/201613/10/201614/07/2016 14/07/2016M/s S.C. Builders 8057786501NEERAJ KUMAR JE RIYAZUDDIN AE BHOLA NATH XECircle 7Completed
915 014/EE/2016/17INFRARenovation of parikrama marg choti parikrama to twon aera Govardhan Mathura 0.00 81.81 03/05/201607/06/2016 07/06/201606/09/201607/06/2016 07/06/2016Bheekam singh SANTOSH KUMAR JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
916 015/EE/2016-17INFRARenovation of Road, drain at Goura nagar Mathura 0.00 83.50 03/05/201607/09/2016 07/06/201606/09/201607/09/2016 07/06/2016SUSHIL SINGHAL 9412255916MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
917 016/EE/2016-17INFRAConst. of Interlocking road drain and culvert at jain hospital to Manas Nagar Mathura 0.00 36.99 03/05/201607/06/2016 07/06/201606/09/201607/06/2016 07/06/2016R.K. Enterprisess 9760099926MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
918 017/EE/2016-17INFRAConst. of Interlocking road, drain at Alkapuri balajipuram Mathura 0.00 41.31 03/05/201607/06/2016 07/06/201606/09/201607/06/2016 07/06/2016Govind Singh MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
919 01/EE/CD-16GZB/2015-16PARISHAD PROJECT FUNDProviding and Laying of Sewer Line in Sector-10 (Part) at Siddharth Vihar, Ghaziabad 0.00 63.00 18/11/201518/03/2016 18/03/201617/09/201618/03/2016 18/03/2016Progressive Construction Co. 09888812764ARUN KUMAR SINGH VISHAN,LOKESH KUMAR JE ASHOK KUMAR AGARWAL,S.K. VERMA AE LALIT MOHAN PANDEY,MOHD ALI SAFDAR XECircle 7Completed
920 03/EE/CD-16/2016-17PARISHAD PROJECT FUNDConstruction of Internal Drain & Culvert in Bhramputra Enclave Sector-10, Siddharth Vihar, Ghaziabad 0.00 45.00 07/04/201623/07/2016 23/07/201622/11/201623/07/2016 23/07/2016Balaji Infra Engineering Pvt Ltd 9958955700A.B. ANSARI,ARUN KUMAR SINGH VISHAN JE ASHOK KUMAR AGARWAL,S.K. VERMA AE LALIT MOHAN PANDEY,MOHD ALI SAFDAR XECircle 7Completed
921 018/EE/2016-17INFRARenovation of Prikrma marg at Mansiganga Govrdhan Mathura 0.00 99.08 03/05/201609/06/2016 09/06/201608/09/201609/06/2016 09/06/2016Garg Resurfacing Const. SANTOSH KUMAR JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
922 01/EE/CD-16/GZB/2018-19PARISHAD PROJECT FUNDConstruction of Boundary wall in Mela Ground Sector-7, Vasundhara, Ghaziabad 0.00 29.68 12/02/201811/04/2018 11/04/201810/07/201811/04/2018 11/04/2018V K Builder 9958725398LOKESH KUMAR JE ASHOK KUMAR AGARWAL,S.K. VERMA AE LALIT MOHAN PANDEY,MOHD ALI SAFDAR XECircle 7Completed
923 019/EE/2016-17INFRARenovation of road, drain and culvert at near shreeji baba school road Govardhan road Mathura 0.00 60.43 03/05/201609/06/2016 09/06/201608/09/201609/06/2016 09/06/2016N.S. Const. 9897041950SANTOSH KUMAR JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
924 04/EE/CD-16GZB/2018-19PARISHAD PROJECT FUNDProviding and Fixing Play Station & Other Item in Kids Zone in Ganga, Yamuna and Hindon Apartment at Sector-7, Siddharth Vihar, Ghaziabad 0.00 39.30 03/08/201804/12/2018 04/12/201803/03/201904/12/2018 04/12/2018Kalia Recreation 9899612126LOKESH KUMAR JE ASHOK KUMAR AGARWAL AE LALIT MOHAN PANDEY XECircle 7Completed
925 020/EE/2016-17INFRARenovation of road drain near gyandeep school karshni complax govardhan road, Mathura 0.00 52.45 03/05/201609/06/2016 09/06/201608/09/201609/06/2016 09/06/2016ARUN KUMAR AGARWAL & CO. 9759027944MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
926 01/EE/CD-16GZB/2017-18PARISHAD PROJECT FUNDLaying of Distrubution water Supply line of Sector-7 and Sector 8 and Internal Water Supply line in Bhramputra Enclave Sector-10 Siddharth Vihar, Ghaziabad 0.00 37.10 27/05/201707/07/2017 07/07/201706/09/201707/07/2017 07/07/2017S.P. Singh 9455923183RADHEY SHYAM CD-10 JE S.K. VERMA AE LALIT MOHAN PANDEY,MOHD ALI SAFDAR XECircle 7Completed
927 021/EE/2016-17INFRARenovation of road, dran at Govind Nagar Sec-A V.I.P. Gate Janmbhomi Mathura 0.00 55.11 03/05/201609/06/2016 09/06/201608/09/201609/06/2016 09/06/2016UJJAWAL INFRATECH PVT. LTD. 9412277775MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
928 022/EE/2016-17INFRARenovation of road, dran at Dawanal kund vrandavan Mathura 0.00 59.90 03/05/201609/06/2016 09/06/201608/09/201609/06/2016 09/06/2016AGARWAL COMPANY MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
929 024/EE/2016-17INFRARenovation of Parikrma marg jatipura govardhan Mathura 0.00 99.20 04/09/201522/06/2016 22/06/201621/09/201622/06/2016 22/06/2016Kamlesh Kumar SANTOSH KUMAR JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
930 01/EE/CD-12/2015-16PARISHAD PROJECT FUNDWMM and Mixseal Surfacing work of Internal Roads at Sect-14(part), Vrindavan Yojna, Lucknow. 0.00 53.50 26/02/201530/04/2015 29/08/201530/04/2015 Shiv Shakti Construction and Traders Circle VrindavanCompleted
931 01/EE.CD-4/2017-18PARISHAD PROJECT FUNDInstallation & Signage Board In Bahraich Bhinga Marg Bhoomi Vikas Evam Grihsthan Yojna Bahraich. 0.00 19.74 14/08/2017 14/08/201713/10/2017 14/08/2017Raunak Interprises CHANDAN KUMAR JE RAM RAMAPATI TIWARI AE PRASHANT VARDHAN XECircle 3Completed
932 13/EE/CD-2/19-20PARISHAD PROJECT FUNDConstruction of new 18.00 m wide bituminous road in Sec-15 VVY-04 Lucknow. 0.00 35.46 04/10/201916/11/2019 16/11/201915/12/201916/11/2019 16/11/2019SHIVANSH CONSTRUCTION ADIL BEG JE SUNIL KUMAR SINGH AE RAMAYAN SHARAN XECircle 3Completed
933 10/EE/CD-25/2016-17AWASTHAPNA FUNDstrengthing work of road and drain from himgiri tiraha to dr sarfraz ahmed station road harthala mbd 0.00 62.00 21/11/201602/01/2017 02/01/201701/04/201702/01/2017 02/01/2017M/s M A Developers & Engineering 999772222K K ACHARYA,RAHUL KUMAR JE PRASHANT VARDHAN AE A K MITTAL XECircle 5Completed
934 20/EE/2016-17Dt22.03.2017AWASTHAPNA FUNDupgrading of road from charkhammba to wine godowon shahjahanpur. 0.00 26.89 04/01/201722/03/2017 22/03/201721/05/201722/03/2017 22/03/2017M/S KAVERI ENTERPRISES 9412293360 Circle 5Completed
935 21/EE/2016-17Dt22.03.2017AWASTHAPNA FUNDUpgrading of road sujat kahn puliya to nighohi road via Hafiz Mazar Hathithan Shahjahanpur 0.00 15.51 04/01/201722/03/2017 22/03/201721/05/201722/03/2017 22/03/2017Mahaveer Singh & Comp. 9536490321 Circle 5Completed
936 14/EE/CD-25/2016-17AWASTHAPNA FUNDSupply & installation of retro refflective signboard at different place in mbd 0.00 4.56 14/12/201602/01/2017 02/01/201701/02/201702/01/2017 02/01/2017M/s Shri Vinayak Enterprises 9454472029SRI ARVIND KUMAR JE PRASHANT VARDHAN AE A K MITTAL XECircle 5Completed
937 22/EE/2016-17Dt22.03.2017AWASTHAPNA FUNDupgrading of road from gattu hotal to aya mahila inter college via paror house near nisat Takij Shahjahanpur 0.00 10.80 04/01/201722/03/2017 22/03/201721/05/201722/03/2017 22/03/20173D CREATION Circle 5Completed
938 13/EE/CD-25/2016-17AWASTHAPNA FUNDsupply and installation of retro reflective signboard at different place in mbd 0.00 7.37 14/12/201602/01/2017 02/01/201701/02/201702/01/2017 02/01/2017M/s Shri Vinayak Enterprises 9454472029SRI ARVIND KUMAR JE PRASHANT VARDHAN AE A K MITTAL XECircle 5Completed
939 23/EE/2016-17Dt22.03.2017AWASTHAPNA FUNDStrengthening of Road from ram prasad bismil park to ramcharan Dharamsala shahjahanpur. 0.00 16.80 04/01/201722/03/2017 22/03/201721/05/201722/03/2017 22/03/2017M/S KAILASH RAM 9651534882 Circle 5Completed
940 01/EE/CD-22/2020-21PARISHAD PROJECT FUNDplantation and maintenance in green belt in sector-10 mandola 0.00 70.50 15/01/202008/05/2020 07/11/202108/05/2020 M/S D.B.GARDEN TRADERS 9761410176U.S.CHAURASIYA JE RAM AVTAR MITTAL AE UMA NATH SHUKLA XECircle MantolaIn Progress
941 02/EE/CD-22/2019-20PARISHAD PROJECT FUNDlaying of internal waterline in sector 4A(plot portion) mandola 0.00 17.55 01/08/201927/09/2019 26/12/201927/09/2019 Laxman Buildcon U.S.CHAURASIYA JE RAM AVTAR MITTAL AE UMA NATH SHUKLA XECircle MantolaIn Progress
942 04/EE/CD-22/2015-16PARISHAD PROJECT FUNDplantation and maintenance in sector 4A & 5 ,green belt and roads in mandola vihar. 0.00 36.00 23/05/201531/07/2015 30/03/201631/07/2015 M/S D.B.GARDEN TRADERS 9761410176 JE NAVEEN KUMAR JAIN AE LALTA PRASAD XECircle MantolaCompleted
943 01/EE/CD29/19-20AWASTHAPNA FUNDLAYING OF INTERLOCKING TILES, C.C ROAD,DRAIN & CULVERT IN MAHARANI BAAG 'A' BLOCK AGRA NEAR & FRONT OF PLOT NO-79 TO 87, 87 TO SALONI COMPLEX,PLOT 75 TO76 0.00 96.63 04/06/201930/11/2019 30/11/201929/02/202030/11/2019 30/11/2019SHIVAM GROUPS 9837001873RAJIV KUMAR VERMA JE ASHOK KUMAR SHARMA AE CHANDRAMA RAM XECircle 6In Progress
944 05/EE/2019-20Dt13-11-2019AWASTHAPNA FUNDConstruction of road betwwen Pocket-A & Pocket of Lal Kothi of Yojna No-4 Civil Lines District-Bareilly. 0.00 6.60 07/09/201913/11/2019 13/11/201912/12/201913/11/2019 13/11/20193D CREATION Circle 5Completed
945 03/EE/2015-16Dt01.03.2016AWASTHAPNA FUNDUpgrading of road of vandana sweet house to kesar sweet house at rajendra nagar Bareilly 0.00 51.87 03/02/201601/03/2016 01/03/201623/04/201601/03/2016 01/03/2016Bhatia Construction Co. Circle 5Completed
946 04/EE/2015-16DT01-03-2016AWASTHAPNA FUNDUPGRADING OF ROAD FROM HEAD POST OFFICE VIA DANIK JAGARAN BEHIND BAREILLY CLUB TO CIRCUT HOUSE CHAOURAHA AT BAREILLY. 0.00 61.37 25/02/201601/03/2016 01/03/201630/04/201601/03/2016 01/03/2016NARENDRA DEV RAILWAYS Circle 5Completed
947 21/EE/2015-16Dt21-03-2016AWASTHAPNA FUNDInfra work in jaswantri devi yojna no 1 renovation work from jaswantri devi road to mazar 12 mtr wide road 0.00 28.56 19/03/201621/03/2016 21/03/201620/05/201621/03/2016 21/03/2016Moh Ashiq Circle 5Completed
948 15/EE/2015-16Dt01-03-2016AWASTHAPNA FUNDupgrading of road of police line civil lines bareilly 0.00 19.29 03/02/201601/03/2016 01/03/201630/04/201601/03/2016 01/03/2016Jal Akash Circle 5Completed
949 16/EE/2015-16Dt01-03-2016AWASTHAPNA FUNDupgrading of road from bhaseem traders mini bypass to hartman hospital ward No 43 at Bareilly 0.00 31.14 03/02/201601/03/2016 01/03/201630/04/201601/03/2016 01/03/2016Jal Akash Circle 5Completed
950 02/AE/CD-25/2019-20PARISHAD PROJECT FUNDMaintenance of work of internal trunk services at majhola yojna no-4 ph-2 mbd 0.00 0.84 06/03/202006/03/2020 06/03/202005/04/202006/03/2020 06/03/2020M/s Arif khan contractor 9760674305RAHUL KUMAR,SARVESH KUMAR VERMA JE RAJ KUMAR AE PAWAN KUMAR VERMA XECircle 5Completed
951 01/AE/CD-25/2019-20PARISHAD PROJECT FUNDProtection work for plant in park at majhol yojna no-4 ph-2 (vistar) sec-15 and 16 mbd 0.00 0.87 31/12/201931/12/2019 31/12/201930/01/202031/12/2019 31/12/2019M/s Arif khan contractor 9760674305RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XECircle 5Completed
952 01/AE/CD-25/2018-19PARISHAD PROJECT FUNDMaintenance and repair work of 02 No staff quarter at jigar vihar yojna mbd 0.00 0.68 22/02/2019 22/02/201908/03/201922/02/2019 22/02/2019M/s Arif khan contractor 9760674305SARVESH KUMAR VERMA JE RAJESH MISRA AE PAWAN KUMAR VERMA XECircle 5Completed
953 01/EE/CD-25/2018-19DEPOSIT WORK FUNDRepaiing and renevation work of ITI Building Rampur 0.00 32.18 31/08/201816/01/2019 16/01/201915/05/201916/01/2019 16/01/2019M/S KAILASH RAM 9651534882RAHUL KUMAR,RAJENDRA BAHADUR JE RAJESH MISRA AE PAWAN KUMAR VERMA XECircle 5Completed
954 03/EE/CD-25/2017-18PARISHAD PROJECT FUNDConst of central verge under HT line in majhola no-4 ph-2 vistar mbd 0.00 46.60 13/04/2017 27/05/201726/08/2017 27/05/2017M/s Arif khan contractor 9760674305RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XECircle 5In Progress
955 08/EE/CD-25/2017-18AWASTHAPNA FUNDElectrification work at community center at Village Mau mbd 0.00 11.00 13/04/201730/05/2017 30/05/201730/05/201730/05/2017 30/05/2017M/s Jain Power Construction 9412245572RAHUL KUMAR,RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XECircle 5In Progress
956 07/EE/CD-25/2017-18AWASTHAPNA FUNDconstruction of public toilet building in mbd 0.00 8.30 13/04/201730/05/2017 30/05/201729/08/201730/05/2017 30/05/2017M/s M M Associates 9997978111RAHUL KUMAR,RAJENDRA BAHADUR JE RAJESH MISRA AE PAWAN KUMAR VERMA XECircle 5Completed
957 02/EE/CD-25/2017-18AWASTHAPNA FUNDconstruction of public toilet block in mbd 0.00 9.70 13/04/201727/05/2017 26/08/201726/08/201727/05/2017 26/08/2017M/s Z M H Construction Co 9927701805RAHUL KUMAR,RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XECircle 5Not Started
958 13/EE/2015-16INFRARenovation and widening of road from Ahilyabai Park via Old Sales Tax Office upto Sant Paul School, Dampier Nagar Mathura. 0.00 89.00 04/09/201507/01/2016 07/01/201606/04/201607/01/2016 07/01/2016G.V. Const MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
959 23/EE/2015-16INFRARenovation and widening of road from Gov. Museum to Quality Tiraha at Dampier Nagar Mathura. 0.00 89.98 04/09/201529/03/2016 29/03/201628/06/201629/03/2016 29/03/2016R. N. Agarwal 9319062251MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
960 12/EE/CD-25/2016-17AWASTHAPNA FUNDsupply and installation of retro reflective signboard at different place in mbd 0.00 7.37 14/12/201602/01/2017 01/02/201702/01/2017 M/s Shri Vinayak Enterprises 9454472029SRI ARVIND KUMAR JE PRASHANT VARDHAN AE A K MITTAL XECircle 5Completed
961 02/EE/CD-25/2016-17AWASTHAPNA FUNDstrengthing work of road from mahila thana chauraha to deputy ganga chauraha mbd 0.00 62.00 20/05/201620/06/2016 20/06/201619/09/201620/06/2016 20/06/2016M/s M.A. Associates RAHUL KUMAR JE PRAKASH CHANDRA AE A K MITTAL XECircle 5Completed
962 05/EE/CD-25/2016-17PARISHAD PROJECT FUNDbarbed wire fencing work in green belt of majhola yojna no-4 ph-2 vistar mbd 0.00 12.00 21/06/201608/08/2016 08/08/201607/09/201608/08/2016 08/08/2016M/s Arif khan contractor 9760674305SRI ARVIND KUMAR JE PRASHANT VARDHAN AE A K MITTAL XECircle 5Completed
963 24/EE/2016-17Dt22.03.2017AWASTHAPNA FUNDRenovation of par at sector No 2 & 3 Yojna No 3 Shahajahanpur 0.00 37.84 04/01/201722/03/2017 22/03/201721/05/201722/03/2017 22/03/2017M/S KAILASH RAM 9651534882 Circle 5Completed
964 25/EE/2016-17Dt23.03.2017AWASTHAPNA FUNDstrengthning of 12 mtr wide road at scctor 4 along Mumukshu Ashram side at Yojana No 3 Shahjahanpur. 0.00 28.90 04/01/201722/03/2017 22/03/201722/05/201722/03/2017 22/03/2017Ramsewak Hargovind Sahay Circle 5Completed
965 01/EE/CD-25/2017-18AWASTHAPNA FUNDconstruction of public toilet in mbd 0.00 4.50 13/04/201727/05/2017 27/05/201726/08/201727/05/2017 27/05/2017M/s Z M H Construction Co 9927701805RAHUL KUMAR,RAJENDRA BAHADUR JE RAJESH MISRA AE PAWAN KUMAR VERMA XECircle 5Completed
966 22/EE/2015-16Dt21.03.2016AWASTHAPNA FUNDDevider and Led Light work from Syamatganj Chauraha to Satelite Chaouraha 0.00 66.11 19/03/201621/03/2016 21/03/201620/03/201621/03/2016 21/03/2016MS Saraswati Electrical Circle 5Completed
967 01/SE(M)/2020-21PARISHAD PROJECT FUNDlaying of sewer line in sector-2 mandola vihar 0.00 130.00 15/01/202005/05/2020 04/11/202005/05/2020 RAMAXE CONSTRUCTION 9811554477KAMAL SINGH JE HARI SHANKAR TIWARI AE UMA NATH SHUKLA XECircle MantolaIn Progress
968 19/EE/2016-17Dt22-03-2017AWASTHAPNA FUNDSupply and fixing of bolard garden / pathway light at shaheed udhyan shahjahanpur 0.00 6.88 04/01/201722/03/2017 22/03/201721/05/201722/03/2017 22/03/2017Naveen Kumar Circle 5Completed
969 4/SE-4/2016-17dt-17-12-2016AWASTHAPNA FUNDrepair & renovation of Kounch road to jaaun bypass orai distt-jaloun 0.00 226.00 08/08/201617/12/2016 17/12/201623/03/201717/12/2016 17/12/2016SUSHIL SINGHAL 9412255916ROHAN RAJPUT JE G S DWIVEDI AE SRI H.S. SHARMA XECircle 6Completed
970 25/EE/2015-16Dt28-03-2016AWASTHAPNA FUNDRenovation work of park in jaswantri devi yojna Pilibhit 0.00 20.11 19/03/201628/03/2016 28/03/201627/05/201628/03/2016 28/03/2016Hindustan Construction Circle 5Completed
971 36/EE/2016-17INFRAStrengthening of road and drain at Avatar Nagar Aligarh 0.00 12.73 19/09/201614/12/2016 14/12/201613/03/201714/12/2016 14/12/2016J.J. Const. 9760428303MOOL CHANDRA JE SASMIT KATIYAR AE XECircle 6Completed
972 33//EE/2016-17INFRAStrengthening of road at Gandhi Eye Hospital, Aligarh 0.00 22.07 19/09/201614/12/2016 14/12/201613/03/201714/12/2016 14/12/2016Mascot Traders 7500329456MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE XECircle 6Completed
973 04/EE/CD-25/2017-18PARISHAD PROJECT FUNDGeneral earth work in majhola yojna no-4 ph-2 vistar mbd 0.00 60.00 13/04/201727/05/2017 27/05/201726/08/201727/05/2017 27/05/2017M/s M.A. Associates RAJNEESH VERMA,SARVESH KUMAR VERMA JE RAJESH MISRA AE PAWAN KUMAR VERMA XECircle 5Completed
974 5/SE(V)/CD-11/STATE FUNDConstruction of 96/144 G+3 EWS Flats of PMAY 0.00 390.70 25/06/201918/06/2020 18/06/202017/12/202118/06/2020 18/06/2020Rituraj Traders 9415180245 Circle VrindavanIn Progress
975 12/EE/2015-16INFRARenovation and widening of mathura-deeg road in front Daanghati Mandir Goverdhan Parikrama Marg, Mathura. 0.00 99.72 04/09/201521/12/2015 21/12/201520/03/201621/12/2015 21/12/2015Govind Singh SANTOSH KUMAR JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
976 34/EE/2016-17INFRAStrengthening of road and drain at Ramghat Road A.D. office Deendyal hospital Aligarh 0.00 39.57 15/10/201614/12/2016 14/12/201613/03/201714/12/2016 14/12/2016Mascot Traders 7500329456MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE XECircle 6Completed
977 26/EE/2015-16Dt28-03-2016AWASTHAPNA FUNDConstruction of Station road from staion to kumar furniture shop at Pilibhit. 0.00 62.74 19/03/201628/03/2016 28/04/201627/05/201628/03/2016 28/04/2016Bhatia Construction Co. Circle 5Completed
978 19/EE/2015-16INFRARenovation and widening of Parikrama Marg in front of Sankarshan Kund Anyor Goverdhan, Mathura. 0.00 99.04 04/09/201518/01/2016 18/01/201617/04/201618/01/2016 18/01/2016M/s Vishnu Dutt Garg 9927082915SANTOSH KUMAR JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
979 35/EE/2016-17INFRAStrengthening of road and drain at Vinay Nagar Coloney Aligarh 0.00 25.17 19/09/201614/12/2016 14/12/201613/03/201714/12/2016 14/12/2016ANULATA CONSTRUCTION COMP. 9568001575MOOL CHANDRA JE SASMIT KATIYAR AE XECircle 6Completed
980 20/EE/2015-16INFRARenovation of Parikrama Marg from Starting of Chhoti Parikrama to Town area Office crossing at Goverdhan, Mathura. 0.00 99.69 04/09/201503/02/2016 03/02/201602/05/201603/02/2016 03/02/2016Bheekam singh SANTOSH KUMAR JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
981 27/EE/2015-16Dt28.03.2016AWASTHAPNA FUNDDevelopment of parking Area of Punjabi Market Bareilly 0.00 24.87 19/03/201628/03/2016 28/03/201627/05/201628/03/2016 28/03/2016Bankey Bihari Builder and Developers 9891225500 Circle 5Completed
982 09/EE/15-16INFRARenovation and widening of Gosala to Radha Kund Parikrama Marg, Goverdhan Mathura. 0.00 99.38 04/09/201524/11/2015 24/11/201523/02/201624/11/2015 24/11/2015Garg Resurfacing Const. SANTOSH KUMAR JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
983 18/EE/2015-16INFRARenovation and widening of Starting & end of Badi Parikrama & Chhoti Parikrama to Barsana Tiraha, Goverdhan Mathura. 0.00 99.99 04/09/201518/01/2016 18/01/201617/04/201618/01/2016 18/01/2016M/s Vishnu Dutt Garg 9927082915SANTOSH KUMAR JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
984 16/EE/2015-16INFRARenovation and widening of Chhoti Parikrama Marg at Bhakto ka Baithaka Goverdhan Mathura. 0.00 91.27 04/09/201518/01/2016 18/01/201617/04/201618/01/2016 18/01/2016M/s Vishnu Dutt Garg 9927082915MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
985 07/EE/CD-12/2016-17PARISHAD PROJECT FUNDLaying of Internal Trunk Sewer at GGY-1, Munnu Khera, Lucknow 0.00 93.02 13/06/201605/09/2016 05/09/201604/01/201705/09/2016 05/09/2016SARVESH RAI 8707238089 JE ER. PANKAJ VERMA AE GYANESHWAR PRASHAD XECircle VrindavanCompleted
986 11/EE/2015-16INFRARenovation and widening in front of Vipin Nursing Home upto Govind Nagar Railway crossing via Telephone Exchange Sankar Vihar, Mathura. 0.00 84.36 04/09/201508/12/2015 08/12/201507/03/201608/12/2015 08/12/2015AGARWAL COMPANY MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
987 12/EE/17-18INFRAConstruction of Inter Locking Road, Drains & Culvert from Begraj Singh house to Helipad Boundarywall, Mathura. 0.00 69.27 02/08/2017 24/08/201723/11/201702/08/2017 24/08/2017UJJAWAL INFRATECH PVT. LTD. 9412277775SANTOSH KUMAR JE G S DWIVEDI AE MUKESH YADAV XECircle 6Completed
988 17/EE/2015-16INFRARenovation and widening of road from railway crossing to Champa Agrawal Vidhya Mandir, Dampier Nagar Mathura. 0.00 90.72 04/09/201518/01/2016 18/01/201617/04/201618/01/2016 18/01/2016M/s Vishnu Dutt Garg 9927082915MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
989 15/EE/2015-16INFRARenovation of road at Triveni Complex Goverdhan road Mathura. 0.00 89.57 04/09/201518/01/2016 18/01/201617/04/201618/01/2016 18/01/2016R. N. Agarwal 9319062251MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
990 09/EE/CD-25/2016-17AWASTHAPNA FUNDstrengthing work of damage road and drain from abdulla tiraha to tehsil in himgiri colony at mbd city 0.00 36.00 21/11/201602/01/2017 02/01/201701/04/201702/01/2017 02/01/2017M/s M.A. Associates K K ACHARYA,RAHUL KUMAR JE PRASHANT VARDHAN AE A K MITTAL XECircle 5Completed
991 01/EE/CD-25/2016-17AWASTHAPNA FUNDstrengthing work of road from chakkar ki milak to pandit shankar dutt sharma marg in mbd 0.00 38.00 20/05/201620/06/2016 20/06/201619/09/201620/06/2016 20/06/2016M/s Aparna Infrastructure 9837019057K K ACHARYA JE P KVARSHNEY AE A K MITTAL XECircle 5Completed
992 03/EE/2016-17DT.02-05-2016AWASTHAPNA FUNDEXPENSION AND RENOVATION WORK OG GANDHI AUDITORIUM PILIBHIT 0.00 60.25 01/03/201602/05/2016 02/05/201601/11/201602/05/2016 02/05/2016M/S B. D. GAURAV ENTERPRISES 9457336633 Circle 5Completed
993 04/EE/2016-17DT.13-05-20168835.23CONSTRUCTION OF BY INTERLOCKING TILES NEAR NAGAR MAGISTRATE OFFICE OLD BAREILLY 0.00 9.12 01/03/201613/05/2016 13/05/201612/07/201613/05/2016 13/05/2016M/S KAILASH RAM 9651534882 Circle 5Completed
994 01/SEVR/CD11/2017-18PARISHAD PROJECT FUNDSupply and Laying Of Trunk Sewer Line for Sector-17, 18 and 20 (Part) and Construction of Village Road at Vrindavan Yojna-4 Lucknow 0.00 117.48 22/04/201702/06/2017 02/06/201701/10/201702/06/2017 02/06/2017M/S Gungun Trading Co. RAKESH KUMAR SAXENA JE HARISHANKAR SINGH AE ANIL KUMAR MISHRA XECircle VrindavanCompleted
995 06/EE/2016-17DT.09-06-2016AWASTHAPNA FUNDINSTTALATION OF SOLAR LIGHT IN GANDHI UDHYAN BAREILLY 0.00 11.88 01/03/201609/06/2016 09/06/201608/08/201609/06/2016 09/06/2016M/S GREENAGE Circle 5Completed
996 29/EE/2016-17Dt23.03.2017AWASTHAPNA FUNDUpgrading of road from sheesham wali mazar via lddgah road kakrala shahjahanpur 0.00 29.33 04/01/201723/03/2017 23/03/201722/05/201723/03/2017 23/03/2017MS Raja Construction Circle 5Completed
997 24/EE/2015-16DT28-03-2016AWASTHAPNA FUNDREAPAIR & WIDENING OF ROAD FRON JAWANTRI DEVI ROAD TO TANAKPUR ROAD PILIBHIT 0.00 18.76 01/01/201628/03/2016 28/03/201627/05/201628/03/2016 28/03/2016R.C.BUILDERS 09750002346 Circle 5Completed
998 14/EE/2015-16INFRARenovation and widening road in Krishna Nagar Uppal Nursing Home to Dr. Rakesh Garg House at Mathura. 0.00 66.90 04/09/201512/01/2016 12/01/201611/04/201612/01/2016 12/01/2016SUSHIL SINGHAL 9412255916MAHAVIR SINGH JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
999 22/EE/2015-16INFRARenovation and widening road at Highway Colony Navada Mathura. 0.00 55.97 04/09/201529/03/2016 29/03/201628/06/201629/03/2016 29/03/2016Siddarth Associates 9457000613SANTOSH KUMAR JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
1000 10/EE/2016-17DT.21-10-2016AWASTHAPNA FUNDCONSTRUCTION OF BOUNDARY WALL GATE AND DRAIN IN A.D.M COMPOUND BAREILLY 0.00 29.39 22/08/201621/10/2016 21/10/201620/12/201621/10/2016 21/10/2016SHRI DHIRENDRA PRATAP SINGH Circle 5Completed
1001 03/EE/CD11/2017-18PARISHAD PROJECT FUNDConst. of Box type Culvert at 45.00 m Wide Road on Gosaiganj Minor, Vrindavan Yojna, Lucknow. 0.00 49.08 31/05/201718/10/2017 18/10/201817/12/201718/10/2017 18/10/2018MISHRA CONSTRUCTIONS 9450463847ARUN KUMAR RAI JE HARISHANKAR SINGH AE ANIL KUMAR MISHRA XECircle VrindavanCompleted
1002 12/EE/2016-17DT.21-10-2016AWASTHAPNA FUNDUPDGRATION OG CHATRI CHAURAHA ,NAGWA CHAURAHA, ASSAM CHAURAHA PILIBHIT 0.00 8.74 20/02/201621/10/2016 21/10/201620/12/201621/10/2016 21/10/2016M/S KAILASH RAM 9651534882 Circle 5Completed
1003 13/EE/2016-17DT.21-10-2016AWASTHAPNA FUNDCONSTRUCTION OF MAIN ROAD CHOTI VIHAR WARD NO.7 PILIBHIT BYE PASS BAREILLY 0.00 38.52 20/08/201621/10/2016 21/10/201620/12/201621/10/2016 21/10/2016M/S Arora R.C.C. Works 9837391824 Circle 5Completed
1004 01/SEVR/CD11/2016-17PARISHAD PROJECT FUNDUpgradation/Widening of Existing 30.00 Wide Road to 45.00 M Wide Road Between Sector-14 and Sector-15, Vrindavan Yojna, Lucknow. 0.00 397.00 28/03/201602/06/2016 02/06/201601/09/201602/06/2016 02/06/2016RAM SINGH AGARWAL ARUN KUMAR RAI JE AKHILESHWAR SINGH AE U.C. SINGH XECircle VrindavanCompleted
1005 02/EE/2016-17Dt28.04.2016AWASTHAPNA FUNDupgrading of 9 mtr wide road at sector 1 &5 at yojana no 3 Shahjahanpur 0.00 79.69 29/03/201628/04/2016 28/04/201627/06/201628/04/2016 28/04/2016Brij Construction Circle 5Completed
1006 26/EE/2016-17Dt23.03.2017AWASTHAPNA FUNDStrengthening of 9 mtr wide road at sector 4 along River side at Yojnana No 4 Shahjahanpur. 0.00 17.22 04/01/201723/03/2017 23/03/201722/05/201723/03/2017 23/03/2017RAMSEVAK HARGOVIND SAHAI 9415149653 Circle 5Completed
1007 27/EE/2016-17Dt23.03.2017AWASTHAPNA FUNDStrenghtening of 9 mtr road at sector 3 at Yojna no 3 Shahjahanpur. 0.00 27.51 04/01/201723/03/2017 23/03/201722/05/201723/03/2017 23/03/2017Ramsewak Hargovind Sahay Circle 5Completed
1008 06/EE/CD-25/2016-17PARISHAD PROJECT FUNDMaintenance of internal roads of sec-7b 7c 6a and 9b at majhola yojna no-4 ph-2 mbd 0.00 71.39 22/08/201603/11/2016 03/11/201602/02/201703/11/2016 03/11/2016M/s M.A. Associates K K ACHARYA,SRI ARVIND KUMAR JE PRASHANT VARDHAN AE A K MITTAL XECircle 5Completed
1009 07/EE/CD-25/2016-17AWASTHAPNA FUNDconst of two nos round about at differnt place mbd city 0.00 5.00 21/11/201624/12/2016 24/12/201723/01/201724/12/2016 24/12/2017M/s Z M H Construction Co 9927701805K K ACHARYA JE PRASHANT VARDHAN AE A K MITTAL XECircle 5Completed
1010 28/EE/2016-17Dt23.03.2017AWASTHAPNA FUNDStrengthening of internal road of sector 4 (Bitumnious work)at yojana No 3 Shahjahanpur 0.00 37.36 04/01/201723/03/2017 23/03/201722/05/201723/03/2017 23/03/2017Ramsewak Hargovind Sahay Circle 5Completed
1011 14/EE/CD-12/2017-18PARISHAD PROJECT FUNDConstruction of Park and Parking at Gokul Gram Yojna-1, Munnu Khera, Lucknow. 0.00 92.80 28/04/201703/08/2017 03/08/201702/12/201703/08/2017 03/08/2017CLAYSON INFRATECH PVT.LTD. D.C. RAI JE ER. PANKAJ VERMA AE S.C. TRIPATHI XECircle VrindavanCompleted
1012 03/EE/CD-25/2016-17AWASTHAPNA FUNDsupply and fixing in retro refflective signboard at different place in mbd 0.00 16.00 20/05/201602/07/2016 02/07/201601/10/201602/07/2016 02/07/2016M/s Abheesht Industries 9415313467SRI ARVIND KUMAR JE PRASHANT VARDHAN AE A K MITTAL XECircle 5Completed
1013 08/EE/CD-25/2016-17AWASTHAPNA FUNDstrengthing work of remaining road over bridge near hanuman murti tiraha mbd city 0.00 22.30 21/11/201602/01/2017 02/01/201701/04/201702/01/2017 02/01/2017M/S Arora R.C.C. Works 9837391824K K ACHARYA,SRI ARVIND KUMAR JE PRASHANT VARDHAN AE A K MITTAL XECircle 5Completed
1014 03/EE/CD-12/2017-18PARISHAD PROJECT FUNDConstruction of 12.00 wide road in Gokul Gram Yojna No.-1, Munnu Khera, Lucknow. 0.00 74.95 19/12/201601/04/2017 01/04/201730/09/201701/04/2017 01/04/2017M/S Apex Construction Company 9839098580HIMANSHU SINGH JE A.K.SINHA AE S.C. TRIPATHI XECircle VrindavanCompleted
1015 16/EE/CD-12/2016-17PARISHAD PROJECT FUNDConstruction of Drain and Culverts at Gokul Gram Yojna-1, Munnu Khera, Lucknow. 0.00 96.36 15/10/201613/12/2016 13/12/201612/04/201713/12/2016 13/12/2016SARVESH RAI 8707238089VIJAY SINGH JE O.P. PANDEY AE GYANESHWAR PRASHAD XECircle VrindavanCompleted
1016 30/EE/2016-17Dt23.03.2017AWASTHAPNA FUNDConstruction of road on tilak makrdet to brinda sweet house via shaheed udhyan at shahjahanpur 0.00 39.51 04/01/201723/03/2017 23/03/201722/05/201723/03/2017 23/03/2017Hindutan Steel Circle 5Completed
1017 03/EE/CD-12/2016-17PARISHAD PROJECT FUNDConstruction of Road at Gokul Gram Yojna-1, Munnu Khera, Lucknow. 0.00 88.00 02/03/201626/05/2016 26/05/201625/02/201726/05/2016 26/05/2016CLAYSON INFRATECH PVT.LTD. KRISHNANAND JE A.K.SINHA AE SHASHANK PANDEY XECircle VrindavanCompleted
1018 09/SEVR/CD11/2017-18PARISHAD PROJECT FUNDConst./Widening of 24.00 m Wde Road at Sector-17, Vrindavan Yojna-4, Lucknow 0.00 280.70 12/07/201701/11/2017 01/11/201728/02/201801/11/2017 01/11/2017M/S Ram Singh Agarwal 7348688888AKBAR ALI JE HARISHANKAR SINGH,RAJIV SRIVASTAVA AE ANIL KUMAR MISHRA XECircle VrindavanCompleted
1019 18/EE/2015-16/CD-28PARISHAD PROJECT FUNDCONSTRUCTION OF BOUNDRY WALLS & OTHER REMAING WORK AT OFFICE COMPLEX, SEC-13 SIKANDRA YOJNA, AGRA 0.00 107.70 20/01/201621/03/2016 21/03/201620/07/201621/03/2016 21/03/2016ARUN KUMAR AGARWAL & CO. 9759027944DEENA NATH JE P. S. GUPTA AE NAGESH CHANDRA XECircle 6Completed
1020 07/EE2016-17DT.06-09-2016AWASTHAPNA FUNDSUPPLY AND FIXING OF SIGNAGE BOARD AT YOJNA NO.1,2,3&4 AT BAREILLY 0.00 24.56 02/04/201606/09/2016 06/09/201605/11/201606/09/2016 06/09/2016Jal Akash Circle 5Completed
1021 09/EE/2016-17DT.21-10-2016AWASTHAPNA FUNDCONSTRUCTION OF ROAD BETWEEN KARAMCHARI NAGAR AND OFFICERS ENCLAVE COLONY MINI BYE PASS BAREILLY 0.00 22.86 20/08/201621/10/2016 21/10/201620/12/201621/10/2016 21/10/2016M/S RAJEEV TRADERS Circle 5Completed
1022 01EE/2016-17Dt06.04.2016AWASTHAPNA FUNDupgrading of Trunk 18 mtr wide at yojna no 3 Shahjahanpur 0.00 54.90 06/02/201606/04/2016 06/04/201605/06/201606/04/2016 06/04/2016Brij Construction Circle 5Completed
1023 14/EE/2016-17DT17-11-2016AWASTHAPNA FUNDUPGRADING OF HOTMIX ROAD IN HYDEL COLONY RAMPUR GARDEN BAREILLY 0.00 25.04 20/08/201617/11/2016 17/11/201616/01/201717/11/2016 17/11/2016Jal Akash Circle 5Completed
1024 03/EE/CD-12/2018-19PARISHAD PROJECT FUNDMaintenance of 7.50 & 6.00 Mt. wide Road at Gokul Gram Yojna-2, Bibi Khera, Lucknow. 0.00 59.86 27/11/201820/02/2019 20/02/201919/05/201920/02/2019 20/02/2019SAILANI HIMANSHU SINGH JE A.K.SINHA AE SRI H.S. SHARMA XECircle VrindavanCompleted
1025 19/EE/2015-16Dt21.03.2016AWASTHAPNA FUNDStrenthning of 9 mtr wide road at sector 1 & 5 Yojna no 3 Shahjahanpur 0.00 62.44 11/03/201621/03/2016 21/03/201620/05/201621/03/2016 21/03/2016Ramsewak Hargovind Sahay Circle 5Completed
1026 15/EE/2016-17DT17-11-2016AWASTHAPNA FUNDCONSTRUCTION OF MAIN ROAD FROM SANJAY NAGAR BYE PASS BEHIND MEGA CITY TOWARDS DURGA NAGAR WARD NO. 11 BAREILLY 0.00 81.27 22/08/201617/11/2016 17/11/201616/01/201717/11/2016 17/11/2016M/S AGARWAL CONTRACTORS Circle 5Completed
1027 02/SEVR/CD11/2016-17PARISHAD PROJECT FUNDConst. of 12.00 Wide Service Road(Bituminous Work) along Shaheed path from Rae Bareilly Road to Canal at Vrindavan Yojna, Lucknow. 0.00 125.00 09/03/201615/07/2016 15/07/201614/11/201615/07/2016 15/07/2016RAM SINGH AGARWAL AKBAR ALI JE AKHILESHWAR SINGH AE U.C. SINGH XECircle VrindavanCompleted
1028 23/EE2015-16Dt28.03.2016AWASTHAPNA FUNDStrengthening of 12 mtr and 15 mtr wide road at sector 3 yojna no 3 Shahjahanpur 0.00 67.76 11/03/201628/03/2016 28/03/201627/05/201628/03/2016 28/03/2016Brij Construction Circle 5Completed
1029 20/EE/2015-16Dt21.03.2016AWASTHAPNA FUNDStrenthning of 24 mtr wide road at yojna no 3 Shahjahanpur 0.00 76.26 11/03/201621/03/2016 21/03/201620/05/201621/03/2016 21/03/2016Ramsewak Hargovind Sahay Circle 5Completed
1030 16/EE/2016-17DT.18-11-2016AWASTHAPNA FUNDCONSTRUCTION OF ROAD FROM PILIBHIT BYE PASS VIA PARVANA NAGER TO BARI VIHAR WARD NO.7 BAREILLY 0.00 61.96 17/10/201618/11/2016 18/11/201617/01/201718/11/2016 18/11/2016M/S AZMAL HASSAN Circle 5Completed
1031 01/E.E/C.D-5/2019-20PARISHAD PROJECT FUNDLaying of 80 mm thick Interlocking Tiles on Parties of External Road, Demarcation of Plots and Water Connection in Sector-5 at Jagriti vihar (extension) Yojna No. 11 , Meerut 0.00 74.00 13/12/201915/02/2020 15/02/202014/05/202015/02/2020 15/02/2020M/s S.K. Singh 9837488572ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XECircle 2Completed
1032 12/EE/2015-16/CD-28AWASTHAPNA FUNDConstruction of Drains & Laying of Interlocking Tiles Flooring in Laxmi Vihar Phase-II, Deori Road, Agra 0.00 74.28 14/07/201514/01/2016 14/01/201613/04/201614/01/2016 14/01/2016VISHNU DUTT GARG 9927082915YOGENDRA KUMAR GUPTA JE PRAMOD GOEL AE NAGESH CHANDRA XECircle 6Completed
1033 01/SE(V)/CD-12/2020-2021CENTRAL AND STATE FUNDConstruction of 144/176 Nos. G+3 EWS (PMAY) Houses (Group-C) in Village Miranpur Pinvat, Sarojini, Nagar, Lucknow. 0.00 716.65 04/02/201918/05/2020 18/05/202017/11/202118/05/2020 18/05/2020M/S Aditya Engineers & Builders 9415149007 Circle VrindavanNot Started
1034 07/EE/2015-16/CD-28AWASTHAPNA FUNDStrengthening of Internal Roads In Sec.-13, Sikandra Yojna, Agra 0.00 97.95 03/07/201517/12/2015 17/12/201516/03/201617/12/2015 17/12/2015B. S. CONSTRUCTIONS 8477941111G. P. TIWARI JE P. S. GUPTA AE NAGESH CHANDRA XECircle 6Completed
1035 01/EE/CD-8/2020-21PARISHAD PROJECT FUNDDevelopment works (Internal Water Supply System, Internal Sewerage System & Internal Drainage System) in Pocket of Sector-3 (Part), Jagriti Vihar (Ext.), Scheme-11, Meerut. 0.00 28.17 06/02/202002/05/2020 02/05/202001/08/202002/05/2020 02/05/2020M/s Ramaxe Construction Co 9811554477SH. SANDEEP KUMAR JE SAURAV KUMAR AE AFTAB AHMAD XECircle 2In Progress
1036 11/EE/2016-17DT.20-12-2016AWASTHAPNA FUNDUPGRADING OF CONFERENCE HALL COMMISIONER OFFICE BAREILLY 0.00 21.76 23/09/201620/12/2016 20/12/201619/02/201620/12/2016 20/12/20163D CREATION Circle 5Completed
1037 02/EE/CD-35/2019-20AWASTHAPNA FUNDConst. of Gali & Nali at Naya Vihar in front of inliten public school from shri narendra yadav house to shri indersen singh tomer house, prayagraj 0.00 12.24 11/07/201917/10/2019 17/10/201916/01/202017/10/2019 17/10/2019Dharvi Associates 9140324815HAWALDAR RAM JE KAMALESHWAR NATH MISHRA AE ABHISHEK NATH TIWARI XECircle 1Completed
1038 05/EE/CD-25/2017-18AWASTHAPNA FUNDConstruction of public toilet in infrastructure fund in mbd (old tehsil) 0.00 9.50 13/04/201727/05/2017 27/05/201726/08/201727/05/2017 27/05/2017M/s Raj Construction Co RAHUL KUMAR,RAJENDRA BAHADUR JE RAJ KUMAR AE PAWAN KUMAR VERMA XECircle 5Completed
1039 10/EE/CD-12/2017-18PARISHAD PROJECT FUNDWater Connection work in 288 No. F-30 Type (G+3) Houses at Gokul Gram Yojna-2, Bibi Khera, Lucknow 0.00 0.00 12/09/2017 13/06/201712/09/201712/09/2017 13/06/2017Swami Construction A.K. SINHA JE O.P. PANDEY AE S.C. TRIPATHI XECircle VrindavanCompleted
1040 02/EE/CD11/2016-17PARISHAD PROJECT FUNDConst. of 02 Nos Parks at Sector-17, Vrindavan Yojna-4, Lucknow. 0.00 20.00 23/01/201618/05/2016 18/05/201617/07/201618/05/2016 18/05/2016Ansh Contruction 9450072493ARUN KUMAR RAI JE AKHILESHWAR SINGH AE ANIL KUMAR MISHRA XECircle VrindavanCompleted
1041 18/EE2015-16Dt21.03.2016AWASTHAPNA FUNDupgrading of road 9mtr in sector 5 and 2 at yojna no 3 shahjahanpur 0.00 72.35 11/03/201620/05/2016 21/05/201620/05/201620/05/2016 21/05/2016Ramsewak Hargovind Sahay Circle 5Completed
1042 18/EE/2016-17DT22-03-2017AWASTHAPNA FUNDINSTALLATION OF HIGHT BEARIGATING AND SINAGE BOARD IN YOJNA 3 SHAHJANPUR 0.00 17.16 04/01/201722/03/2017 22/03/201721/05/201722/03/2017 22/03/2017Ms UK industries Circle 5Completed
1043 03/EE/CD11/2016-17PARISHAD PROJECT FUNDLaying of Internal Sewer(Branch Line) at G+3 Houses Site, Vrindavan Yojna-4, Lucknow. 0.00 0.00 09/06/2016 09/06/201608/08/201609/06/2016 09/06/2016T Y TRADERS 9004537987RAJESH KUMAR VERMA JE AKHILESHWAR SINGH AE ANIL KUMAR MISHRA XECircle VrindavanCompleted
1044 04/E.E/C.D-5/2019-20PARISHAD PROJECT FUNDConstruction of Drain & Culvert Sector-5 Part at Scheme No.11 Jagriti Vihar (Ext.) Meerut. 0.00 24.46 13/12/201906/03/2020 06/03/202005/06/202006/03/2020 06/03/2020M/s Ramaxe Construction Co 9811554477ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XECircle 2In Progress
1045 35/EE/CD-12/2016-17PARISHAD PROJECT FUNDConstruction of Community Center at Village-Barauli Kharlilabad, Vrindavan Yojna-3, Sector-12, Lucknow. 0.00 98.25 15/10/201603/01/2017 03/01/201702/05/201703/01/2017 03/01/2017MAA GAYATRI ENTERPRISES KRISHNANAND JE ER. PANKAJ VERMA AE S.C. TRIPATHI XECircle VrindavanCompleted
1046 15/EE/2015-16/CD-28AWASTHAPNA FUNDStrengthening of Road from House of Sri. Ram Singh up to Near House of Banwari Lal Gautam Near Transformer in Ananad Nagar Phase-II Near Dhakari Mahal Gari Badauriya (Word No. 22) Agra 0.00 64.15 16/07/201518/01/2016 18/01/201617/04/201618/01/2016 18/01/2016Siddarth Associates 9457000613DEENA NATH JE PRAMOD GOEL AE NAGESH CHANDRA XECircle 6Completed
1047 03/E.E/C.D-5/2019-20PARISHAD PROJECT FUNDLaying & Jointing Internal Water Supply Line in Sector-5 (Part) at Scheme No-11, Jagriti Vihar (Extension), Meerut. 0.00 8.80 13/12/201929/02/2020 29/02/202028/05/202029/02/2020 29/02/2020M/s Manpal 9719316437ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XECircle 2In Progress
1048 12/S.E-2/C.D-5/2019-20PARISHAD PROJECT FUNDConstruction of 9.00 M & 12.00 M Wide Bituminous Road in Sector-5 at Scheme No-11, Jagriti Vihar (Extension), Meerut. 0.00 148.67 22/11/201913/03/2020 13/03/202012/07/202013/03/2020 13/03/2020M/s S.K. Singh 9837488572ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XECircle 2In Progress
1049 01/E.E/C.D-5/2020-21PARISHAD PROJECT FUNDConstruction of Switch Room Cum S.D.O. Office for 33/11 K.V.A. Sub-Station at Sector-5, in Jagriti Vihar (Extension) Scheme No-11, Meerut. 0.00 49.00 25/02/202015/05/2020 15/05/202014/11/202015/05/2020 15/05/2020A.S CONSRTUCTION 8273230008ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XECircle 2In Progress
1050 28/EE/2016-17DT.23-03-2017AWASTHAPNA FUNDSTRNGTHING OF INTERNAL ROAD OF SECTOR 4 YOJNA 3 SHAHJHANPUR 0.00 39.90 04/01/201723/03/2017 23/03/201722/05/201723/03/2017 23/03/2017M/S Ram Sewak Hargovind Sahai 9415149653 Circle 5Completed
1051 04/EE/CD11/2016-17PARISHAD PROJECT FUNDThird Party Quality Assurance, Goverdhan Enclave, Vrindavan Yojna-4, Lucknow. 0.00 0.00 25/07/2016 26/07/201624/01/201925/07/2016 26/07/2016SERTECH CONSULTANTS JE HARISHANKAR SINGH AE NAVJOT SINGH VERMA XECircle VrindavanIn Progress
1052 16/EE/2015-16/CD-28AWASTHAPNA FUNDSTRENGTHENING OF HOTMIX PLANT ROAD & DRAIN SUBASH NAGAR TO SUBASH NAGAR TURN (HALF DISTANCE) AT KAMLA NAGAR, AGRA 0.00 95.11 16/07/201527/01/2016 27/01/201626/04/201627/01/2016 27/01/2016R.N. Agarwal 9319052251BRIJKISHOR SINGH JE PRAMOD GOEL AE NAGESH CHANDRA XECircle 6Completed
1053 05/EE/2015-16/CD-28AWASTHAPNA FUNDSTRENGTHENING OF ROAD & DRAIN ZONE-2, TAJGANJ-38, LAXMI PALACE PT. RAJESH HOUSE TO SULEMAAN KHAN HOUSE TAJGANJ, AGRA 0.00 57.45 14/07/201510/12/2015 10/12/201509/02/201610/12/2015 10/12/2015M/S. SAKSHAM CONSTRUCTIONS 9837117096G. P. TIWARI JE P. S. GUPTA AE NAGESH CHANDRA XECircle 6Completed
1054 10/EE/2015-16/CD-28AWASTHAPNA FUNDSTRENGTHENING OF ROAD KAMLA NAGAR WARD NO-82 YAMUNAVIHA SH. RAMNARMADA SEWA SADAN TO VAISHNODHAM AMITA VIHAR, ST. ANDREWS ROAD, AGRA 0.00 64.55 16/07/201501/01/2016 01/01/201631/03/201601/01/2016 01/01/2016S.R.S. INFRATECH 9412258076DEENA NATH JE P. S. GUPTA AE NAGESH CHANDRA XECircle 6Completed
1055 02/EE/CD-27/2015-16EXTERNAL DEVELOPMENT FUNDConstruction of Boundary wall of (G+3) LIG Houses in Brahamputra Enclave at Sector-10, Siddharth Vihar Yojan. Ghziabad. (Group-B) 0.00 38.00 18/11/201511/02/2016 11/02/201610/05/201611/02/2016 11/02/2016Diamond Infrastructure NEERAJ KUMAR JE M.B. KAUSHIK AE N.H. FAZLI XECircle 7Completed
1056 05/EE/CD11/2016-17PARISHAD PROJECT FUNDLaying of Internal Water Supply(Branch Line) G+3 Houses at Sector-17, Vrindavan Yojna-4, Lucknow 0.00 22.00 21/03/201625/07/2016 25/07/201624/09/201625/07/2016 25/07/2016J.P.TRADERS RAJESH KUMAR VERMA JE AKHILESHWAR SINGH AE ANIL KUMAR MISHRA XECircle VrindavanCompleted
1057 47/EE/2016-17INFRAStrengthening of road and drain at Mamod Nagar Gali no-4 Aligarh 0.00 50.10 19/09/201620/12/2016 20/12/201619/03/201720/12/2016 20/12/2016N.S. Const. 9897041950MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE XECircle 6Completed
1058 48/EE/2016-17INFRAStrengthening of road and drain at Mamod Nagar Gali no-3 Aligarh 0.00 11.44 19/09/201620/12/2016 20/12/201619/03/201720/12/2016 20/12/2016N.S. Const. 9897041950MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE XECircle 6Completed
1059 49/EE/2016-17INFRAStrengthening of road and drain at Satynarayan house to pushplata house sidaunli Aligarh 0.00 18.81 19/09/201621/12/2016 21/12/201620/03/201721/12/2016 21/12/2016Lord Shiva Shiv Const. 8859503517MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE XECircle 6Completed
1060 12/EE/CD-3/2016-17INFRAConstruction of Cycle Track at Sec-8, Indira Nagar Yojna, Lucknow from Little Angel School to Ring Road 0.00 0.00 05/12/201604/03/2017 05/12/2016PRIYA ENTERPRISES Circle VrindavanCompleted
1061 13//EE/CD-3/2016-17INFRAइंदिरा नगर योजना लखनऊ के सेक्टर 18 में अस्मिता पार्क का अनुरक्षण एवं सौंदर्यीकरण 0.00 0.00 21/12/201620/03/2017 21/12/2016Dev Construction 9690017262 Circle VrindavanCompleted
1062 50/EE/2016-17INFRAConst. of Helipad in circuit house tinshade in commisioner office and renovation in M.S. hospital & badmentian court stediam Aligarh 0.00 27.20 15/10/201621/12/2016 21/12/201620/03/201721/12/2016 21/12/2016Mascot Traders 7500329456MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE XECircle 6Completed
1063 15/EECD-21/2017-18PARISHAD PROJECT FUNDDevelopment of Pond in Village Peer Nagar Amrapali Yojna Hardoi Road Lucknow 0.00 33.46 28/12/201629/06/2017 29/06/201728/09/201729/06/2017 29/06/2017RAJARAM TRADERS ANIL KUMAR JE PRAMOD KUMAR AE K.C.SRIVASATAVA XECircle VrindavanCompleted
1064 17/EE/2016-17DT.20-12-2016AWASTHAPNA FUNDUPGRADING OF CONFERENCE HALL AT COMMISSIONER OFFICE AT BAREILLY 0.00 21.76 23/09/201620/12/2016 20/12/201619/02/201720/12/2016 20/12/2016M/S COOLING SOLUTION Circle 5Completed
1065 01/EE/CD-6/2016-17INFRAStrengthning of road in Sector- 1, 2 & 3 (Part) at Mangal Pandey Nagar, Meerut. 0.00 64.17 15/03/201617/05/2016 17/05/201616/08/201617/05/2016 17/05/2016M/s Juneja Construction Pvt. Ltd. 9810787577NAVRATAN SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
1066 09/EE/CD11/2016-17PARISHAD PROJECT FUNDConst. of Internal Road at G+3 Houses at Sector-17, Vrindavan Yojna-4 Lucknow. 0.00 0.00 20/12/2016 20/12/201619/03/201720/12/2016 20/12/2016MAA VINDHYAVASINI ENTERPRISES 09950007102 JE AKHILESHWAR SINGH AE ANIL KUMAR MISHRA XECircle VrindavanCompleted
1067 10/EE/CD11/2016-17PARISHAD PROJECT FUNDConst. Of Internal Road at G+3 Houses at Sector-17, Vrindavan Yojna-4, Lucknow. 0.00 65.50 22/09/201603/01/2017 03/01/201702/04/201703/01/2017 03/01/2017RAM SINGH AGARWAL AKBAR ALI JE AKHILESHWAR SINGH AE ANIL KUMAR MISHRA XECircle VrindavanCompleted
1068 06/EE/2015-16/CD-28AWASTHAPNA FUNDSTRENGTHENING AND WIDENING OF ROAD FROM B.D. JAIN GIRLS INER COLLEGE TO MALL ROAD (PART LENGTH) AGRA 0.00 24.77 14/07/201511/12/2015 11/12/201510/02/201611/12/2015 11/12/2015GARG RESURFACING & CONSTRUCTIONS 9837037476BRIJKISHOR SINGH JE PRAMOD GOEL AE NAGESH CHANDRA XECircle 6Completed
1069 01/EE/CD-27/2015-16EXTERNAL DEVELOPMENT FUNDConstruction of Boundary wall of (G+3) LIG Houses in Brahamputra Enclave at Sector-10, Siddharth Vihar Yojan. Ghziabad. (Group-A) 0.00 30.00 18/11/201511/02/2016 11/02/201610/05/201611/02/2016 11/02/2016AS Infrasolution Pvt. Ltd NEERAJ KUMAR JE M.B. KAUSHIK AE N.H. FAZLI XECircle 7Completed
1070 37/EE/2016-17INFRAStrengthening of road and drain at Mathura road Panchi Nagari chauraha Y-9 Aligarh 0.00 41.09 19/09/201614/12/2016 14/12/201613/03/201714/12/2016 14/12/2016J.J. Const. 9760428303MOOL CHANDRA JE SASMIT KATIYAR AE XECircle 6Completed
1071 01/EE/CD-3/2015-16PARISHAD PROJECT FUNDCONSTRUCTION OF TRUNK DRAIN 18.00M. WIDE ROAD AT SULTANPUR ROAD, AWADH VIHAR YOJNA, LUCKNOW. 0.00 0.00 31/07/2015  31/07/2015GOPI CHAND RANGLINI 9956510351 Circle VrindavanCompleted
1072 19/EE/CD-21/2017-18PARISHAD PROJECT FUNDDevelopment work of Pond Vill. Peer nagar Amarapali Yojna hardoi Road, Lucknow (Group-B) 0.00 21.51 28/12/201630/06/2017 30/06/201729/09/201730/06/2017 30/06/2017Ahmad Builders 7905820562ANIL KUMAR JE A.K.SINHA AE JAGDISH KUMAR XECircle VrindavanIn Progress
1073 42/EE/2016-17INFRAStrengthening of road and drain in Gadhiya Panchayat to babu singh Inter collage Aligarh 0.00 54.29 19/09/201616/12/2016 15/03/201716/12/2016 Simrah Builder 9953662669MOOL CHANDRA JE SASMIT KATIYAR AE XECircle 6Completed
1074 43/EE/2016-17INFRAStrengthening of road and drain at Mamod Nagar Gali No-2 Aligarh 0.00 44.94 19/09/201620/12/2016 20/12/201619/03/201720/12/2016 20/12/2016Gyandra Kumar 9761425293MUKESH PAL SINGH JE SASMIT KATIYAR AE XECircle 6Completed
1075 44/EE/2016-17INFRAStrengthening of road and drain at Madhav Nagar ward no-6 Aligarh 0.00 17.86 19/09/201620/12/2016 20/12/201619/03/201720/12/2016 20/12/2016Gyandra Kumar 9761425293MUKESH PAL SINGH JE SASMIT KATIYAR AE XECircle 6Completed
1076 45/EE/2016-17INFRAStrengthening of road and drain at Agra road to baba neem karauri dham Aligarh 0.00 47.54 19/09/201620/12/2016 20/12/201619/03/201720/12/2016 20/12/2016Lord Shiva Shiv Const. 8859503517MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE XECircle 6Completed
1077 10/EE/CD-3/2016-17EXTERNAL DEVELOPMENT FUNDDevelopment work of Pipri Khera gaun, Vrindavan Yojna, Lucknow. 0.00 0.00 02/12/201601/09/2017 02/12/2016MANSHA ENTERPRISES Circle VrindavanCompleted
1078 46/EE/2016-17INFRAStrengthening of road and drain at G.T. Road to Chidiyaghar, Etah 0.00 60.59 15/10/201620/12/2016 20/12/201619/03/201720/12/2016 20/12/2016Chetan Const. 9412181977MUKESH PAL SINGH JE SASMIT KATIYAR AE XECircle 6Completed
1079 11/EE/CD-3/2016-17INFRAइंदिरा नगर योजना लखनऊ के सेक्टर-8 सुषमा हॉस्पिटल से पुलिस चौकी तक साइकिल ट्रैक का कार्य 0.00 0.00 02/12/201601/03/2017 02/12/2016R.K. Enterprisess 9760099926 Circle VrindavanCompleted
1080 01/EE/CD-25/2015-16AWASTHAPNA FUNDSupply of fixing of retro refflective sign board at different place in mbd 0.00 7.43 01/11/201517/12/2015 17/12/201516/01/201617/12/2015 17/12/2015M/s Abheesht Industries 9415313467SRI ARVIND KUMAR JE PRASHANT VARDHAN AE A K MITTAL XECircle 5Completed
1081 11/EE/CD11/2016-17PARISHAD PROJECT FUNDWater and Sewer Connection Work in 640 Nos G+3 Houses at Sector-17, Vrindavan Yojna-4, Lucknow. 0.00 28.90 17/11/201603/01/2017 03/01/201702/04/201703/01/2017 03/01/2017M/S Savitri Associate RAJESH KUMAR VERMA JE AKHILESHWAR SINGH AE ANIL KUMAR MISHRA XECircle VrindavanCompleted
1082 01/SE-V/2015-16AWASTHAPNA FUNDStrengthing work of 24.0 mtr wide remaining road mora ki milak tiraha to VC residence road tiraha and sale tax chauraha to sai mandir in mbd city 0.00 130.00 11/06/201530/07/2015 30/07/201529/10/201530/07/2015 30/07/2015M/s Aparna Infrastructure 9837019057K K ACHARYA,SRI ARVIND KUMAR JE PRASHANT VARDHAN AE A K MITTAL XECircle 5Completed
1083 12/EE/CD11/2016-17PARISHAD PROJECT FUNDConst. of Recharge Well and Pigometer in G+3 Houses for Rain Water Harvesting in Sector-17, Vrindavan Yojna-4, Lucknow. 0.00 46.50 17/11/201609/01/2017 09/01/201708/04/201709/01/2017 09/01/2017MAN ENTERPRISES AKBAR ALI JE RAJESH KR VERMA AE ANIL KUMAR MISHRA XECircle VrindavanCompleted
1084 08/EE/2015-16/CD-28AWASTHAPNA FUNDSTRENGTHENING OF ROAD & DRAIN LAXMI PURAM, MADHUVAN COLONY, DEVORI ROAD, AGRA 0.00 71.12 14/07/201517/12/2015 17/12/201516/03/201617/12/2015 17/12/2015AGARWAL & COMPANY 9412258768BRIJKISHOR SINGH JE PRAMOD GOEL AE NAGESH CHANDRA XECircle 6Completed
1085 14/EE/2015-16/CD-28AWASTHAPNA FUNDSTRENGTHENING OF ROAD & DRAIN FROM GOPAL KUNJ DEVORI ROAD INTERNAL STREET AGRA 0.00 87.71 14/07/201518/01/2016 18/01/201617/04/201618/01/2016 18/01/2016VISHNU DUTT GARG 9927082915BRIJKISHOR SINGH JE PRAMOD GOEL AE NAGESH CHANDRA XECircle 6Completed
1086 17/EE/2015-16/CD-28AWASTHAPNA FUNDLaying of Inter Locking Road From Dargarha Hajrat Hazi Edrish Rehman to NH-2 Agra 0.00 77.16 29/12/201527/02/2016 27/02/201626/04/201627/02/2016 27/02/2016AGARWAL & COMPANY 9412258768DEENA NATH JE P. S. GUPTA AE NAGESH CHANDRA XECircle 6Completed
1087 13/EE/CD11/2016-17PARISHAD PROJECT FUNDConst. of Internal Road at G+3 Houses, Sector-17, Vrindavan Yojna-4, Lucknow. 0.00 78.00 22/09/201601/01/2017 01/01/201708/04/201701/01/2017 01/01/2017RAM SINGH AGARWAL AKBAR ALI JE RAJIV SRIVASTAVA AE ANIL KUMAR MISHRA XECircle VrindavanCompleted
1088 14/EE/CD11/2016-17PARISHAD PROJECT FUNDConst. of Brick Work and External Dev. Work Of Community Centre, Sector-2, Vrindavan Yojna - 2, Lucknow 0.00 33.00 15/10/201613/05/2017 13/05/201712/04/201713/05/2017 13/05/2017JAI MAA DURGEY TRADERS RAJIV RASTOGI JE AKHILESHWAR SINGH AE ANIL KUMAR MISHRA XECircle VrindavanCompleted
1089 04/EE/2015-16/CD-28AWASTHAPNA FUNDSTRENGTHENING OF ROAD & DRAIN ZONE-2 TAJGANJ-38 RAMVIHAR-I FROM VIJAY JADON HOUSE TO UKHRRA ROAD AND RAMESH CHAND HOUSE TO SH. KAMLA TRIPATHI AT TAJGANG, AGRA 0.00 25.28 14/07/201510/12/2015 10/12/201509/02/201610/12/2015 10/12/2015M/S. SAKSHAM CONSTRUCTIONS 9837117096G. P. TIWARI JE P. S. GUPTA AE NAGESH CHANDRA XECircle 6Completed
1090 03/EE/2015-16/CD-28AWASTHAPNA FUNDSTRENGTHENING OF ROAD FROM SAUDAN SINGH SCHOOL TO KALINDI VIHAR, AGRA 0.00 16.79 14/07/201510/12/2015 10/12/201509/02/201610/12/2015 10/12/2015ABHAY KUMAR SINGAL 9412258133BRIJKISHOR SINGH JE PRAMOD GOEL AE NAGESH CHANDRA XECircle 6Completed
1091 18/EE/CD11/2016-17PARISHAD PROJECT FUNDConst. of Drains and Culvert of at Sector-17(Part), Vrindavan Yojna-4, Lucknow. 0.00 46.00 15/10/201622/02/2017 22/02/201721/05/201722/02/2017 22/02/2017JAI MAA DURGEY TRADERS RAJIV RASTOGI JE RAJIV SRIVASTAVA AE ANIL KUMAR MISHRA XECircle VrindavanCompleted
1092 09/EE/2015-16/CD-28AWASTHAPNA FUNDSTRENGTHENING OF HOTMIX PLANT ROAD & DRAIN MUGAL ROAD TO SUBHAS NAGAR TURN (HALF DISTANCE) AT KAMLA NAGAR, AGRA 0.00 95.11 16/07/201529/12/2015 29/12/201528/03/201629/12/2015 29/12/2015KAILA DEVI CONSTRUCTION 9412256954BRIJKISHOR SINGH JE PRAMOD GOEL AE NAGESH CHANDRA XECircle 6Completed
1093 11/SEVR/CD11/2015-16PARISHAD PROJECT FUNDConst. of 30 Nos. 29/60 Type Semi Finished Houses at Sector-20, Vrindavan Yojna-4, Lucknow. 0.00 0.00 22/12/2015 22/12/201521/06/201622/12/2015 22/12/2015SINGH ASSOCIATES 9450453113AKBAR ALI JE AKHILESHWAR SINGH AE ANIL KUMAR MISHRA,U.C. SINGH XECircle VrindavanCompleted
1094 53/EE/2016-17INFRAStrengthening of Chauraha Nada pul khair bypass Aligarh 0.00 41.49 19/09/201628/12/2016 28/12/201627/03/201728/12/2016 28/12/2016Chetan Const. 9412181977MAYANK KUMAR KAUSHIK,MUKESH PAL SINGH JE SASMIT KATIYAR AE XECircle 6Completed
1095 05/EE/CD-3/2017-18PARISHAD PROJECT FUNDConstruction of Boundrywall of Electrical Sub Station at Avadh Vihar Yojna, Lucknow. 0.00 19.30 28/12/2016 18/05/201717/08/2017 18/05/2017Devansh Enterprises RAVINDRA NATH JE UDAIVEER SINGH AE D.K. SRIVASTAVA XECircle VrindavanCompleted
1096 03/EE/CD-27/2015-16EXTERNAL DEVELOPMENT FUNDConstruction of Boundary wall of (G+3) LIG Houses in Brahamputra Enclave at Sector-7, Siddharth Vihar Yojan. Ghziabad. (Group-C) 0.00 40.00 18/11/201511/02/2016 11/02/201610/05/201611/02/2016 11/02/2016SRISHTI CONSTRUCTION 9212861816MONAJ KUMAR RAO JE M.B. KAUSHIK AE N.H. FAZLI XECircle 7Completed
1097 14/EE/CD-3/2016-17INFRAConstruction of Cycle Track Indira Nagar Vistar yojna Lucknow From Hanuman Mandir to Ring Road 0.00 0.00 21/12/201620/03/2017 21/12/2016T Y TRADERS 9004537987 Circle VrindavanCompleted
1098 51/EE/2016-17INFRAStrengthening of road and drain at 6mtr Road Sec-1 kasganj 0.00 42.18 15/10/201628/12/2016 28/12/201627/03/201728/12/2016 28/12/2016Gyandra Kumar 9761425293MUKESH PAL SINGH JE SASMIT KATIYAR AE XECircle 6Completed
1099 MetroGhaziabadINFRAMatro Rail New Bas Stand Ghaziabad 0.00 24500.00 15/03/2018  15/03/2018 ghaziabad development authority Circle 7Completed
1100 15/EE/CD-3/2016-17AWASTHAPNA FUNDवृन्दावन योजना संख्या 4 से 19 में 30 मीटर चौड़ी सड़क टॉप कोट का निर्माण 0.00 0.00 31/12/201630/04/2017 31/12/2016CLAYSON INFRATECH PVT.LTD. Circle VrindavanCompleted
1101 52/EE/2016-17INFRAStrengthening of road and drain in 9mtr and 6mtr road at sec-1 Kasganj 0.00 32.81 15/10/201628/12/2016 28/12/201627/03/201728/12/2016 28/12/2016Gyandra Kumar 9761425293MUKESH PAL SINGH JE SASMIT KATIYAR AE XECircle 6Completed
1102 56/EE/2016-17INFRAStrengthening of Hotal Maya place chauraha and thandi sadak tiaraha Etah 0.00 7.22 15/10/201628/12/2016 28/12/201627/02/201728/12/2016 28/12/2016Chetan Const. 9412181977SATENDRA HYANKI JE SASMIT KATIYAR AE XECircle 6Completed
1103 1402/G-48/30/16-17AWASTHAPNA FUNDSUPPLY OF RCC HUME , PIPE FOR LAYING IN SEWER LINE AT VIP COLONY , BIJNOR 0.00 0.00 22/09/201621/10/2016 21/10/201620/12/201621/10/2016 21/10/2016M/S RAJSHREE PIPE FACTORY 9837287641 Circle 5Completed
1104 04/EE/CD-3/2017-18PARISHAD PROJECT FUNDConstruction of 33/11 KVA Electric Sub Station in Sector-3, Avadh Vihar Yojna, Lucknow. 0.00 90.57 28/03/201718/05/2017 18/05/201717/11/201718/05/2017 18/05/2017T Y TRADERS 9004537987RAVINDRA NATH JE UDAIVEER SINGH AE D.K. SRIVASTAVA XECircle VrindavanCompleted
1105 04/EECD26/2017-18PARISHAD PROJECT FUNDGeneral Earth Filling Work in Group Housing Plot related to Maya Nagar Sahkari Awas Samiti Ltd. in Sector-7B at Majhola Yojna No.-4, Phase-2, Moradabad 0.00 74.80 08/05/201703/07/2017 03/07/201702/10/201703/07/2017 03/07/2017M/S ANIL KUMAR 9415011392ANOOP KUMAR SHRIVASTAV JE DEVENDRA PAL SINGH AE SHOBHIT KUMAR PATHAK XECircle 5Completed
1106 08/EE/CD-21/2017-18PARISHAD PROJECT FUNDDevelopment work in Village Mansoor Nagar Amrapali Yojna Hardoi Road Lucknow 0.00 18.41 28/12/201612/06/2017 12/12/201711/09/201712/06/2017 12/12/2017savitri construction K.N.MISHRA JE PRAMOD KUMAR AE K.C.SRIVASATAVA XECircle VrindavanCompleted
1107 09/SEVR/CD11/2015-16PARISHAD PROJECT FUNDConst. of Internal Road WMM and Bituminous Work at Sector-20(Part), Vrindavan Yojna-4, Lucknow. 0.00 0.00 25/07/2015 25/07/201524/01/201625/07/2015 25/07/2015SHAKTI TAR PRODUCERS RAJESH KUMAR VERMA JE R.K. MISHRA AE U.C. SINGH XECircle VrindavanCompleted
1108 10/EE/CD11/2015-16PARISHAD PROJECT FUNDWidening of 30.00 M Wide Road Parallel to Sharda Canal 45.00 m to 24.00 m Wide Road in Sector-17, Vrindavan Yojna-4, Lucknow. 0.00 36.50 11/05/201515/06/2015 15/06/201514/09/201515/06/2015 15/06/2015ALPHA CONSTRUCTION COMPANY JE R.K. MISHRA AE U.C. SINGH XECircle VrindavanCompleted
1109 07/EE/CD-21/2017-18PARISHAD PROJECT FUNDConstruction of Platform Sector H-2 Amrapali Yojna Hardoi Road Lucknow 0.00 24.67 28/06/201612/06/2017 11/09/201712/06/2017 Tirupati Construction SHAILENDRA SINGH JE A.K.SINHA AE JAGDISH KUMAR XECircle VrindavanNot Started
1110 02/EE/CD-3/2015-16INFRARenovation/Strangthing of 24.00 wide road at Sector-8, Sushma Hospital to 8/212, Indira Nagar, Lucknow. 0.00 0.00 03/08/2015  03/08/2015GOPI CHAND RANGLINI 9956510351 Circle VrindavanCompleted
1111 08/SEVR/CD11/2015-16PARISHAD PROJECT FUNDConst. of Internal Drains and Culverts at Sector-20(Part), Vrindavan Yojna-4, Lucknow. 0.00 0.00 08/07/2015 08/07/201507/01/201608/07/2015 08/07/2015D.N.SINGAL RAKESH KUMAR SAXENA JE HARISHANKAR SINGH AE U.C. SINGH XECircle VrindavanCompleted
1112 13/EE/CD11/2015-16PARISHAD PROJECT FUNDConst. Work of balanced 24.00 m Wide Road in Sector-4, Vrindavan Yojna-2 (Part-1), Lucknow. 0.00 29.00 14/07/201513/08/2015 13/08/201512/11/201513/08/2015 13/08/2015RAM SINGH AGARWAL JE HARISHANKAR SINGH AE U.C. SINGH XECircle VrindavanCompleted
1113 06/EE/CD-21/2017-18PARISHAD PROJECT FUNDDevelopment work at Village Peer nagar Amrapali Yojna Hardoi Road Lucknow 0.00 10.42 28/12/201612/06/2017 12/06/201711/09/201712/06/2017 12/06/2017C.D. ASSOCIATES RAMBRIKSH SING YADAV JE PRAMOD KUMAR AE K.C.SRIVASATAVA XECircle VrindavanCompleted
1114 14/EE/CD11/2015-16PARISHAD PROJECT FUNDSupply/Fixing of Mild Steel Circular Pipe Railing on 7.00 m Wide Road from Sharda Canal between Kalindi Park and 45.00 m Wide Road, Vrindavan Yojna-4, Lucknow. 0.00 22.00 14/07/201513/08/2015 13/08/201512/11/201513/08/2015 13/08/2015RAM SINGH AGARWAL RAKESH KUMAR SAXENA JE HARISHANKAR SINGH AE U.C. SINGH XECircle VrindavanCompleted
1115 03/EE/CD-3/2015-16INFRARenovation/Strangthing of sector-17 in 17/05 to 17/1174 & Sector-11 in 11/204 to 11/818 upto Takrohi, Indira Nagar, Lucknow. 0.00 0.00 03/08/201502/11/2015 03/08/2015RAM SINGH AGARWAL Circle VrindavanCompleted
1116 16/EE/CD11/2015-16PARISHAD PROJECT FUNDConst. of 7.00 m Wide Road on Right Pattri of Sharda Canal from Kalindi van Park Bridge to 45.00 m Wide Road towards PGI, Vrindavan Yojna-4, Lucknow. 0.00 0.00 09/09/2015 09/09/201508/12/201509/09/2015 09/09/2015RAM SINGH AGARWAL RAKESH KUMAR SAXENA JE AE U.C. SINGH XECircle VrindavanCompleted
1117 17/EE/CD11/2015-16PARISHAD PROJECT FUNDConst. of Boundary Wall and Guard Room with Toilet at campus of Neelgiri Enclave, Sector-17, Vrinadavan Yojna-4, Lucknow. 0.00 68.00 11/08/201504/11/2015 04/11/201503/03/201604/11/2015 04/11/2015ALPHA CONSTRUCTION COMPANY ARUN KUMAR RAI JE AKHILESHWAR SINGH AE U.C. SINGH XECircle VrindavanCompleted
1118 JALNIGAMGEN. FUNDwater line shifting 0.00 9.60 18/06/2015 Jal Nigam ghaziabad 7757021383 Circle 7Completed
1119 15/EE/CD11/2015-16PARISHAD PROJECT FUNDConst. of Boundary Wall for Widening of 30.00 m Wide Road between Sector-18 and Sector-19 at Vrindavan Yojna-4, Lucknow. 0.00 0.00 21/09/2015 21/09/201520/12/201521/09/2015 21/09/2015SINGH CONSTRUCTION COMPANY 09355402572AKBAR ALI JE AE U.C. SINGH XECircle VrindavanCompleted
1120 13/EE/CD-21/2017-18PARISHAD PROJECT FUNDConstruction of Plateform at Sector H-2 Amrapali Yojna Hardoi Road Lucknow 0.00 25.95 28/12/201612/06/2017 12/06/201711/09/201712/06/2017 12/06/2017A.S.A. ENTERPRISES SHAILENDRA SINGH JE A.K.SINHA AE JAGDISH KUMAR XECircle VrindavanNot Started
1121 04/EE/CD-3/2015-16INFRARenovation/Strangthing of sector-14 in Takrohi Road to Shivajipuram Gate & Sector-19 in 19/357 to 19/753 & Sector-22/189 to 22/462, Indira Nagar, Lucknow. 0.00 0.00 03/08/201502/11/2015 03/08/2015Devansh Enterprises Circle VrindavanCompleted
1122 23/EE/CD11/2015-16PARISHAD PROJECT FUNDProviding and Fixinf of RCC Post with Barbed Wire for Open Pockets at Sector-15, Vrindavan Yojna-4, Lucknow. 0.00 0.00 15/03/2016 15/03/201614/05/201615/03/2016 15/03/2016SINGH CONSTRUCTION COMPANY 09355402572ARUN KUMAR RAI JE R.K. MISHRA AE U.C. SINGH XECircle 7Completed
1123 14/EE/CD-21/2017-18PARISHAD PROJECT FUNDConstruction of Plateform at sector H--2 at Amrapali Yojna Hardoi Road Lucknow 0.00 14.83 28/12/201629/06/2017 29/06/201728/09/201729/06/2017 29/06/2017RAJARAM TRADERS ANIL KUMAR JE A.K.SINHA AE JAGDISH KUMAR XECircle VrindavanNot Started
1124 25/EE/CD11/2015-16PARISHAD PROJECT FUNDConst. of Cycle Track and Service Road between Sector-2 and Sector-3 on 30.00 M wide Road, Vrindavan Yojna-2 (Part-1), Lucknow. 0.00 90.00 23/01/201618/03/2016 18/03/201617/06/201618/03/2016 18/03/2016RAM SINGH AGARWAL RAJIV RASTOGI,RAKESH KUMAR SAXENA JE HARISHANKAR SINGH,RAJIV SRIVASTAVA AE ANIL KUMAR MISHRA XECircle VrindavanCompleted
1125 03/EECD-3/2016-17PARISHAD PROJECT FUNDConst. of Trunk Drain along 30 M wide Road at Avadh Vihar Yojna, Lucknow 0.00 0.00 02/09/201601/11/2016 02/09/2016T Y TRADERS 9004537987 Circle VrindavanCompleted
1126 05/EE/CD-3/2015-16INFRARenovation/Strangthing of sector-12 in Chandrama Suprim to 18.00 M. wide Road & Sector-18 in Hanuman Mandir to 18/01, Sector-8, Police Chauki to 8/150, Indira Nagar, Lucknow. 0.00 0.00 03/08/201502/11/2015 03/08/2015Mukesh Corporation Circle VrindavanCompleted
1127 06/EE/CD-3/2015-16INFRARenovation/Strangthing of Road of Sector-12 in 12/643 to Munshi pulia & Sector-21 in 21/01 to 21/1118, Indira Nagar, Lucknow. 0.00 0.00 04/08/201503/11/2015 04/08/2015Mukesh Corporation Circle VrindavanCompleted
1128 18/EE/CD-21/2017-18PARISHAD PROJECT FUNDDevelopment work at Village Mansoor Nagar Amrapali Yojna Hadoi Road Lucknow 0.00 7.17 28/12/201630/06/2017 30/06/201729/09/201730/06/2017 30/06/2017Raunak Interprises K.N.MISHRA JE PRAMOD KUMAR AE K.C.SRIVASATAVA XECircle VrindavanCompleted
1129 20/EE/CD11/2016-17PARISHAD PROJECT FUNDSewer Connection in 30.00 Nos LIG Houses at Sector-20, Vrindavan Yojna-4, Lucknow. 0.00 3.85 17/11/201601/03/2017 01/03/201731/03/201701/03/2017 01/03/2017SINGH ASSOCIATES 9450453113AKBAR ALI JE AKHILESHWAR SINGH AE ANIL KUMAR MISHRA XECircle VrindavanCompleted
1130 01/EE/CD-3/2017-18PARISHAD PROJECT FUNDConstruction of Boundrywall of Commerial Plot at Sector-14, Indira Nagar, Lucknow. 0.00 10.00 19/12/201626/04/2017 26/04/201725/06/201726/04/2017 26/04/2017Raj Pal Singh Contractor RAVINDRA NATH JE UDAIVEER SINGH AE D.K. SRIVASTAVA XECircle VrindavanCompleted
1131 ShiftingofExisting2000mmdiaRawWaterMainLinEXTERNAL DEVELOPMENT FUNDShifting of Existing 2000mm dia Raw Water Main Coming under Expressway of National Highway-24 (New NH-9) Due to Widening of NH-24 0.00 129.60   Jal Nigam ghaziabad 7757021383 Circle 7In Progress
1132 57/EE/2016-17INFRAStrengthening of road and drain at Deendayal house to harendra singh house Partibha coloney Aligarh 0.00 19.47 19/09/201631/12/2016 31/12/201630/03/201731/12/2016 31/12/2016Lord Krishna Builder 9359443857MUKESH PAL SINGH JE SASMIT KATIYAR AE XECircle 6Completed
1133 12/EE/CD-7/19-20PARISHAD PROJECT FUNDPatch work and strengthening of road Node 12 to 8 in AVY Lucknow 0.00 130.00 16/12/201920/01/2020 20/01/202003/02/202020/01/2020 20/01/2020SAILANI MOH. KHURSHEED,PARMOD KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XECircle HQCompleted
1134 17/SEHQ/CD-7/19-20PARISHAD PROJECT FUNDPatch work and strengthening of road node no. 8 to 3 in AVY Lucknow 0.00 190.00 16/12/201913/01/2020 13/01/202027/01/202013/01/2020 13/01/2020SAILANI J.N. MISHRA,LALIT KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XECircle HQIn Progress
1135 16/SEHQ/CD-7/19-20PARISHAD PROJECT FUNDPatch work and strengthening of road node no. 8, 9, 10 & 5 in AVY Lucknow 0.00 160.00 16/12/201913/01/2020 13/01/202027/01/202013/01/2020 13/01/2020SAILANI A.B.SINGH,J.N. MISHRA JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XECircle HQCompleted
1136 07/SEVR/CD11/2015-16PARISHAD PROJECT FUNDConst. of 30.00 m Wide Road between Sector-18 and Sector-19, Vrindavan Yojna-4, Lucknow. 0.00 0.00 25/06/2015 25/06/201524/10/201525/06/2015 25/06/2015BHUVNESHWAR CONSTRUCTION COMPANY AKBAR ALI JE AE ANIL KUMAR MISHRA XECircle VrindavanCompleted
1137 07/EE/CD-3/2015-16INFRARenovation/Strangthing of Sector-16 in 16/625 to 16/414 and Sector-13 in 13/133 to 12/416, Indira Nagar, Lucknow. 0.00 0.00 04/08/201503/11/2015 04/08/2015Mukesh Corporation Circle VrindavanCompleted
1138 39/EE/2016-17INFRAStrengthening of road and drain at Mamod Nagar Gali no-5 Aligarh 0.00 27.19 19/09/201614/12/2016 14/12/201613/03/201714/12/2016 14/12/2016Pyare Lal Garg & sons 9760322332MUKESH PAL SINGH JE SASMIT KATIYAR AE XECircle 6Completed
1139 08/EE/CD-3/2015-16INFRARenovation/Strangthing of Sector-12 in 12/643 to 24.00 M. Wide Road at, Indira Nagar, Lucknow. 0.00 0.00 07/11/201506/02/2016 07/11/2015CLAYSON INFRATECH PVT.LTD. Circle VrindavanCompleted
1140 40/EE/2016-17INFRAStrengthening of Park at Sec-1 & 4A Kasganj 0.00 21.86 15/10/201616/12/2016 16/12/201615/03/201716/12/2016 16/12/2016Vikas Enterprises 9758495056 Circle 6Completed
1141 20/EE/CD-21/2017-18PARISHAD PROJECT FUNDDevelopment work at Village Mansoor Nagar Amrapali Yojna Hardoi Road Lucknow 0.00 13.02 28/12/201631/07/2017 31/07/201730/10/201731/07/2017 31/07/2017D.N.SINGAL K.N.MISHRA JE AJAI KUMAR AE K.C.SRIVASATAVA XECircle VrindavanCompleted
1142 04/EE/CD-3/2016-17AWASTHAPNA FUNDRenovation/Strangthing of Road sector-15/70 to 15/186 at 20.00 M. Wide Road at Indira Nagar, Lucknow. 0.00 0.00 02/09/201601/11/2016 02/09/2016ABDUL SALAM 9454438786 Circle VrindavanCompleted
1143 05/EE/CD-3/2016-17AWASTHAPNA FUNDRenovation/Strangthing of Road sector-21/1118 to Om Plaza, Indira Nagar, Lucknow. 0.00 0.00 16/09/201615/11/2016 16/09/2016ABDUL SALAM 9454438786 Circle VrindavanCompleted
1144 09/EE/CD-3/2015-16PARISHAD PROJECT FUNDConstruction of Trunk Drain of Crosing 18.00 M. Wide Road at Avadh Vihar Yojna, Lucknow. 0.00 0.00 16/11/201515/01/2016 16/11/2015Shagun Associates Circle VrindavanCompleted
1145 06/EE/CD-3/2016-17AWASTHAPNA FUNDRenovation/Strangthing of 9.00 & 18.00 M. Wide Road at Indira Nagar Yojna, Raibareli. 0.00 0.00 22/11/201621/01/2017 22/11/2016CLAYSON INFRATECH PVT.LTD. Circle VrindavanCompleted
1146 41/EE/2016-17INFRAStrengthening of road and drain at Sanjay Gandhi Coloney Aligarh 0.00 18.18 19/09/201616/12/2016 16/12/201615/03/201716/12/2016 16/12/2016Simrah Builder 9953662669MOOL CHANDRA JE SASMIT KATIYAR AE XECircle 6Completed
1147 10/EE/CD-3/2015-16PARISHAD PROJECT FUNDConstruction of Trunk Drain along 30.00 M. wide Road at Avadh Vihar Yojna, Lucknow. 0.00 0.00 20/01/201619/04/2016 20/01/2016T Y TRADERS 9004537987 Circle VrindavanCompleted
1148 07/EE/CD-3/2016-17AWASTHAPNA FUNDRenovation/Strangthing of 12.00 M Wide ( Under Infrastructure Fund) Indira Nagar Yojna, Raibareli. 0.00 0.00 22/11/201621/01/2017 22/11/2016RAM SINGH AGARWAL Circle VrindavanCompleted
1149 11/EE/CD-3/2015-16PRADHIKARAN KOSHConstruction of Internal Raoad Sector-3, Awadh Vihar Yojna, Lucknow. 0.00 0.00 15/02/201614/06/2016 15/02/2016R.K.CONSTRUCTION 09754304596 Circle VrindavanCompleted
1150 12/EE/CD-3/2015-16PARISHAD PROJECT FUNDConstruction of Internal Road at Sector-3, Avadh Vihar Yojna, Lucknow. 0.00 0.00 15/02/201614/06/2016 15/02/2016VINAYAK CONSTRUCTION Circle VrindavanCompleted
1151 13/EE/CD-3/2015-16PARISHAD PROJECT FUNDConstruction of Internal Road at Sector-3, Avadh Vihar Yojna, Lucknow. 0.00 0.00 12/05/201611/02/2017 12/05/2016ABDUL SALAM 9454438786 Circle VrindavanCompleted
1152 08/EE/CD-3/2016-17INFRARenovation/Strangthing of 7.50m, 9.00 m, 12.00m & 9.00 M. Wide Road Under Infrastructure Fund at Raibareli. 0.00 0.00 28/11/201627/01/2017 28/11/2016PRASIDHI CONSTRUCTION AND SUPPLIER Circle VrindavanCompleted
1153 01/SE-7/2016-17PARISHAD PROJECT FUNDConstruction of 9.0 Mt to 3.0 Mt Wide Road in Sector-10, Siddharth Vihar, Ghaziabad 0.00 133.00 07/04/201604/08/2016 04/08/201603/12/201604/08/2016 04/08/2016Mahesh Chand Contractor 9350931122A.B. ANSARI,ARUN KUMAR SINGH VISHAN JE A.K.AGRAWAL,S.K. VERMA AE LALIT MOHAN PANDEY,MOHD ALI SAFDAR XECircle 7Completed
1154 10/EE/CD-21/2017-18PARISHAD PROJECT FUNDDevelopment work at Village Peer Nagar Amrapali Yojna Hardoi Road Lucknow 0.00 30.32 28/12/201612/06/2017 12/06/201711/09/201712/06/2017 12/06/2017JAI MAA DURGEY TRADERS RAMBRIKSH SING YADAV JE AJAI KUMAR AE K.C.SRIVASATAVA XECircle VrindavanCompleted
1155 01/AE-1/2018-19PARISHAD PROJECT FUNDConstruction of 3.0Mt Wide Road Path in Sector-10A at Vasundhara, Ghaziabad 0.00 0.88 03/02/201809/04/2018 09/04/201808/05/201809/04/2018 09/04/2018Ramesh Chand & Co. 9213288266D.K. SRIVASTAVA JE A.K.AGRAWAL,S.K. VERMA AE MOHD ALI SAFDAR XECircle 7Completed
1156 02/EE/CD-21/2016-17PARISHAD PROJECT FUNDDevelopment work in Village Barawan Khurd at Amrapali Yojna Hardoi Road Lucknow 0.00 35.84 30/09/201623/11/2016 23/11/201622/02/201723/11/2016 23/11/2016JAINENDRA SINGH MANOJ KUMAR KEVAT JE PRAMOD KUMAR AE K.C.SRIVASATAVA XECircle VrindavanCompleted
1157 02/EE/CD-3/2017-18PRADHIKARAN KOSHConstruction of Boundrywall of Health Center at Sector-11, Indira Nagar, Lucknow. 0.00 10.00 19/12/201626/04/2017 26/04/201725/06/201726/04/2017 26/04/2017Raj Pal Singh Contractor RAVINDRA NATH JE UDAIVEER SINGH AE D.K. SRIVASTAVA XECircle VrindavanCompleted
1158 01/EE/CD-21/2016-17PARISHAD PROJECT FUNDDevelopment work in Village Barawan Khurd at Amrapali Yojna Hardoi Road Lucknow 0.00 36.29 30/09/201623/11/2016 23/11/201622/02/201723/11/2016 23/11/2016JAINENDRA SINGH MANOJ KUMAR KEVAT JE PRAMOD KUMAR AE K.C.SRIVASATAVA XECircle VrindavanCompleted
1159 11/EE/CD-21/2017-18PARISHAD PROJECT FUNDDevelopment work of Peer nagar at Amrapali Yojna Hardoi Road Lucknow 0.00 18.68 28/12/201612/06/2017 12/06/201711/09/201712/06/2017 12/06/2017Ram singh RAMBRIKSH SING YADAV JE PRAMOD KUMAR AE K.C.SRIVASATAVA XECircle VrindavanCompleted
1160 03/EE/CD-3/2017-18PARISHAD PROJECT FUNDवृन्दावन योजना संख्या-4, लखनऊ के सेक्टर-19 में 30.00 मीटर चौड़ी सड़क पर बिटुमिनस का कार्य 0.00 90.00 17/11/201608/05/2017 08/05/201707/09/201708/05/2017 08/05/2017CLAYSON INFRATECH PVT.LTD. RAVINDRA NATH JE UDAIVEER SINGH AE D.K. SRIVASTAVA XECircle VrindavanCompleted
1161 Date26-05-2015STATE AWASTHAPNA FUNDMetro Project Work Phase-II in Ghaziabad 0.00 5000.00 26/05/201526/05/2015 26/05/2015 26/05/2015 26/05/2015ghaziabad development authority RANDHIR SINGH JE NARENDRA PAL AE ATUL KUMAR SINGH XECircle 7Completed
1162 01/EE/CD-3/2016-17PARISHAD PROJECT FUNDConstruction of Drain & Colvert at Indira Nagar Yojna, Raibareli 0.00 0.00 09/08/201608/10/2016 09/08/2016PRATAP CONSTRUCTION Circle VrindavanCompleted
1163 02/EE/CD-3/2016-17PARISHAD PROJECT FUNDConstruction of Park, Indira Nagar Yojna, Raebareli 0.00 0.00 09/08/201608/10/2016 09/08/2016PRATAP CONSTRUCTION Circle VrindavanCompleted
1164 16/EE/CD-3/2016-17AWASTHAPNA FUNDConstruction of Cycle track in Indira Nagar yojna, Lucknow from Faizabad road to Hanuman Mandir 0.00 0.00 31/12/201630/04/2017 31/12/2016MUKESH CONSTRUCTION Circle VrindavanCompleted
1165 17/EE/CD-3/2016-17INFRAइंदिरा नगर योजना रायबरेली में 12 मीटर चौड़ी सड़क का सौंदर्यीकरण 0.00 0.00 03/01/201702/05/2017 03/01/2017PRATAP CONSTRUCTION Circle VrindavanCompleted
1166 18/EE/CD-3/2016-17INFRAवृन्दावन योजना संख्या 2 भाग 2 के सेक्टर 9 बी स्थित पार्क का सौंदर्यीकरण 0.00 0.00 03/01/201702/03/2017 03/01/2017GOPI CHAND RANGLINI 9956510351 Circle VrindavanCompleted
1167 54/EE/2016-17INFRAStrengthening of road and drain at G.T. Road to SBI tiraha kachahari road Etah 0.00 85.65 15/10/201628/12/2016 28/12/201627/03/201728/12/2016 28/12/2016Sanjesh Yadav SATENDRA HYANKI JE SASMIT KATIYAR AE XECircle 6Completed
1168 Combind50CusecGangaWaterEXTERNAL DEVELOPMENT FUNDCombind 50 Cusec Ganga water supply Project including 6 Lane Delhi - Meerut Expressway and 8-laining of NH-24 from Km 8.360 to Km 27.740 (UP Gate to Dasna in Uttar Pradesh) Supply, Laying jointing, Testing and commissioning of 1500mm dia Raw water main (MS Pipe) and 1200mm Clear Water Main (MS Pipe) along NH-24, Due to Widening of NH-24 by NHAI 0.00 11694.15   Jal Nigam ghaziabad 7757021383 Circle 7In Progress
1169 55/EE/2016-17INFRAStrengthening of road and drain Ramghat road to aanad home Vinay Nagar Aligarh 0.00 56.35 19/09/201628/12/2016 28/12/201627/03/201728/12/2016 28/12/2016ANULATA CONSTRUCTION COMP. 9568001575MOOL CHANDRA JE SASMIT KATIYAR AE XECircle 6Completed
1170 19/EE/CD-3/2016-17INFRALaying of Rising Main from Tubewell and OHT at Sector-19, Vrindavan Yojna, Lucknow. 0.00 0.00 14/03/201713/05/2017 14/03/2017J.P. TRADERS Circle VrindavanCompleted
1171 1314/STP/SIDDHARTHVIHARDATE09-04-2019PARISHAD PROJECT FUNDConsultancy free for Design and DPR for STP 40MLD, Siddharth Vihar Yojna, Ghaziabad 0.00 23.60 09/04/201909/04/2019  09/04/2019 3D CREATION RANDHIR SINGH JE NARENDRA PAL AE ATUL KUMAR SINGH XECircle 7Completed
1172 06/EE/CD-24/16-17AWASTHAPNA FUNDSUPPLY & FIXING RETRO BOARDS IN OPP. OF INDRA PARK , BIJNOR 0.00 7.40 23/08/201629/09/2020 29/08/201628/11/201629/09/2020 29/08/2016M/S VINAYAK ENTERPRISES 9454472029 Circle 5Completed
1173 03/EE/CD-3/2018-19PARISHAD PROJECT FUNDComplete Dismentling of Partly dismentlled Pucca Structure and disposal of dismental Malva from site and Construction of 12.00m Wide Road at Sector-18, Indira Nagar, Lucknow. 0.00 6.70 04/09/201827/11/2018 27/11/201926/01/201927/11/2018 27/11/2019Swarnim Enterprises Circle VrindavanCompleted
1174 04/EE/CD-3/2018-19PRADHIKARAN KOSHTubewell Boring work at Sri Arvind Park. Sector-13, Indira Nagar, Lucknow. 0.00 4.50 12/12/2018 27/02/201926/04/2019 27/02/2019MANSHA ENTERPRISES Circle VrindavanCompleted
1175 05/EE/CD-3/2018-19PARISHAD PROJECT FUNDConstruction of 18.00 M. Wide Road at Sec-03, Avadh Vihar Yojna, Lucknow. 0.00 73.95 04/01/2019 08/03/201917/05/2019 08/03/2019T Y TRADERS 9004537987 Circle VrindavanCompleted
1176 01/EE/PM/17-18PARISHAD PROJECT FUNDSUPPLY & FIXING OF REFLECTIVE SIGNAGE BOARD AT FAIZABAD MARG BHUMI VIKAS EVAM GRIHSTHAN YOJNA -AZAMGARH 0.00 11.50 12/05/201728/08/2017 28/08/201727/10/201728/08/2017 28/08/2017A.S.A. ENTERPRISES Circle 3Completed
1177 01/EE/CD-3/2019-20PARISHAD PROJECT FUNDRenovation of Road Patri at Secor-15, Indira Nagar, Lucknow. 0.00 15.41 12/12/201828/05/2019 28/05/201927/07/201928/05/2019 28/05/2019SAILANI KAMAL DEO PRASAD JE RAJESH KR VERMA AE GYANESHWAR PRASHAD XECircle VrindavanCompleted
1178 02/EE/CD-3/2019-20PARISHAD PROJECT FUNDConstruction of Drain and Culvert at Sector-3, Awadh Vihar Yojna, Lucknow. 0.00 73.36 04/01/2019 28/05/201927/08/2019 28/05/2019Gungun Trading V. P. MISHRA JE UDAIVEER SINGH AE GYANESHWAR PRASHAD XECircle VrindavanCompleted
1179 03/EE/CD-3/2019-20PARISHAD PROJECT FUNDConstruction of Internal Drains & C.C. Tiles work in 33/11 KVA Electric Sub-Station Campus at Sector-3, Awadh Vihar Yojna, Lucknow. 0.00 9.60 27/12/201828/05/2019 28/05/201927/07/201928/05/2019 28/05/2019DEV CONSTRUCTION CO. V. P. MISHRA JE UDAIVEER SINGH AE GYANESHWAR PRASHAD XECircle VrindavanCompleted
1180 15/EE/CD11/2016-17PARISHAD PROJECT FUNDConst. of Open Car Parking Work at G+3 Houses, Sector-17, Vrindavan Yojna-4, Lucknow. 0.00 0.00 23/01/2017 23/01/201722/04/201723/01/2017 23/01/2017PRIYANKA INFRASTRUCTURE RAKESH KUMAR SAXENA JE HARISHANKAR SINGH AE ANIL KUMAR MISHRA XECircle VrindavanCompleted
1181 04/EE/CD-3/2019-20PARISHAD PROJECT FUNDConstruction of 01 No. 600KL capacity & 26.00M Staging RCC Over Head Tank in Sector-13, Vrindavan Yojna No.-4, Lucknow 0.00 73.80 08/03/201914/10/2019 14/10/201913/08/202014/10/2019 14/10/2019P. K. Sharma KAMAL DEO PRASAD JE RAJESH KR VERMA AE GYANESHWAR PRASHAD XECircle VrindavanIn Progress
1182 60/EE/2016-17INFRASupply Lamp post with laying in various Park at Aligarh 0.00 4.83 15/10/201631/12/2016 31/12/201628/02/201731/12/2016 31/12/2016R.K. & Co. 8171211222MOOL CHANDRA JE SASMIT KATIYAR AE XECircle 6Completed
1183 61/EE/2016-17INFRALighting of Roadway with street ligth from Sasni Gate to Khirni gate Aligarh 0.00 24.79 15/10/201631/12/2016 31/12/201628/02/201731/12/2016 31/12/2016R.K. & Co. 8171211222MOOL CHANDRA JE SASMIT KATIYAR AE XECircle 6Completed
1184 62/EE/2016-17INFRAInstalation LED solar high mast ligth in Ahiliyabai holkar stadium Aligarh 0.00 4.95 15/10/201631/12/2016 31/12/201628/02/201731/12/2016 31/12/2016R.K. & Co. 8171211222MOOL CHANDRA JE SASMIT KATIYAR AE XECircle 6Completed
1185 63/EE/2016-17INFRASupply and fixing of swing & seeswa at various park at Aligarh 0.00 28.18 15/10/201631/12/2016 31/12/201628/02/201731/12/2016 31/12/2016Ramnath Metals 9412563961MOOL CHANDRA JE SASMIT KATIYAR AE XECircle 6Completed
1186 25/EE/CD29/2016-17AWASTHAPNA FUNDLaying of interlocking tiles And const. of Drain in Tansport Nagar, Mainpuri. 0.00 99.07 20/04/201623/05/2016 23/05/201622/07/201623/05/2016 23/05/2016Sky Builders 9412408768 Circle 6Completed
1187 M.KanshiramYojnaAWASTHAPNA FUNDWater Supply work for 248 Nos. House handed over amount to Nagar Panchyat Bhaogaev, Mainpuri 0.00 27.05 05/09/2017 05/09/201705/09/201705/09/2017 05/09/2017Nagar Panchayat Maipuri Circle 6Completed
1188 3127/A-7/62Date08-08-2019PARISHAD PROJECT FUNDPlantation work in Sec-7 & 8, Siddharth Vihar Yojna, Ghaziabad 0.00 12.27   3D CREATION YOGENDRA KUMAR GUPTA JE NARENDRA KUMAR AE ATUL KUMAR SINGH XECircle 7Completed
1189 3424/A-7/05Date18-08-2015PARISHAD PROJECT FUNDPlantation of Road, Park & Greenbelt , Sec-7, 1100 Nos Tree, Siddharth Vihar Yojna, Ghaziabad 0.00 2.65   3D CREATION YOGENDRA KUMAR GUPTA JE NARENDRA KUMAR AE ATUL KUMAR SINGH XECircle 7Completed
1190 15/SEHQ/CD-7/18-19PARISHAD PROJECT FUNDInterlocking tiles work in service road node 11 to 16 AVY 0.00 350.00 21/02/201923/10/2019 23/10/201922/01/202023/10/2019 23/10/2019SHAKTI CONSTRUCTION CO. 09121900191MOH. KHURSHEED,PRAMOD KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XECircle HQIn Progress
1191 03/EE/CD-1GZB/2016-17DATE24-11-2016PARISHAD PROJECT FUNDSupply & fixing of Retro Reflective sign board in Siddharth Vihar Yojna, Ghaziabad 0.00 90.00 06/08/201624/11/2016 24/11/201623/01/201724/11/2016 24/11/20163D CREATION R.K. GUPTA JE NARENDRA PAL AE ATUL KUMAR SINGH XECircle 7Completed
1192 02/EE/CD-24/16-17AWASTHAPNA FUNDCONST.OF BOUNDARY WALL BETWEEN MANYAWAR KANSHIRAM YOJNA, AND PARISHAD COLONY,BIJNOR. 0.00 16.00 01/06/201616/08/2016 16/08/201615/11/201616/08/2016 16/08/2016M.K.CONSTRUCTION Circle 5Completed
1193 03/EE/CD-24/16-17AWASTHAPNA FUNDLAYING OF PAVER TILES,CONST. OF TOILET, INDRA PARK, BIJNOR. 0.00 35.00 01/06/201616/08/2016 16/08/201615/11/201616/08/2016 16/08/2016Shree Gyanendra Chaudhary Circle 5Completed
1194 08/EE/CD-24/16-17AWASTHAPNA FUNDSUPPLY & FIXING OF SPV STREET SOLAR LIGHT, IN INDIRA PARK, BIJNOR 0.00 0.00 22/09/201604/01/2017 04/01/2017 04/01/2017 04/01/2017M/S DHA CONTRACTOR 9557944477 Circle 5Completed
1195 06/EE/CD-3/2017-18PARISHAD PROJECT FUNDवृन्दावन योजना संख्या-2 व 4 लखनऊ के सेक्टर-9, 14 व 19 में आंतरिक सड़क को गड्ढा मुक्त किये जाने का कार्य 0.00 33.26 08/05/201701/06/2017 01/06/201730/06/201701/06/2017 01/06/2017Aakriti Traders RAVINDRA NATH JE UDAIVEER SINGH AE D.K. SRIVASTAVA XECircle VrindavanCompleted
1196 07/EE/CD-3/2017-18INFRAअवस्थापना निधि के अंतरगत इंदिरा नगर योजना, लखनऊ के सेक्टर-15 में 15/104 से 15/19 तक इंटरलॉकिंग टाइल्स का निर्माण कार्य 0.00 75.56 24/12/201614/06/2017 14/06/201713/09/201714/06/2017 14/06/2017R. K. Enterprises 9760099926 Circle VrindavanCompleted
1197 08/EE/CD-3/2017-18PARISHAD PROJECT FUNDसेक्टर-18 इंदिरा नगर, लखनऊ में सड़क / नालियों सा सामान्य मरमम्त का कार्य 0.00 0.00 17/06/201716/09/2017 17/06/2017Mukesh Corporation Circle VrindavanCompleted
1198 09/EE/CD-3/2017-18INFRARenovation/Strangthing of Roads & Drain Under Infrastructure Fund Houses No.-15/112 to 15/91, Indira Nagar, Lucknow. 0.00 0.00 17/06/201716/09/2017 17/06/2017Mukesh Corporation Circle VrindavanCompleted
1199 10/EE/CD-3/2017-18PARISHAD PROJECT FUNDसेक्टर-13, इंदिरा नगर, लखनऊ में भवन संख्या - 13/125 से 13/108 तक सड़क का निर्माण कार्य 0.00 0.00 19/06/201718/09/2017 19/06/2017DEV ENTERPRISES 09250013069 Circle VrindavanCompleted
1200 01/EE/CD-3/2018-19PARISHAD PROJECT FUNDConstruction of Sewer work at Sector-3, Awadh Vihar Yojna, Lucknow. 0.00 49.80 20/09/201829/10/2018 29/10/201828/01/201929/10/2018 29/10/2018Gungun Trading V. P. MISHRA JE UDAIVEER SINGH AE GYANESHWAR PRASHAD XECircle VrindavanCompleted
1201 02/EE/CD-3/2018-19PARISHAD PROJECT FUNDInternal Water Supply work at sector-3, (Basera-1 & 2), Awadh Vihar Yojna, Lucknow. 0.00 22.50 04/09/201829/10/2018 29/10/201828/12/201829/10/2018 29/10/2018SAILANI Circle VrindavanCompleted
1202 02/EE/CD-6/2016-17INFRAStrengthning of road from abu nala to univiersity road and patch work from garh road to abu nala at Mangal Pandey Nagar, Meerut. 0.00 41.02 15/03/201617/05/2016 17/05/201616/08/201617/05/2016 17/05/2016M/s Juneja Construction Pvt. Ltd. 9810787577NAVRATAN SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
1203 05/EE/CD-6/2016-17PARISHAD PROJECT FUNDLaying & Jointing of rising main line to connect OHT tubewall at Sector-3, 4, 5, 6 at Scheme No.-11, Jagriti Vihar (Ext.), Meerut. 0.00 13.41 04/06/201613/10/2016 13/10/201602/01/201713/10/2016 13/10/2016Progressive Construction Co. 09888812764AJAB SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
1204 06/EE/CD-6/2016-17PARISHAD PROJECT FUNDConstruction of 2 Nos park in Sector-4 at Scheme No.-11, Jagriti Vihar (Ext.), Meerut. 0.00 23.36 08/11/201621/12/2016 21/12/201620/02/201721/12/2016 21/12/2016A.S CONSRTUCTION 8273230008S.P. SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
1205 05/EE/CD-3/2019-20PARISHAD PROJECT FUNDPainting of Staff Quarter Houses and supply with installation of PVC Water Storage Tank at Staff Quarter Sector-23, Indira Nagar, Luckow 0.00 18.00 13/12/201901/02/2020 01/02/202030/04/202001/02/2020 01/02/2020Lakhan Construction KAMAL DEO PRASAD JE RAJESH KR VERMA AE PANKAJ VERMA XECircle VrindavanIn Progress
1206 02/EE/CD29/2015-16AWASTHAPNA FUNDStrengthening of road From Sahid Nahar Chauraha to Rajpur Chungi 0.00 64.27 03/03/201528/04/2015 27/06/201528/04/2015 B. S. CONSTRUCTIONS 8477941111 Circle 6Completed
1207 03/EE/CD29/2015-16PARISHAD PROJECT FUND2500 Nos. Plantation work at Sector-1,2,3,4,8,9,12 or 16 in Sikandra Yojna 0.00 4.31 02/05/201526/09/2015 25/03/201626/09/2015 Mahaveer Singh & Comp. 9536490321 Circle 6Completed
1208 11/EE/2015-16/CD-28AWASTHAPNA FUNDSTRENGTHENING OF INTERNAL ROAD AND DRAIN IN MONOJ RAWAT ST. FLOWERS SCHOOL DURGA ENCLAVE AT AGRA 0.00 69.65 16/07/201514/01/2016 14/01/201613/04/201614/01/2016 14/01/2016VISHNU DUTT GARG 9927082915YOGENDRA KUMAR GUPTA JE PRAMOD GOEL AE NAGESH CHANDRA XECircle 6Completed
1209 04/EE/CD29/2015-16PARISHAD PROJECT FUNDDevelopment work in 25 Nos SFS Houses Area in Sector-13A (Road, Park, drain etc.) 0.00 64.47 14/10/201501/12/2015 01/12/201531/01/201601/12/2015 01/12/2015ARUN KUMAR AGARWAL & CO. 9759027944 Circle 6Completed
1210 034039/CD35AWASTHAPNA FUNDConst/Reno. of Park at near B-43 C.S.A. Nagar Yojana, Prayagraj 0.00 33.55 10/07/201710/04/2017 05/03/201709/07/201710/04/2017 05/03/2017Departmental (Self) J.P. MAURYA JE LAL JI YADAV AE S.C. TRIPATHI XECircle 1Completed
1211 11/EE/CD29/2015-16AWASTHAPNA FUNDLaying of interlocking tiles from transport Nagar and const. Culvert in Mainpuri 0.00 98.20 05/01/2016 29/01/201528/03/2016 29/01/2015B. S. CONSTRUCTIONS 8477941111 Circle 6Completed
1212 12/EE/CD29/2015-16AWASTHAPNA FUNDLaying of interlocking tiles and park in Awabagh Colony, Mainpuri 0.00 28.15 05/01/201629/01/2016 29/01/201601/02/201629/01/2016 29/01/2016B. S. CONSTRUCTIONS 8477941111 Circle 6Completed
1213 031095/CD35AWASTHAPNA FUNDConst./Renovation of Park in front of House No 1/75 to 4/23 at Jhunsi Yoajana, Prayagraj Jhunsi Yoajana, Prayagraj 0.00 51.97 08/05/201708/05/2017 08/05/201707/07/201708/05/2017 08/05/2017Departmental (Self) JAY PRAKASH MAURYA JE LAL JI YADAV AE S.C. TRIPATHI XECircle 1Completed
1214 06/EE/CD-3/2019-20PARISHAD PROJECT FUNDPainting Work of Sri Arvind Park at Sector-13, Indira nagar, Lucknow. 0.00 4.10 13/12/201919/02/2020 19/02/202018/04/202019/02/2020 19/02/2020OM SAI ENTERPRISES KAMAL DEO PRASAD JE AE PANKAJ VERMA XECircle VrindavanIn Progress
1215 58/EE/2016-17INFRAStrengthing of various Park in various yojna and Shamshanghat Aligarh 0.00 44.59 15/10/201631/12/2016 31/12/201630/03/201731/12/2016 31/12/2016Quality Builders 9312870962MOOL CHANDRA JE SASMIT KATIYAR AE XECircle 6Completed
1216 59/EE/2016-17INFRALight of road way with street ligth at Nada chauraha Aligarh 0.00 4.35 15/10/201631/12/2016 31/12/201628/02/201731/12/2016 31/12/2016R.K. & Co. 8171211222MOOL CHANDRA JE SASMIT KATIYAR AE XECircle 6Completed
1217 01/EECD-14/2016-17PARISHAD PROJECT FUNDConstruction of internal sewer line in the area of ​​EWS / LIG type buildings in Sector-5 of Awadh Vihar Yojana, Lucknow 0.00 34.93 26/10/201631/12/2016 31/12/201630/03/201731/12/2016 31/12/2016T Y TRADERS 9004537987 Circle HQCompleted
1218 02/EECD-14/2016-17PARISHAD PROJECT FUNDParking work of Park / Pathway etc. in the area of ​​G + 3 types of buildings under construction in Sector-5 of Awadh Vihar Yojna, Lucknow 0.00 27.92 26/10/201631/12/2016 31/12/201630/04/201731/12/2016 31/12/2016PRIYANKA INFRASTRUCTURE Circle HQCompleted
1219 03/EECD-14/2016-17PARISHAD PROJECT FUNDParking work in the area of ​​G + 3 types of buildings under construction in Sector-5 of Awadh Vihar Yojana, Lucknow 0.00 38.89 26/10/201631/12/2016 31/12/201630/04/201731/12/2016 31/12/2016Raj Pal Singh Contractor Circle HQCompleted
1220 01/EE/CD-12/2016-16PARISHAD PROJECT FUNDWMM & Mixser Surfacing work of Internal Roads at Sect-14(Part), VVY-3, Lucknow. 0.00 0.00 30/04/2015 30/04/201529/08/201530/04/2015 30/04/2015SHIV SHAKTI CONSTRUCTION Circle VrindavanCompleted
1221 1/SE-6/2015-16INFRARenovation of Govardhan parikrama marg from mansi ganga to Mathura deeg road Govardhan Mathura 0.00 130.00 02/03/201506/06/2015 06/06/201505/10/201506/06/2015 06/06/2015ANULATA CONSTRUCTION COMP. 9568001575SANTOSH KUMAR JE M.M.SRIVASTAVA AE MUKESH YADAV XECircle 6Completed
1222 08/EE/2016-17/CD-28PARISHAD PROJECT FUNDCONSTRUCTION OF DRAIN AND ROAD IN FRONT OF OFFICE COMPLEX SEC.-13, SKIKANDRA AGRA 0.00 17.83 07/05/201631/05/2016 31/05/201630/07/201631/05/2016 31/05/2016ARUN KUMAR AGARWAL & CO. 9759027944BRIJKISHOR SINGH JE P. S. GUPTA AE SHRI SATYENDRA KUMAR XECircle 6Completed
1223 02/EE/CD-6/2015-16INFRAStrengthning of road from garh road to university road along nala at Mangal Pandey Nagar, Meerut. 0.00 28.49 20/12/201415/05/2015 15/05/201514/08/201515/05/2015 15/05/2015M/S R.S. Builders 9837058948NAVRATAN SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
1224 03/EE/CD-6/2015-16INFRAStrengthning of road from garh road to victoria park road along nala at Mangal Pandey Nagar, Meerut. 0.00 57.35 20/12/201415/05/2015 15/05/201514/08/201515/05/2015 15/05/2015M/S R.S. Builders 9837058948NAVRATAN SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
1225 034047/CD35AWASTHAPNA FUNDConstruction of Gali and Nali in front of Inliten public to Narendra yadava to Indrasen Singh Tomer, Prayagraj 0.00 12.24 31/07/201917/10/2019 17/10/201916/01/202017/10/2019 17/10/2019Departmental (Self) JAY PRAKASH MAURYA JE LAL JI YADAV AE S.C. TRIPATHI XECircle 1Completed
1226 002/EE/2015-16INFRAStrengthening of road and drain at Ganjay Gandhi Coloney Aligarh Group-B 0.00 44.01 11/05/201511/06/2015 11/06/201510/09/201511/06/2015 11/06/2015Mascot Traders 7500329456MOOL CHANDRA JE SUDAMA PRASHAD AE MUKESH YADAV XECircle 6Completed
1227 031079/CD35AWASTHAPNA FUNDStrengthning of Park,boundary wall near myorabad charch and basana nala at Prayagraj 0.00 31.38 02/08/201623/08/2016 23/08/201630/06/201723/08/2016 23/08/2016Departmental (Self) JAY PRAKASH MAURYA JE LAL JI YADAV AE S.C. TRIPATHI XECircle 1Completed
1228 003/EE/2015-16INFRAStrengthening of road and drain at Nagla Patwari Aligarh 0.00 47.17 11/05/201520/06/2015 20/06/201519/09/201520/06/2015 20/06/2015Lord Shiva Shiv Const. 8859503517VIJAY SINGH JE SUDAMA PRASHAD AE MUKESH YADAV XECircle 6Completed
1229 07/EE/2016-17/CD-28AWASTHAPNA FUNDSTRENGTHENING OF INTERNAL ROADS AND DRAIN IN SHYAM NAGAR AGRA 0.00 42.38 07/05/201630/05/2016 30/05/201629/07/201630/05/2016 30/05/2016GARG RESURFACING & CONSTRUCTIONS 9837037476BRIJKISHOR SINGH JE P. S. GUPTA AE SHRI SATYENDRA KUMAR XECircle 6Completed
1230 004/EE/2015-16INFRAStrengthening of road and drain in Sanjay Gandhi Coloney Aligarh Group-A 0.00 43.78 11/05/201520/06/2015 20/06/201519/09/201520/06/2015 20/06/2015Pyare Lal Garg & sons 9760322332MUKESH PAL SINGH JE SUDAMA PRASHAD AE MUKESH YADAV XECircle 6Completed
1231 005/EE/2015-16INFRAStrengthening of road and drain at Gadhiya Panchayat Beema Nagar Aligarh 0.00 73.91 11/05/201502/07/2015 02/07/201501/10/201502/07/2015 02/07/2015ANULATA CONSTRUCTION COMP. 9568001575MUKESH PAL SINGH JE SUDAMA PRASHAD AE MUKESH YADAV XECircle 6Completed
1232 031021/CD35PARISHAD PROJECT FUNDplantation of 400 no. plant in jhushi yojana 2&3 in financial year 2019-20 0.00 0.92 19/03/2019 19/08/201915/08/2019 19/08/2019Departmental (Self) MOH. TANVEER,VIVEK KUMAR MAURYA JE KAMALESHWAR NATH MISHRA AE ABHISHEK NATH TIWARI XECircle 1Completed
1233 006/EE/2015-16INFRAStrengthening of road and drain at ward no-43 Sanjay Gandhi Coloney Aligarh 0.00 60.40 11/05/201503/07/2015 03/07/201502/10/201503/07/2015 03/07/2015Simrah Builder 9953662669MOOL CHANDRA JE SUDAMA PRASHAD AE MUKESH YADAV XECircle 6Completed
1234 007/EE/2015-16INFRAStrengthening of road and drain at Nagla Patwari Aligarh Group-B 0.00 46.96 11/05/201515/07/2015 15/07/201514/10/201515/07/2015 15/07/2015N.S. Const. 9897041950MAYANK KUMAR KAUSHIK JE SUDAMA PRASHAD AE MUKESH YADAV XECircle 6Completed
1235 9/EE/CD29/2016-17AWASTHAPNA FUNDStrengthening of Road and Laying of interlocking tile in Sector 16A , Sikandra Yojna, Agra (Part-A) 0.00 33.35 09/03/201626/04/2016 26/04/201607/06/201626/04/2016 26/04/2016Govind Contractor 9450865204 Circle 6Completed
1236 3/EE/CD29/2016-17AWASTHAPNA FUNDStrengthening of Road and Laying of interlocking tile in Sector 16A , Sikandra Yojna, Agra (Part-B) 0.00 35.07 09/03/201625/04/2016 25/04/201608/06/201625/04/2016 25/04/2016Mahaveer Singh & Comp. 9536490321 Circle 6Completed
1237 15/EE/CD29/2016-17AWASTHAPNA FUNDStrengthening of Road and Laying of interlocking tile in Sector 16A , Sikandra Yojna, Agra (Part-C) 0.00 25.66 09/03/201626/04/2016 26/04/201607/06/201626/04/2016 26/04/2016B. S. CONSTRUCTIONS 8477941111 Circle 6Completed
1238 04/EE/2016-17/CD-28AWASTHAPNA FUNDINSTALLATION OF SUBMERSIBLE PUMP, HAND PUMP AND STREET LIGHT AT VASUDEV MAI AND URMARA SHIKOHABAD 0.00 95.60 02/05/201607/05/2016 07/05/201606/07/201607/05/2016 07/05/2016VISHNU DUTT GARG 9927082915YOGENDRA KUMAR GUPTA JE PRAMOD GOEL AE NAGESH CHANDRA XECircle 6Completed
1239 10/EE/CD29/2016-17AWASTHAPNA FUNDStrengthening of Road and Laying of interlocking tile in Sector 3A, Sikandra Yojna, Agra (Part-A) 0.00 36.56 09/03/201625/04/2016 25/04/201608/06/201625/04/2016 25/04/2016Siddarth Associates 9457000613 Circle 6Completed
1240 02/EE/CD29/2016-17AWASTHAPNA FUNDStrengthening of Road and Laying of interlocking tile in Sector 3A, Sikandra Yojna, Agra (Part-B) 0.00 29.29 09/03/201625/04/2016 25/04/201608/06/201625/04/2016 25/04/2016Sai Contractor and suppliers 9410659448 Circle 6Completed
1241 24/EE/CD29/2016-17AWASTHAPNA FUNDLaying of interlocking tile and Const. of drain in Chhata zone word-35 Chandra pan gali Agra (Part-B) 0.00 22.93 20/04/201612/05/2016 11/07/201612/05/2016 Shri Ram Constructions 9457068512 Circle 6Completed
1242 23/EE/CD29/2016-17AWASTHAPNA FUNDLaying of interlocking tile and Const. of drain in Chhata zone word-35 Chandra pan gali Agra Part-A) 0.00 22.94 20/04/201612/05/2016 12/05/201611/07/201612/05/2016 12/05/20163D CREATION Circle 6Completed
1243 29/EE/CD29/2016-17AWASTHAPNA FUNDLaying of interlocking tile and Const. of drain in Chhida Nai Abadiword-3, Bheemnagari, Agra 0.00 55.69 20/04/201623/05/2016 23/05/201622/08/201623/05/2016 23/05/2016AGARWAL & COMPANY 9412258768 Circle 6Completed
1244 26//EE/CD29/2016-17AWASTHAPNA FUNDStrengthening of Road in avabagh and Adaj Nagar Polic chaoki, Mainpuri. 0.00 24.69 20/04/201623/05/2016 23/05/201622/06/201623/05/2016 23/05/2016Sky Builders 9412408768 Circle 6Completed
1245 27/EE/CD29/2016-17AWASTHAPNA FUNDStrengthening of Road and Const. of Drain in Tansport Nagar, Mainpuri. 0.00 98.48 20/04/201623/05/2016 23/05/201622/07/201623/05/2016 23/05/2016B. S. CONSTRUCTIONS 8477941111 Circle 6Completed
1246 28/EE/CD29/2016-17AWASTHAPNA FUNDLaying of interlocking tiles in Tansport Nagar, Mainpuri. 0.00 26.40 20/04/201623/05/2016 23/05/201622/06/201623/05/2016 23/05/2016B. S. CONSTRUCTIONS 8477941111 Circle 6Completed
1247 05/EE/2016-17/CD-28AWASTHAPNA FUNDSTABLIZATION OF C.C. ROAD FROM N.H. TO F.S. COLLEGE SHIKOHABAD 0.00 99.83 02/05/201607/05/2016 07/05/201606/07/201607/05/2016 07/05/2016VISHNU DUTT GARG 9927082915YOGENDRA KUMAR GUPTA JE PRAMOD GOEL AE NAGESH CHANDRA XECircle 6Completed
1248 06/EE/2016-17/CD-28AWASTHAPNA FUNDSTABILIZATION OF C.C. ROAD AT INTERNAL ROADS OF VASUDEVMAI AND URMARA SHIKOHABAD 0.00 76.76 02/05/201607/05/2016 07/05/201606/07/201607/05/2016 07/05/2016GARG RESURFACING & CONSTRUCTIONS 9837037476YOGENDRA KUMAR GUPTA JE PRAMOD GOEL AE NAGESH CHANDRA XECircle 6Completed
1249 04/EE/CD-6/2016-17PARISHAD PROJECT FUNDConstruction of 24.00 mt. wide road in sector-4 Scheme No.-11, Jagriti Vihar (Ext.) Meerut. 0.00 70.98 21/06/201604/08/2016 04/08/201603/02/201704/08/2016 04/08/2016M/S R.S. Builders 9837058948S.P. SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
1250 029038/CD35AWASTHAPNA FUNDRenovation of road and construction of Divider, footpath and from luxim takiz to commisinor Office, prayagraj 0.00 165.40 19/10/201519/10/2015 19/10/201618/01/201619/10/2015 19/10/2016Departmental (Self) RAM PRATAP JE LAL JI YADAV AE S.C. TRIPATHI XECircle 1Completed
1251 031080/CD35AWASTHAPNA FUNDRovation of roasd, construction of divider, footpath and nali repair form lakshmi takiz to commisnar Office, Prayagraj. 0.00 67.38 25/05/201625/05/2016 25/05/201624/08/201625/05/2016 25/05/2016Departmental (Self) JAY PRAKASH MAURYA,SUBEDAR NAVIK JE LAL JI YADAV AE S.C. TRIPATHI XECircle 1Completed
1252 031076/CD35AWASTHAPNA FUNDStrengthning of road at Manohar das bagiya, gungagunj, Prayagraj 0.00 92.12 25/05/201625/05/2016 25/05/201624/08/201625/05/2016 25/05/2016Departmental (Self) JAY PRAKASH MAURYA JE LAL JI YADAV AE S.C. TRIPATHI XECircle 1Completed
1253 05/EE/CD-21/2016-17PARISHAD PROJECT FUNDThir party Quality Assurance of 1260 Multistoried flats Ampali Enclave Lucknow 0.00 55.13 18/05/201602/02/2017 02/02/2017 02/02/2017 02/02/2017SERTECH CONSULTANTS ANIL KUMAR JE A.K.SINHA,PRAMOD KUMAR AE JAGDISH KUMAR,K.C.SRIVASATAVA XECircle VrindavanIn Progress
1254 031077/CD35AWASTHAPNA FUNDRenovation of road at House of Ram pujan Patel (Ex minister), teliyergunj, Prayagraj. 0.00 31.94 01/08/201601/08/2018 01/08/201631/07/201701/08/2018 01/08/2016Departmental (Self) JAY PRAKASH MAURYA JE LAL JI YADAV AE S.C. TRIPATHI XECircle 1Completed
1255 031082/CD35AWASTHAPNA FUNDConstruction of interlocking tiles and nali at C.S.A. Nagar Yojana, Prayagraj. 0.00 66.63 26/09/201626/09/2016 26/09/201625/12/201626/09/2016 26/09/2016Departmental (Self) JAY PRAKASH MAURYA JE LAL JI YADAV AE S.C. TRIPATHI XECircle 1Completed
1256 031078/CD35AWASTHAPNA FUNDconstruction and renovation of road at Jhunsi Yojana-2, Prayagraj 0.00 15.65 01/08/201601/08/2016 01/08/201630/11/201601/08/2016 01/08/2016Departmental (Self) JAY PRAKASH MAURYA JE LAL JI YADAV AE S.C. TRIPATHI XECircle 1Completed
1257 03/SE(P)/CD-21/2013-14PARISHAD PROJECT FUNDConsultancy work for 1260 nos flats at Amrapali Enclave Lucknow 0.00 255.26 17/11/2014 17/11/2014 17/11/2014 17/11/2014SAJAG CONSULTANTS ANIL KUMAR,MANOJ KUMAR KEVAT JE PRAMOD KUMAR AE K.C.SRIVASATAVA XECircle VrindavanIn Progress
1258 01/EE/CD35/2019-20AWASTHAPNA FUNDConst. of Int. tiles from Mayorabad to Cristan Kabristan ADA Colony, Prayagraj. 0.00 24.26 17/10/201917/10/2019 17/10/201916/01/202017/10/2019 17/10/2019Dharvi Associates 9140324815HAWALDAR RAM JE KAMALESHWAR NATH MISHRA AE ABHISHEK NATH TIWARI XECircle 1Completed
1259 031075/CD35AWASTHAPNA FUNDStrength of road in front of H.No. 3/1 to 3/346, 3/917 to 3/365 and 1/127 to 1/226 at Jhunsi Yojana-3, Prayagraj. 0.00 77.94 26/09/201626/09/2016 26/09/201625/12/201626/09/2016 26/09/2016Departmental (Self) JAY PRAKASH MAURYA,RAM PRATAP JE LAL JI YADAV AE S.C. TRIPATHI XECircle 1Completed
1260 031083/CD35AWASTHAPNA FUNDstrengthning of road from House No. 6/515 to 6/266 at Jhunsi Yojana-3, Prayagraj, 0.00 19.64 10/11/201610/11/2016 10/11/201628/02/201710/11/2016 10/11/2016Departmental (Self) JAY PRAKASH MAURYA JE LAL JI YADAV AE S.C. TRIPATHI XECircle 1Completed
1261 031084/CD35AWASTHAPNA FUNDConstruction of C.C. Road and Interlocking Tiles at C.S.A. Nagar Yojana, Prayagraj. 0.00 39.27 10/11/201610/11/2016 10/11/201628/02/201710/11/2016 10/11/2016Departmental (Self) JAY PRAKASH MAURYA JE LAL JI YADAV AE S.C. TRIPATHI XECircle 1Completed
1262 031081/CD35AWASTHAPNA FUNDInstalation of Sinage Board at Jhunsi-2 & 3 and C.S.A. Nagar Yojana, Prayagraj. 0.00 0.92 14/10/201614/10/2016 14/10/201613/01/201714/10/2016 14/10/2016Departmental (Self) RAM PRATAP JE LAL JI YADAV AE S.C. TRIPATHI XECircle 1Completed
1263 04/EE/CD29/2016-17AWASTHAPNA FUNDStrengthening of Road and Laying of interlocking tile in Sector 2B, Sikandra Yojna, Agra (Part-B) 0.00 21.25 09/03/201626/04/2016 25/04/201608/06/201626/04/2016 25/04/2016SUSHIL KUMAR 9412255916 Circle 6Completed
1264 01/EECD-14/2015-16PARISHAD PROJECT FUNDConstruction of Internal Roads at Sector-5, Avadh Vihar Yojna, Lucknow 0.00 60.00 26/09/201515/02/2016 15/02/201614/08/201615/02/2016 15/02/2016SAILANI Circle HQCompleted
1265 22/EE/CD29/2016-17AWASTHAPNA FUNDConst. of CC Road in transport Nagar ( Bijalighar Chaurha to Link CC road ) 0.00 90.88 09/03/201612/05/2016 12/05/201611/07/201612/05/2016 12/05/2016ARUN KUMAR AGARWAL & CO. 9759027944 Circle 6Completed
1266 08/EE/CD29/2016-17AWASTHAPNA FUNDStrengthening of 6 mt. wide Road and Laying of interlocking tile in Sector 7, Sikandra Yojna, Agra Part-A) 0.00 32.46 09/03/201625/04/2016 25/04/201608/06/201625/04/2016 25/04/2016Lord Shiva Shiv Const. 8859503517 Circle 6Completed
1267 06/EE/CD29/2016-17AWASTHAPNA FUNDStrengthening of 6 mt. wide Road and Laying of interlocking tile in Sector 7, Sikandra Yojna, Agra (Part-B) 0.00 14.55 09/03/201626/04/2016 26/04/201607/06/201626/04/2016 26/04/2016Mahaveer Singh & Comp. 9536490321 Circle 6Completed
1268 01/EE/CD29/2016-17AWASTHAPNA FUNDStranthenining of 6 mt. wide Road and Laying of interlocking tile in Sector 7, Sikandra Yojna, Agra (Part-C) 0.00 14.55 09/03/201625/04/2016 25/04/201608/06/201625/04/2016 25/04/2016Sai Contractor and suppliers 9410659448 Circle 6Completed
1269 17/EE/CD29/2016-17AWASTHAPNA FUNDStrengthening of Road and Laying of interlocking tile in Sector 3A, Sikandra Yojna, Agra (Part-C) 0.00 10.92 09/03/201626/04/2016 26/04/201607/06/201626/04/2016 26/04/2016B. S. CONSTRUCTIONS 8477941111 Circle 6Completed
1270 16/EE/CD29/2016-17AWASTHAPNA FUNDStrengthening of Road and Laying of interlocking tile in Sector 6, Sikandra Yojna, Agra (Part-A) 0.00 44.25 09/03/201626/04/2016 26/04/201625/06/201626/04/2016 26/04/2016B. S. CONSTRUCTIONS 8477941111 Circle 6Completed
1271 01/EE/2015-16INFRAConst. of drain and Culvert at M.S.K.J.S.Y. near tahsil Bulandshahar 0.00 41.50 18/04/2015 18/04/201517/08/201518/04/2015 18/04/2015Sirohi Const. Comp. 9412303326D.S. MEHRA JE SASMIT KATIYAR AE MUKESH YADAV XECircle 6Completed
1272 13/EE/CD29/2016-17AWASTHAPNA FUNDConst. of CC Road in transport Nagar (CC Road to JaIl Road via Bijalighar Chaurha) 0.00 97.63 09/03/201626/04/2016 26/04/201607/06/201626/04/2016 26/04/2016Garg Resurfacing Const. Circle 6Completed
1273 20/EE/CD29/2016-17AWASTHAPNA FUNDConst. of CC Road in transport Nagar ( Bijalighar Chaurha to Link CC road )(P-1)(Part-A) 0.00 45.63 09/03/201626/04/2016 26/04/201625/06/201626/04/2016 26/04/2016AGARWAL & COMPANY 9412258768 Circle 6Completed
1274 19/EE/CD29/2016-17AWASTHAPNA FUNDConst. of CC Road in transport Nagar ( Bijalighar Chaurha to Link CC road )(P-1) (Part-B) 0.00 45.63 09/03/201626/04/2016 26/04/201625/06/201626/04/2016 26/04/2016R. U. Construction 8630037006 Circle 6Completed
1275 05/EE/CD29/2016-16AWASTHAPNA FUNDStrengthening of Road and Laying of interlocking tile in Sector 7, Sikandra Yojna, Agra (Part-A) 0.00 24.84 09/03/201626/04/2016 26/04/201608/06/201626/04/2016 26/04/2016K.S. Constractor 9897518536 Circle 6Completed
1276 11/EE/CD29/2016-17AWASTHAPNA FUNDStrengthening of Road and Laying of interlocking tile in Sector 7, Sikandra Yojna, Agra (Part-B) 0.00 29.71 09/03/201626/04/2016 26/04/201607/06/201626/04/2016 26/04/2016Garg Resurfacing Const. Circle 6Completed
1277 05/EE/CD-12/2015-16AWASTHAPNA FUNDConstruction and strengthening of 18.00 mt. wide road at Rajajipuram, Lucknow. 0.00 62.50 21/05/201528/07/2015 28/07/201527/10/201528/07/2015 28/07/2015Upadhyay Construction Co., Malviya Marg, Gandhi Na 8960509086 Circle VrindavanCompleted
1278 14/EE/CD29/2016-17AWASTHAPNA FUNDStrengthening of Road and Laying of interlocking tiles in Sector 2C Sikandra Yojna, Agra (Part-B) 0.00 24.48 09/03/201626/04/2016 26/04/201607/06/201626/04/2016 26/04/2016Manpal 9917316437 Circle 6Completed
1279 18/EE/CD29/2016-17AWASTHAPNA FUNDStrengthening of Road and Laying of interlocking tiles in Sector 2C Sikandra Yojna, Agra (Part-A) 0.00 21.94 09/03/201625/04/2016 25/04/201608/06/201625/04/2016 25/04/2016Mahaveer Singh & Comp. 9536490321 Circle 6Completed
1280 07/EE/CD29/2016-17AWASTHAPNA FUNDStrengthening of Road and Laying of interlocking tile in Sector 6, Sikandra Yojna, Agra (Part-B) 0.00 25.70 09/03/201625/04/2016 25/04/201608/06/201625/04/2016 25/04/2016Dev Construction 9690017262 Circle 6Completed
1281 12/EE/CD29/2016-17AWASTHAPNA FUNDStrengthening of Road and Laying of interlocking tile in Sector 2B, Sikandra Yojna, Agra(Part-B) 0.00 31.71 09/03/201626/04/2016 26/04/201607/06/201626/04/2016 26/04/2016Garg Resurfacing Const. Circle 6Completed
1282 HandedoverServicesPARISHAD PROJECT FUNDSector-4, 5 or 6 in Yojna No. 1, Mainpuri Services Handed Over to Nagar palika Parishad, Mainpuri 0.00 40.00 06/04/2016 06/04/201606/04/201506/04/2016 06/04/2016Nagar Palika Parishad, Maipuri Circle 6Completed
1283 08/EE/2015-16PARISHAD PROJECT FUNDConst. of road at Khurja Yojna 0.00 37.78 25/08/2015 25/08/201524/12/201525/08/2015 25/08/2015Quality Builders 9312870962D.S. MEHRA JE SASMIT KATIYAR AE XECircle 6Completed
1284 06/EECD-14/2016-17PARISHAD PROJECT FUNDWork of internal water supply in the area of ​​buildings under construction in Sector-5 of Awadh Vihar Yojana, Lucknow 0.00 20.96 26/10/201631/12/2016 31/12/201631/03/201731/12/2016 31/12/2016R.K. Enterprisess 9760099926 Circle HQCompleted
1285 21/EE/CD29/2016-17AWASTHAPNA FUNDStrengthening of 6 mt. wide Road and Laying of interlocking tile in Sector 7, Sikandra Yojna, Agra (Part-D) 0.00 36.07 09/03/201602/05/2016 02/05/201616/06/201602/05/2016 02/05/2016Virendra Singh Circle 6Completed
1286 03/EE/CD-12/2015-16AWASTHAPNA FUNDConstruction and Strengthening of 24.00 wide road from police station to H.No.-F-3028 at Rajajipram, Lucknow 0.00 70.00 21/05/201528/07/2015 28/07/201527/10/201528/07/2015 28/07/2015Upadhyay Construction Co., Malviya Marg, Gandhi Na 8960509086 Circle VrindavanCompleted
1287 04/EE/CD-12/2015-16AWASTHAPNA FUNDConstruction and Strengthening of 24.00 wide road From House No.-F-3028 to Alam Nagar, Railway Station at Rajajipuram, Lucknow. 0.00 70.00 21/05/201528/07/2015 27/10/201528/07/2015 Upadhyay Construction Co., Malviya Marg, Gandhi Na 8960509086 Circle VrindavanCompleted
1288 06/EE/CD-12/2015-16AWASTHAPNA FUNDConstruction/ Strengthening of 24 mt. wide road (Police station to house no. f-3028) at Rajajiupram, Lucknow under Infrastructur development. (Group-4) 0.00 41.50 21/05/201528/07/2015 28/07/201527/10/201528/07/2015 28/07/2015Upadhyay Construction Co., Malviya Marg, Gandhi Na 8960509086 Circle VrindavanCompleted
1289 08/EE/CD-12/2015-16PARISHAD PROJECT FUNDDevelopment/ Beautification work of pond no.-3 in sec 12 Vrindavan Yojna -3, Lucknow. 0.00 86.00 28/05/201525/08/2015 25/08/201524/11/201525/08/2015 25/08/2015MAA GAYATRI ENTERPRISES Circle VrindavanCompleted
1290 09/EE/CD-12/2015-16PARISHAD PROJECT FUNDSupply and fixing of 3 No. Singnboard at Gokul Gram Yojna-I (Munnu Khera) and Gokul Gram Yojna-II (Bibi Khera) Lucknow 0.00 15.64 07/08/201509/09/2015 09/09/201508/10/201509/09/2015 09/09/2015Ever Green Advertising Pvt. Ltd., Lucknow. Circle VrindavanCompleted
1291 02/EE/CD-12/2015-16PARISHAD PROJECT FUNDConstruction of Internal Drain and Culverts at Sect-14(Part) Vrindavan Yojna, Lucknow. 0.00 56.63 27/03/201530/04/2015 30/04/201529/07/201530/04/2015 30/04/2015MAA GAYATRI ENTERPRISES Circle VrindavanCompleted
1292 07/EE/CD-12/2015-16PARISHAD PROJECT FUNDRepaire and Beautification work of parks at sec 11 Vrindavan Yojna -3, Lucknow 0.00 61.09 10/06/201525/08/2015 25/08/201524/11/201525/08/2015 25/08/2015Shiv Shakti Construction and Traders Circle VrindavanCompleted
1293 10/EE/CD-12/2015-16PARISHAD PROJECT FUNDDevelopment/Beautification work of road No.-01, Sector-12, Vrindavan Yojna, Lucknow. 0.00 45.00 28/05/201502/11/2015 02/11/201501/02/201602/11/2015 02/11/2015T Y TRADERS 9004537987 Circle VrindavanCompleted
1294 13/EE/CD-12/2015-16AWASTHAPNA FUNDConstruction and Strenthing of Road at Rajajipuram, lucknow under Infrastructur fund (Group-A) 0.00 76.50 16/07/201502/11/2015 02/11/201501/02/201602/11/2015 02/11/2015Upadhyay Construction Co., Malviya Marg, Gandhi Na 8960509086 Circle VrindavanCompleted
1295 15/EE/CD-12/2015-16PARISHAD PROJECT FUNDConstruction of C.C. Road, Drain in vill- Ishwari khera, Vrindavan Yojna, Lucknow. 0.00 17.29 16/07/201507/01/2016 07/01/201606/06/201607/01/2016 07/01/2016OM Vashudevay Enterprises, 6c/20, Vrindavan Yojna 95595578311 Circle VrindavanCompleted
1296 02/SE-III/CD-4/2012-13PARISHAD PROJECT FUNDConstruction of 128 Nos.(8 Block) Multistoried (G+3), Residencial Flat in Sapna-II in Sec-18 Vrindavan Yojna Lucknow. 0.00 1296.82 10/04/201217/07/2012 17/07/201216/01/201417/07/2012 17/07/2012M/S A.K. Builders & Suppliers 9935596863J.N. MISHRA,UDAY VIR SINGH JE MANOJ PANDEY AE R.S SINGH XECircle 3Completed
1297 01/EE.CD-4/2015-16PARISHAD PROJECT FUNDConstruction of Rain Water Harvesting In Sapna-II Enclave Campus at Sec-18 Vrindavan Yojna Lucknow. 0.00 22.17 04/06/201530/06/2015 30/06/201529/08/201530/06/2015 30/06/2015M/S A.K. Builders & Suppliers 9935596863ER JAI SHANKAR DIWEDI JE YOGENDRA SINGH AE R.S SINGH XECircle 3Completed
1298 17/EE/CD-12/2015-16AWASTHAPNA FUNDProviding and Laying of C.C. Interlocking tiles under Under Infrastructure at Prahladpuri Yojna, Hardoi.(Group-B) 0.00 43.00 07/12/201509/03/2016 09/03/201608/06/201609/03/2016 09/03/2016Milestone Urban Infra Engineering, M.R. Road, Hard 9839602070 Circle VrindavanCompleted
1299 14/EE/CD-12/2015-16AWASTHAPNA FUNDConstruction and Strengthening of road at Rajajipuram, Lucknow. 0.00 79.00 16/07/201502/11/2015 02/11/201501/02/201602/11/2015 02/11/2015Radhey Radhey Contractor, Dubagga, Lucknow. 7607137533 Circle VrindavanCompleted
1300 18/EE/CD-12/2015-16AWASTHAPNA FUNDProviding and laying Interlocking tiles under Infrastructure at Prahladpuri Yojna, Hardoi. 0.00 48.00 07/12/201509/03/2016 09/03/201608/06/201609/03/2016 09/03/2016Milestone Urban Infra Engineering, M.R. Road, Hard 9839602070 Circle VrindavanCompleted
1301 19/EE/CD-12/2015-16AWASTHAPNA FUNDConstruction of Trunk Drain and Culvert at Bilgram Road, Hardoi. 0.00 68.50 07/12/201509/03/2016 09/03/201608/07/201609/03/2016 09/03/2016Chandra Construction, 169, Civil Line, Hardoi. 9415180786 Circle VrindavanCompleted
1302 21/EE/CD-12/2015-16DEPOSIT WORK FUNDS/L of Interlocking tiles and filling E/W at M.S.K. R.J.S.G.A.Y., Phase-III, Hardoi. Goup-B 0.00 42.00 25/02/201630/03/2016 30/03/201629/05/201630/03/2016 30/03/2016MAA GAYATRI ENTERPRISES Circle VrindavanCompleted
1303 22/EE/CD-12/2015-16DEPOSIT WORK FUNDS/L of Interlocking tiles and beautification of parks at Sandi, Hardoi Under M.S.K.R.J.S.G.A.Y., Hardoi. 0.00 40.00 25/02/201630/03/2016 30/03/201629/05/201630/03/2016 30/03/2016M/S Aditya Engineers & Builders 9415149007 Circle VrindavanCompleted
1304 02/EE/CD-12/2016-17AWASTHAPNA FUNDConstruction of Trunk Drain/Culverts and C.C. Interlocking Tiles at Bil gram Yojna, Lucknow. 0.00 38.00 18/01/201611/04/2016 11/04/201610/07/201611/04/2016 11/04/2016Chandra Construction, 169, Civil Line, Hardoi. 9415180786 Circle VrindavanCompleted
1305 04/EE/CD-12/2016-17PARISHAD PROJECT FUNDLaying of Interlocking tiles at Barauli Khalilabad, Sect-12, Vrindavan Yojna, Lucknow. 0.00 45.96 03/03/201618/06/2016 18/06/201617/09/201618/06/2016 18/06/2016MAA GAYATRI ENTERPRISES Circle VrindavanCompleted
1306 06/EE/CD-12/2016-17PARISHAD PROJECT FUNDMaintenance of Mini Indoor Stadium, Lucknow. 0.00 10.96 16/07/201605/09/2016 05/09/201604/12/201605/09/2016 05/09/20163D CREATION Circle VrindavanCompleted
1307 01/EE/CD-12/2016-17PARISHAD PROJECT FUNDConstruction of O.H.T. with Boundrywall at GGY-1, Munnu Khera, Lucknow. 0.00 76.95 14/01/201611/04/2016 11/04/201610/10/201611/04/2016 11/04/2016Mukesh Agrawal, 9/751, Idira Nagar, Lucknow 05222347764 Circle VrindavanCompleted
1308 05/EE/CD-12/2016-17PARISHAD PROJECT FUNDConstruction of road at Gokul Gram Yojna-1, Munnu Khera, Lucknow Group-A 0.00 0.00 21/03/201605/09/2016 05/09/201604/06/201705/09/2016 05/09/2016CLAYSON INFRATECH PVT.LTD. Circle VrindavanCompleted
1309 MillatNagarBastiAWASTHAPNA FUNDConstruction & Interlocking work of House of Maulana Allauddin to House of Firoz and House of Kayum to House of Maulana Alauddin and House of Mizaul to House of Mustak and House of Gufran to House of Mizaul at Basti 0.00 47.07 05/11/201605/11/2016 05/11/201604/02/201705/11/2016 05/11/2016Departmental (Self) RAJNEESH SRIVASTAV JE AMIT KUMAR MALL AE MOHD HASHIM IQBAL XECircle 1Completed
1310 MaqboolNagarBastiAWASTHAPNA FUNDConstruction & Interlocking work of Near House of Lekhpal In Makhbool Nagar At Basti(In Infrastructure Fund) 0.00 2.64 01/09/201601/09/2016 01/09/201631/12/201601/09/2016 01/09/2016Departmental (Self) RAJNEESH SRIVASTAV JE AMIT KUMAR MALL AE MOHD HASHIM IQBAL XECircle 1Completed
1311 16/E.E.C.D.-34/AWASTHAPNANIDHI/2015-16AWASTHAPNA FUNDAWASTHPANA NIDHI KE ANTRAGAT VARANASI NAGAR KSHTRA ME KRAYE JANE WALE VIBHINYA KARYA (SONARPURA CHAURAHA SE GODOLIA MARG PER NAI SEWER LINE DANLNE, SUDAMAPUR BAZARDIHA MARG PER FARUKI NAGAR SE SEWER LINE DALNE , DEVDIYABIR CHUMUHANI ME SEMI HARMAST LIGHT LAGANE EVAM PANCH ANYA KARYA) KA KARYA 0.00 73.16 09/12/2015 19/03/2016  19/03/2016M/S Awadh Associates 9451871010ARJUN VERMA JE SUMIT KUMAR AE PANKAJ KUMAR PAL XECircle 1Completed
1312 11/E.E.C.D.-34/AWASTHPNANIDHI/2015-16AWASTHAPNA FUNDCONSTRUCTION OF of Drain from Kabir Chura to Jalpa Devi Tiraha to Choti piyari Tiraha, Varanasi. 0.00 19.83 09/12/201609/12/2015 08/03/201607/05/201609/12/2015 08/03/2016MAA VINDHYAVASINI ENTERPRISES 09950007102R.K. GUPTA JE SHIV PRASAD AE PANKAJ KUMAR PAL XECircle 1Completed
1313 HorticultureWorkPARISHAD PROJECT FUNDPlantation of Tree in Trunk Road, Park and Green Belt and fixing of Tree guard, RCC post and barbed wire fencing at Siddharth Vihar, Ghaziabad. 0.00 40.43   Departmental (Self) Circle 7In Progress
1314 HarwatGKPAWASTHAPNA FUNDConstruction & Strengthening of Road From Laldiggi to Domingargh at Hawart Check Dam, Gorakhpur 0.00 467.33 08/07/201608/07/2016 08/07/201630/06/201708/07/2016 08/07/2016Departmental (Self) RAJNEESH SRIVASTAV JE AMIT KUMAR MALL AE MOHD HASHIM IQBAL XECircle 1Completed
1315 RafiqNagarBastiAWASTHAPNA FUNDConstruction of Interlocking Road & Drain to Rahman Manzil via Late Hayatullah House AT Rafiq Nagar Basti 0.00 9.97 31/08/201631/08/2016 31/08/201630/11/201631/08/2016 31/08/2016Departmental (Self) RAJNEESH SRIVASTAV JE AMIT KUMAR MALL AE MOHD HASHIM IQBAL XECircle 1Completed
1316 09/EE/CD-12/2016-17PARISHAD PROJECT FUNDDismentaling and Construction 01 No. Koodaghar in Sect-06, Vrindavan Yojna-1, Lucknow. 0.00 7.90 09/08/201623/09/2016 23/09/201622/10/201623/09/2016 23/09/2016MAA GAYATRI ENTERPRISES Circle VrindavanCompleted
1317 11/EE/CD-12/2016-17AWASTHAPNA FUNDLaying of C.C. Interlocking tiles and Strengthening of roads from Nirikshan Bhawan (PWD) to awadh Hospital, Hardoi under infrastructure fund 0.00 50.73 02/08/201620/10/2016 20/10/201619/01/201720/10/2016 20/10/2016Engineer Mukesh, SARAI Thok, Hardoi. 9415149140 Circle VrindavanCompleted
1318 12/EE/CD-12/2016-17AWASTHAPNA FUNDLaying of C.C. Interlocking tiles from Mukhya Vikas Adhikari Bhawan to Pihani road, Hardoi under infrastructure fund 0.00 50.73 02/08/201620/10/2016 19/01/201720/10/2016 Milestone Urban Infra Engineering, M.R. Road, Hard 9839602070 Circle VrindavanCompleted
1319 15/EE/CD-12/2016-17PARISHAD PROJECT FUNDConstruction of Drainage system at Supparaus, Rajajipuram Yojna, Lucknow. 0.00 85.00 13/05/201624/11/2016 24/11/201623/02/201724/11/2016 24/11/2016Sun Construction, 624/11, Bharwara, Gomti Nagar, L 8960509086 Circle VrindavanCompleted
1320 05/EECD-14/2016-17PARISHAD PROJECT FUNDWork of internal road in the area of ​​newly created plot number-5/4 and 5/4 in Sector-5 of Avadh Vihar Yojana, Lucknow 0.00 19.76 26/10/201631/12/2016 31/12/201630/03/201731/12/2016 31/12/2016BALA JI ENTERPRISES Circle HQCompleted
1321 04/EECD-14/2016-17PARISHAD PROJECT FUNDWork of internal sewer in the area of ​​newly created plot number 5/4 and 5/4 in Sector-5 of Avadh Vihar Yojna, Lucknow 0.00 11.86 26/10/201631/12/2016 31/12/201628/02/201731/12/2016 31/12/2016A.S CONSRTUCTION 8273230008 Circle HQCompleted
1322 07/EECD-14/2016-17PARISHAD PROJECT FUNDWork of internal water supply in the area of ​​newly created plot number-5/4 and 5/4 in Sector-5 of Avadh Vihar Yojana, Lucknow 0.00 5.76 26/10/201631/12/2016 31/12/201628/02/201731/12/2016 31/12/2016Pawan Entrerprises Circle HQCompleted
1323 01/EECD-14/2018-19PARISHAD PROJECT FUNDHorticultural Work at Janhvi Enclave Campus Sector-5, Avadh Vihar Yojna, Lucknow 0.00 2.93 17/03/201804/09/2018 04/09/2018 04/09/2018 04/09/2018AMIT Circle HQCompleted
1324 01/EECD-14/2019-20PARISHAD PROJECT FUNDSupply of suction cum Jetting Machine 8000ltr. along with one year opereation. 0.00 66.83 14/10/201927/01/2020 27/01/202026/04/202027/01/2020 27/01/2020Kam Avida Enviro Engineers Pvt. Ltd. Circle HQCompleted
1325 09/EECD-14/2016-17PARISHAD PROJECT FUNDWork of internal Nali in the area of ​​newly created plot number-5/4 and 5/4 in Sector-5 of Avadh Vihar Yojana, Lucknow 0.00 10.80 26/10/201631/12/2016 28/02/201731/12/2016 SHIV SHAKTI CONSTRUCTION Circle HQCompleted
1326 NandanagarGKPAWASTHAPNA FUNDConstruction of Interlocking Patries from Aakas vihar Shameher Gate to Nanda Nagar Police Booth GKP 0.00 145.66 22/11/201622/11/2016 22/11/201621/02/201722/11/2016 22/11/2016Departmental (Self) RAJNEESH SRIVASTAV JE AMIT KUMAR MALL AE MOHD HASHIM IQBAL XECircle 1Completed
1327 BichhiyaGKPAWASTHAPNA FUNDConstruction of Interlocking Path With Drain At Near Baghel Marriage House At Bichhiya Gorakhpur 0.00 8.48 17/10/201620/10/2016 20/10/201619/01/201720/10/2016 20/10/2016Departmental (Self) RAJNEESH SRIVASTAV JE AMIT KUMAR MALL AE J K KAUSHAL XECircle 1Completed
1328 08/EE/CD-12/2016-17PARISHAD PROJECT FUNDSupply of Various dia R.C.C. hume pipe (Sewer Line) at GGY-1, Munnu Khera, Lucknow. 0.00 21.82 13/06/201623/09/2016 23/09/201622/10/201623/09/2016 23/09/20163D CREATION Circle VrindavanCompleted
1329 SurajkundFlyGkpAWASTHAPNA FUNDConstruction of Road Near Flyover Tiraha Surajkund Colony To Sidharipur Tiraha Via Nirankari Bhawan Gorakhpur 0.00 17.98 13/10/201613/10/2016 13/10/201612/01/201713/10/2016 13/10/2016Departmental (Self) RAJNEESH SRIVASTAV JE AMIT KUMAR MALL AE MOHD HASHIM IQBAL XECircle 1Completed
1330 PattanGKPAWASTHAPNA FUNDConstruction Of Road From Sarswati Shishu Mandir to Sonouli Road Via Pattan Chowk Gorakhpur 0.00 132.08 14/12/201614/12/2016 14/12/201613/03/201714/12/2016 14/12/2016Departmental (Self) RAJNEESH SRIVASTAV JE AMIT KUMAR MALL AE MOHD HASHIM IQBAL XECircle 1Completed
1331 ParkBastiAWASTHAPNA FUNDRenewing & development work of Park to House No 527 and House of 530 in Avas Vikas Colony Katra Yojna Basti(In Infrastructure Fund) 0.00 10.90 31/08/201631/08/2016 31/08/201630/11/201631/08/2016 31/08/2016Departmental (Self) RAJNEESH SRIVASTAV JE AMIT KUMAR MALL AE MOHD HASHIM IQBAL XECircle 1Completed
1332 12/E.E.C.D.-34/AWASTHPNANIDHI/2015-16AWASTHAPNA FUNDRenovation of Drain from Raj Sweet House to Bhrama Nand colony Culvert & its Branch Road Some PartsVaranasi. 0.00 52.97 09/12/2015 09/03/201608/05/2016 09/03/2016Akhilesh Infra structure Pvt. Ltd. 9415202926ARJUN VERMA,R.K. GUPTA JE R.P. TIWARI AE PANKAJ KUMAR PAL,RAM ACHAL VERMA XECircle 1Completed
1333 09/E.E.C.D.-34/AWASTHAPNANIDHI/2015-16AWASTHAPNA FUNDRenovation of Drain from Raj Sweet House to Bhrama Nand colony Culvert & its Branch Road Some PartsVaranasi. 0.00 28.26 09/12/2015 15/02/201614/04/2016 15/02/2016MAA VINDHYAVASINI ENTERPRISES 09950007102R.K. GUPTA JE SUMIT KUMAR AE RAM ACHAL VERMA XECircle 1Completed
1334 01/E.E./C.D.-34/RENOVATION/2019-20PARISHAD PROJECT FUNDRenovation of office complex C.D-34, Varanasi 0.00 30.00 15/10/201915/10/2019 15/10/201914/12/202015/10/2019 15/10/2019M/S S.K. Construction 9453608534 Circle 1Completed
1335 03/E.E.C.D.-34/AWASTHAPNANIDHI/2016-17AWASTHAPNA FUNDRENOVATION OF ROAD AT PANDEYPUR FROM KALIJI MANDIR TO AZAMGARH ROAD, VARANASI 0.00 80.30 30/08/201620/10/2016 20/10/201619/12/201620/10/2016 20/10/2016RAJ ASSOCIATES 09650027361R.K. GUPTA JE SHIV PRASAD AE XECircle 1Completed
1336 10/EE/CD-12/2016-17PARISHAD PROJECT FUNDMaintenance of Community Center, Rajajipuram, Lucknow. 0.00 10.40 16/07/201613/10/2016 13/01/201712/01/201713/10/2016 13/01/2017MAA GAYATRI ENTERPRISES Circle VrindavanCompleted
1337 13/EE/CD-12/2016-17PARISHAD PROJECT FUNDLaying of Internal trunk sewer at Gokul Gram Yojna-I, (Munnu Khera) Lucknow 0.00 93.02 13/06/201620/10/2016 20/10/201619/02/201720/10/2016 20/10/2016Dream Construction 9936086993 Circle VrindavanCompleted
1338 14/EE/CD-12/2016-17AWASTHAPNA FUNDRenovation and Strengthening of roads at Shahabad Nagar Palika Parishad, Hardoi. 0.00 12.01 02/08/201623/11/2016 23/11/201622/02/201723/11/2016 23/11/2016M/S RAJA CONSTRUCTION 7651903756 Circle VrindavanCompleted
1339 PlantationworkPARISHAD PROJECT FUNDPlantation of 834 Nos Tree in Bhramputra Enclave Cluster Sector-10 at siddharth Vihar Yojna, Ghaziabad 0.00 1.77   Departmental (Self) Circle 7Completed
1340 03/EE/CD-2/19-20AWASTHAPNA FUNDInterlocking road and drain work from Sri Sharad Awasthi MLA house to Sri Ram kripal house in Barabanki. 0.00 14.70 25/06/201910/09/2019 10/09/201909/12/201910/09/2019 10/09/2019M/S Savitri Associate Circle 3In Progress
1341 04/EE/CD-2/19-20AWASTHAPNA FUNDBitumin work on main 15.00 m wide road in Obri Yojna Barabanki 0.00 35.70 25/06/201910/09/2019 10/09/201909/12/201910/09/2019 10/09/2019Mahek Enterprises 8423036649 Circle 3In Progress
1342 05/EE/CD-2/19-20AWASTHAPNA FUNDInterlocking tiles road work from Metrology office to Jagnehta in Barabanki. 0.00 38.24 25/06/201910/09/2019 10/09/201909/12/201910/09/2019 10/09/2019Mahek Enterprises 8423036649 Circle 3In Progress
1343 MaintenanceofBoundarywallPARISHAD PROJECT FUNDMaintenance of Boundary wall Constructed in Sector-16 Vasundhara Yojna, Ghaziabad. 0.00 1.32   Departmental (Self) Circle 7Not Started
1344 06/EE/CD-2/19-20AWASTHAPNA FUNDInterloking tile and drain work from 2/82 to OHT & park 2/62 to 2/72 in Obri Barabanki 0.00 53.26 25/06/201910/09/2019 09/12/201909/12/201910/09/2019 09/12/2019Mahek Enterprises 8423036649 Circle 3In Progress
1345 14/EE/CD-2/19-20AWASTHAPNA FUNDInterlocking road work from 4/142 to 4/116 in obri yojna,Barabanki. 0.00 10.52 25/06/201916/11/2019 16/11/201915/02/202016/11/2019 16/11/2019Mahek Enterprises 8423036649 Circle 3Not Started
1346 16/EE/CD-2/19-20AWASTHAPNA FUNDInterloking tile and drain work from Kanshiram colony to Faizabad road in Barabanki 0.00 35.85 25/06/201904/01/2020 04/01/202003/04/202004/01/2020 04/01/2020Ganesh Enterprises Circle 3In Progress
1347 01/EE/2020-21ED-1PARISHAD PROJECT FUNDMts. of Light point in Avadh Shilp Gram at Avadh Vihar Yojna Lucknow 0.00 6.05 28/01/202006/05/2020 06/05/202020/05/202006/05/2020 06/05/2020Preeti Electric works Circle ElectricalCompleted
1348 02/EE/2020-21ED-1PARISHAD PROJECT FUNDMts. of street light fittings at Jhunsi Yojna no.2 Prayagraj 0.00 6.03 28/01/202006/03/2020 06/05/202020/05/202006/03/2020 06/05/2020Preeti Electric works Circle ElectricalCompleted
1349 03/EE/2020-21ED-1PARISHAD PROJECT FUNDMts. of solar pannel in Avadh Shilp Gram At Avadh Vihar Yojna Lucknow 0.00 8.37 06/05/202006/05/2020 20/05/202006/05/2020 Preeti Electric works Circle ElectricalCompleted
1350 01/EE/CD-2/19-20AWASTHAPNA FUNDInterlocking tiles road and drain work from 2/4/64 to 2/4/33 in obri yojna Barabanki. 0.00 8.70 24/01/201920/07/2019 20/07/201919/10/201920/07/2019 20/07/2019Mahek Enterprises 8423036649 Circle 3In Progress
1351 02/EE/CD-2/19-20AWASTHAPNA FUNDConstruction of CC road & drain in Moharipurwa in Barabanki. 0.00 50.17 24/01/201920/07/2019 19/10/201920/07/2019 Mahek Enterprises 8423036649 Circle 3Not Started
1352 04/EE/2020-21ED-1PARISHAD PROJECT FUNDMts. of street light fittings at Jhunsi Yojna no.3 Prayagraj 0.00 6.03 28/01/202006/05/2020 06/05/202020/05/202006/05/2020 06/05/2020Preeti Electric works Circle ElectricalCompleted
1353 07/EE/2020-21ED-1PARISHAD PROJECT FUNDMts. of street light fittings at Various Sector at Manjhola Yojna no. 4 phase-2 Moradabad. 0.00 8.34 28/01/202006/05/2020 05/05/202020/05/202006/05/2020 05/05/2020Preeti Electric works Circle ElectricalCompleted
1354 08/EE/2020-21ED-1PARISHAD PROJECT FUNDMts. of CCTV Camera Avadh Shilp Gram at Avadh Vihar Yojna Lucknow. 0.00 7.10 28/01/202006/05/2020 06/05/202020/05/202006/05/2020 06/05/2020Preeti Electric works Circle ElectricalCompleted
1355 09/EE/2020-21ED-1PARISHAD PROJECT FUNDMts. of Street light fittings at Avadh Vihar Yojna Lucknow 0.00 8.06 28/01/202006/05/2020 06/05/202020/05/202006/05/2020 06/05/2020Preeti Electric works Circle ElectricalCompleted
1356 10/EE/2020-21ED-1PARISHAD PROJECT FUNDMts. of street light at Kalinivan park Vrindavan Yojna Lucknow 0.00 4.99 06/03/202006/05/2020 06/05/202020/05/202006/05/2020 06/05/2020Swastikk Electricals Circle ElectricalCompleted
1357 15/EE/2020-21ED-1PARISHAD PROJECT FUNDShifting of 11 KV line & its related work Infront of Kailash Enclave Sector-18 Vrindavan Yojna no. -4, Lucknow. 0.00 8.83 06/03/202021/05/2020 21/05/202030/05/202021/05/2020 21/05/2020Preeti Electric works Circle ElectricalCompleted
1358 16/EE/2020-21ED-1PARISHAD PROJECT FUNDShifting of 11 KV line & its related work infront of Aravali Enclave at Vrindavan Yojna no. 3 sector-12 Lucknow. 0.00 8.72 06/03/202001/06/2020 01/06/202010/06/202001/06/2020 01/06/2020Preeti Electric works Circle ElectricalCompleted
1359 07/EE/CD-2/19-20AWASTHAPNA FUNDInterlocking tiles work on road patri and road work in Khasra 339 ,Obri Yojna,Barabanki. 0.00 18.93 25/06/201930/10/2019 30/10/201929/01/202030/10/2019 30/10/2019M/S Savitri Associate Circle 3In Progress
1360 08/EE/CD-2/19-20AWASTHAPNA FUNDBeautification of Major park in sector 5 obri yojna Barabanki. 0.00 7.97 25/06/201930/10/2019 30/10/201929/01/202030/10/2019 30/10/2019Vishal Singh Contractor 9984165500 Circle 3In Progress
1361 18/EE/CD-12/2016-17AWASTHAPNA FUNDLaying of Interlocking tiles on patries of road from zila Udyog Kendra to smt. Vimlesh Kumari's House in Dist. Hardoi. 0.00 80.44 03/09/201817/12/2016 17/12/201616/04/201717/12/2016 17/12/2016KUMUD BUILDERS, 313, Aloo thok, Hardoi. 9415417966 Circle VrindavanCompleted
1362 21/EE/CD-12/2016-17AWASTHAPNA FUNDStrengthening of road from jindpeer chauraha to diet chauraha in dist. Hardoi. 0.00 77.37 03/09/201617/12/2016 17/12/201616/04/201717/12/2016 17/12/2016KARUN INFRATECH PVT. LTD., SW-66, DAYALBAGH ROAD, 9839602079 Circle VrindavanCompleted
1363 11/EE/20-21ED-1PARISHAD PROJECT FUNDExternal Electrification work of G+3 Type houses area in Sec-13 at Vrindavan Yojna Lucknow 0.00 153.32 03/10/201911/05/2020 11/05/202010/09/202011/05/2020 11/05/2020PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
1364 14/EE/20-21ED-1PARISHAD PROJECT FUNDConstruction of Required 11 KV Line in Vrindavan Yojna No-4 Lucknow. 0.00 189.46 06/01/202015/05/2020 15/05/202014/07/202015/05/2020 15/05/2020EAGLE ENTERPRISES 09752100976 Circle ElectricalCompleted
1365 23/EE/CD-12/2016-17AWASTHAPNA FUNDLaying of Interlocking tiles on patries of Road from Jailar Awas to police Line Hand pump at Koyalbagh gali No.-04 in Hardoi. 0.00 33.71 03/09/201617/12/2016 17/12/201616/03/201717/12/2016 17/12/2016KARUN INFRATECH PVT. LTD., SW-66, DAYALBAGH ROAD, 9839602079 Circle VrindavanCompleted
1366 02/EE/CD-19/2020-21PARISHAD PROJECT FUNDRenovation work of Office Complex, Sector-9, Vrindavan Yojna, Lucknow 0.00 116.67 02/06/202023/06/2020 23/06/202022/09/202023/06/2020 23/06/2020T Y TRADERS 9004537987AJAY KUMAR JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XECircle 3In Progress
1367 19/EE/2020-21ED-1PARISHAD PROJECT FUNDDecorated and its related work in Avadh Shilpa Gram at Avadh Vihar Yojna Lucknow 0.00 5.10 12/03/202001/06/2020 01/06/202010/06/202001/06/2020 01/06/2020Preeti Electric works Circle ElectricalCompleted
1368 20/EE/2020-21ED-1PARISHAD PROJECT FUNDMts. & Decoration of Office complex located in Sector-9 at Vrindavan Yojna no. 2 Part-2 Lucknow 0.00 5.07 12/03/202001/06/2020 01/06/202010/06/202001/06/2020 01/06/2020Preeti Electric works Circle ElectricalCompleted
1369 21/EE/20-21ED-1PARISHAD PROJECT FUNDMaintenance & Repairing of Pump House at Sec-11,12,14 &16 Vrindavan Yojna Lucknow. 0.00 8.39 02/03/202001/06/2020 15/06/202001/06/2020 PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
1370 22/EE/20-21ED-1PARISHAD PROJECT FUNDConstruction of 100 KVA Pole mounted SubStation and its related work infront of Sec-7D Saryu Enclave (Near OHT) at Avadh Vihar Yojna Lucknow 0.00 7.72 12/03/202001/06/2020 10/06/202001/06/2020 PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
1371 23/EE/20-21ED-1PARISHAD PROJECT FUNDMaintenance of Street Light fitting and related work on main road at Majhola Yojna No-4 Phase-II Moradabad 0.00 7.70 02/03/202001/06/2020 15/06/202001/06/2020 PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
1372 10/SE-1/2015-16AWASTHAPNA FUNDInfrastructure work Different type Jaunpur 0.00 121.75 11/01/201611/01/2016 11/01/201616/05/201711/01/2016 11/01/20163D CREATION Circle 1Completed
1373 14/SE-1/2016-17AWASTHAPNA FUNDInfrastructure work different type, Jaunpur 0.00 164.06 23/06/201623/06/2016 23/06/201607/11/201723/06/2016 23/06/20163D CREATION Circle 1Completed
1374 04/EE/CUETAWAH/2020-21AWASTHAPNA FUNDConstruction of 02 Nos. Vehicle Stoppage (With Toilet Block) Near Numaish Chauraha Etawah 0.00 42.35 28/01/202028/07/2020 28/07/202027/10/202028/07/2020 28/07/2020Lal Bahadur Singh Contractor 9415472725DEVENDRA YADAV JE ARVIND KUMAR AE PRADEEP KUMAR XECircle 4Not Started
1375 02/EE/CUETAWAH/2020-21AWASTHAPNA FUNDConstruction of 02 Nos. Vehicle Stoppage (With Toilet Block) Near DM Chauraha Etawah 0.00 42.35 28/01/2020 28/07/202027/10/2020 28/07/2020Lal Bahadur Singh Contractor 9415472725SRI ANIL KUMAR CHAUDHARY JE ARVIND KUMAR AE PRADEEP KUMAR XECircle 4Not Started
1376 24/EE/20-21ED-1PARISHAD PROJECT FUNDMts. of HT/LT pannel in Avadh Shilp Gram at Avadh Vihar Yojna Lucknow 0.00 6.19 28/01/202001/06/2020 01/06/202015/06/202001/06/2020 01/06/2020Preeti Electric works Circle ElectricalCompleted
1377 26/EE/20-21ED-1PARISHAD PROJECT FUNDSupply & Fixing of caging & its related work at secure RMU in various sector Avadh Vihar Yojna Lucknow 0.00 8.08 12/03/202001/06/2020 01/06/202010/06/202001/06/2020 01/06/2020Swastikk Electricals Circle ElectricalCompleted
1378 27/EE/20-21ED-1PARISHAD PROJECT FUNDCleaning of Sewage pumping plant & its related work at Vrindavan Yojna no. 4 sector-18 Lucknow 0.00 4.02 12/03/202001/06/2020 01/06/202030/06/202001/06/2020 01/06/2020Swastikk Electricals Circle VrindavanCompleted
1379 28/EE/20-21ED-1PARISHAD PROJECT FUNDCleaning of sewage pumping plant & its related work at Jhunsi Yojna No. 2 Prayagraj 0.00 5.69 06/03/202001/06/2020 01/06/202015/06/202001/06/2020 01/06/2020Swastikk Electricals Circle ElectricalCompleted
1380 03/PM/2015-16AWASTHAPNA FUNDInfrastructure work, Machhli shahar, Parao, Jaunpur 0.00 26.68 29/11/2015 29/11/201525/04/201729/11/2015 29/11/20153D CREATION Circle 1Completed
1381 03/SE(V)/CD-11/2020-21CENTRAL AND STATE FUNDConstruction of 96 Nos. Group (n) (G+3) EWS houses at Village Kankaha, Mohanlalganj, Lucknow. 0.00 390.70 04/02/201918/06/2020 18/06/202017/12/202118/06/2020 18/06/2020M/s Bansal Traders 9450364731PRAMOD KUMAR YADAV JE JITENDRA PRAKASH SINGH,RAKESH KUMAR SAXENA AE NAVJOT SINGH VERMA XECircle VrindavanIn Progress
1382 02/EE/CD-2/2020-21PARISHAD PROJECT FUNDGENERAL EARTH WORK AT GONDA FAIZABAD MARG BHOOMI VIKAS YOJNA GONDA 0.00 28.85 10/12/201910/08/2020 09/11/202010/08/2020 Ansh Contruction 9450072493 Circle 3In Progress
1383 05/EE/CD-38/2020-21PARISHAD PROJECT FUNDConst of Internal Drain & Culvert in sec-15 & 16B 0.00 62.50 11/05/202018/08/2020 18/08/202017/02/202118/08/2020 18/08/2020Jai Jagdamba Contractor & Engineers 9971688121VEER SINGH JE RAVINDRA BHATT AE AMAN TYAGI XECircle MantolaCompleted
1384 22/EE/CD-12/2016-17AWASTHAPNA FUNDLaying of Internal Tiles both side of road from zila Jail to Jailer Awas in Hardoi. 0.00 29.61 03/09/201617/12/2016 17/12/201616/03/201717/12/2016 17/12/2016Milestone Urban Infra Engineering, M.R. Road, Hard 9839602070 Circle VrindavanCompleted
1385 09/SE-III/CD-19/2019-20CENTRAL AND STATE FUNDConst. of 96 Nos. (G+3) Flats under PMAY (Urban) at Village-Anaura, Tehsil-Sadar, Distt.- Lucknow 0.00 398.77 20/06/201921/03/2020 21/03/202020/09/202121/03/2020 21/03/2020M/S Neel Constructions 9415117988AJAY KUMAR JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XECircle 3In Progress
1386 10/SE-III/CD-19/2019-20CENTRAL AND STATE FUNDConst. of 96 Nos. (G+3) Flats under PMAY (Urban) at Village-Anaura, Tehsil-Sadar, Distt.-Lucknow 0.00 398.77 20/06/201921/03/2020 21/03/202020/09/202121/03/2020 21/03/2020M/S Neel Constructions 9415117988AJAY KUMAR JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XECircle 3In Progress
1387 11/SE-III/CD-19/2019-20CENTRAL AND STATE FUNDConst. of 96 Nos. (G+3) Flats under PMAY (Urban) at Village-Anaura, Tehsil-Sadar, Distt.-Lucknow 0.00 398.77 20/06/201921/03/2020 21/03/202020/09/202121/03/2020 21/03/2020M/S Neel Constructions 9415117988AJAY KUMAR JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XECircle 3In Progress
1388 17/EE/20-21ED-1PARISHAD PROJECT FUNDSupply and installation street light at Avadh Vihar Yojna Lucknow in nearest Saryu Enclave (Group-B) 0.00 8.74 18/01/202001/06/2020 01/06/202015/06/202001/06/2020 01/06/2020PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
1389 18/EE/20-21ED-1PARISHAD PROJECT FUNDSupply and installation of street light and Transfomation work at Avadh Vihar Yojna Lucknow in near Saryu Enclave (Group-C) 0.00 8.92 18/01/202001/06/2020 01/06/202015/06/202001/06/2020 01/06/2020PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
1390 01/EE/CD-38/2020-21PARISHAD PROJECT FUNDConst of Park in sector-16B 0.00 10.34 15/01/202026/06/2020 26/06/202025/09/202026/06/2020 26/06/2020Santosh Enterprises 8368572852ABHISHEK KUMAR MISHRA JE NARESH GUPTA AE AMAN TYAGI,SHOBHIT KUMAR PATHAK,UMA NATH SHUKLA XECircle MantolaCompleted
1391 02/EE/CD-38/2020-21PARISHAD PROJECT FUNDConst of RCC Post & Barbed wire Fencing work in green belt at sec-14 a & 14 B 0.00 10.57 04/12/201926/06/2020 26/06/202025/09/202026/06/2020 26/06/2020ANUJ ASSOCIATE 9411902544ABHISHEK KUMAR MISHRA JE NARESH GUPTA AE AMAN TYAGI,SHOBHIT KUMAR PATHAK,UMA NATH SHUKLA XECircle MantolaCompleted
1392 00AWASTHAPNA FUNDअवस्थापना निधि के अन्तर्गत जनपद-वाराणसी में छित्तूपुर से हनुमान पार्क तक सीवर सुधार कार्य 0.00 391.63   3D CREATION Circle 1Completed
1393 000AWASTHAPNA FUNDअवस्थापना निधि के अन्तर्गत जनपद-वाराणसी में आदमपुर पुलिस स्टेशन से हनुमान पाठक तक डिस्मेन्टलिंग तथा आजाद पार्क सेे आदमपुर एवं जी0टी0 रोड तक इण्टरकनेक्श का कार्य। 0.00 327.37   3D CREATION Circle 1Completed
1394 0000AWASTHAPNA FUNDअवस्थापना निधि के अन्तर्गत जनपद-वाराणसी में गोदौलिया से गिरजाघर चैराहे तक ट्रेन्चलेस के द्वारा सीवर बिछाने का कार्य 0.00 125.00   3D CREATION Circle 1Completed
1395 00000AWASTHAPNA FUNDअवस्थापना निधि के अन्तर्गत जनपद-वाराणसी में जलकल विभाग द्वारा कराये जाने वाले कार्य 0.00 2.92   3D CREATION Circle 1Completed
1396 000000AWASTHAPNA FUNDअवस्थापना निधि के अन्तर्गत जनपद-वाराणसी में जलकल विभाग नगर निगम, वाराणसी द्वारा कराये जाने वाले विभिन्न कार्य 0.00 80.00   3D CREATION Circle 1Completed
1397 00000000AWASTHAPNA FUNDअवस्थापना निधि के अन्तर्गत जनपद-मिर्जापुर में ग्रामीण अभियन्त्रण अनुभाग द्वारा कराये जाने वाले कार्य 0.00 31.72   3D CREATION Circle 1Completed
1398 0000000000AWASTHAPNA FUNDनिर्माण खण्ड-34, वाराणसी द्वारा वर्ष 2018-19 में 500 नग वृक्षारोपण का कार्य 0.00 4.17   3D CREATION Circle 1Completed
1399 00000000000AWASTHAPNA FUNDपाण्डेयपुर योजना, वाराणसी के सीवर लाइन को जल निगम की मुख्य सीवर लाइन से जोड़ने हेतु परियोजना प्रबन्धक जल निगम वाराणसी का कार्य 0.00 18.61   3D CREATION Circle 1Completed
1400 13/EE/20-21ED-1PARISHAD PROJECT FUNDConstruction of 33 KV line ofor 220/132/33 KV S/S to 33/11 KV S/S sector-8 Avadh Vihar Yojna Lucknow. 0.00 433.81 27/09/201913/05/2020 13/05/202012/09/202013/05/2020 13/05/2020Preeti Electric works Circle ElectricalCompleted
1401 Plantation2020-21PARISHAD PROJECT FUND178 NOS. PLANTATION WORK AT VIKAS NAGAR YOJNA GORAKHPUR(2020-21) 0.00 0.66 29/06/2020 29/06/202005/07/202029/06/2020 29/06/2020Departmental (Self) RAJNISH KUMAR SIRVASTAVA JE ASHOK KUMAR AE J K KAUSHAL XECircle 1Completed
1402 06/EE(GKP)/2020-21AWASTHAPNA FUNDConstruction of Interlocking & Drain At Sri Ram Public School (Old Post Office Gate) Sri Ram Public School( Back Side Gate) At Basti 0.00 18.00 28/03/202020/05/2020 20/05/202031/10/202020/05/2020 20/05/2020M/S TIGER ELECTRICAL & CONSTRUCTION COMPANY RAVINDRA NATH JE ASHOK KUMAR AE J K KAUSHAL XECircle 1Completed
1403 05/EE/(GKP)/2020-21AWASTHAPNA FUNDConstruction of Interlocking & Drain at (In Belwadadi From Harijun House to New House of Gauri Shanker) At Basti 0.00 0.00 28/03/202020/05/2020 20/05/202019/09/202020/05/2020 20/05/2020M/S TIGER ELECTRICAL & CONSTRUCTION COMPANY RAVINDRA NATH JE ASHOK KUMAR AE J K KAUSHAL XECircle 1Completed
1404 03/EE(GKP)/2020-21AWASTHAPNA FUNDConstruction of Interlocking & Drain at ( Ward No-09 Pikaura Shiv Gulam From Mr. Rajesh House to Mr. Vinod Gupta & Goli Teli House Via Gram Sabha Road) At Basti 0.00 36.00 02/03/202020/05/2020 20/05/202031/10/202020/05/2020 20/05/2020M/S TIGER ELECTRICAL & CONSTRUCTION COMPANY RAVINDRA NATH JE ASHOK KUMAR AE J K KAUSHAL XECircle 1Completed
1405 02/EE(GKP)/2020-21AWASTHAPNA FUNDConstruction of Interlocking & Drain at ( Ward No-02 Nahaiya Banrahi Harijan Basti To Railway Crossing Road) At Basti 0.00 37.00 02/03/202020/05/2020 20/05/202019/09/202020/05/2020 20/05/2020M/S TIGER ELECTRICAL & CONSTRUCTION COMPANY RAVINDRA NATH JE ASHOK KUMAR AE J K KAUSHAL XECircle 1Completed
1406 02/EE/CD-12/2020-21PARISHAD PROJECT FUNDStrengthening of 24.00 Mt. wide road at Sector-11, Vrindavan Yojna, Lucknow. 0.00 106.75 13/03/202024/08/2020 24/08/202023/11/202024/08/2020 24/08/2020RAM SINGH AGARWAL ER. MUHAR SINGH JE A.K.SINHA AE SHASHANK PANDEY XECircle VrindavanCompleted
1407 05/SE-3/2019-20CENTRAL AND STATE FUNDConstruction of 96 Nos PMAY (U) houses at civil line Gonda. 0.00 394.57 15/02/202025/02/2020 25/02/202024/08/202125/02/2020 25/02/2020Izhar Ali Contractor Circle 3In Progress
1408 01/SE-I/VNS/CD-37/2020-21STATE FUNDRemaining Work of 48 Nos. Houses of Manyawar Kashiram Ji Shahri Garib Avas Yojna (Phase-III) At Basi Siddarthnagar 0.00 57.44 04/12/201908/07/2020 08/07/202007/07/202108/07/2020 08/07/2020AVADH ENTERPRISES 09152105232JEYOTI NARAYAN JE ASHOK KUMAR AE J K KAUSHAL XECircle 1In Progress
1409 30/EE/20-21ED-1PARISHAD PROJECT FUNDConst. of 220 mtr. Deep 01 No. Tubewell Boring by D.C. rig Machine at Sector-13, Vrindavan Yojna Lucknow 0.00 23.36 26/05/202011/06/2020 11/06/202010/10/202011/06/2020 11/06/2020Drillcon India Circle ElectricalCompleted
1410 08/SE(V)/CD-12/2020-21PARISHAD PROJECT FUNDConstruction of 1.00 MLD capacity sewage treatment plant based on constructed wet land technology including O&M for 3 years at Gokul Gram Yojna-1, Munnu Khera, Lucknow. 0.00 273.00 17/06/202027/08/2020 27/08/202026/02/202227/08/2020 27/08/2020SOLAR TECH ENGINEER MANOJ KUMAR KEWAT JE A.K.SINHA AE SHASHANK PANDEY XECircle VrindavanIn Progress
1411 1506/A-7/70PARISHAD PROJECT FUNDPlantation Work in Sec-7 & Sec-8, Siddharth Vihar Yojna, Ghaziabad 0.00 0.00   3D CREATION YOGENDRA KUMAR GUPTA JE NARENDRA KUMAR AE ATUL KUMAR SINGH XECircle 7In Progress
1412 100CusecGangaWaterEXTERNAL DEVELOPMENT FUNDOperation and Maintenance of 100 Cusec Ganga Water 0.00 116.79   Jal Nigam ghaziabad 7757021383 Circle 7In Progress
1413 32/EE/20-21ED-1PARISHAD PROJECT FUNDSupplu & Installation of high mask fitting and its related work infront of alakhnanda enclave avadh vihar Yojna Lucknow. 0.00 5.35 02/03/202019/06/2020 19/06/202028/06/202019/06/2020 19/06/2020PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
1414 04/EE(GKP)/2020-21AWASTHAPNA FUNDConst. & Interlocking & Drain at (Ward No-09 pikaura Shi Gulam From Srivastav Ji house via Harischand Agrwal to Mr Ramji Singh Bording) At Basti 0.00 24.00 02/03/202020/05/2020 20/05/202031/10/202020/05/2020 20/05/2020M/S TIGER ELECTRICAL & CONSTRUCTION COMPANY RAVINDRA NATH JE ASHOK KUMAR AE J K KAUSHAL XECircle 1Completed
1415 02/E.E./CD-24/MBD/2020-21EXTERNAL DEVELOPMENT FUNDLaying of Water Supply Line in Kotdwar Road Bhumi Vikas Evam Grahsthan Yojna No. 1, Najibabad, Bijnor 0.00 19.00 15/07/202018/08/2020 18/08/202017/11/202018/08/2020 18/08/2020VIKAS ENGINEERING YOGESH KUMAR JE A.K.SAXENA AE FARAZ ASLAM XECircle 5Not Started
1416 02/EE/CD-22/2020-21PARISHAD PROJECT FUNDLaying of internal sewer line in sector-4A plots at Mandola Vihar Ghaziabad 0.00 48.71 13/05/202031/08/2020 31/08/202028/02/202131/08/2020 31/08/2020RAMAXE CONSTRUCTION 9811554477 Circle MantolaIn Progress
1417 02/EE/2020-21PARISHAD PROJECT FUNDMaintenance/Repair of Pot Holes and Trunk Roads in Majhola Yojna No.-4, Phase-2, Moradabad 0.00 12.45 24/08/202003/10/2020 03/10/202002/11/202003/10/2020 03/10/2020M/s Rakesh Kumar 9837019057 Circle 5In Progress
1418 03/EE/CD-24/MBD/2020-21PARISHAD PROJECT FUNDConstruction of 29 Nos LIG 29/60 Type Semifinished Houses in Kotdwar Road Yojna, Najibabad, Bijnor 0.00 105.00 04/08/202008/10/2020 08/10/202007/07/202108/10/2020 08/10/2020M/S PARI ENTERPRISES 9540747089 Circle 5In Progress
1419 65/EE/20-21PARISHAD PROJECT FUNDConstruction of 390 mtr deep 02 nos. tubewell boring by D,C Rig machine at Sec-10 B Avadh Vihar Yojna Lucknow 0.00 89.49 24/11/202015/12/2020 15/12/202014/03/202115/12/2020 15/12/2020CENTRAL INDIA TUBEWELL 9839900466 Circle ElectricalCompleted
1420 01/EE/CD-24/MBD/2020-21EXTERNAL DEVELOPMENT FUNDConstruction of 02 Nos. Pump House at Rawli Road Yojna Bijnor 0.00 6.70 05/02/202024/06/2020 24/06/202023/08/202024/06/2020 24/06/2020M/ S SOHAN LAL CONTRACTOR 9808951209 Circle 5Completed
1421 01/EE/2020-21PARISHAD PROJECT FUNDConstruction of OHT 700 K.L./26.00 M. Staging Under Development Works in Sector-15 at Majhola Yojna No.-4, Phase-2 (Vistar), Moradabad. 0.00 74.50 27/02/202013/07/2020 13/07/202012/04/202113/07/2020 13/07/2020P. K. Sharma SURENDRA PRASAD JE ANIL KUMAR SAXENA AE SASMIT KATIYAR XECircle 5Completed
1422 03/EE/CUETAWAH/2020-21AWASTHAPNA FUNDConstruction of 02 Nos. Vehicle Stoppage (With Toilet Block) Near Shastri Chauraha Etawah 0.00 42.35 28/01/202028/07/2020 28/07/202027/10/202028/07/2020 28/07/2020Lal Bahadur Singh Contractor 9415472725DEVENDRA YADAV JE ARVIND KUMAR AE PRADEEP KUMAR XECircle 4Not Started
1423 01/EE/CUETAWAH/2020-21AWASTHAPNA FUNDConstruction of 02 Nos. Vehicle Stoppage (With Toilet Block) Near ITI Chauraha Etawah 0.00 42.35 28/01/202028/07/2020 28/07/202027/10/202028/07/2020 28/07/2020Lal Bahadur Singh Contractor 9415472725SRI DEVENDRA YADAV JE ARVIND KUMAR AE PRADEEP KUMAR XECircle 4Not Started
1424 05/EE/CUETAWAH/2020-21AWASTHAPNA FUNDConstruction of 02 Nos. Vehicle Stoppage (With Toilet Block) Near Gwalior Bus Stand Etawah 0.00 42.35 28/01/202028/07/2020 28/07/202027/10/202028/07/2020 28/07/2020Lal Bahadur Singh Contractor 9415472725ARUN KUMAR PATEL JE ARVIND KUMAR AE PRADEEP KUMAR XECircle 4Not Started
1425 03/S.E.-1/VNS/CD-34/2020-21AWASTHAPNA FUNDINTERLOCKING IN ROAD PATRIES IN AWAS VIKAS COLONY PANDEYPUR, VARANASI 0.00 140.00 04/05/202024/07/2020 24/07/202023/10/202024/07/2020 24/07/2020PUJA ENTERPRISES 9653030053TRIBHUVAN LAL JE V. P. MISHRA AE AJIT KUMAR CHAUDHARY XECircle 1Completed
1426 01/EE/ED-III/20-21PARISHAD PROJECT FUNDConstruction of 420 Meter Deep Tubewell at Ganga Enclave Scheme No. -3, Kanpur 0.00 45.92 28/05/202026/06/2020 26/06/202025/10/202026/06/2020 26/06/2020CIT DRILLERS & DEVELOPERS Circle ElectricalIn Progress
1427 02/S.E.-1/C.D.-34/2020-21AWASTHAPNA FUNDCONSTRUCTION OF INTER LOCKING & DRAIN FROM RAILWAY STATION TO SHATISH CHANDRA COLLAGE VIA MALGODAM IN BALLIA 0.00 227.00 09/06/202024/07/2020 24/07/202023/01/202124/07/2020 24/07/2020M/S Sai Enterprises 9653091241ARJUN VERMA JE V. P. MISHRA AE AJIT KUMAR CHAUDHARY XECircle 1Completed
1428 02/E.E/C.D-5/2020-21PARISHAD PROJECT FUNDLaying of Sectorial Sewer Line In Sector-5 at Scheme No-11 Jagriti Vihar (Ext.) Meerut 0.00 52.38 21/11/201929/05/2020 29/05/202028/08/202029/05/2020 29/05/2020M/s Ramaxe Construction Co 9811554477ER. DUJAI RAM JE ER. SUNIL KUMAR AE ER. ARVIND KUMAR XECircle 2Completed
1429 49/EE/2020-21PARISHAD PROJECT FUNDConstruction of 33 KV line to crossing Railway line only from 220/33 KV S/S Avadh Vihar Lucknow to connect the proposed 33/11 KV S/S at Avadh Vihar Yojna Lucknow 0.00 109.33 28/08/202013/10/2020 13/10/202012/12/202013/10/2020 13/10/2020PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
1430 11/SE-II/CD-6/2019-20PARISHAD PROJECT FUNDConstruction of remaining 45.00m wide road (node 25, 26, 27) at Scheme-11, Jagriti Vihar (Ext.), Meerut 0.00 388.35 14/08/201901/02/2020 01/02/202031/07/202001/02/2020 01/02/2020M/s S.K. Singh 9837488572AJAB SINGH JE VIRENDRA KUMAR AE M.B. KAUSHIK XECircle 2Completed
1431 02/SE/Meerut/2020-21PARISHAD PROJECT FUNDConstruction of 18.00m wide remaining road and drain along the road to G.T. Road, Pahasu Marg, Scheme No. 2, Khurja, Distt. Bulandshahr 0.00 126.07 14/10/202007/11/2020 07/11/202006/05/202107/11/2020 07/11/2020Smt. Urmila Yadav AJAB SINGH JE M BKAUSHIK AE M.B. KAUSHIK XECircle 2Completed
1432 02/EE/CD/Meerut-01/2020-21PARISHAD PROJECT FUNDDevelopment works in pocket (Free from dispute) in Sector-11, Scheme No. 7, Shastri Nagar, Meerut 0.00 15.45 06/02/202013/01/2021 13/01/202112/04/202113/01/2021 13/01/2021M/S GURU CONSTRUCTION CO. 9997628189SH. SANDEEP KUMAR JE SH. RAVINDRA KUMAR AE M.B. KAUSHIK XECircle 2Completed
1433 70/EE/20-21PARISHAD PROJECT FUNDExternal Electrification work in the area of PMAY at Sec-10 B Avadh Vihar Yojna Lucknow. 0.00 382.96 24/11/202011/11/2020 29/12/202028/03/202111/11/2020 29/12/2020EAGLE CONSTRUCTION 9415103222 Circle ElectricalCompleted
1434 05/EE/ED-III/20-21PARISHAD PROJECT FUNDConstructions of 11 K.V.Feeder (Under External Electrification) work for Sector-2, for 33/11 K.V. Sub Station at Sector-2, Scheme No.-11 Jagrati Vihar (Ext.) Meerut. 0.00 9.92 15/07/202024/09/2020 24/09/202023/12/202024/09/2020 24/09/2020ADITYA ENTERPRISES Circle ElectricalNot Started
1435 07/EE/ED-III/20-21PARISHAD PROJECT FUNDSupply and Installation of 11 K.V. Outgoing V.C.B. Panel for 33/11 K.V. Sub Station at Sector-3, Jagravi Vihar (Ext.) Scheme No.-11, Meerut. 0.00 9.77 15/07/202024/09/2020 24/09/202023/12/202024/09/2020 24/09/2020SINGH CONSTRUCTION 9794412774 Circle ElectricalIn Progress
1436 05/SE(V)/CD-11/2020-21CENTRAL AND STATE FUNDConstruction of 96 Nos. Group (n) (G+3) EWS houses at Village Kankaha, Mohanlalganj, Lucknow. 0.00 390.70 04/02/201918/06/2020 18/06/202017/12/202118/06/2020 18/06/2020Rituraj Traders 9415180245NEERAJ KUMAR JE AKBAR ALI,RAJIV RASTOGI AE NAVJOT SINGH VERMA XECircle VrindavanIn Progress
1437 06/SE(V)/CD-11/2020-21CENTRAL AND STATE FUNDConstruction of 96 Nos. Group (n) (G+3) EWS houses at Village Kankaha, Mohanlalganj, Lucknow. 0.00 390.70 04/02/201918/06/2020 18/06/202017/12/202118/06/2020 18/06/2020M/S Ram Sewak Hargovind Sahai 9415149653PRAMOD KUMAR YADAV JE JITENDRA PRAKASH SINGH,RAKESH KUMAR SAXENA AE NAVJOT SINGH VERMA XECircle VrindavanIn Progress
1438 07/SE(V)/CD-11/2020-21CENTRAL AND STATE FUNDConstruction of 96 Nos. Group (n) (G+3) EWS houses at Village Kankaha, Mohanlalganj, Lucknow. 0.00 390.70 04/02/201918/06/2020 18/06/202017/12/202118/06/2020 18/06/2020GOPI CHAND RANGLINI 9956510351PRAMOD KUMAR YADAV JE JITENDRA PRAKASH SINGH,RAKESH KUMAR SAXENA AE NAVJOT SINGH VERMA XECircle VrindavanIn Progress
1439 1445/TQ/01/2020-21PARISHAD PROJECT FUNDConstruction of 50.00 Mtr Wide Road(Part) Siddharth Vihar Yojna Ghaziabad. 0.00 247.66 27/02/202022/06/2020 22/06/202021/12/202022/06/2020 22/06/2020S S CONSTRUCTION 9999999645RANDHIR SINGH JE NARENDRA PAL AE ATUL KUMAR SINGH XECircle 7In Progress
1440 1446/TQ/02/2020-21PARISHAD PROJECT FUNDConstruction of 24.00 Mtr Wide Road (A&B) in Siddharth Vihar Yojna Ghaziabad. 0.00 104.38 27/02/202022/06/2020 22/06/2020 22/06/2020 22/06/2020Shree Ji Infraproject P Ltd RANDHIR SINGH JE NARENDRA PAL AE ATUL KUMAR SINGH XECircle 7In Progress
1441 756/PRO-50/48PARISHAD PROJECT FUNDConstructions of 18.00 Mtr wide Road (Part) at sec-7 Siddharth Vihar Yojna Ghaziabad. 0.00 47.38   3D CREATION R.K. GUPTA JE NARENDRA PAL AE ATUL KUMAR SINGH XECircle 7Not Started
1442 34/ee/cd-12/2016-17PARISHAD PROJECT FUNDLaying of water line in Gokul Gram Yojna No.-1, Munnu Khera, Lucknow. 0.00 60.78 15/10/201603/01/2017 03/01/201702/05/201703/01/2017 03/01/2017J.P. TRADERS Circle VrindavanCompleted
1443 33/EE/CD-12/2016-17PARISHAD PROJECT FUNDProviding laying and joining water supply line at Gokul Gram Yojna-1, Munnu Khera, Lucknow. (LIG cluster) 0.00 60.78 15/10/201603/01/2017 03/01/201702/05/201703/01/2017 03/01/2017MAA GAYATRI ENTERPRISES Circle VrindavanCompleted
1444 761/PRO-50/49PARISHAD PROJECT FUNDLaying & Jointing Internal Sewer Line on 24.00 mtr wide road between sec-1 & 3 in Siddhath Vihar Yojna, Gzb 0.00 19.77 10/07/202017/08/2020 17/08/202016/12/202017/08/2020 17/08/20203D CREATION R.K. GUPTA JE NARENDRA PAL AE ATUL KUMAR SINGH XECircle 7In Progress
1445 01/EE/CD-10/2020-21PARISHAD PROJECT FUNDSupply and Laying of Rising Main from Tube well near Sector-17 Electric Sub Station upto Overhead Tank at Sector-17, Const. of Pump House/Operator Room & Boundary Wall near Sector-17 Electric Sub Station, Mandola Vihar Yojna Ghaziabad 0.00 27.09 20/08/202023/09/2020 23/09/202022/03/202123/09/2020 23/09/2020SHIVAM CONTRACTOR 8755427501OMPRAKASH CD10 JE T.K. BANERJEE AE FARAZ ASLAM XECircle MantolaCompleted
1446 66/EE/20-21PARISHAD PROJECT FUNDExternal Electrification work in the area of PMAY at Lohramau Bhoomi Vikas Evam Grehsthan Yojna Sultanpur 0.00 34.89 24/11/202018/12/2020 18/12/202017/02/202118/12/2020 18/12/2020ADITYA ENTERPRISES Circle ElectricalCompleted
1447 69/EE/2020-21PARISHAD PROJECT FUNDExternal Electrification work in the area of PMAY at sec-3 Avadh Vihar Yojna Lucknow 0.00 309.29 24/11/202029/12/2020 29/12/202028/03/202129/12/2020 29/12/2020EAGLE CONSTRUCTION 9415103222 Circle ElectricalCompleted
1448 03/EE/CDBagpat-02/2020-21PARISHAD PROJECT FUNDMaking Water and Sewer Connection Work in Sector-4A (Plots Portion) 0.00 24.29 17/12/202016/04/2021 17/12/2020Tahir Hussain Ansari 9990619560 Circle MantolaIn Progress
1449 04/EE/CD/Meerut-01/2020-21PARISHAD PROJECT FUNDConstruction of Internal Drain at Pahasu Marg, Scheme-02, Khurja, Distt. Bulandshahr 0.00 7.50 21/01/202117/03/2021 17/03/202116/05/202117/03/2021 17/03/2021K.V. Chandraraj Const. Co. 9837451414AJAB SINGH JE SH. RAVINDRA KUMAR AE M.B. KAUSHIK XECircle 2Completed
1450 36/EE/CD-12/2016-17PARISHAD PROJECT FUNDDevelopment work at 6.00 Mt. wide road in sector-12, Rajajipuram, Lucknow. 0.00 16.00 17/11/201603/01/2017 03/01/201702/04/201703/01/2017 03/01/2017SHEE COMMUNICATIONS Circle VrindavanCompleted
1451 72/EE/20-21PARISHAD PROJECT FUNDExternal Electrification work (Part) of sec-4 scheme-2 phase-I Vrindavan Yojna Lucknow 0.00 18.79 22/12/202030/12/2020 31/12/202028/02/202130/12/2020 31/12/2020PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
1452 03/EE/ED-III/20-21PARISHAD PROJECT FUNDSupply and Installation of 02 No. 1000 LPM 40 Mtr. Head Submersible Pumping Plant at Gange Enclave in Scheme No. 3, Ambedkarpuram, Kanpur 0.00 8.20 13/07/202013/08/2020 13/08/202012/10/202013/08/2020 13/08/2020M.A. Engineering works Circle ElectricalIn Progress
1453 06/EE/ED-III/20-21PARISHAD PROJECT FUNDConstructions of External Electrification Transformation work for Street Light work at Trunk Road Scheme No.-11 Jagrati Vihar Ext. Meerut. 0.00 9.65 24/09/202024/09/2020 24/09/202023/12/202024/09/2020 24/09/2020SINGH CONSTRUCTION 9794412774 Circle ElectricalCompleted
1454 05/EE/CD,MRT-02/2020-21PARISHAD PROJECT FUNDConstruction Of Road In The Campus Of 624 Nos. PMAY Flats In Sector-2 & 4, Scheme No.-11, Jagriti Vihar (Ext.), Meerut 0.00 103.50 12/11/202006/01/2021 06/01/2021 06/01/2021 06/01/2021M/s Jeet Construction Co. 9837021527S.P. SINGH JE MANOJ KUMAR SAXENA AE SHRI RAJEEV KUMAR XECircle 2In Progress
1455 04/EE/CD,MRT-02/2020-21INFRAInternal Sewerage System Works in the Campus of 624 (480+144) Nos PMAY Scheme Flats in Sector-2 & 4, Scheme No.-11, Jagriti Vihar (Ext.), Meerut 0.00 40.70 12/11/202029/12/2020 28/03/202128/03/202129/12/2020 28/03/2021M/s G.A. Enterprises 9548760117S.P. SINGH JE SANJEEV KUMAR TIWARI AE SHRI RAJEEV KUMAR XECircle 2In Progress
1456 05/EE/CD/Meerut-01/2020-21PARISHAD PROJECT FUNDLaying of Trunk Sewer Line at Pahasu Marg, Scheme-02, Khurja, Distt. Bulandshahr 0.00 18.00 21/01/202117/03/2021 17/03/202116/05/202117/03/2021 17/03/2021Manpal 9917316437AJAB SINGH JE SH. RAVINDRA KUMAR AE M.B. KAUSHIK XECircle 2Completed
1457 03/EE/CD/Meerut-01/2020-21PARISHAD PROJECT FUNDConstruction of Park at Pahasu Marg, Scheme-02, Khurja, Distt. Bulandshahr 0.00 7.50 21/01/202117/03/2021 17/03/202116/05/202117/03/2021 17/03/2021K.V. Chandraraj Const. Co. 9837451414AJAB SINGH JE SH. RAVINDRA KUMAR AE M.B. KAUSHIK XECircle 2Completed
1458 03ee20-21PARISHAD PROJECT FUNDConstruction of boundary wall around Amber masque at Sec-16, Vrindavan Yojna, Lucknow 0.00 20.16 26/06/202019/08/2020 19/08/202018/10/202019/08/2020 19/08/2020OM SAI ENTERPRISES MANOJ KUMAR JE K.N. MISHRA AE D.K. SRIVASTAVA XECircle VrindavanCompleted
1459 02/EE/CDR-02/2020-21PARISHAD PROJECT FUNDLaying of Internal Sewer line for 288 No Houses in the permisses of 816 No PMAY (Urban) Houses at Sector-16 of Majhola Yojna No-4, Ph-2 (Vistar) Moradabad 0.00 43.73 30/09/202030/12/2020 03/12/202002/04/202130/12/2020 03/12/2020M/s Progressive Construction Co. 9810846441 Circle 5In Progress
1460 03/EE/CDR-02/2020-21PARISHAD PROJECT FUNDLaying of Internal Sewer Line at Sec-16 Excluding PMAY Pocket in Majhola Yojna No-4, Ph-2 (Vistar), Moradabad. 0.00 25.42 04/08/202003/12/2020 03/12/202002/04/202103/12/2020 03/12/2020M/s M.A. Associates Circle 5In Progress
1461 01/EE/ED-III/2020-21PARISHAD PROJECT FUNDConstruction of 420 Mtr. Deep Tubewell at Ganga Enclave Scheme No. - 3, Ambedkarpuram, Kanpur 0.00 41.00 14/05/202026/06/2020 26/06/202025/10/202026/06/2020 26/06/2020CIT DRILLERS & DEVELOPERS Circle ElectricalIn Progress
1462 71/EE/20-21PARISHAD PROJECT FUNDExternal electrification work in the area of PMAY at sector-7 A Avadh vihar yojna lucknow. 0.00 199.35 24/11/202029/12/2020 29/12/202028/03/202129/12/2020 29/12/2020SRI SAI SUDHA ENTERPRISES Circle ElectricalCompleted
1463 04/EE/CDBaghpat-01/2020-21PARISHAD PROJECT FUNDConstruction of Remaining 45M. & 30M. Wide Trunk Roads of Sec.-20 to 25 in Mandola Vihar Yojna, Gzb. 0.00 79.74 09/02/202120/03/2021 20/03/202119/09/202120/03/2021 20/03/2021RAMAXE CONSTRUCTION 9811554477 Circle MantolaIn Progress
1464 02/SE-Bkd/2021-22PARISHAD PROJECT FUNDConstruction of Sewer Line in Yojana No-3 Jhansi 0.00 387.60 29/04/202120/07/2021 20/07/202119/07/202220/07/2021 20/07/2021ISHWAR SINGH 9415084207 ProjectIn Progress
1465 06/SE(E)/21-22dated27-08-2021PARISHAD PROJECT FUNDExternal Electrification work at Avadh Vihar YojnaLucknow. 0.00 147.94 03/04/202127/08/2021 27/08/202126/12/202127/08/2021 27/08/2021PREETI ELECTRIC WORK 9150011801 Circle 1Completed
1466 2/SE-VI/2020-21PARISHAD PROJECT FUNDCONSTRUCTION OF ROAD IN YOJANA NO-3JHANSI 0.00 141.35 08/06/202022/09/2020 22/09/202021/06/202122/09/2020 22/09/2020R. N. Agarwal 9319062251MANVENDRA DHAMANIYA JE DAYASAGAR AE EKHLAQUE AHMAD XECircle 6In Progress
1467 02/PM/CU-JHS/20-21PARISHAD PROJECT FUNDCONSTRUCTION OF PARK IN YOJANA NO-3 JHANSI 0.00 39.77 20/03/202028/08/2020 27/11/202028/08/2020 RAJESH KUMAR LITORIYA 9450034807ANUP KUMAR JE DAYASAGAR AE EKHLAQUE AHMAD XECircle 6In Progress
1468 04/EE/ED-III/20-21PARISHAD PROJECT FUNDConstructions of 11 K.V.Feeder (Under External Electrification) work for Sector-3, for 33/11 K.V. Sub Station at Sector-3, Scheme No.-11 Jagrati Vihar (Ext.) Meerut. 0.00 9.92 15/07/202008/09/2020 08/09/202007/12/202008/09/2020 08/09/2020ADITYA ENTERPRISES Circle ElectricalCompleted
1469 C.B.06/SE(E)/21-22dated27-08-2021PARISHAD PROJECT FUNDExternal Electrification work at Avadh Vihar Yojna Lucknow 0.00 147.95 03/04/202127/08/2021 23/08/202126/12/202127/08/2021 23/08/2021PREETI ELECTRIC WORK 9150011801 Circle 1Completed
1470 02/SE-Ruhelkhand/21-22CENTRAL AND STATE FUNDConstruction of 96/144 nos Flats ( G+3) under PM Avas Yojna (Urban) at Sec-15, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad . (Group-1य) 0.00 409.30 14/02/201914/09/2021 14/09/202113/03/202314/09/2021 14/09/2021M/s Bhatiya Construction RAHUL KUMAR,SARVESH KUMAR VERMA JE RAJ KUMAR AE YOGENDRA KUMAR GOEL XECircle 5In Progress
1471 14/EE/ED-III/20-21PARISHAD PROJECT FUNDSupply of 01 No. 10 MVA & 01 No 5 MVA 33/11 KV Power Transformer at Sector-3 Jagrati Vihar (Extension) Scheme No.-11, Meerut. 0.00 103.96 17/12/202005/03/2021 05/03/202104/07/202105/03/2021 05/03/2021Elecon Conductor 9837007408 Circle ElectricalIn Progress
1472 01/EE/ED-III/21-22PARISHAD PROJECT FUNDShifting of 11 KV Line at 45 Meter wide Inner Ring Road Infront of PMAY Houses Jagrati Vihar (Ext.) Scheme No.-11, Meerut. 0.00 10.00 25/08/202104/10/2021 04/10/202103/01/202204/10/2021 04/10/2021SPARKLE ENTERPRISES 9837394838 Circle ElectricalIn Progress
1473 05/EE/ED-III/21-22DEPOSIT WORK FUNDSupply & Installation work at Campus of Multi Purpose Hall in Harcourt Butler Technical University, Kanpur. 0.00 22.65 01/10/202113/10/2021 13/10/202112/11/202113/10/2021 13/10/2021SARA ENTERPRISES 9451176938 Circle ElectricalIn Progress
1474 08/EE/ED-III/20-21PARISHAD PROJECT FUNDSITC of 01 No. 1500 LPM 58 Mtr. Head KSB make Submersible Pumping Plant for OHT Campus Tubewell at Sector-6, Jagrati Vihar (Ext.) Scheme No.-11 Meerut. 0.00 10.00 31/08/202001/10/2020 01/10/202031/12/202001/10/2020 01/10/2020ADITYA ENTERPRISES Circle ElectricalIn Progress
1475 09/EE/ED-III/20-21PARISHAD PROJECT FUNDExternal Electrification (Transformation) work in OHT Campus Tubewell at Sector-6, jagrati Vihar (Ext.) Scheme No.-11, Meerut. 0.00 9.50 31/08/202001/10/2020 01/10/202031/12/202001/10/2020 01/10/2020ADITYA ENTERPRISES Circle ElectricalIn Progress
1476 11/EE/2021-22PARISHAD PROJECT FUNDStreet Lighting work at Main Crossing of Avadh Vihar Yojna Lucknow. 0.00 70.84 03/04/202125/08/2021 25/06/202124/12/202125/08/2021 25/06/2021PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
1477 02/SE/Meerut/2020-21ExtendedPARISHAD PROJECT FUNDConstruction of 18.00m wide remaining road and drain along the road to G.T. Road, Pahasu Marg, Scheme No. 2, Khurja, Distt. Bulandshahr 0.00 126.07 14/10/202007/11/2020 07/11/202006/05/202107/11/2020 07/11/2020Smt. Urmila Yadav AJAB SINGH JE M BKAUSHIK AE M.B. KAUSHIK XECircle 2Completed
1478 13/EE/ED-III/20-21PARISHAD PROJECT FUNDExternal Electrification Work in (G+3) Type Housesv (PMAY) at Sector-2 & 4 , Jagrati Vihar (Extension) Scheme No.-11,Meerut. 0.00 119.22 28/10/202031/12/2020 31/12/202030/04/202131/12/2020 31/12/2020OM ASSOCIATES 9312359633 Circle ElectricalCompleted
1479 07/EE/ED-III/21-22PARISHAD PROJECT FUNDStreet Lighting work (Remaining Part) on 45 Meter wide Road in front of 220/132/33 KV Sub-Station at Jagrati vihar (Ext.) Scheme No.-11, Meerut. 0.00 9.91 07/09/202120/10/2021 20/10/202119/01/202220/10/2021 20/10/2021SINGH CONSTRUCTION 9794412774 Circle ElectricalIn Progress
1480 08/EE/ED-III/21-22PARISHAD PROJECT FUNDStreet Lighting work (Remaining Part) on 45 Meter wide Inner Ring Road in front of Under Constructed PMAY (G+3) Houses at Jagrati vihar (Ext.) Scheme No.-11, Meerut. 0.00 9.88 23/10/202123/10/2021 23/10/202122/01/202223/10/2021 23/10/2021SINGH CONSTRUCTION 9794412774 Circle ElectricalCompleted
1481 21/EE/2021-22DATED18-10-2021PARISHAD PROJECT FUNDStreet Lighting Work in remaining portion of Trunk Road at Avadh Vihar yojna Lucknow. 0.00 85.07 03/04/202118/10/2021 18/10/2021 18/10/2021 18/10/2021PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
1482 02/EE/21-22PARISHAD PROJECT FUNDSupply pf 02 No- 500 KVA 3 Phase silen D.G. set with mannual pannel for Covid-19 Hospital At Avadh Shilp Gram Avadh Vihar Yojna Lucknow. 0.00 58.30 01/05/202106/05/2021 06/05/202112/05/202106/05/2021 06/05/2021ADITYA ENTERPRISES Circle ElectricalCompleted
1483 02/AEII/2021-22PARISHAD PROJECT FUNDSERVICE CONNECTION FOR TUBEWELL NO-3 AT GOKUL GRAM YOJNA MUNNU KHERA LUCKNOW 0.00 0.37 14/10/202020/05/2021 20/05/202108/06/202120/05/2021 20/05/2021PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
1484 12/EE/21-22dated09-07-2021PARISHAD PROJECT FUNDStreet Lighting work on central Verge of 30 mtr wide road at sector 7 Avadh Vihar Yojna, Lucknow 0.00 32.07 03/04/202109/07/2021 09/07/202108/11/202109/07/2021 09/07/2021PREETI ELECTRIC WORK 9150011801 Circle 1Completed
1485 03/SEBUNDELKHAND-CIRCLE/2021-22PARISHAD PROJECT FUNDCONSTRUCTION OF DRAIN AND CULVERT AT BHUMI VIKAS EVAM GRAH SATHAN YOJANA 3 JHANSI 0.00 193.29 20/05/202118/08/2021 18/08/202117/08/202218/08/2021 18/08/2021Dharvi Associates 9140324815MANVENDRA DHAMANIYA JE SHARAD KUMAR AE SAMAR UPADHAYAY XEProjectIn Progress
1486 06/EE/CDR-3/2021-22PARISHAD PROJECT FUNDInternal Aluminium Partition Work in Office Complex Building (G+2) at Majhola Yojna No.-4, Phase-2, Moradabad 0.00 78.80 24/06/202117/07/2021 17/07/202116/01/202217/07/2021 17/07/2021GAURAV ENTERPRISES SATENDRA HYANKI JE SANJAY SHARMA AE FARAZ ASLAM XECircle 5In Progress
1487 05/EE/CDR-3/2021-22PARISHAD PROJECT FUNDConstruction of Under Ground R.C.C. Water Tank, 02 Nos. (Fire) Stair Case, 01 Nos. Pump House and Civil work of Second Floor Guest House in Office Complex (G+2) Building at Majhola Yojna No.-4, Phase-2, Moradabad 0.00 24.20 24/06/202116/07/2021 16/07/202115/01/202216/07/2021 16/07/2021M/s G.A. Enterprises 9548760117SATENDRA HYANKI JE SANJAY SHARMA AE FARAZ ASLAM XECircle 5In Progress
1488 06/EE/ED-III/21-22DEPOSIT WORK FUNDSupply & Installation of 250 KVA 11/0.433 KV CSS and Sub-Station Related work at Campus of Multi Purpose Hall in H.B.T.U. Kanpur. 0.00 39.76 02/09/202120/10/2021 20/10/202103/12/202120/10/2021 20/10/2021PRAKASH ENGINEERS & CONSULTANT 9838656565 Circle ElectricalIn Progress
1489 03/SE-Ruhelkhand/21-22CENTRAL AND STATE FUNDConstruction of 48/96 nos Flats ( G+3) under PM Avas Yojna (Urban) at Sec-15, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad (Group-1र) 0.00 204.66 14/02/201914/09/2021 14/09/202113/03/202314/09/2021 14/09/2021M/s Vipin Bhatiya RAHUL KUMAR,SARVESH KUMAR VERMA JE RAJ KUMAR AE YOGENDRA KUMAR GOEL XECircle 5In Progress
1490 04/SE-Ruhelkhand/21-22CENTRAL AND STATE FUNDConstruction of 96/144 nos Flats ( G+3) under PM Avas Yojna (Urban) at Sec-15, Majhola Yojna No-4, Ph-2 (Vistar) Moradabad .(Group1द) 0.00 409.30 14/02/201914/09/2021 14/09/202113/03/202314/09/2021 14/09/2021M/s Fair Builders RAHUL KUMAR,SARVESH KUMAR VERMA JE RAJ KUMAR AE YOGENDRA KUMAR GOEL XECircle 5In Progress
1491 10/EE/ED-III/2020-21PARISHAD PROJECT FUNDExternal Electrification Work in F-45 & F-70 Type (G+3) Storied in Sector-2A. Shakumbhari Vihar Yojna Saharanpur 0.00 76.06 17/10/202024/12/2020 24/12/202002/06/202124/12/2020 24/12/2020OM ASSOCIATES 9312359633 Circle ElectricalIn Progress
1492 11/EE/ED-III/2020-21PARISHAD PROJECT FUNDConstruction of 33/11 KV Sub-Station (Capacity Increasing) at Sector-3, Jagrati Vihar (Extension) Scheme No.-11, Meerut. 0.00 113.38 28/10/202028/12/2020 28/12/202027/04/202128/12/2020 28/12/2020YASH ENTERPRISES Circle ElectricalIn Progress
1493 12/EE/ED-III/20-21PARISHAD PROJECT FUNDShifting of 33 KV Line Passing Through Sector-2 and 3 On 24 Mtr. Wide Road at Jagrati Vihar (Extension) Scheme No.-11, Meerur. 0.00 91.85 17/10/202031/12/2020 31/12/202030/03/202131/12/2020 31/12/2020OM ASSOCIATES 9312359633 Circle ElectricalIn Progress
1494 02/EE/ED-III/21-22PARISHAD PROJECT FUNDShifting of 11 KV Line at 45 Meter wide Inner Ring Road Infront of STP Jagrati Vihar (Ext.) Scheme No.-11, Meerut. 0.00 10.00 28/08/202104/10/2021 04/10/202103/01/202204/10/2021 04/10/2021SPARKLE ENTERPRISES 9837394838 Circle ElectricalIn Progress
1495 03/EE/ED-III/21-22DEPOSIT WORK FUNDSupply Erection Testing & Commissioning of Audio Video System work in Multi Purpose Hall at Campus of Harcourt Butler Technical Univesity, Kanpur. 0.00 99.83 08/09/202108/10/2021 08/10/202111/11/202108/10/2021 08/10/2021OPTITEL COMMUNICATION 9415023645 Circle ElectricalIn Progress
1496 04/EE/ED-III/21-22PARISHAD PROJECT FUNDShifting of 11 KV H.T. Line on 45 Meter wide Passing Infront of Sector-8 Jagrati Vihar (Ext.) Scheme No.-11, Meerut 0.00 9.86 07/09/202108/10/2021 08/10/202107/01/202208/10/2021 08/10/2021SPARKLE ENTERPRISES 9837394838 Circle ElectricalIn Progress
1497 16/EE/2021-22Dated11-08-2021PARISHAD PROJECT FUNDCleaning of sumpwell and its related work at Sewage pumping station Jhunsi Yojna No-2 Allahabad, Prayagraj. (16/EE/2021-22 Dated 11-08-2021) 0.00 74.99 21/06/202111/08/2021 11/08/202125/08/202111/08/2021 11/08/2021ADITYA ENTERPRISES Circle ElectricalCompleted
1498 07/SE(E)/2021-22Dated21-10-2021PARISHAD PROJECT FUNDConstruction of 33KV Line for Connecting 33/11 KV Substation of Sector-3 &Sector-9 Vrindavan Yojna Lucknow From 220/132/33 KV Substation Avadh Vihar Yojna Lucknow. 0.00 176.16 21/10/202121/10/2021 21/10/202120/02/202221/10/2021 21/10/2021PREETI ELECTRIC WORK 9150011801 Circle ElectricalIn Progress
1499 01/EE/CD-1GZB/2021-22PARISHAD PROJECT FUNDConstruction of 18.00 Mtr Wide Road (Part) Sector-7 Siddharth Vihar Yojna Ghaziabad 0.00 46.43 10/12/202024/05/2021 24/05/202123/11/202124/05/2021 24/05/2021Ramesh Chand & Co. 9213288266R.K. GUPTA JE RIYAZUDDIN AE UMA NATH SHUKLA XECircle 7Completed
1500 08/SE(E)/2021-22Dated21-10-21PARISHAD PROJECT FUNDConstruction of 33 KV line for interlinking 33/11 KV S/S at sector 3 and Vrindavan Yojna Lucknow 0.00 180.00 28/06/202121/10/2021 21/10/202120/02/202221/10/2021 21/10/2021YASH ENTERPRISES Circle ElectricalCompleted
1501 09/SE(ELECT)/ED-III/2021-22PARISHAD PROJECT FUNDExternal Electrification work at Bhumi Vikas Evam Ghrah Sansthan Scheme No.-3, Jhansi 0.00 377.70 05/10/202110/12/2021 10/12/202109/06/202210/12/2021 10/12/2021R K and Company 8171211222 Circle ElectricalIn Progress
1502 10/SE(ELECT)/ED-III/2021-22PARISHAD PROJECT FUNDConstruction of 03 Nos 350 x 200 mm dia size Tubewell 200 Meter Below Ground Level & Related External Electrification work in Sector-2, 3 & 8 at Jagrati Vihar (Extension) Scheme No.-11, Meerut 0.00 153.10 02/12/202107/01/2022 07/01/202206/07/202207/01/2022 07/01/2022M.A. Engineering works Circle ElectricalIn Progress
1503 06/EE/2021-22dated23-06-2021PARISHAD PROJECT FUNDSITC of 02 No.1200 LPM. 58 Mtr. Head KSB make Submersible Pumping Plant at Sector-10 B Avadh Vihar Yojna Lucknow.(06/EE/2021-22 dated 23-06-2021) 0.00 11.59 11/11/202023/06/2021 23/06/202122/07/202123/06/2021 23/06/2021ADITYA ENTERPRISES Circle ElectricalCompleted
1504 05/SE(E)/2021-22dated17-08-2021PARISHAD PROJECT FUNDExternal Electrification Work at Kotdwar Road Bhoomi Vikas Evam Grahshan yojna No-1 Najibabad bijnor.( Work By Sparkle Enterprises)(05/SE(E)/ 2021-22 dated 17-08-2021) 0.00 126.87 17/08/2021 17/08/202116/12/202117/08/2021 17/08/2021SPARKLE ENTERPRISES 9837394838 Circle ElectricalIn Progress
1505 03/EE/CDBaghpat-03/2021-22PARISHAD PROJECT FUNDEarth work in filling in sec-15 Plot Pocket 0.00 28.00 02/08/202107/10/2021 07/10/2021 07/10/2021 07/10/2021Apex Construction 9412280150HEMANT KUMAR JE AE AMAN TYAGI XECircle MantolaCompleted
1506 04/EE/CDBaghpat-03/2021-22PARISHAD PROJECT FUNDSewer & Water Connection for Plot Pocket in sec-15 0.00 10.64 31/07/202125/10/2021 25/10/202124/02/202225/10/2021 25/10/2021ANUJ ASSOCIATE 9411902544 Circle MantolaIn Progress
1507 03/EE/ED-2/GZB/2021-22PARISHAD PROJECT FUNDWORK RELATED TO ELECTRIFICATION AT SECTOR-16, GUEST HOUSE, VASUNDHARA YOJNA, GZB 0.00 8.26 31/05/202118/06/2021 18/06/202124/06/202118/06/2021 18/06/2021M/S OM ASSOCIATES 9312388633PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
1508 01/SEGZBCIRCLE/2021-22DATE09-07-2021PARISHAD PROJECT FUNDDesign, Construction, Supply, Installation, Testing and Commissioning of 43 MLD capacity Main Pumping Station & 21.5 MLD S.T.P. on Sequential Batch Reactor (SBR) Process including disposal of effluent from STP to Outfall Drain and O& M for 5 years Siddarth Vihar Yojna Ghaziabad (UP) 0.00 441527000.00 18/06/202109/07/2021 09/07/202108/07/202309/07/2021 09/07/2021M/s Khilari Infrastructure Pvt. Ltd 9554957890RANDHIR SINGH JE RIYAZUDDIN AE UMA NATH SHUKLA XECircle 7In Progress
1509 08/EE/ED-2/GZB/2021-22PARISHAD PROJECT FUNDAMC OF KONE MAKE LIFT AT OFFICE COMPLEX SECTOR-16, VASUNDHARA, GZB. 0.00 1.15 03/09/202120/11/2021 20/11/202119/11/202220/11/2021 20/11/2021KONE ALIVETOR INDIA PVT. LTD. 9560361414PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
1510 05/EE/ED-2/GZB/2021-22PARISHAD PROJECT FUNDAMC OF 08 NO LIFT AT SHIKHAR ENCLAVE SECTOR-15 (BLOCK-A, B, C, D), VASUNDHARA GZB. 0.00 12.69 26/03/202102/01/2021 02/01/202101/01/202202/01/2021 02/01/2021KONE ALIVETOR INDIA PVT. LTD. 9560361414PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
1511 13/EE/2021-22dated02-08-2021PARISHAD PROJECT FUNDInternal/External Electrification for office complex at Sector 5 Manjhola Yojna No.4 Phase 2 Moradabad.(13/EE/2021-22 dated 02-08-2021) 0.00 199.17 07/05/202102/08/2021 02/08/202101/11/202102/08/2021 02/08/2021ADITYA ENTERPRISES Circle ElectricalCompleted
1512 02/SE(E)/2022-23PRADHIKARAN KOSHExternal Electrification 11KV line (H.T) work in Sector-7 C at Avadh Vihar Yojna Lucknow 0.00 236.51 08/02/202219/05/2022 19/05/202218/11/202219/05/2022 19/05/2022EAGLE CONSTRUCTION 9415103222 Circle ElectricalCompleted
1513 07/EE/ED-2/GZB/2021-22PARISHAD PROJECT FUNDCONSTRUCTION OF TRESSES, SHAD & CAGING WORK FOR GENERATOR SET, PANEL AT TRAINING CENTRE, CONVENTION CENTRE & OFFICE COMPLEX, VASUNDHAR GZB. 0.00 8.96 12/07/202119/08/2021 19/08/202102/09/202119/08/2021 19/08/2021RAJ POWER PROJECTS 8130191931PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
1514 06/EE/ED-2/GZB/2021-22PARISHAD PROJECT FUNDHIGH PRESSURE TESTING OF 33KV CABLE & 33KV JOINTING KIT AT 33KV S/S SECTOR-8, VASUNDHARA, GZB. 0.00 8.93 12/07/202119/08/2021 19/08/202102/09/202119/08/2021 19/08/2021Bala ji Electrical & Mechnical works PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
1515 01/EE/ED-2/GZB/2021-22PARISHAD PROJECT FUNDCONSTRUCTION OF 11KV FEEDER TO ENERGIZED FREGRANCE SOCIETY (GH-4) IN SECTOR-3 SV YOJNA GZB. 0.00 93.51 08/03/202114/06/2021 14/06/202113/08/202114/06/2021 14/06/2021K. ELECTRIC WORKS PVT. LTD PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
1516 02/EE/ED-2/GZB/2021-22PARISHAD PROJECT FUNDCONSTRUCTION OF 11KV FEEDER FOR APEX HEIGHT SOCIETY SECTOR-5 SV YOJNA GZB. 0.00 122.85 08/03/202114/06/2021 14/06/202113/08/202114/06/2021 14/06/2021K. ELECTRIC WORKS PVT. LTD PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
1517 03/EE/CDBAG02/2021-22PARISHAD PROJECT FUNDConstruction of Internal Drains & Culvert in Sector 4A( Plots Area ) at Mandola Vihar Gzb. 0.00 0.00 01/09/2021 01/09/202130/01/202201/09/2021 01/09/2021Tahir Hussain Ansari 9990619560 Circle MantolaIn Progress
1518 08/EE/CDBaghpat-03/2021-22PARISHAD PROJECT FUNDConstruction of Parking in the campus of Samajwadi Houses (Gulmohar Enclave) in Sector-15 &16 B 0.00 59.43 31/12/202107/01/2022 07/01/202206/05/202207/01/2022 07/01/2022SHIVAM CONTRACTOR 8755427501 Circle MantolaIn Progress
1519 06/EE/CDBaghpat-03/2021-22PARISHAD PROJECT FUNDConstruction of Ramp in Stilt Floor of 1 B.H.K. and 2 B.H.K. Flats at Gulmohar Enclave in Sector 15 & 16 B 0.00 44.70 23/10/202131/12/2021 31/12/202130/03/202231/12/2021 31/12/2021SHIVAM CONTRACTOR 8755427501 Circle MantolaIn Progress
1520 07/EE/CDBaghpat-03/2021-22PARISHAD PROJECT FUNDConstruction of Internal Drain and culvert in Campus of Sec. 15 Plot Pocket 0.00 38.43 03/12/202131/12/2021 31/12/202130/03/202231/12/2021 31/12/2021K.V. Chandraraj Const. Co. 9837451414 Circle MantolaIn Progress
1521 01/EE/CDBaghpat-03/2022-23PARISHAD PROJECT FUNDLaying & Jointing of Internal Sewer Line in sector-1A 0.00 12.03 07/01/202208/04/2022 08/04/202207/07/202208/04/2022 08/04/2022Ramesh Chand & Co. 9213288266 Circle MantolaCompleted
1522 04/EE/ED-2/GZB/2021-22PARISHAD PROJECT FUNDWORK RELATED TO ELECTRIFICATION AT SECTOR-4 MANDOLA VIHAR YOJNA GZB. 0.00 9.52 31/05/202118/06/2021 18/06/202124/06/202118/06/2021 18/06/2021Bala ji Electrical & Mechnical works PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
1523 03/SE(E/M)/LKO/2021-22PARISHAD PROJECT FUNDEXTERNAL ELECTRIFICATION WORK (UGS) FOR FLOTS AT SECTOR-4A MV YOJNA GZB. 0.00 565.25 21/05/202109/08/2021 09/08/202108/02/202209/08/2021 09/08/2021M/S PRAKASH ENGINEERS 8527167618PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalIn Progress
1524 02/SE(E/M)/LKO/2021-22PARISHAD PROJECT FUNDCONSTRUCTION OF 33KV LINE FOR 33KV S/S AT SECTOR-9 FROM 220KV S/S SV YOJNA GZB. 0.00 279.65 23/03/202114/07/2021 14/07/202113/10/202114/07/2021 14/07/2021M/S PRAKASH ENGINEERS 8527167618PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalIn Progress
1525 09/EE/CD-GZB-02/2021-22PARISHAD PROJECT FUNDProviding & Laying of Interlocking Tiles at front and back side of 64Nos EWS Houses at Sector 9 Siddharth Vihar Yojna, Ghaziabad 0.00 4.82 26/02/2022 26/02/202225/04/202226/02/2022 26/02/2022Ujjwal Infratech (India) Pvt Ltd. 9412277775KAMLESH KUMAR CD GZB-02 JE SURAJ PAL CD-GZB-02 AE SUMIT KUMAR CD GZB-02 XECircle 7In Progress
1526 01/SE(E/M)/LKO/2021-22PARISHAD PROJECT FUNDCONSTRUCTION OF 33KV LINE TO ENERGIZED PRATEEK GROUP HOUSING SECTOR-4 SV YOJNA GZB. 0.00 192.78 08/03/202119/06/2021 19/06/202118/08/202119/06/2021 19/06/2021YASH ENTERPRISES PANKAJ KUMAR PUSHKAR JE ASHOK KUMAR AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
1527 01/EE/CDBaghpat02/2021-22PARISHAD PROJECT FUNDConstruction of parks & Footpath in Sector 4A at Mandola vihar Ghaziabad. 0.00 20.00 08/06/202103/07/2021 03/07/202102/10/202103/07/2021 03/07/2021Tahir Hussain Ansari 9990619560 Circle MantolaIn Progress
1528 03/SEMeerut/2022-23PARISHAD PROJECT FUNDConstruction of Service road of 45.00m wide road along node no. 21-22 at Jagriti Vihar (Ext.), Scheme No. 11, Meerut 0.00 160.00 16/03/202220/05/2022 20/05/202219/11/202220/05/2022 20/05/2022M/s Mukesh Chandra Yadav SH. SANDEEP KUMAR JE SAURAV KUMAR AE AFTAB AHMAD XECircle 2In Progress
1529 02/SEMeerut/2022-23PARISHAD PROJECT FUNDConstruction of Service road of 45.00m wide road along node no. 22-23 at Jagriti Vihar (Ext.), Scheme No. 11, Meerut 0.00 153.00 16/03/202220/05/2022 20/05/202219/11/202220/05/2022 20/05/2022Smt. Urmila Yadav SH. SANDEEP KUMAR JE SAURAV KUMAR AE AFTAB AHMAD XECircle 2In Progress
1530 01/SEMeerut/2022-23PARISHAD PROJECT FUNDConstruction of Service road of 45.00m wide road along node no. 26-27 at Jagriti Vihar (Ext.), Scheme No. 11, Meerut 0.00 185.00 16/03/202217/05/2022 17/05/202216/11/202217/05/2022 17/05/2022M/s S.K. Singh 9837488572SH. SANDEEP KUMAR JE SAURAV KUMAR AE AFTAB AHMAD XECircle 2In Progress
1531 05/SE(E)/2022-23PARISHAD PROJECT FUNDStreet Light Work at Sector-7C Avadh Vihar Yojna, Lucknow 0.00 107.29 18/06/202212/07/2022 12/07/202211/01/202312/07/2022 12/07/2022SRI SAI SUDHA ENTERPRISES Circle ElectricalIn Progress
1532 01/EE/ED-III/22-23DEPOSIT WORK FUNDREMAINING STREET LIGHTING & A.C. INSTALLATION WORK IN CAMPUS OF MULTI PURPOSE HALL IN HARTCOURT BUTLER TECHNICAL UNIVERSITY, KANPUR 0.00 24.21 14/07/202220/08/2022 20/08/202203/10/202220/08/2022 20/08/2022SARA ENTERPRISES 9451176938 Circle ElectricalIn Progress
1533 09/EE/ED-III/21-22PARISHAD PROJECT FUNDMaintenance & Repairing Work of Damaged 12 Meter Long Double Arm Street Light Pole, Bracket & 400W HPSV Fittings On 45 Meter Wide Road At Jagrati Vihar (Extension) Scheme No.-11, Meerut 0.00 16.59 11/10/202122/11/2021 22/11/202121/12/202122/11/2021 22/11/2021SPARKLE ENTERPRISES 9837394838 Circle ElectricalIn Progress
1534 03/S.E(E).2022-23dated27-05-2022PARISHAD PROJECT FUNDConstruction of 11 KV Feeder of 33/11 KV S/S at sector 3 Avadh Vihar Yojna Lucknow 0.00 214.78 04/12/202127/05/2022 27/05/202226/09/202227/05/2022 27/05/2022PREETI ELECTRIC WORK 9150011801 Circle ElectricalIn Progress
1535 01/SE(ELECT)LKO/ED-III/22-23DEPOSIT WORK FUNDInternal Electrification work in Type-III 40 Nos (S+5) and Type-IV 16 Nos (S+4) Faculty Residential Building at Govt. S.N. Medical College, Agra. 0.00 225.82 07/01/202220/04/2022 20/04/202219/01/202320/04/2022 20/04/2022SINGH ELECTRICALS 9451248514 Circle ElectricalIn Progress
1536 07/SE(E)/2022-23dated13-12-2022DEPOSIT WORK FUNDElectrical/Mechnical work in 50 beded eye hospital at Ramai patti Tehsil-Sadar, District-Mirzapur.(Work By M/s Aditya Enterprises) 0.00 188.51 20/05/202213/12/2022 13/12/202212/12/202313/12/2022 13/12/2022ADITYA ENTERPRISES Circle ElectricalIn Progress
1537 08/SE(E)/2022-23Dated24-12-2022PARISHAD PROJECT FUNDElectrical and Mechnical related work for under constructed 33/11 KV substation at sector-5 Avadh Vihar Yojna Lucknow.(Work by M/s Eagle Construction) 0.00 455.28 03/08/202224/12/2022 24/12/202223/06/202324/12/2022 24/12/2022EAGLE CONSTRUCTION 9415103222 Circle ElectricalIn Progress
1538 08/EE/2022-23Dated26-07-2022PARISHAD PROJECT FUNDAnnual maintenance of Installed 02 Nos. Lift and 02 Nos. Escalator Johnosn lift at Avadh Shilp Gram in Avadh Vihar Yojna Lucknow.(Work By M/s Johnson Pvt. Ltd.) 0.00 3.49 05/07/202226/07/2022 26/07/202225/07/202326/07/2022 26/07/2022Johnson Pvt. Ltd. Circle ElectricalIn Progress
1539 10/EE/2022-23Dated04-08-2022PARISHAD PROJECT FUNDCleaning of sewage pumping plant & related work at Jhunsi Yojna No-2 Prayagraj.(10/EE/2022-23 Dated 04-08-2022)(Work By Sri Sai Sudha Enterprises) 0.00 4.32 06/06/202204/08/2022 04/08/202218/08/202204/08/2022 04/08/2022SRI SAI SUDHA ENTERPRISES Circle ElectricalCompleted
1540 23/EE/2022-23Dated22-11-2022PARISHAD PROJECT FUNDRenovation of street light system in civil line Yojna Badayun.(Work By M/s Shri Bala Ji Electrical and mechanical) 0.00 15.55 27/09/202222/11/2022 22/11/202221/12/202222/11/2022 22/11/2022Bala ji Electrical & Mechnical works Circle ElectricalIn Progress
1541 02/EE/ED-III/22-23PARISHAD PROJECT FUNDExternal Electrification work in New Development Pocket of Sector-3 and Street Lighting work in Development Area Sector-2 and Sector-3- at Scheme No.-1 Shikohabad. 0.00 48.95 14/07/202223/08/2022 23/08/202222/11/202223/08/2022 23/08/2022ADITYA ENTERPRISES Circle ElectricalIn Progress
1542 04/EE/2022-2023Date15.06.2022PARISHAD PROJECT FUNDसिविल लाइन्‍स योजना संख्‍या 02 भाग-02 बदायॅू में 500 क0िली0 क्षमता एवं 26 मी0 स्‍टेजिंग आर0सी0सी0 ओ0एच0टी0 के न‍िर्माण कार्य के सम्‍बन्‍ध में। 0.00 0.00 15/06/2022 15/06/202212/09/202215/06/2022 15/06/2022Lalit Kishore 8400020921 Circle 5In Progress
1543 22/EE/2022-23Dated09-11-2022PARISHAD PROJECT FUNDDrilling of 02 Nos Mtr. Deep Tubewell and its Development Related Work at Civil Line Yojna-02 Part-02 Budaun.(Work By Bala ji Trading and Engineering Co. ) (22/EE/2022-23 Dated 09-11-2022) 0.00 113.72 09/11/2022 09/11/2022 09/11/2022 09/11/2022Bala Ji Trading And Engineering Company 9415575163 Circle ElectricalIn Progress
1544 08/SEMeerut/2022-23PARISHAD PROJECT FUNDConstruction of 240 Nos PMAY Houses (Group-A) in Sector-8A, at Jagriti Vihar (Ext.), Scheme No. 11, Meerut. 0.00 1038.08 28/12/202222/02/2023 22/02/202321/08/202422/02/2023 22/02/2023Hindutan Steel AJAB SINGH JE SAURAV KUMAR AE AFTAB AHMAD XECircle 2In Progress
1545 06/SEMeerut/2022-23PARISHAD PROJECT FUNDConstruction of 240 Nos PMAY Houses (Group-B) in Sector-8A, at Jagriti Vihar (Ext.), Scheme No. 11, Meerut. 0.00 1038.08 28/12/202222/02/2023 22/02/202321/08/202422/02/2023 22/02/2023Kumar Builders 9358403917SH. SANDEEP KUMAR JE SAURAV KUMAR AE AFTAB AHMAD XECircle 2In Progress
1546 07/SEMeerut/2022-23PARISHAD PROJECT FUNDConstruction of 192 Nos PMAY Houses (Group-C) in Sector-8A, at Jagriti Vihar (Ext.), Scheme No. 11, Meerut. 0.00 830.47 28/12/202222/02/2023 22/02/202321/08/202422/02/2023 22/02/2023Kumar Builders 9358403917SH. SANDEEP KUMAR JE SAURAV KUMAR AE AFTAB AHMAD XECircle 2In Progress
1547 03/EE/ED-III/22-23PARISHAD PROJECT FUNDCleaning of Sewage Pumping Plant and Related Work at Barhpur Yojna Fatehgarh. 0.00 9.37 17/12/202204/01/2023 04/01/2023 04/01/2023 04/01/2023M.A. Engineering works Circle ElectricalCompleted
1548 06/EE/ED-III/22-23PARISHAD PROJECT FUNDCleaning of Sewage Pumping Plant and Related Work at Shakuntlam Yojna Muzaffar Nafar. 0.00 8.22 17/12/202205/01/2023 05/01/202304/02/202305/01/2023 05/01/2023NARAYAN CONSTRUCTION 9455694510 Circle ElectricalCompleted
1549 01/EE/CDMeerut-01/2022-23PARISHAD PROJECT FUNDStrengthening of Service Road of 36.00m wide Road (Node Part 1-2-3) at Scheme No. 11, Jagriti Vihar (Ext.), Meerut 0.00 21.66 08/08/202230/09/2022 30/09/202229/01/202330/09/2022 30/09/2022M/s Guru Construction Co., SH. SANDEEP KUMAR JE VIRENDRA KUMAR AE RAJEEV KUMAR XECircle 2Completed
1550 07/EE/ED-III/22-23PARISHAD PROJECT FUNDExternal Electrification Work for Service Connection of Ganga Enclave Pariyojna at Scheme No.-3, Ambedkarpuram, Kanpour 0.00 7.40 03/01/202320/01/2023 20/01/202303/02/202320/01/2023 20/01/2023NARAYAN CONSTRUCTION 9455694510 Circle ElectricalCompleted
1551 10/SE(ELect.)ED-III//21-22PARISHAD PROJECT FUNDConstruction of 03 Nos 350x200 MM Dia Size Tubewell 200 Meter Below Ground Level & Related External Electrification Work in Sector-2, 3 & 8 At Jagrati Vihar Extension Scheme No.-11, Meerut. 0.00 133.34 02/12/202107/01/2022 07/01/202206/07/202207/01/2022 07/01/2022M.A. Engineering works Circle ElectricalIn Progress
1552 01/EE/ED-2/2022-23PARISHAD PROJECT FUNDStreet Light on Central Verge of 50 Mtr. Wide Road from L&T Crossing at Sector-7 to 220/33 KV S/S at Siddharth Vihar Yojna, Ghaziabd. 0.00 45.00 16/08/202225/01/2023 25/01/202324/04/202325/01/2023 25/01/2023K. ELECTRIC WORKS PVT. LTD Circle ElectricalIn Progress
1553 28/EE/22-23PARISHAD PROJECT FUNDDrilling of 02 Nos. T/W and its Development related work at Bhoomi vikas and grah sthan yojna Gonda Faizabad road Gonda 0.00 79.40 28/12/202220/02/2023 20/02/202319/04/202320/02/2023 20/02/2023M.A. Engineering works Circle ElectricalIn Progress
1554 03/SE(ELECT)/LKO/2023-24DEPOSIT WORK FUNDConstruction of 33/11 KV Sub-Station and 11 KV Networking with 11/0.433 LT Substation at LPS Cardiology Institute, Kanpur 0.00 823.43 31/03/202319/08/2023 19/08/202318/02/202419/08/2023 19/08/2023EAGLE CONSTRUCTION 9415103222 JE MANOJ PANDEY AE AVESH XECircle ElectricalIn Progress
1555 02/EE/ED-III/2023-24DEPOSIT WORK FUNDExternal Electrification/Mechanical Work in New Constructed Chemical Engineering Building At Harcourt Butler Technical University, Kanpur. 0.00 54.20 03/01/202415/02/2024 15/02/202414/05/202415/02/2024 15/02/2024Bala ji Electrical & Mechnical works JE MANOJ PANDEY AE AVESH XECircle ElectricalIn Progress
1556 05/SE(E)/2022-23Dated12-07-2022PARISHAD PROJECT FUNDStreet light Work at sector 7 C Awadh Vihar Yojna Lucknow.(05/SE(E)/2022-23 dated 12-07-2022)(Work By Sri Sai Sudha Enterprises) 0.00 107.00 23/05/202212/07/2022 12/07/202211/01/202312/07/2022 12/07/2022Sai Sudha Enterprises Circle ElectricalIn Progress
1557 10/SE(E)/2022-23Dated19-01-2023PARISHAD PROJECT FUNDSUPPLY, INSTALLATION, TESTING, COMMISSIONING AND OPERATION, MAINTENANCE FOR 5 YEARS OF THE FACADE LIGHT WORK AT AWADH SHILP GRAM, AWADH VIHAR YOJNA LUCKNOW (U.P.). 0.00 333.74 19/12/202219/01/2023 19/01/202302/02/202319/01/2023 19/01/2023EAGLE ENTERPRISES 09752100976 Circle ElectricalIn Progress
1558 05/EE/ED-III/22-23PARISHAD PROJECT FUNDCleaning of Sewage Pumping Plant and Related Work at Scheme No.-1, Auraiya 0.00 8.88 17/12/202205/01/2023 04/02/202305/01/2023 M.A. Engineering works Circle ElectricalCompleted
1559 29/EE/22-23PARISHAD PROJECT FUNDConstruction Drilling and related development work for 01 nos. new 210 mtr. Deep Tubewell at Civil line yojna-02 part-01 Badaun 0.00 28.26 03/02/202329/03/2023 29/03/202328/05/202329/03/2023 29/03/2023Bala Ji Trading And Engineering Company 9415575163 Circle ElectricalIn Progress
1560 01/EE/ED-III/2023-24PARISHAD PROJECT FUNDEXTERNAL ELECTRIFICATION WORK (BALANCE) IN SEC.-1 & 3B AT SCHEME NO.-2, HANSPURAM KANPUR 0.00 49.91 18/11/202322/12/2023 22/12/202321/03/202422/12/2023 22/12/2023Bala ji Electrical & Mechnical works JE MANOJ PANDEY AE AVESH XECircle ElectricalIn Progress
1561 03/SEMeerut/2023-24PARISHAD PROJECT FUNDDevelopment works, Road, Drain, Sewer, Water Supply and Park in sector-2(Part), Scheme No. 11, Jagriti Vihar (Ext.), Meerut. 0.00 328.55 30/01/202414/03/2024 14/03/202413/09/202414/03/2024 14/03/2024M/S R.S. Builders 9837058948SH. SANDEEP KUMAR JE SAURAV KUMAR AE AFTAB AHMAD XECircle 2In Progress
1562 04/SEMeerut/2023-14PARISHAD PROJECT FUNDDevelopment works, Road, Drain, Sewer, Water Supply and Park in sector-3(Part), Scheme No. 11, Jagriti Vihar (Ext.), Meerut. 0.00 398.96 30/01/202414/03/2024 14/03/202413/09/202414/03/2024 14/03/2024M/S R.S. Builders 9837058948SH. SANDEEP KUMAR JE SAURAV KUMAR AE AFTAB AHMAD XECircle 2In Progress
1563 CBNO.-07/SE(ELECT)/LKO/2024-25DEPOSIT WORK FUNDELECTRICAL SAFETY RELATED EXTERNAL ELECTRIFICATION WORK AT LALA LAJPAT RAI & AFFILIATED GOVT. MEDICAL COLLEGE, KANPUR 0.00 1100.00 25/06/202408/10/2024 08/10/202407/04/202508/10/2024 08/10/2024EAGLE CONSTRUCTION 9415103222 Circle 1In Progress
1564 04/SE(E)/2022-23Dated24-06-2022PARISHAD PROJECT FUNDExternal Electrification (Transformation & LT) work sector 7C at awadh vihar Yojna Lucknow.(04/SE(E)/2022-23 Dated 24-06-2022)( Work By M/s Yash Enterprises) 0.00 346.00 22/03/202224/06/2022 24/06/202223/10/202224/06/2022 24/06/2022YASH ENTERPRISES Circle ElectricalIn Progress
1565 06/SE(E)/2022-23Dated18-08-2022PARISHAD PROJECT FUND06/SE(E)/2022-23 Dated 18-08-2022 0.00 380.00 16/06/202218/08/2022 18/08/202217/02/202318/08/2022 18/08/2022SPARKLE ENTERPRISES 9837394838 Circle ElectricalIn Progress
1566 CBNO.-11/SE(ELECT)/2023-24DEPOSIT WORK FUNDELECTRICAL/MECHANICAL WORK IN 02 STORIED UNDER CONSTRUCTION CENTRAL EVALUATION BUILDING AT CHAUDHARY CHARAN SINGH UNIVERSITY, MEERUT. 0.00 107.09 19/12/202315/03/2024 15/03/202414/09/202415/03/2024 15/03/2024SPARKLE ENTERPRISES 9837394838 Circle ElectricalIn Progress
1567 CBNO.-03/EE/ED-III/2023-24PARISHAD PROJECT FUNDEXTERNAL ELECTRIFICATION IN PMAY (4 BLOCK) G+3 TYPE 192 NOS HOUSES AT KATAI MILL CAMPUS ETAWAH. (CB NO.-03/ EE/ED-III/2023-24 DATE-29/02/2024) M/s SAI SUDHA ENTERPRISES, LUCKNOW. 0.00 4480857.66 10/01/202429/02/2024 29/02/202428/06/202429/02/2024 29/02/2024Sai Sudha Enterprises Circle ElectricalIn Progress
1568 01/SE(ELECT)/LKO/2024-25DEPOSIT WORK FUNDAIR CONDITIONING WORK AT CENTRAL EVALUATION BUILDING IN CHAUDHARY CHARAN SINGH UNIVERSITY, MEERUT 0.00 144.73 20/11/202307/06/2024 07/06/202406/12/202407/06/2024 07/06/2024KRISHNA REFRIGRATION 09652303229 Circle ElectricalIn Progress
1569 14/EE/2022-23Dated23-08-2022PARISHAD PROJECT FUNDExternal Electrification work of 11/0.4KV(63KVA) LT Substation and related Work at Munnu Khera Gokul Gram Yojna, Lucknow. ( Work By M/s Sri Sai Sudha Enterprises)(14/EE/2022-23 Dated 23-08-2022) 0.00 5.29 30/06/202223/08/2022 23/08/202222/09/202223/08/2022 23/08/2022SRI SAI SUDHA ENTERPRISES Circle ElectricalIn Progress
1570 01/SE(ELect.)ED-III//19-20PARISHAD PROJECT FUNDSupply of 02 Nos 33/11 KV 10 MVA Power Transformer for 33/11 KV Sub-Station at Sector-3A, Jagrati Vihar (Extension) Scheme No.-11, Meerut 0.00 132.00 20/12/201816/07/2019 16/07/201915/11/201916/07/2019 16/07/2019Elecon Conductor 9837007408 Circle ElectricalCompleted
1571 02/EE/CD/Meerut-01/2023-24PARISHAD PROJECT FUNDMaintenance/Renovation/Removing Pits in various roads at Scheme No. 11, Jagriti Vihar (Ext.), Meerut. 0.00 0.00 31/10/202311/12/2023 11/12/202325/12/202311/12/2023 11/12/2023M/s Jitender Kumar Contractor 9012953595SH. SANDEEP KUMAR JE SAURAV KUMAR AE RAJEEV KUMAR XECircle 2Completed
1572 07/SE(ELECT)/LKO/2024-25DEPOSIT WORK FUNDELECTRICAL SAFETY RELATED EXTERNAL ELECTRIFICATION WORK AT LALA LAJPAT RAI & AFFILIATED GOVT. MEDICAL COLLEGE, KANPUR 0.00 1100.00 25/06/202408/10/2024 08/10/202407/04/202508/10/2024 08/10/2024YASH ENTERPRISES Circle ElectricalIn Progress
1573 05/SE-VthRuhelkhand/21-22Dt14.12.2021PARISHAD PROJECT FUNDConstruction of 12.00 M and 9.00/7.50M internal Roads at Civil Lines Yojna No 2 Phase-2 Badaun 0.00 0.00 14/12/202113/06/2022 14/12/2021Mukesh Chandra Yadav Circle 5In Progress
1574 09/S.E.(E)/2022-23dated16-01-2023PARISHAD PROJECT FUNDHIGH MAST LIGHT FITTING WORK AT WORK SITE OF PROPOSED U.P. GLOBAL INVESTORS SUMMIT-2023 AND PARTIALLY STREET LIGHT WORK OF SIDE ROAD OF CANAL AT SECTOR-15 VRINDAVAN YOJNA-4 LUCKNOW.( Work By M/s YASH ENTERPRISES)(09/S.E.(E)/2022-23 dated 16-01-2023) 0.00 153.00 09/12/202216/01/2023 16/01/202304/02/202316/01/2023 16/01/2023YASH ENTERPRISES Circle ElectricalIn Progress
1575 04/EE/ED-III/22-23PARISHAD PROJECT FUNDCleaning of Sewage Pumping Plant and Related Work at Scheme No. 3 Ambekarpuram, Kanpur 0.00 8.81 17/12/202205/01/2023 05/01/202304/02/202305/01/2023 05/01/2023M.A. Engineering works Circle ElectricalCompleted
1576 09/SE(ELect.)ED-III//21-22PARISHAD PROJECT FUNDExternal Electrification Work at Bhumi Vikas Evam Grah Sansthan Scheme No.-3, Jhansi 0.00 438.96 05/10/202110/12/2021 10/12/202109/06/202210/12/2021 10/12/2021R K and Company 8171211222 Circle ElectricalIn Progress
1577 CBNO.-06/SE(ELECT)/LKO/2024-25DEPOSIT WORK FUNDInternal Electrical/ Mechanical Work in Proposed Building for Newly Operated Pharmacy Department At Campus of Chaudhary Charan Singh University, Meerut. 0.00 141.54 13/06/202408/10/2024 08/10/202407/04/202508/10/2024 08/10/2024SPARKLE ENTERPRISES 9837394838 Circle ElectricalIn Progress