SrNoWORK ORDER NOCIRCLEWORK NAMEESTIMATE COST & DATETENDER AMOUNT & DATEAGREEMENT DATE & ACTUAL WORK START DATETarget date of Work CompletionAgreement date & ACTUAL work start DATE1CONTRACTOR NAME & PHONE NO.ENG. NAME AND PHONE NOcircle1Physical Progress
1 11/EE/2017-18Circle 5S/I of CCTV & its related work in banquet hall & Admin Block at Avadh shilp Gram Avadh Vihar Yojna Lucknow. 0.00 37.25 06/07/2017 06/07/201705/09/201706/07/2017 06/07/2017m/s triflex solution JAY JAY RAM 8795810656JE D.C SHUKLA 8795810096AE AVESH 8795810240XECircle 5Completed
2 12/EE/2018-19Circle ElectricalStreet light work at the central verge of the road from Anchal ganj Chauraha to Gagan Khera Chauraha In Unnao City From Infrastructure fund (Goup-A) 0.00 56.78 21/02/201814/08/2018 13/11/201814/08/2018 Preeti Electric works BHOOPLAL 91493206628JE V.V TRIPATHI 8795810607AE AVESH 8795810240XECircle ElectricalCompleted
3 01/EE/2018-19Circle ElectricalS/I of Bus Bar pannel & Meetring Pannel at Sector-8 (Basera 1& 2 ) Avadh Vihar Yojna Lucknow 0.00 30.05 20/01/201824/04/2018 24/04/201823/05/201824/04/2018 24/04/2018m/s electro builder JAY JAY RAM 8795810656JE D.C SHUKLA 8795810096AE AVESH 8795810240XECircle ElectricalCompleted
4 08/EE/2018-19Circle ElectricalConstruction of 02 No. Tubewell and Its related work at Lohramau Yojna Sultanpur. 0.00 30.54 27/12/201728/06/2018 28/06/201827/08/201828/06/2018 28/06/2018m/s m.a engineering works JAY JAY RAM 8795810656JE D.C SHUKLA 8795810096AE AVESH 8795810240XECircle ElectricalCompleted
5 13/EE/2018-19Circle ElectricalStreet light wrok at the Central Verge of the road from Anchalganj Chauraha To Gagand Khera Chauraha in Unnao city from Infrastructure fund(Group-B) 0.00 55.85 21/02/201814/08/2018 14/08/201813/11/201814/08/2018 14/08/2018Preeti Electric works BHOOPLAL 91493206628JE D.C SHUKLA 8795810096AE AVESH 8795810240XECircle ElectricalCompleted
6 09/EE/2018-19Circle ElectricalConstruction of HT Line for Electric Supply Basera 1 & 2 Sector-8 At Avadh Vihar Yojna Lucknow. 0.00 10.87 20/01/201806/07/2018 06/07/201805/08/201806/07/2018 06/07/2018m/s durgeh enterprises JAY JAY RAM 8795810656JE D.C SHUKLA 8795810096AE AVESH 8795810240XECircle ElectricalCompleted
7 21/EE/2017-18Circle ElectricalS/I of pre-paid electric meter (Gangotri Enclave) sector-8 Avadh Vihar Yojna Lucknow. 0.00 83.01 08/11/201716/01/2018 16/01/201815/05/201816/01/2018 16/01/2018m/s sjs system and solution JAY JAY RAM 8795810656JE D.C SHUKLA 8795810096AE AVESH 8795810240XECircle ElectricalCompleted
8 02/SE(V)/CD-3/2017-2018Circle Vrindavan64 NOS HOUSES (G+3) LIG 0.00 643.84 24/05/201721/09/2017 21/09/201720/09/201921/09/2017 21/09/2017SHAIL BUILDERS & CONTRACTOR 9415029218KAMAL DEO PRASAD 8795810262JE SHARAD KUMAR T 8795810558AE PANKAJ VERMA 8795810066XECircle VrindavanIn Progress
9 05/SE(V)/CD-3/2017-2018Circle Vrindavan64 NOS HOUSES (G+3) LIG 0.00 643.84 21/06/201719/09/2017 19/09/201719/09/201919/09/2017 19/09/2017SINGH ASSOCIATE KAMAL DEO PRASAD 8795810294JE U. V. SINGH 8795810363AE PANKAJ VERMA 8795810066XECircle VrindavanIn Progress
10 06/SE(V)/CD-3/2017-2018Circle Vrindavan96 NOS HOUSES(G+3) LIG 0.00 965.76 21/06/201723/09/2017 23/09/201722/09/201723/09/2017 23/09/2017T Y TRADERS 9004537987ANOOP JAISWAL 8795810262JE U. V. SINGH 8795810558AE PANKAJ VERMA 8795810066XECircle VrindavanIn Progress
11 08/SE(V)/CD-3/2017-2018Circle Vrindavan96 HOUSES(G+3) LIG 0.00 965.76 21/06/201727/09/2017 27/09/201726/09/201927/09/2017 27/09/2017RAJAWAT ASSOCIATE 9415523037ANOOP JAISWAL 8795810564JE UDAIVEER SINGH 8795810363AE PANKAJ VERMA 8795810066XECircle VrindavanIn Progress
12 10/SE(V)/CD-3/2017-2018Circle Vrindavan64 NOS HOUSES(G+3) LIG 0.00 643.84 14/09/201715/01/2018 15/01/201814/01/202015/01/2018 15/01/2018INDIA STONE COMPANY 9648555666NARAYAN PRASHAD 8795810262JE R.P. GUPTA 8795810289AE PANKAJ VERMA 8795810066XECircle VrindavanIn Progress
13 11/SE(V)/CD-3/2017-2018Circle Vrindavan96 NOS HOUSES (G+3) LIG 0.00 965.76 14/09/201715/01/2018 15/01/201814/01/202015/01/2018 15/01/2018INDIA STONE COMPANY 9648555666NARAYAN PRASHAD 8795810262JE R.P. GUPTA 8795810289AE PANKAJ VERMA 8795810066XECircle VrindavanIn Progress
14 03/SE(V)/CD-3/2017-2018Circle Vrindavan64 NOS HOUSES(G+3) EWS 0.00 425.60 21/06/201721/09/2017 21/09/201720/09/201921/09/2017 21/09/2017SHARIK MIYA 9412710500KAMAL DEO PRASAD 8795810294JE U. V. SINGH 8795810363AE PANKAJ VERMA 8795810066XECircle VrindavanIn Progress
15 04/SE(V)/CD-3/2017-2018Circle Vrindavan96 NOS HOUSES(G+3) EWS 0.00 638.40 21/06/201727/09/2017 27/09/201726/09/201927/09/2017 27/09/2017GOPI CHAND RANGLINI 9956510351KAMAL DEO PRASAD 8795810262JE SHARAD KUMAR 8795810558AE PANKAJ VERMA 8795810066XECircle VrindavanIn Progress
16 07/SE(V)/CD-3/2017-2018Circle Vrindavan64 NOS HOUSES (G+3) EWS 0.00 425.60 21/06/201727/09/2017 27/09/201726/09/201927/09/2017 27/09/2017S. P. & COMPANY 9935586687ANOOP JAISWAL 8795810564JE UDAIVEER SINGH 8795810363AE PANKAJ VERMA 8795810066XECircle VrindavanIn Progress
17 02/SE-V/2016-17Circle 5Construction of 61 Nos. 72/162 Type Semi Finished Houses in Sector-7A at Majhola Yojna No.-4, Phase-II, Moradabad under Self Financing Scheme-2016 0.00 517.11 29/08/201628/10/2016 28/10/201602/03/201828/10/2016 28/10/2016M/s S.S. Solanki 9235889931ANOOP KUMAR SHRIVASTAV,GYAN PRAKASH,SURENDRA PRASAD JE DEVENDRA PAL SINGH AE SHOBHIT KUMAR PATHAK XECircle 5Completed
18 05/SE-III/CD-19/2018-19Circle 3Construction of 192 Nos., EWS Flat under PMAY (Shahari) Sector-7A, Part-I, Avadh Vihar Yojna, Lucknow 0.00 752.00 02/04/201828/07/2018 28/07/201827/01/202028/07/2018 28/07/2018M/S Neel Constructions 9415117988HEM SINGH JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XECircle 3In Progress
19 04/SE-III/CD-19/2018-19Circle 3Construction of 192 Nos. EWS Houses Under PMAY (Sahari) at Sector-7A, Awadh Vihar Yojna, Lucknow 0.00 752.00 02/04/201828/07/2018 28/07/201827/01/202028/07/2018 28/07/2018M/S Apex Construction Company 9839098580HEM SINGH JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XECircle 3In Progress
20 03/SE-III/CD-19/2018-19Circle 3Construction of Remaining Work of Multi storied residential houses in Himalaya Enclave, Phase-II, Sector-17, Vrindavan Yojna, Lucknow 0.00 2000.00 06/03/201815/05/2018 15/05/201814/10/201815/05/2018 15/05/2018M/S A.K. Builders & Suppliers 9935596863AJAY KUMAR,JAY PRAKASH MAURYA JE ER. SURENDRA NATH AE ER. RAMESH CHANDRA YADAV XECircle 3Completed
21 07/SEHQ/CD-7/18-19Circle HQCONSTRUCTION OF 288 NOS FOUR STORIED (G+3) FLATS AT SECTOR 10B, AWADH VIHAR YOJNA LUCKNOW 0.00 1128.00 04/04/201808/08/2018 08/08/201807/02/202008/08/2018 08/08/2018R.S.CONSTRUCTION J.N. MISHRA,PARMOD KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XECircle HQIn Progress
22 .1.01/SEHQ/CD15/2013-14Circle HQCONSTRUCTION OF MULTISTORY (S+7) RESIDENTIAL FLATS GANGOTRI ENCLAVE 784 NOS. F-84 & F-64 TYPES 0.00 11541.20 17/01/201403/03/2014 03/03/201402/03/201603/03/2014 03/03/2014K.P.C. PROJECT LTD 09956298822KAMTA PRASAD,MANUDEV JE Circle HQCompleted
23 .3.12/SEHQ/CD-7/2013-14Circle HQCONSTRUCTION OF MULTI STORED-BHAGIRATHI (B+S+16) RESIDENTIAL FLATS IN BHAGIRATHI ENCLAVE 03BHJ+3BHK+SERVANT 0.00 30030.00 12/07/201316/09/2013 06/11/201305/02/201616/09/2013 06/11/2013N.C.C.LIMITED 09952301417A.B.SINGH,J.N. MISHRA,LALIT KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XECircle HQCompleted
24 N/ACircle HQ64 Nos EWS (G+3) Flats at Lohramau Yojna, Sultarnpu 0.00 335.90 15/09/201630/12/2016 30/12/201631/01/201930/12/2016 30/12/2016SINGH ASSOCIATE MANOJ KUMAR JE R.C. SRIVASTAVA,S.P.S. AGARWAL AE D.K. SRIVASTAVA XECircle HQCompleted
25 04/SEHQ/CD-15/15-16Circle HQCONSTRUCTION OF 60 NO. (G+2) SPECIAL TYPE EWS HOUSES AT SECTOR 5D 0.00 207.21 15/11/201419/12/2015 19/12/201518/03/201719/12/2015 19/12/2015S.S CONSTRUCTION AMARJEET YADAV JE D.K.GOYAL AE D.B.YADAV XECircle HQCompleted
26 01/SE-III/CD-19/2019-20Circle 3Upgradation/Beautification work of Existing 45M wide road between sector-14 & 19 0.00 512.31 12/03/201928/06/2019 28/06/201927/12/201928/06/2019 28/06/2019M/S Ram Singh Agarwal 7348688888DINESH KUMAR VISHAWAKARMA JE ER. RAM PRATAP AE ER. RAMESH CHANDRA YADAV XECircle 3Completed
27 08/SEHQ/CD-7/18-19Circle HQCONSTRUCTION OF 288 NOS FOUR STORIED (G+3) FLATS AT SECTOR 10B, AWADH VIHAR YOJNA LUCKNOW 0.00 1128.00 04/04/201808/08/2018 08/08/201807/02/202008/08/2018 08/08/2018R.S.CONSTRUCTION J.N. MISHRA,PARMOD KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XECircle HQIn Progress
28 09/SEHQ/CD-7/18-19Circle HQCONSTRUCTION OF 288 NOS FOUR STORIED (G+3) FLATS AT SECTOR 10B, AWADH VIHAR YOJNA LUCKNOW 0.00 1128.00 04/04/201808/08/2018 08/08/201807/02/202008/08/2018 08/08/2018R.S.CONSTRUCTION A.B.SINGH,J.N. MISHRA JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XECircle HQIn Progress
29 .4.09/SEHQ/CD15/2015-16Circle HQCONSTRUCTION OF 1680 MULTISTORY IN RESIDENTIAL FLATS IN SAMAJWADI AVAS YOJNA & 448 NOS SEMIFINISHED MULTISTORY RESIDENTIAL FLATS IN GOMTI ENCLAVE SECTOR-8 0.00 27010.00 06/11/201527/01/2016 27/01/201628/02/202027/01/2016 27/01/2016LARSEN & TOUBRO LIMITED 09450000009AMARJEET YADAV,KAMTA PRASAD,MANUDEV JE A.K.SHAHU,D.K.GOYAL AE D.B.YADAV XECircle HQIn Progress
30 20/SEHQ/CD-14Circle HQCONST. OF MULTISTORY (B+S+14) RESIDENTIAL FLATS AVADH VIHAR YOJNA LKO 0.00 18381.02 02/09/201320/02/2014 20/02/201419/05/201620/02/2014 20/02/2014N.C.C.LIMITED 09952301417SUGENDRA KUMAR VISHWAKARMA,S. K. SINGH BHADAURIYA,SUBEDAR NAVIK,RAMESH CHANDRA CHAURASIYA,RAM PRATAP JE ABHISHEK NATH TIWARI AE PRAMOD KUMAR SINGH XECircle HQCompleted
31 08/SEHQ/CD-7/15-16Circle HQENGINEERING PROCUREMENT AND CONSTRUCTION OF MULTI-STOREYED RESIDENTIAL FLATS IN SARYU ENCLAVE 0.00 52529.33 08/11/201525/01/2016 25/01/201614/08/202025/01/2016 25/01/2016N.C.C.LIMITED 09952301417A.B.SINGH,J.N. MISHRA,LALIT KUMAR,MOH. KHURSHEED,PRAMOD KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XECircle HQIn Progress
32 10/SE(HQ)/CD-31/18-19dt.29-8-18Circle HQConstt. of 96 No. EWS (G+3) Houses under PMAY at Sultanpur 0.00 378.34 28/02/201829/08/2018 29/08/201820/02/202029/08/2018 29/08/2018M/S Shiv Giri Traders 9984854111MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XECircle HQIn Progress
33 NACircle HQConstruction of Community Center at Sector-10B, Vrindavan Yojan no-2, Lucknow 0.00 294.78 10/07/201526/09/2015 26/09/201526/06/201626/09/2015 26/09/2015M/S Dream Construction 8765392315AJEET KUMAR DWIVEDI,MANOJ KUMAR JE R.C. SRIVASTAVA,S.P.S. AGARWAL AE D.K. SRIVASTAVA XECircle HQCompleted
34 06/SE-1/CD-31/15-16Circle HQConstruction of Multistoryed (S+8) 688 Nos 2BHK & 576 No. 3BHK Flats (kailash Enclave) at Sector-18, Vrindavan yojna, Lucknow 0.00 28611.00 19/03/201502/07/2015 02/07/201530/06/201902/07/2015 02/07/2015M/S Vascon Engineers Ltd. 7525046101AJEET KUMAR DWIVEDI,ANIL KUMAR SHUKLA,D.S. MEHRA,J.P.MISHRA,MANOJ KUMAR JE R.C. SRIVASTAVA,S.P.S. AGARWAL AE D.K. SRIVASTAVA,K.P.TRIPATHI XECircle HQCompleted
35 4130/A-4/96Circle 4Construction of 50 Nos A-72 type Semi Finished houses at Spinning Mill Campus Etawah 0.00 373.67 16/12/201612/10/2017 12/10/201711/07/201812/10/2017 12/10/2017RAJAWAT ASSOCIATE 9415523037SRI ARUN KUMAR PATEL,SRI ARVIND KUMAR JE NAGENDRA KUMAR,NAVJOT SINGH VERMA,SRI ABHISHEK VERMA AE PRADEEP KUMAR XECircle 4In Progress
36 4131/A-4/96Circle 4Construction of 32 Nos A-72 type Finished houses at Spinning Mill Campus Etawah 0.00 392.00 06/10/201725/01/2018 25/01/201824/01/201925/01/2018 25/01/2018Gun-Gun Construction & Electricals 9410487559SRI DEVENDRA YADAV JE ARVIND KUMAR,NAGENDRA KUMAR,NAVJOT SINGH VERMA,SRI ABHISHEK VERMA AE PRADEEP KUMAR XECircle 4In Progress
37 .6.04/SEHQ/CD15/18-19Circle HQConstruction of 288 Nos. (G+3) Flats under PMAY at Sector-10B, Avadh Vihar Yojna, Lucknow. 0.00 1095.88 05/04/201825/07/2018 25/07/201824/01/202025/07/2018 25/07/2018T Y TRADERS 9004537987AMARJEET YADAV JE D.K.GOYAL AE D.B.YADAV XECircle HQIn Progress
38 05/SEHQ/CD15/18-19Circle HQConstruction of 224 Nos. (G+3) Flats under PMAY, at Sector-10 Avadh Vihar Yojna, Lucknow 0.00 851.86 05/04/201825/07/2018 25/07/201824/01/202025/07/2018 25/07/2018GOPI CHAND RANGLINI 9956510351MANUDEV JE A.K.SHAHU AE D.B.YADAV XECircle HQIn Progress
39 N.A.Circle HQConstruction of Community Center at Sector-16, Vrindavan Yojan no-4, Lucknow 0.00 192.28 02/02/201619/03/2016 19/03/201618/12/201619/03/2016 19/03/2016M/S S.S. Solanki Constrauction 8765392315AJEET KUMAR DWIVEDI JE R.C. SRIVASTAVA AE D.K. SRIVASTAVA,K.P.TRIPATHI XECircle HQCompleted
40 11/SEHQ/CD-7/18-19Circle HQCONSTRUCTION OF 240 NOS FOUR STORIED (G+3) FLATS AT SECTOR 10B, AWADH VIHAR YOJNA LUCKNOW 0.00 846.63 20/07/201809/10/2018 09/10/201808/04/202009/10/2018 09/10/2018SHAKTI CONSTRUCTION CO. 09121900191A.B.SINGH,LALIT KUMAR JE A.K.AGRAWAL AE PRAMOD KUMAR SINGH XECircle HQIn Progress
41 06/SEHQ/CD15/18-19Circle HQConstruction of 224 Nos. (G+3) Flats under PMAY at Sector-10B, Avadh Vihar Yojna, Lucknow. 0.00 851.86 05/04/201825/07/2018 25/07/201824/01/202025/07/2018 25/07/2018SHARIK MIYA 9412710500MANUDEV JE A.K.SHAHU AE D.B.YADAV XECircle HQIn Progress
42 05/SE-III/CD13/13-14Circle 3Const. of Multi Storeyed (S+13) Flats Residential Flats ( Everest Enclave) in Sect-18, Vrindavan Yojna No.4 Lucknow 0.00 13362.38 26/12/201305/03/2014 26/02/201425/02/201705/03/2014 26/02/2014Vascon Engineers Ltd 7525046101MEWALAL JE SAMRAJ AE BRIJEDRA PRATAP XECircle 3In Progress
43 01/SE-III/CD-19/2012-13Circle 3Engineering, procurement and construction of multi storeyed residential finished houses including basement, based on RCC monolithic shear wall concept using aluminum form work in Himalaya Enclave in Sector-17, Vrindavan Yojna, Lucknow including soil testing, structural design, construction of boundary wall and all site internal development complete in all respect ready to move in for living condition. 0.00 19000.00 17/01/201218/06/2012 18/06/201217/09/201418/06/2012 18/06/2012M/S Larsen & Toubro Limited 7338144299AJAY KUMAR,DINESH KUMAR VISHAWAKARMA,HEM SINGH,JAY PRAKASH MAURYA JE ER. RAM PRATAP,ER. SURENDRA NATH AE ER. RAMESH CHANDRA YADAV XECircle 3Completed
44 04/SE-III/CD-31/13-14Circle HQDesign, Construction, Supply, Installation, Testing and Commissioning of 37.50 MLD Capacity Sewage Treatment Plant 0.00 5392.21 03/01/2014 03/01/201402/07/202003/01/2014 03/01/2014S.N. ENVIRO TECH PVT LTD 9818210108ANIL KUMAR SHUKLA,D.S. MEHRA,MANOJ KUMAR JE AE D.K. SRIVASTAVA,K.P.TRIPATHI XECircle HQCompleted
45 17/SE(HQ)/CD-7/13-14Circle HQconstruction of 700 nos flats 0.00 24393.06 16/07/201318/01/2014 18/01/201417/04/201718/01/2014 18/01/2014M/S N.C.C. Ltd 9936457615ADITYA KUMAR TRIPATHI JE RAJ KAMAL SAXENA AE JAGDISH KUMAR XECircle HQCompleted
46 18/SE-1/CD-31/16-17Circle HQConstruction of 48 Nos (G+3) LIG at Lohramau Yojna, Sultanpur 0.00 399.81 15/09/201630/12/2016 30/12/201631/01/201930/12/2016 30/12/2016SINGH ASSOCIATE MANOJ KUMAR JE R.C. SRIVASTAVA,S.P.S. AGARWAL AE D.K. SRIVASTAVA,K. P. TRIPATHI XECircle HQCompleted
47 01/S.E-2/2018-19Circle 2Const. of 144 Nos Houses (G+3) under PMAY at Sector-4 Jagriti Vihar (Ext.) Scheme No-11, Meerut 0.00 563.21 16/04/201824/08/2018 24/08/201823/02/202024/08/2018 24/08/2018M/s Kumar Builders 9358403917AJAB SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2In Progress
48 17/EE/CD-12/2016-17Circle VrindavanConstruction of 19 Nos. 45/75 Type SFS Houses at Shahabad Yojna, Hardoi. 0.00 98.52 13/09/201617/12/2016 17/12/201616/09/201717/12/2016 17/12/2016M/S Aditya Engineers & Builders 9415149007NARENDRA KUMAR JE SRI D.N. PANDEY AE SRI H.S. SHARMA XECircle VrindavanCompleted
49 01/SE-V/2016-17Circle 5CONTSTRUCTION OF 30 mtr and 24 mtr TRUNK ROADS IN MAJHOLA YOJNA NO-4 PH-2 VISTAR MORADABAD. 0.00 404.00 31/05/201617/08/2016 17/08/201616/11/201617/08/2016 17/08/2016M/s R.G, Buildwell Engineers Ltd 9837391824RAHUL KUMAR JE RAJ KUMAR AE PAWAN KUMAR VERMA XECircle 5In Progress
50 31/EE/CD-12/2016-17Circle VrindavanConstruction of 13 Nos. 53/127 Type SFS Houses at Shahabad Yojna, Hardoi. 0.00 97.52 13/09/201629/12/2016 29/12/201628/09/201729/12/2016 29/12/2016M/S RAJA CONSTRUCTION 7651903756NARENDRA KUMAR JE SRI D.N. PANDEY AE SRI H.S. SHARMA XECircle VrindavanCompleted
51 29/EE/2018-19ED-1Circle ElectricalConstruction of 1 No. tubewell 200 mtr deep & its related work in sec-7 A Awadh Vihar Yojna Lucknow. 0.00 16.69 22/02/201827/02/2019 07/02/201926/05/201927/02/2019 07/02/2019M.A. Engineering works Circle ElectricalCompleted
52 04/EE/CD-8/2018-19Circle 2Internal Water Supply Distribution in Sector-3 at Scheme-11, Jagriti Vihar (Ext.), Meerut 0.00 11.00 24/07/201825/10/2018 25/10/201824/01/201925/10/2018 25/10/2018M/s Manpal 9719316437SANJAY SHARMA JE SH. A.K. BANSAL AE SH. ARVIND KUMAR XECircle 2Completed
53 02/SE(M)/CD-38/2018-19Circle MantolaConst of Ineternal Road in Campus of Gulmohar Enclave in sec-15 0.00 115.00 23/02/201801/06/2018 01/06/201830/11/201801/06/2018 01/06/2018SHIVAM CONTRACTOR 8755427501ABHISHEK KUMAR MISHRA JE ALOKSHEEL DWIVEDI,NARESH GUPTA,SATYENDRA SINGH AE BISHEMBER SINGH,S.K. SIRVASTAVA,SHOBHIT KUMAR PATHAK XECircle MantolaIn Progress
54 08/EE(GKP)2020-21Circle 1Construction of Interlocking & Drain at ( Dr. S.P. Chaudhari Clinic To Office Zila Krishi Adhikari) At Basti 0.00 45.00 28/03/202004/06/2020 04/06/202003/10/202004/06/2020 04/06/2020M/S TIGER ELECTRICAL & CONSTRUCTION COMPANY RAVINDRA NATH JE ASHOK KUMAR AE J K KAUSHAL XECircle 1Completed
55 01/SE-3/CD-2/2018-19Dt04.05.2018Circle 3Construction of 128 Nos EWS houses in Sec-13 VVy-4 Lucknow 0.00 708.96 15/12/201704/05/2018 04/05/201803/05/202004/05/2018 04/05/2018M/s Harihar contractor & suppliers 9984427700ADIL BEG,HEMANT KUMAR JE M.M.SRIVASTAVA AE A.K.MITTAL XECircle 3In Progress
56 14/EE/2018-19Circle 6Strengthening of road construction of Toilet Block and Tinshade at Naurangilal Inter Collage Campus Aligarh 0.00 46.69 27/06/201801/11/2018 01/11/201831/01/201901/11/2018 01/11/2018S.K. Engineering 9457193428MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE XECircle 6Completed
57 01/EE/CD-1/2019-20Circle 7Construction of 06 Nos. Kuda Ghar in differt. Sectors of Siddharth Vihar Yojna Ghaziabad. 0.00 34.40 02/03/2019 26/06/201925/12/2019 26/06/2019M/s Shri Ram Construction Co. 9412469569NARENDRA PAL JE YOGENDRA KUMAR VERMA AE ATUL KUMAR SINGH XECircle 7In Progress
58 07/SE-II/2019-20Circle 2Re-construction of Road from CO mandi thana Residance to end towards Railway Station Muzaffarnagar 0.00 119.00 28/05/201921/09/2019 21/09/201920/02/202021/09/2019 21/09/2019M/s Om Shiv Construction 9837085092SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XECircle 2In Progress
59 18/SE(M)/CD-36/2015-16Circle Mantolaconst. 384 Nos. 2BHK (S+4) flats in Mandola Vihar Ghaziabad 0.00 3376.76 30/09/201511/02/2016 11/02/201610/08/201711/02/2016 11/02/2016KASHYAPI INFRASTRUCTURE PVT. LTD. 9971799850BHARAT SINGH CD36,NANDA BALLABH CD36 JE SANJEEV SHUKLA,VIRENDRA KUMAR AE AMAN TYAGI XECircle MantolaCompleted
60 05/SE(M)/2018-19Circle MantolaConstruction of Balance Part of 24 M Road along scheme boundary 0.00 308.16 28/08/201828/01/2019 28/01/201912/09/201928/01/2019 28/01/2019Shree Ji Infraproject P Ltd ABHISHEK KUMAR MISHRA,RADHESHYAM JE ALOKSHEEL DWIVEDI,NARESH GUPTA AE AMAN TYAGI,SHOBHIT KUMAR PATHAK,UMA NATH SHUKLA XECircle MantolaIn Progress
61 03/SE(M)/CD-38/2018-19Circle MantolaConst of 12M, 6M, & 6M set back Road in sec-16B 0.00 186.00 28/04/201828/08/2018 20/08/201819/02/201928/08/2018 20/08/2018ANUJ ASSOCIATE 9411902544VEER SINGH,VIVEK KUMAR MAURYA JE ALOKSHEEL DWIVEDI,RAVINDRA BHATT,SATYENDRA SINGH AE AMAN TYAGI,BISHEMBER SINGH,SHOBHIT KUMAR PATHAK,UMA NATH SHUKLA XECircle MantolaIn Progress
62 09/EE/19-20ED-1Circle ElectricalSITC of 02 no. 1000 LPM 60 mtr. head KSB make Submersible pumping plant at Lohramau Yojna Sultanpur. 0.00 11.68 18/03/201913/08/2019 12/09/201913/08/2019 Preeti Electric works Circle ElectricalCompleted
63 06/EE/CD-8/2017-18Circle 2Laying of Sectorial Sewer in Sector-2 at Jagriti Vihar, Yojna-11, Meerut. 0.00 50.90 23/09/201720/12/2017 20/12/201719/03/201820/12/2017 20/12/2017Rakesh Singh Nursery 9810117408SH. RAVINDRA KUMAR JE SH. A.K. BANSAL AE SH. D.V. SINGH XECircle 2Completed
64 01/EE/CD-8/2017-18Circle 2Supply & Fixing of 1000 Tree Guard at Scheme No. 11, Jagriti Vihar (Ext.), Meerut 0.00 14.00 14/06/201714/06/2017 14/06/201713/09/201714/06/2017 14/06/2017Rajkanwar Enterprises 9927876456SH. RAVINDRA KUMAR JE SH. A.K. BANSAL AE SH. D.V. SINGH XECircle 2Completed
65 03/EE/CD-8/2018-19Circle 2Internal Water Supply Distribution System in Sector-2 (Part) at Scheme-11, Jagriti Vihar (Ext.), Meerut. 0.00 11.00 11/07/201825/10/2018 25/10/201824/01/201925/10/2018 25/10/2018Manpal 9917316437SH. RAVINDRA KUMAR JE SH. A.K. BANSAL AE SH. D.V. SINGH XECircle 2Completed
66 02/E.E./C.D.-6/19-20Circle 2Const. internal drain culvert in sec. - 4 (Part) 0.00 13.82 07/03/201902/07/2019 02/07/201901/10/201902/07/2019 02/07/2019M/S GURU CONSTRUCTION CO. 9997628189KHUSHALI JE M.B. KAUSHIK AE ARVIND KUMAR XECircle 2Completed
67 06/EE/CD-38/2016-17Circle MantolaConst. of 9M Wide Road in sec-19 0.00 66.00 26/09/201622/12/2016 22/12/201621/04/201722/12/2016 22/12/2016SHIVAM CONTRACTOR 8755427501MUNNA LAL,RADHESHYAM JE ALOKSHEEL DWIVEDI,NARESH GUPTA,SATYENDRA SINGH AE BISHEMBER SINGH,D.V.SINGH,SHOBHIT KUMAR PATHAK XECircle MantolaCompleted
68 02/SE-7/GZB/2011-12Circle 7Construction of Multi Storied (S+9) 108 Nos. (2BHK 36 and 3 BHK 72) 0.00 1900.00 10/06/201103/08/2011 03/08/201102/02/201303/08/2011 03/08/2011SAI CONSTRUCTION COMPEY 9311189551 Circle 7Completed
69 03/EE/CD-1GZB/2018-19DATE07-03-2019Circle 7Plantation work supply and fixing R.C.C. Pannel Tree Guards, Barbed wire fencing & MS gate in green belt of sec-7 Siddharth Vihar Yojna, Gzb. 0.00 17.03 18/12/201807/03/2019 07/09/201906/07/201907/03/2019 07/09/2019M/S D.B.GARDEN TRADERS 9761410176YOGENDRA KUMAR GUPTA JE NARENDRA KUMAR,YOGENDRA KUMAR VERMA AE ATUL KUMAR SINGH XECircle 7In Progress
70 11/EE/19-20ED-1Circle ElectricalConst. of 235 mtr. deep 02 nos. tubewell boring by D.C. Rig matchine at Rawali Road Yojna Bijnor 0.00 39.14 10/07/201926/08/2019 26/08/201925/10/201926/08/2019 26/08/2019Gopal Engineering works Circle ElectricalCompleted
71 01/EE/2019-20CD-28Circle 6Construction of C.C. Road & Drains in Rammohan Nagar, Shastri Puram Road, Sikandra, Agra 0.00 89.98 12/02/201902/09/2019 02/09/201901/12/201902/09/2019 02/09/2019R. N. Agarwal 9319062251RAMSHANKAR JE ASHOK KUMAR SHARMA AE GIRISH CHANDRA XECircle 6Completed
72 01/EE/CD-27/2018-19Circle 7Grill Fixing Work at 30m Road (G-A) Ajantapuram Yojna Ghaziabad 0.00 10.00 08/02/201915/02/2019 16/02/201925/02/201915/02/2019 16/02/2019M/s Ramesh Chand & Co. 9213288266MONAJ KUMAR RAO JE RIYAZUDDIN AE BHOLA NATH XECircle 7Completed
73 14/SE(HQ)/CD-31Circle HQConstt. of 96 No. EWS (G+3) Houses (Group-A) under PMAY at Sultanpur 0.00 378.34 28/02/201802/08/2019 02/08/201901/02/202102/08/2019 02/08/2019M/S Navneet Enterprises 9918381889MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XECircle HQIn Progress
74 17/EE/19-20ED-1Circle ElectricalMts. of Street light at scheeme no. 4 Vrindavan Yojna Lucknow. 0.00 9.10 16/09/201911/11/2019 11/11/201910/12/201911/11/2019 11/11/20193D CREATION Circle ElectricalCompleted
75 18/EE/19-20ED-1Circle ElectricalMaintenance of street Light at Amarpali Yojna Hardoi Road Lucknow. 0.00 8.46 16/09/201920/11/2019 20/11/201919/12/201920/11/2019 20/11/20193D CREATION Circle ElectricalCompleted
76 03/EE/CD-27/2018-19Circle 7Const. of Surface Trunk Drain and Culvert at sect-3 (Part) 0.00 40.32 29/01/201905/03/2019 05/03/201904/07/201905/03/2019 05/03/2019SHREE RAM CONSTRUCTION A.D. SHANDILYA JE RIYAZUDDIN AE BHOLA NATH XECircle 7Completed
77 03/SE-7/GZB/2013-14Circle 7Const. of four storied 576 nos LIG Houses in Brahmputra Enclave 0.00 3870.00 10/02/201403/03/2014 03/03/201402/09/201503/03/2014 03/03/2014GAUTAM BUILDERS 7055008855AKHILESH DATT SANDILYE,MONAJ KUMAR RAO JE MONAJ KUMAR RAO,RIYAZUDDIN AE BHOLA NATH,RAJESH RANJAN XECircle 7Completed
78 04/SE-7/GZB/2013-14Circle 7Const. of Four Storied 480 nos LIG Houses in Brahmputra Enclave sect-7 0.00 3672.38 06/02/201403/03/2014 03/03/201402/09/201503/03/2014 03/03/2014ANAND BUILDERS DINESH PAL SINGH JE MONAJ KUMAR RAO,RIYAZUDDIN AE BHOLA NATH,RAJESH RANJAN XECircle 7Completed
79 05/SE-7/GZB/2013-14Circle 7Const. of Multi storied 512 Nos LIG Houses in Brahmputra Enclave in sect- 7 0.00 3440.00 06/02/201403/03/2014 03/03/201402/09/201503/03/2014 03/03/2014Pandit Realtor Pvt Ltd 8929977910DINESH PAL SINGH JE MONAJ KUMAR RAO,RIYAZUDDIN AE BHOLA NATH,RAJESH RANJAN XECircle 7Completed
80 02/SE-7/2013-14Circle 7Const. of Four Storyed (G+3) 448 Nos LIG House at Sector-7 Siddharth Vihar GHAZIABAD 0.00 2448.26 06/02/201403/03/2014 03/03/201402/09/201503/03/2014 03/03/2014ANAND BUILDTECH PVT LTD 9810300761A.B. ANSARI,ALOK GUPTA,D.K. SRIVASTAVA,PREM PRAKASH,RADHEY SHYAM JE ASHOK KUMAR AGARWAL,S.K. VERMA AE LALIT MOHAN PANDEY,MOHD ALI SAFDAR XECircle 7Completed
81 01/SE-7/2017-18Circle 7Laying of Rising Water Main Line From Pump Houses to CWR and CWR Sector-8 to OHT Situated at Sector-7, Siddharth Vihar, GZB 0.00 245.38 24/07/201716/09/2017 16/09/201715/01/201816/09/2017 16/09/2017HMS INFRATECH PVT LTD 9837500055PREM PRAKASH,RADHEY SHYAM JE ASHOK KUMAR AGARWAL,S.K. VERMA AE MOHD ALI SAFDAR XECircle 7Completed
82 01/SE-7/2018-19Circle 7Const. of Community Centre in Sector-9, Siddharh Vihar, Ghaziabad 0.00 192.10 12/03/201827/07/2018 27/07/201826/07/201927/07/2018 27/07/2018Mohan Infradevelopers Pvt Ltd 9675411111ARUN KUMAR SINGH VISHAN JE ASHOK KUMAR AGARWAL AE LALIT MOHAN PANDEY XECircle 7Completed
83 02/SE-7/2012-13Circle 7Const. of Multi storyed Building (Ganga, yamuna & Hindon Enclave) in Sector-7, Siddharth Vihar GZB. 0.00 35000.00 27/12/201112/07/2012 12/07/201211/01/201512/07/2012 12/07/2012LARSEN & TOUBRO LIMITED 09450000009LOKESH KUMAR,RAJEEV SARSWAT,SUDHIR KUMAR JE ASHOK KUMAR AGARWAL,BHUVNESHWAR SINGH,SHOBHIT KUMAR PATHAK AE LALIT MOHAN PANDEY,MOHD ALI SAFDAR XECircle 7Completed
84 12/EE/19-20ED-1Circle ElectricalAnnual Mts. of 4 Nos. Otis lift in office complex sector-09 at Vrindavan Yojna No. 2 Phase-2 Lucnow. 0.00 8.74 01/06/201901/10/2019 01/10/201930/09/202001/10/2019 01/10/2019OTIS ELEVATOR CO.(INDIA) LTD. Circle ElectricalCompleted
85 13/EE/19-20ED-1Circle ElectricalConstruction of 220 mtr. deep 01 No. Tubewell Boring By D.G. Rig machine at Sector-15 Vrindavan Yojna No. 4 Lucknow 0.00 23.36 19/09/201924/10/2019 24/10/201923/12/201924/10/2019 24/10/2019GOPAL ELECTRICALS Circle ElectricalIn Progress
86 14/EE/19-20ED-1Circle ElectricalMts. of Street light at Manjhola Yojna No. 4 Phase-2 Moradabad. 0.00 8.18 16/09/201930/10/2019 29/11/201930/10/2019 Swastikk Electricals Circle ElectricalCompleted
87 02/EE/CD-38/2018-19Circle MantolaConst. of Internal 18 M wide Road In sec-1B 0.00 124.00 28/03/201828/05/2018 28/05/201827/09/201828/05/2018 28/05/2018ANUJ ASSOCIATE 9411902544MUNNA LAL,RADHESHYAM JE SATYENDRA SINGH AE BISHEMBER SINGH,D.V.SINGH,S.K. SIRVASTAVA,SHOBHIT KUMAR PATHAK XECircle MantolaCompleted
88 04/EE/CD-38/2018-19Circle MantolaLaying of Water Supply line sec 15 (Plot Pocket) & 16 B Rising Main sec-17 0.00 61.00 26/09/201819/12/2018 19/12/201818/03/201919/12/2018 19/12/2018RAMAXE CONSTRUCTION 9811554477JEET SINGH,VEER SINGH JE ALOKSHEEL DWIVEDI,RAVINDRA BHATT,SATYENDRA SINGH AE AMAN TYAGI,BISHEMBER SINGH,SHOBHIT KUMAR PATHAK,UMA NATH SHUKLA XECircle MantolaIn Progress
89 06/SE(M)/2015-16Circle MantolaConstruction of 1856 No Multistory Houses in sec-7 0.00 45000.00 18/04/201503/07/2015 03/07/201502/07/202003/07/2015 03/07/2015N.C.C.LIMITED 09952301417ABHISHEK KUMAR MISHRA,AJAY KUMAR AGNIHOTRI,H.S.TIWARI,JEET SINGH,LOKENDRA KUMAR,NARESH KUMAR GUPTA,U.S.CHAURASIYA,VEER SINGH,VIVEK KUMAR MAURYA JE ALOKSHEEL DWIVEDI,AMAN TYAGI,NAVEEN KUMAR JAIN,O.P. VERMA,RAM AVTAR MITTAL,SATYENDRA SINGH AE AKHILESHWAR SINGH,BISHEMBER SINGH,D.V.SINGH,K.P.TRIPATHI,LALTA PRASAD,MANEESH KUMAR PATHAK,S.K. SIRVASTAVA,SHOBHIT KUMAR PATHAK XECircle MantolaIn Progress
90 15/EE/19-20ED-1Circle ElectricalBalance Ext. Electrification work of EWS & LIG Flats at sector-13 in Vrindavan yojna Lucknow 0.00 119.05 22/10/201905/11/2019 05/11/201904/02/202005/11/2019 05/11/2019Electro Builders Circle ElectricalIn Progress
91 16/EE/19-20ED-1Circle ElectricalConstruction of 33 KV Line for Connecting 33/11 KV S/S Switcheted in various sector of vrindavan yojna to 220/132 KV S/S Switcheted in Avadh Vihar Yojna Lucknow. by Crossing Railway Line 0.00 185.64 03/10/201911/11/2019 11/11/201910/02/202011/11/2019 11/11/2019Preeti Electric works Circle ElectricalCompleted
92 02/EE2019-20Circle 6Construction of Inter Locking Road, Drains & Culvert at Behind ATV upto Railway Line, Mathura. 0.00 65.66 18/02/201930/09/2019 30/09/201929/12/201930/09/2019 30/09/2019TRIMURTI ENTERPRISES SANTOSH KUMAR JE R.K. GANGWAR AE SRI H.S. SHARMA XECircle 6In Progress
93 03/EE2019-20Circle 6Construction of Inter Locking Road, Drains & Culvert at Shakti Dhaam Colony Aurangabad, Mathura. 0.00 56.93 18/02/201930/09/2019 30/09/201929/12/201930/09/2019 30/09/2019TRIMURTI ENTERPRISES SANTOSH KUMAR JE R.K. GANGWAR AE SRI H.S. SHARMA XECircle 6In Progress
94 20/EE/19-20Circle ElectricalConstruction of 11 KV Feeder of 33/11 KV Sub Staion in Vrindavan Yojna No-4 Lucknow Group-B 0.00 41.67 14/11/201927/11/2019 27/11/201926/01/202027/11/2019 27/11/2019PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
95 02/EE/CD38/2019-20Circle MantolaConstruction of 2 No Parks in Sec-15 0.00 15.50 14/10/201931/12/2019 31/12/201931/03/202031/12/2019 31/12/2019SNG Enterprises RADHESHYAM JE NARESH GUPTA AE AMAN TYAGI,SHOBHIT KUMAR PATHAK,UMA NATH SHUKLA XECircle MantolaIn Progress
96 3268/A-4/511Circle 4Construction of drain and culvert in spining mill awasiya yojna Etawah 0.00 77.50 27/09/201826/11/2019 26/11/201925/05/202026/11/2019 26/11/2019M/s Siwansi Concrete Product 9412183483SRI ANIL KUMAR CHAUDHARY JE ARVIND KUMAR AE PRADEEP KUMAR XECircle 4In Progress
97 01/EE/CD-12/2019-20Circle VrindavanExternal Painting work of EWS Blocks at Gokul Gram Yojna No -1, Munnu Khera, Lucknow 0.00 0.00 21/11/2019 21/11/201920/02/2020 21/11/2019M/S Shivrudram Construction 9838308833HIMANSHU SINGH JE A.K.SINHA AE SHASHANK PANDEY XECircle VrindavanCompleted
98 28/EE/19-20ED-1Circle ElectricalConstruction of 11 KV line and shifting of old 11 KV line crossing over the proposed light house project plot at sector-5 Avadh Vihar Yojna Lucknow.(Group-A) 0.00 7.83 27/12/201910/01/2020 10/01/202024/01/202010/01/2020 10/01/2020PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
99 01/EE/CD11/2018-19Circle VrindavanRenovation of Millennium Club V.Yo 2 Part 1 Lko 0.00 30.22 04/09/201816/11/2018 16/11/201815/03/201916/11/2018 16/11/2018JAINENDRA SINGH RAJIV RASTOGI JE RAJIV SRIVASTAVA AE ANIL KUMAR MISHRA XECircle VrindavanCompleted
100 32/EE/19-20ED-1Circle ElectricalMaintenance of Electric Equipment at Office complex Vrindavan Yojna Lucknow 0.00 8.04 25/10/201915/01/2020 15/01/202014/02/202015/01/2020 15/01/2020Preeti Electric works Circle ElectricalCompleted
101 33/EE/19-20ED-1Circle ElectricalElectrification work of Office complex Sector-9 Vrindavan Yojna 2 Phase-2 Lucknow. 0.00 8.09 25/10/201920/01/2020 20/01/202019/03/202020/01/2020 20/01/2020Preeti Electric works Circle ElectricalCompleted
102 21/EE/19-20Circle ElectricalConstruction of Balance 11 KV Feeder of 33/11 KV Sub Staion in Vrindavan Yojna No-4 Lucknow Group-A 0.00 53.57 16/11/201927/11/2019 27/11/201926/01/202027/11/2019 27/11/2019Preeti Electric works Circle ElectricalCompleted
103 22/EE/19-20Circle ElectricalConstruction of Balance 11 KV Feeder of 33/11 KV Sub Staion in Vrindavan Yojna No-4 Lucknow Group-B 0.00 44.43 14/11/201927/11/2019 27/11/201926/01/202027/11/2019 27/11/2019PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
104 01/EE(GKP)/2019-20Circle 1Construction of Interlocking Road & drain Under Infrastructure from house of Ram prakash Gupta to House of Pramod Srivastav at Belwadadi in Basti 0.00 20.00 02/07/201903/10/2019 30/10/201902/04/202003/10/2019 30/10/2019M/S TIGER ELECTRICAL & CONSTRUCTION COMPANY RAVINDRA NATH JE ASHOK KUMAR AE J K KAUSHAL XECircle 1Completed
105 02/EE(GKP)2019-20Circle 1Construction of Interlocking Road & Drain Under Infrastructure from house of Kallu Dhobi to Pal bhawan in Rameshwarpuri Distt Basti 0.00 40.00 02/07/201911/10/2019 11/10/201910/04/202011/10/2019 11/10/2019M/S TIGER ELECTRICAL & CONSTRUCTION COMPANY RAVINDRA NATH JE ASHOK KUMAR AE J K KAUSHAL XECircle 1Completed
106 01/EE/CD-8/2019-20Circle 2Construction of Drain and Culvert in Sector-2(Part), at Scheme-11, Jagriti Vihar (Ext.), Meerut 0.00 23.50 14/08/201929/11/2019 29/11/201928/03/202029/11/2019 29/11/2019Guru Kripa Construction 9517580363SH. RAVINDRA KUMAR JE SH. SANJAI SHARMA AE ER. ARVIND KUMAR XECircle 2In Progress
107 27/EE/19-20ED-1Circle ElectricalConstruction of 11 kv feeder line for Energisation of Tubewell Situated in Secotr-10 Avadh Vihar Yojna Lucknow. 0.00 61.86 18/12/201903/01/2020 03/01/202017/01/202003/01/2020 03/01/2020PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
108 02/EE/CD-12/2019-20Circle VrindavanConstruction of 33/11 KVA, Electric Sub-station, Staff Room Office, at Sector-14(Part), Vrindavan Yojna, Lucknow 0.00 0.00 25/06/201905/12/2019 05/12/201904/09/202005/12/2019 05/12/2019SINGH CONSTRUCTION COMPANY 09355402572MUHAR SINGH JE A.K.SINHA AE SHASHANK PANDEY XECircle VrindavanCompleted
109 29/EE/2019-20ED-1Circle ElectricalConstruction of 11 KV line and shifting of old 11 KV line crossing over the proposed light house project plot at sector-5 Avadh Vihar Yojna Lucknow.(Group-C) 0.00 9.21 27/12/201910/01/2020 10/01/202024/01/202010/01/2020 10/01/2020PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
110 30/EE/19-20ED-1Circle ElectricalConstruction of 11 KV line Feeder of 33/11 KV S/S Sector-8 at Avadh Vihar Yojna Luxknow 0.00 722.91 28/09/201910/01/2020 10/01/202009/05/202010/01/2020 10/01/2020PREETI ELECTRIC WORK 9150011801 Circle ElectricalIn Progress
111 31/EE/19-20ED-1Circle ElectricalConstruction of 11 KV line and shifting of old 11 KV line crossing over the proposed light house project plot at sector-5 Avadh Vihar Yojna Lucknow.(Group-B) 0.00 9.21 27/12/201913/01/2020 13/01/202027/01/202013/01/2020 13/01/2020Swastikk Electricals Circle ElectricalCompleted
112 01/EE/CD11/2019-20Circle VrindavanLaying of rising main of Tube Well No 2 at Sector 17 Vrindan Yo 4 Lko 0.00 14.58 13/12/201824/07/2019 24/07/201923/10/201924/07/2019 24/07/2019SAILANI RAJIV RASTOGI JE RAJIV SRIVASTAVA AE NAVJOT SINGH VERMA XECircle VrindavanCompleted
113 07/EE/GKP/19-20Circle 1Const. of Estate Manager Office in Office Complex(Basement Shop 05 Nos) Shahpur Yojna No 2/3, Gorakhpur 0.00 12.00 12/12/201927/01/2020 27/01/202026/03/202027/01/2020 27/01/2020M/s Diya Swaroop Panday 9919990823JEYOTI NARAYAN JE ASHOK KUMAR AE J K KAUSHAL XECircle 1Completed
114 04/EE/CD-12/2019-20Circle VrindavanConstruction /Renovation of 12.00 Mt. wide road, at Sector-11A, VVY-3, Lucknow. 0.00 17.73 13/09/201916/12/2019 16/12/201915/03/202016/12/2019 16/12/2019GAYANTI CONSTRUCTION, B-366, Sidharth Enclave, MUHAR SINGH JE DINESH CHANDRA RAI AE SHASHANK PANDEY XECircle VrindavanCompleted
115 01/EE/ED-2GZB/19-20Circle ElectricalEXTERNAL ELECTRIFICATION WORK AT 33/11 KV S/S FOR GIVING ELECTRICAL SUPPLY TO BRAMHAPUTRA ENCLAVE SEC-10 SIDDHARTHA VIHAR YOJNA, GZB 0.00 12.02 23/02/201901/06/2019 01/06/201930/06/201901/06/2019 01/06/2019RAJ ASSOCIATES 09650027361SUDHAKAR PATHAK JE TEAJBIR SINGH AE MANEESH KUMAR PATHAK XECircle ElectricalCompleted
116 25/EE/19-20Circle ElectricalSupply and Fixing of caging for Bas Bar and metering Panel at Gokul gram Yojna Munnu khera Lucknow 0.00 16.51 22/08/201917/12/2019 17/12/201916/02/202017/12/2019 17/12/2019M.A. Engineering works Circle ElectricalCompleted
117 03/EE/CD-12/2019-20Circle VrindavanConstruction of Pump House and Operator Room at Gokul Gram Yojna No-1, Munnu Khera, Lucknow 0.00 0.00 30/09/201916/12/2019 16/12/201915/06/202016/12/2019 16/12/2019M/S Shivrudram Construction 9838308833HIMANSHU SINGH JE A.K.SINHA AE SHASHANK PANDEY XECircle VrindavanIn Progress
118 02/EE/CD11/2019-20Circle VrindavanPatch Work of 7 mtr wide road along sharda canal from shani temple at Rai Barelly Road to 45mtr wide road towards pgi 0.00 7.96 11/12/201915/01/2020 15/01/202029/01/202015/01/2020 15/01/2020G.ENTERPRISES RAKESH KUMAR SAXENA JE HARISHANKAR SINGH AE NAVJOT SINGH VERMA XECircle VrindavanCompleted
119 02/EE/CD11/2018-19Circle VrindavanConstruction of Boundry Wall rear side of Neelgiri Enclave Campus Sec 17 Vri. Yo 4 Lko 0.00 18.00 13/12/201825/01/2019 25/01/201924/04/201925/01/2019 25/01/2019DEV CONSTRUCTION CO. RAJIV RASTOGI JE RAJIV SRIVASTAVA AE NAVJOT SINGH VERMA XECircle VrindavanCompleted
120 01/SE-1/VNS/CD-37/2019-20Circle 1Const. & Strengthing of Internal Road At Avas Vikas Colony Vikas Nagar, Gorakhpur In Infrastructure Fund (Group 2(B)) 0.00 152.21 26/11/201912/02/2020 12/02/202031/10/202012/02/2020 12/02/2020M/s K.K. Enterprises 9415743560RAJNEESH SRIVASTAV JE ASHOK KUMAR SINGH AE J K KAUSHAL XECircle 1Completed
121 03/SE-1/VNS/CD-37/2019-20Circle 1Const. & strengthing of Internal Road At Avas Vikas Colony Vikas Nagar, Gorakhpur in Infrastructure Fund(Group-2(A)) 0.00 99.82 26/11/201912/02/2020 12/02/202031/10/202012/02/2020 12/02/2020M/S SAI ASSOCIATES 9005000013RAJNEESH SRIVASTAV JE ASHOK KUMAR SINGH AE J K KAUSHAL XECircle 1Completed
122 02/SE-1/VNS/CD-37/2019-20Circle 1Const. & strengthing of Internal Road at Avas Vikas Colony, Surajkund Gorakhpur In Infrastructure Fund(Group-1(B)) 0.00 99.97 26/11/201912/02/2020 12/02/202031/10/202012/02/2020 12/02/2020M/S SHIVAM ENTERPRISES 9670328000RAJNEESH SRIVASTAV JE ASHOK KUMAR SINGH AE J K KAUSHAL XECircle 1In Progress
123 02/EE/CD-19/2019-20Circle 3Patch work/Strengthening of roads of setcor-17/18 and Peripherial Road for DEFEXPO-2020 at Vrindavan Yojna, Lucknow 0.00 56.00 05/12/201926/12/2019 26/12/201909/01/202026/12/2019 26/12/2019M/S Ram Singh Agarwal 7348688888JAY PRAKASH MAURYA JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XECircle 3Completed
124 05/EE(GKP)/2019-20Circle 1Renewing and Development of Open space at Avas Vikas Colony Vikas Nagar Gorakhpur In Infrastructure Fund(Group-2(C)) 0.00 37.44 12/12/201909/01/2020 09/01/202031/10/202009/01/2020 09/01/2020M/S AJAY CONSTRUCTION AND SUPPLIERS 9935621811RAJNEESH SRIVASTAV JE ASHOK KUMAR SINGH AE J K KAUSHAL XECircle 1Completed
125 06/EE(GKP)2019-20Circle 1Construction and Strengthing of Main Road At Avas Vikas colony Surajkund, Gorakhpur In Infrastructure Fund(Group-1(A)) 0.00 45.40 11/12/201910/01/2020 10/01/202031/10/202010/01/2020 10/01/2020M/S Sai Baba Construction 8608608660RAJNEESH SRIVASTAV JE ASHOK KUMAR SINGH AE J K KAUSHAL XECircle 1Completed
126 38/EE/19-20Circle ElectricalExternal Electrification work for Energization of constructed tubewell No-2 at sec-15 in Vrindavan Yojna No-4 Lucknow 0.00 6.92 30/11/201928/02/2020 28/02/202008/03/202028/02/2020 28/02/2020PREETI ELECTRIC WORK 9150011801 Circle ElectricalCompleted
127 03/SE-III/CD-19/2019-20Circle 3Recerfacing (Bituminous concrete) of existing 30/45M wide road three entry point (shanidev mandir,O.P. chaudhary dental college & kalindi park) to sector-15 at vrindavan yojna lucknow 0.00 414.00 05/10/201915/11/2019 15/11/2019 15/11/2019 15/11/2019M/S Suryansh Infradevelopers Pvt. Ltd. 9415002704DINESH KUMAR VISHAWAKARMA JE ER. RAM PRATAP AE ER. RAMESH CHANDRA YADAV XECircle 3Completed
128 04/SE-III/CD-19/2019-20Circle 3Strengthening of 30M wide road in setcor-18/20 and sector-17/18 at Vrindavan Yojna No.-4 Lucknow 0.00 273.00 05/12/201926/12/2019 26/12/201909/01/202026/12/2019 26/12/2019M/S Ram Singh Agarwal 7348688888J.P. MAURYA JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XECircle 3Completed
129 02/EE.CD-4/2019-20Circle 3Laying of Rising Main in Bahraich Bhinga Marg yojna, Bahraich 0.00 12.12 17/07/201902/11/2019 02/11/201901/03/202002/11/2019 02/11/2019M/S Savitri Associate CHANDAN KUMAR JE K.K ACHARYA AE PRASHANT VARDHAN XECircle 3In Progress
130 34/EE/19-20ED-1Circle ElectricalShifting of 11 KV line at Partial area sector-3 Avadh Vihar Yojna Lucknow 0.00 8.11 25/10/201920/01/2020 20/01/202019/03/202020/01/2020 20/01/2020Preeti Electric works Circle ElectricalCompleted
131 02/SE-III/CD-19/2019-20Circle 3Recerfecing (Bituminous Concrete) of existing 45M wide VVIP road of Raibarelly Road to Shaheed Path at Vrindavan Yojna No.-4, Lucknow 0.00 538.00 05/10/201915/11/2019 15/11/201914/02/202015/11/2019 15/11/2019M/S Suryansh Infradevelopers Pvt. Ltd. 9415002704DINESH KUMAR VISHAWAKARMA JE ER. RAM PRATAP AE ER. RAMESH CHANDRA YADAV XECircle 3Completed
132 06/EE/2019-20DT13-11-2019Circle 5FABRICATION & FIXING OF 6MM THICK POLYCARBONATE SHEET IN M.S. STRUCTURE AT BOUNDARY WALL OF SWIMMING POOL AT GANDHI STADIUM, DISTT.: PILIBHIT [U.P.] 0.00 89.28 30/07/201913/11/2019 13/11/201910/02/202013/11/2019 13/11/2019B.D Gaurav Circle 5In Progress
133 07/EE(GKP)/2020-21Circle 1Const. of Interlocking & Drain in Ward No 09 pikaura Shiv Gulam vishkarma Shop to Babbu Yadav and yadav House to Panna Lal House In Infrastructure 0.00 22.00 28/03/202020/05/2020 20/05/202031/10/202020/05/2020 20/05/2020M/S TIGER ELECTRICAL & CONSTRUCTION COMPANY RAVINDRA NATH JE ASHOK KUMAR AE J K KAUSHAL XECircle 1Completed
134 24/EE/19-20Circle ElectricalSupply and Installation of 400KVA Transformer at Sec-6 A Vrindavan Yojna no-1 Lucknow 0.00 7.29 16/09/201912/12/2019 12/12/201911/02/202012/12/2019 12/12/2019Preeti Electric works Circle ElectricalCompleted
135 03/EE.CD-4/2019-20Circle 3Construction of boundary Wall around 400KL Over Head Tank in Bahraich Bhinga Marg Yojna,Bahrai