SrNo | WORK ORDER NO | CIRCLE | WORK NAME | ESTIMATE COST & DATE | TENDER AMOUNT & DATE | AGREEMENT DATE & ACTUAL WORK START DATE | Target date of Work Completion | Agreement date & ACTUAL work start DATE1 | CONTRACTOR NAME & PHONE NO. | ENG. NAME AND PHONE NO | circle1 | Physical Progress |
1
| 11/EE/2017-18 | PARISHAD PROJECT FUND | S/I of CCTV & its related work in banquet hall & Admin Block at Avadh shilp Gram Avadh Vihar Yojna Lucknow. | 0.00 | 37.25 | 06/07/2017 06/07/2017 | 05/09/2017 | 06/07/2017 06/07/2017 | m/s triflex solution | JAY JAY RAM 8795810656JE D.C SHUKLA 8795810096AE AVESH 8795810240XE | Circle 5 | Completed |
2
| 12/EE/2018-19 | AWASTHAPNA FUND | Street light work at the central verge of the road from Anchal ganj Chauraha to Gagan Khera Chauraha In Unnao City From Infrastructure fund (Goup-A) | 0.00 | 56.78 21/02/2018 | 14/08/2018 | 13/11/2018 | 14/08/2018 | Preeti Electric works | BHOOPLAL 91493206628JE V.V TRIPATHI 8795810607AE AVESH 8795810240XE | Circle Electrical | Completed |
3
| 01/EE/2018-19 | PARISHAD PROJECT FUND | S/I of Bus Bar pannel & Meetring Pannel at Sector-8 (Basera 1& 2 ) Avadh Vihar Yojna Lucknow | 0.00 | 30.05 20/01/2018 | 24/04/2018 24/04/2018 | 23/05/2018 | 24/04/2018 24/04/2018 | m/s electro builder | JAY JAY RAM 8795810656JE D.C SHUKLA 8795810096AE AVESH 8795810240XE | Circle Electrical | Completed |
4
| 08/EE/2018-19 | PARISHAD PROJECT FUND | Construction of 02 No. Tubewell and Its related work at Lohramau Yojna Sultanpur. | 0.00 | 30.54 27/12/2017 | 28/06/2018 28/06/2018 | 27/08/2018 | 28/06/2018 28/06/2018 | m/s m.a engineering works | JAY JAY RAM 8795810656JE D.C SHUKLA 8795810096AE AVESH 8795810240XE | Circle Electrical | Completed |
5
| 13/EE/2018-19 | AWASTHAPNA FUND | Street light wrok at the Central Verge of the road from Anchalganj Chauraha To Gagand Khera Chauraha in Unnao city from Infrastructure fund(Group-B) | 0.00 | 55.85 21/02/2018 | 14/08/2018 14/08/2018 | 13/11/2018 | 14/08/2018 14/08/2018 | Preeti Electric works | BHOOPLAL 91493206628JE D.C SHUKLA 8795810096AE AVESH 8795810240XE | Circle Electrical | Completed |
6
| 09/EE/2018-19 | PARISHAD PROJECT FUND | Construction of HT Line for Electric Supply Basera 1 & 2 Sector-8 At Avadh Vihar Yojna Lucknow. | 0.00 | 10.87 20/01/2018 | 06/07/2018 06/07/2018 | 05/08/2018 | 06/07/2018 06/07/2018 | m/s durgeh enterprises | JAY JAY RAM 8795810656JE D.C SHUKLA 8795810096AE AVESH 8795810240XE | Circle Electrical | Completed |
7
| 21/EE/2017-18 | PARISHAD PROJECT FUND | S/I of pre-paid electric meter (Gangotri Enclave) sector-8 Avadh Vihar Yojna Lucknow. | 0.00 | 83.01 08/11/2017 | 16/01/2018 16/01/2018 | 15/05/2018 | 16/01/2018 16/01/2018 | m/s sjs system and solution | JAY JAY RAM 8795810656JE D.C SHUKLA 8795810096AE AVESH 8795810240XE | Circle Electrical | Completed |
8
| 02/SE(V)/CD-3/2017-2018 | PARISHAD PROJECT FUND | 64 NOS HOUSES (G+3) LIG | 0.00 | 643.84 24/05/2017 | 21/09/2017 21/09/2017 | 20/09/2019 | 21/09/2017 21/09/2017 | SHAIL BUILDERS & CONTRACTOR 9415029218 | KAMAL DEO PRASAD 8795810262JE SHARAD KUMAR T 8795810558AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
9
| 05/SE(V)/CD-3/2017-2018 | PARISHAD PROJECT FUND | 64 NOS HOUSES (G+3) LIG | 0.00 | 643.84 21/06/2017 | 19/09/2017 19/09/2017 | 19/09/2019 | 19/09/2017 19/09/2017 | SINGH ASSOCIATE | KAMAL DEO PRASAD 8795810294JE U. V. SINGH 8795810363AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
10
| 06/SE(V)/CD-3/2017-2018 | PARISHAD PROJECT FUND | 96 NOS HOUSES(G+3) LIG | 0.00 | 965.76 21/06/2017 | 23/09/2017 23/09/2017 | 22/09/2017 | 23/09/2017 23/09/2017 | T Y TRADERS 9004537987 | ANOOP JAISWAL 8795810262JE U. V. SINGH 8795810558AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
11
| 08/SE(V)/CD-3/2017-2018 | PARISHAD PROJECT FUND | 96 HOUSES(G+3) LIG | 0.00 | 965.76 21/06/2017 | 27/09/2017 27/09/2017 | 26/09/2019 | 27/09/2017 27/09/2017 | RAJAWAT ASSOCIATE 9415523037 | ANOOP JAISWAL 8795810564JE UDAIVEER SINGH 8795810363AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
12
| 10/SE(V)/CD-3/2017-2018 | PARISHAD PROJECT FUND | 64 NOS HOUSES(G+3) LIG | 0.00 | 643.84 14/09/2017 | 15/01/2018 15/01/2018 | 14/01/2020 | 15/01/2018 15/01/2018 | INDIA STONE COMPANY 9648555666 | NARAYAN PRASHAD 8795810262JE R.P. GUPTA 8795810289AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
13
| 11/SE(V)/CD-3/2017-2018 | PARISHAD PROJECT FUND | 96 NOS HOUSES (G+3) LIG | 0.00 | 965.76 14/09/2017 | 15/01/2018 15/01/2018 | 14/01/2020 | 15/01/2018 15/01/2018 | INDIA STONE COMPANY 9648555666 | NARAYAN PRASHAD 8795810262JE R.P. GUPTA 8795810289AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
14
| 03/SE(V)/CD-3/2017-2018 | PARISHAD PROJECT FUND | 64 NOS HOUSES(G+3) EWS | 0.00 | 425.60 21/06/2017 | 21/09/2017 21/09/2017 | 20/09/2019 | 21/09/2017 21/09/2017 | SHARIK MIYA 9412710500 | KAMAL DEO PRASAD 8795810294JE U. V. SINGH 8795810363AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
15
| 04/SE(V)/CD-3/2017-2018 | PARISHAD PROJECT FUND | 96 NOS HOUSES(G+3) EWS | 0.00 | 638.40 21/06/2017 | 27/09/2017 27/09/2017 | 26/09/2019 | 27/09/2017 27/09/2017 | GOPI CHAND RANGLINI 9956510351 | KAMAL DEO PRASAD 8795810262JE SHARAD KUMAR 8795810558AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
16
| 07/SE(V)/CD-3/2017-2018 | PARISHAD PROJECT FUND | 64 NOS HOUSES (G+3) EWS | 0.00 | 425.60 21/06/2017 | 27/09/2017 27/09/2017 | 26/09/2019 | 27/09/2017 27/09/2017 | S. P. & COMPANY 9935586687 | ANOOP JAISWAL 8795810564JE UDAIVEER SINGH 8795810363AE PANKAJ VERMA 8795810066XE | Circle Vrindavan | In Progress |
17
| 02/SE-V/2016-17 | PARISHAD PROJECT FUND | Construction of 61 Nos. 72/162 Type Semi Finished Houses in Sector-7A at Majhola Yojna No.-4, Phase-II, Moradabad under Self Financing Scheme-2016 | 0.00 | 517.11 29/08/2016 | 28/10/2016 28/10/2016 | 02/03/2018 | 28/10/2016 28/10/2016 | M/s S.S. Solanki 9235889931 | ANOOP KUMAR SHRIVASTAV,GYAN PRAKASH,SURENDRA PRASAD JE DEVENDRA PAL SINGH AE SHOBHIT KUMAR PATHAK XE | Circle 5 | Completed |
18
| 05/SE-III/CD-19/2018-19 | CENTRAL AND STATE FUND | Construction of 192 Nos., EWS Flat under PMAY (Shahari) Sector-7A, Part-I, Avadh Vihar Yojna, Lucknow | 0.00 | 752.00 02/04/2018 | 28/07/2018 28/07/2018 | 27/01/2020 | 28/07/2018 28/07/2018 | M/S Neel Constructions 9415117988 | HEM SINGH JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XE | Circle 3 | In Progress |
19
| 04/SE-III/CD-19/2018-19 | CENTRAL AND STATE FUND | Construction of 192 Nos. EWS Houses Under PMAY (Sahari) at Sector-7A, Awadh Vihar Yojna, Lucknow | 0.00 | 752.00 02/04/2018 | 28/07/2018 28/07/2018 | 27/01/2020 | 28/07/2018 28/07/2018 | M/S Apex Construction Company 9839098580 | HEM SINGH JE A.K. YADAV AE ER. RAMESH CHANDRA YADAV XE | Circle 3 | In Progress |
20
| 03/SE-III/CD-19/2018-19 | PARISHAD PROJECT FUND | Construction of Remaining Work of Multi storied residential houses in Himalaya Enclave, Phase-II, Sector-17, Vrindavan Yojna, Lucknow | 0.00 | 2000.00 06/03/2018 | 15/05/2018 15/05/2018 | 14/10/2018 | 15/05/2018 15/05/2018 | M/S A.K. Builders & Suppliers 9935596863 | AJAY KUMAR,JAY PRAKASH MAURYA JE ER. SURENDRA NATH AE ER. RAMESH CHANDRA YADAV XE | Circle 3 | Completed |
21
| 07/SEHQ/CD-7/18-19 | CENTRAL AND STATE FUND | CONSTRUCTION OF 288 NOS FOUR STORIED (G+3) FLATS AT SECTOR 10B, AWADH VIHAR YOJNA LUCKNOW | 0.00 | 1128.00 04/04/2018 | 08/08/2018 08/08/2018 | 07/02/2020 | 08/08/2018 08/08/2018 | R.S.CONSTRUCTION | J.N. MISHRA,PARMOD KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XE | Circle HQ | In Progress |
22
| .1.01/SEHQ/CD15/2013-14 | PARISHAD PROJECT FUND | CONSTRUCTION OF MULTISTORY (S+7) RESIDENTIAL FLATS GANGOTRI ENCLAVE 784 NOS. F-84 & F-64 TYPES | 0.00 | 11541.20 17/01/2014 | 03/03/2014 03/03/2014 | 02/03/2016 | 03/03/2014 03/03/2014 | K.P.C. PROJECT LTD 09956298822 | KAMTA PRASAD,MANUDEV JE | Circle HQ | Completed |
23
| .3.12/SEHQ/CD-7/2013-14 | PARISHAD PROJECT FUND | CONSTRUCTION OF MULTI STORED-BHAGIRATHI (B+S+16) RESIDENTIAL FLATS IN BHAGIRATHI ENCLAVE 03BHJ+3BHK+SERVANT | 0.00 | 30030.00 12/07/2013 | 16/09/2013 06/11/2013 | 05/02/2016 | 16/09/2013 06/11/2013 | N.C.C.LIMITED 09952301417 | A.B.SINGH,J.N. MISHRA,LALIT KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XE | Circle HQ | Completed |
24
| N/A | PARISHAD PROJECT FUND | 64 Nos EWS (G+3) Flats at Lohramau Yojna, Sultarnpu | 0.00 | 335.90 15/09/2016 | 30/12/2016 30/12/2016 | 31/01/2019 | 30/12/2016 30/12/2016 | SINGH ASSOCIATE | MANOJ KUMAR JE R.C. SRIVASTAVA,S.P.S. AGARWAL AE D.K. SRIVASTAVA XE | Circle HQ | Completed |
25
| 04/SEHQ/CD-15/15-16 | PARISHAD PROJECT FUND | CONSTRUCTION OF 60 NO. (G+2) SPECIAL TYPE EWS HOUSES AT SECTOR 5D | 0.00 | 207.21 15/11/2014 | 19/12/2015 19/12/2015 | 18/03/2017 | 19/12/2015 19/12/2015 | S.S CONSTRUCTION | AMARJEET YADAV JE D.K.GOYAL AE D.B.YADAV XE | Circle HQ | Completed |
26
| 01/SE-III/CD-19/2019-20 | PARISHAD PROJECT FUND | Upgradation/Beautification work of Existing 45M wide road between sector-14 & 19 | 0.00 | 512.31 12/03/2019 | 28/06/2019 28/06/2019 | 27/12/2019 | 28/06/2019 28/06/2019 | M/S Ram Singh Agarwal 7348688888 | DINESH KUMAR VISHAWAKARMA JE ER. RAM PRATAP AE ER. RAMESH CHANDRA YADAV XE | Circle 3 | Completed |
27
| 08/SEHQ/CD-7/18-19 | CENTRAL AND STATE FUND | CONSTRUCTION OF 288 NOS FOUR STORIED (G+3) FLATS AT SECTOR 10B, AWADH VIHAR YOJNA LUCKNOW | 0.00 | 1128.00 04/04/2018 | 08/08/2018 08/08/2018 | 07/02/2020 | 08/08/2018 08/08/2018 | R.S.CONSTRUCTION | J.N. MISHRA,PARMOD KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XE | Circle HQ | In Progress |
28
| 09/SEHQ/CD-7/18-19 | CENTRAL AND STATE FUND | CONSTRUCTION OF 288 NOS FOUR STORIED (G+3) FLATS AT SECTOR 10B, AWADH VIHAR YOJNA LUCKNOW | 0.00 | 1128.00 04/04/2018 | 08/08/2018 08/08/2018 | 07/02/2020 | 08/08/2018 08/08/2018 | R.S.CONSTRUCTION | A.B.SINGH,J.N. MISHRA JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XE | Circle HQ | In Progress |
29
| .4.09/SEHQ/CD15/2015-16 | PARISHAD PROJECT FUND | CONSTRUCTION OF 1680 MULTISTORY IN RESIDENTIAL FLATS IN SAMAJWADI AVAS YOJNA & 448 NOS SEMIFINISHED MULTISTORY RESIDENTIAL FLATS IN GOMTI ENCLAVE SECTOR-8 | 0.00 | 27010.00 06/11/2015 | 27/01/2016 27/01/2016 | 28/02/2020 | 27/01/2016 27/01/2016 | LARSEN & TOUBRO LIMITED 09450000009 | AMARJEET YADAV,KAMTA PRASAD,MANUDEV JE A.K.SHAHU,D.K.GOYAL AE D.B.YADAV XE | Circle HQ | In Progress |
30
| 20/SEHQ/CD-14 | PARISHAD PROJECT FUND | CONST. OF MULTISTORY (B+S+14) RESIDENTIAL FLATS AVADH VIHAR YOJNA LKO | 0.00 | 18381.02 02/09/2013 | 20/02/2014 20/02/2014 | 19/05/2016 | 20/02/2014 20/02/2014 | N.C.C.LIMITED 09952301417 | SUGENDRA KUMAR VISHWAKARMA,S. K. SINGH BHADAURIYA,SUBEDAR NAVIK,RAMESH CHANDRA CHAURASIYA,RAM PRATAP JE ABHISHEK NATH TIWARI AE PRAMOD KUMAR SINGH XE | Circle HQ | Completed |
31
| 08/SEHQ/CD-7/15-16 | PARISHAD PROJECT FUND | ENGINEERING PROCUREMENT AND CONSTRUCTION OF MULTI-STOREYED RESIDENTIAL FLATS IN
SARYU ENCLAVE | 0.00 | 52529.33 08/11/2015 | 25/01/2016 25/01/2016 | 14/08/2020 | 25/01/2016 25/01/2016 | N.C.C.LIMITED 09952301417 | A.B.SINGH,J.N. MISHRA,LALIT KUMAR,MOH. KHURSHEED,PRAMOD KUMAR JE A.K.AGRAWAL,O.P. PANDEY AE PRAMOD KUMAR SINGH XE | Circle HQ | In Progress |
32
| 10/SE(HQ)/CD-31/18-19dt.29-8-18 | CENTRAL AND STATE FUND | Constt. of 96 No. EWS (G+3) Houses under PMAY at Sultanpur | 0.00 | 378.34 28/02/2018 | 29/08/2018 29/08/2018 | 20/02/2020 | 29/08/2018 29/08/2018 | M/S Shiv Giri Traders 9984854111 | MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XE | Circle HQ | In Progress |
33
| NA | PARISHAD PROJECT FUND | Construction of Community Center at Sector-10B, Vrindavan Yojan no-2, Lucknow | 0.00 | 294.78 10/07/2015 | 26/09/2015 26/09/2015 | 26/06/2016 | 26/09/2015 26/09/2015 | M/S Dream Construction 8765392315 | AJEET KUMAR DWIVEDI,MANOJ KUMAR JE R.C. SRIVASTAVA,S.P.S. AGARWAL AE D.K. SRIVASTAVA XE | Circle HQ | Completed |
34
| 06/SE-1/CD-31/15-16 | EXTERNAL DEVELOPMENT FUND | Construction of Multistoryed (S+8) 688 Nos 2BHK & 576 No. 3BHK Flats (kailash Enclave) at Sector-18, Vrindavan yojna, Lucknow | 0.00 | 28611.00 19/03/2015 | 02/07/2015 02/07/2015 | 30/06/2019 | 02/07/2015 02/07/2015 | M/S Vascon Engineers Ltd. 7525046101 | AJEET KUMAR DWIVEDI,ANIL KUMAR SHUKLA,D.S. MEHRA,J.P.MISHRA,MANOJ KUMAR JE R.C. SRIVASTAVA,S.P.S. AGARWAL AE D.K. SRIVASTAVA,K.P.TRIPATHI XE | Circle HQ | Completed |
35
| 4130/A-4/96 | PARISHAD PROJECT FUND | Construction of 50 Nos A-72 type Semi Finished houses at Spinning Mill Campus Etawah | 0.00 | 373.67 16/12/2016 | 12/10/2017 12/10/2017 | 11/07/2018 | 12/10/2017 12/10/2017 | RAJAWAT ASSOCIATE 9415523037 | SRI ARUN KUMAR PATEL,SRI ARVIND KUMAR JE NAGENDRA KUMAR,NAVJOT SINGH VERMA,SRI ABHISHEK VERMA AE PRADEEP KUMAR XE | Circle 4 | In Progress |
36
| 4131/A-4/96 | PARISHAD PROJECT FUND | Construction of 32 Nos A-72 type Finished houses at Spinning Mill Campus Etawah | 0.00 | 392.00 06/10/2017 | 25/01/2018 25/01/2018 | 24/01/2019 | 25/01/2018 25/01/2018 | Gun-Gun Construction & Electricals 9410487559 | SRI DEVENDRA YADAV JE ARVIND KUMAR,NAGENDRA KUMAR,NAVJOT SINGH VERMA,SRI ABHISHEK VERMA AE PRADEEP KUMAR XE | Circle 4 | In Progress |
37
| .6.04/SEHQ/CD15/18-19 | CENTRAL AND STATE FUND | Construction of 288 Nos. (G+3) Flats under PMAY at Sector-10B, Avadh Vihar Yojna, Lucknow. | 0.00 | 1095.88 05/04/2018 | 25/07/2018 25/07/2018 | 24/01/2020 | 25/07/2018 25/07/2018 | T Y TRADERS 9004537987 | AMARJEET YADAV JE D.K.GOYAL AE D.B.YADAV XE | Circle HQ | In Progress |
38
| 05/SEHQ/CD15/18-19 | CENTRAL AND STATE FUND | Construction of 224 Nos. (G+3) Flats under PMAY, at Sector-10 Avadh Vihar Yojna, Lucknow | 0.00 | 851.86 05/04/2018 | 25/07/2018 25/07/2018 | 24/01/2020 | 25/07/2018 25/07/2018 | GOPI CHAND RANGLINI 9956510351 | MANUDEV JE A.K.SHAHU AE D.B.YADAV XE | Circle HQ | In Progress |
39
| N.A. | PARISHAD PROJECT FUND | Construction of Community Center at Sector-16, Vrindavan Yojan no-4, Lucknow | 0.00 | 192.28 02/02/2016 | 19/03/2016 19/03/2016 | 18/12/2016 | 19/03/2016 19/03/2016 | M/S S.S. Solanki Constrauction 8765392315 | AJEET KUMAR DWIVEDI JE R.C. SRIVASTAVA AE D.K. SRIVASTAVA,K.P.TRIPATHI XE | Circle HQ | Completed |
40
| 11/SEHQ/CD-7/18-19 | CENTRAL AND STATE FUND | CONSTRUCTION OF 240 NOS FOUR STORIED (G+3) FLATS AT SECTOR 10B, AWADH VIHAR YOJNA LUCKNOW | 0.00 | 846.63 20/07/2018 | 09/10/2018 09/10/2018 | 08/04/2020 | 09/10/2018 09/10/2018 | SHAKTI CONSTRUCTION CO. 09121900191 | A.B.SINGH,LALIT KUMAR JE A.K.AGRAWAL AE PRAMOD KUMAR SINGH XE | Circle HQ | In Progress |
41
| 06/SEHQ/CD15/18-19 | CENTRAL AND STATE FUND | Construction of 224 Nos. (G+3) Flats under PMAY at Sector-10B, Avadh Vihar Yojna, Lucknow. | 0.00 | 851.86 05/04/2018 | 25/07/2018 25/07/2018 | 24/01/2020 | 25/07/2018 25/07/2018 | SHARIK MIYA 9412710500 | MANUDEV JE A.K.SHAHU AE D.B.YADAV XE | Circle HQ | In Progress |
42
| 05/SE-III/CD13/13-14 | PARISHAD PROJECT FUND | Const. of Multi Storeyed (S+13) Flats Residential Flats ( Everest Enclave) in Sect-18, Vrindavan Yojna No.4 Lucknow | 0.00 | 13362.38 26/12/2013 | 05/03/2014 26/02/2014 | 25/02/2017 | 05/03/2014 26/02/2014 | Vascon Engineers Ltd 7525046101 | MEWALAL JE SAMRAJ AE BRIJEDRA PRATAP XE | Circle 3 | In Progress |
43
| 01/SE-III/CD-19/2012-13 | PARISHAD PROJECT FUND | Engineering, procurement and construction of multi storeyed residential finished houses including basement, based on RCC monolithic shear wall concept using aluminum form work in Himalaya Enclave in Sector-17, Vrindavan Yojna, Lucknow including soil testing, structural design, construction of boundary wall and all site internal development complete in all respect ready to move in for living condition. | 0.00 | 19000.00 17/01/2012 | 18/06/2012 18/06/2012 | 17/09/2014 | 18/06/2012 18/06/2012 | M/S Larsen & Toubro Limited 7338144299 | AJAY KUMAR,DINESH KUMAR VISHAWAKARMA,HEM SINGH,JAY PRAKASH MAURYA JE ER. RAM PRATAP,ER. SURENDRA NATH AE ER. RAMESH CHANDRA YADAV XE | Circle 3 | Completed |
44
| 04/SE-III/CD-31/13-14 | PARISHAD PROJECT FUND | Design, Construction, Supply, Installation, Testing and Commissioning of 37.50 MLD Capacity Sewage Treatment Plant | 0.00 | 5392.21 | 03/01/2014 03/01/2014 | 02/07/2020 | 03/01/2014 03/01/2014 | S.N. ENVIRO TECH PVT LTD 9818210108 | ANIL KUMAR SHUKLA,D.S. MEHRA,MANOJ KUMAR JE AE D.K. SRIVASTAVA,K.P.TRIPATHI XE | Circle HQ | Completed |
45
| 17/SE(HQ)/CD-7/13-14 | PARISHAD PROJECT FUND | construction of 700 nos flats | 0.00 | 24393.06 16/07/2013 | 18/01/2014 18/01/2014 | 17/04/2017 | 18/01/2014 18/01/2014 | M/S N.C.C. Ltd 9936457615 | ADITYA KUMAR TRIPATHI JE RAJ KAMAL SAXENA AE JAGDISH KUMAR XE | Circle HQ | Completed |
46
| 18/SE-1/CD-31/16-17 | PARISHAD PROJECT FUND | Construction of 48 Nos (G+3) LIG at Lohramau Yojna, Sultanpur | 0.00 | 399.81 15/09/2016 | 30/12/2016 30/12/2016 | 31/01/2019 | 30/12/2016 30/12/2016 | SINGH ASSOCIATE | MANOJ KUMAR JE R.C. SRIVASTAVA,S.P.S. AGARWAL AE D.K. SRIVASTAVA,K. P. TRIPATHI XE | Circle HQ | Completed |
47
| 01/S.E-2/2018-19 | PARISHAD PROJECT FUND | Const. of 144 Nos Houses (G+3) under PMAY at Sector-4 Jagriti Vihar (Ext.) Scheme No-11, Meerut | 0.00 | 563.21 16/04/2018 | 24/08/2018 24/08/2018 | 23/02/2020 | 24/08/2018 24/08/2018 | M/s Kumar Builders 9358403917 | AJAB SINGH JE M.B. KAUSHIK AE ARVIND KUMAR XE | Circle 2 | In Progress |
48
| 17/EE/CD-12/2016-17 | PARISHAD PROJECT FUND | Construction of 19 Nos. 45/75 Type SFS Houses at Shahabad Yojna, Hardoi. | 0.00 | 98.52 13/09/2016 | 17/12/2016 17/12/2016 | 16/09/2017 | 17/12/2016 17/12/2016 | M/S Aditya Engineers & Builders 9415149007 | NARENDRA KUMAR JE SRI D.N. PANDEY AE SRI H.S. SHARMA XE | Circle Vrindavan | Completed |
49
| 01/SE-V/2016-17 | PARISHAD PROJECT FUND | CONTSTRUCTION OF 30 mtr and 24 mtr TRUNK ROADS IN MAJHOLA YOJNA NO-4 PH-2 VISTAR MORADABAD. | 0.00 | 404.00 31/05/2016 | 17/08/2016 17/08/2016 | 16/11/2016 | 17/08/2016 17/08/2016 | M/s R.G, Buildwell Engineers Ltd 9837391824 | RAHUL KUMAR JE RAJ KUMAR AE PAWAN KUMAR VERMA XE | Circle 5 | In Progress |
50
| 31/EE/CD-12/2016-17 | PARISHAD PROJECT FUND | Construction of 13 Nos. 53/127 Type SFS Houses at Shahabad Yojna, Hardoi. | 0.00 | 97.52 13/09/2016 | 29/12/2016 29/12/2016 | 28/09/2017 | 29/12/2016 29/12/2016 | M/S RAJA CONSTRUCTION 7651903756 | NARENDRA KUMAR JE SRI D.N. PANDEY AE SRI H.S. SHARMA XE | Circle Vrindavan | Completed |
51
| 29/EE/2018-19ED-1 | PARISHAD PROJECT FUND | Construction of 1 No. tubewell 200 mtr deep & its related work in sec-7 A Awadh Vihar Yojna Lucknow. | 0.00 | 16.69 22/02/2018 | 27/02/2019 07/02/2019 | 26/05/2019 | 27/02/2019 07/02/2019 | M.A. Engineering works | | Circle Electrical | Completed |
52
| 04/EE/CD-8/2018-19 | PARISHAD PROJECT FUND | Internal Water Supply Distribution in Sector-3 at Scheme-11, Jagriti Vihar (Ext.), Meerut | 0.00 | 11.00 24/07/2018 | 25/10/2018 25/10/2018 | 24/01/2019 | 25/10/2018 25/10/2018 | M/s Manpal 9719316437 | SANJAY SHARMA JE SH. A.K. BANSAL AE SH. ARVIND KUMAR XE | Circle 2 | Completed |
53
| 02/SE(M)/CD-38/2018-19 | PARISHAD PROJECT FUND | Const of Ineternal Road in Campus of Gulmohar Enclave in sec-15 | 0.00 | 115.00 23/02/2018 | 01/06/2018 01/06/2018 | 30/11/2018 | 01/06/2018 01/06/2018 | SHIVAM CONTRACTOR 8755427501 | ABHISHEK KUMAR MISHRA JE ALOKSHEEL DWIVEDI,NARESH GUPTA,SATYENDRA SINGH AE BISHEMBER SINGH,S.K. SIRVASTAVA,SHOBHIT KUMAR PATHAK XE | Circle Mantola | In Progress |
54
| 08/EE(GKP)2020-21 | AWASTHAPNA FUND | Construction of Interlocking & Drain at ( Dr. S.P. Chaudhari Clinic To Office Zila Krishi Adhikari) At Basti | 0.00 | 45.00 28/03/2020 | 04/06/2020 04/06/2020 | 03/10/2020 | 04/06/2020 04/06/2020 | M/S TIGER ELECTRICAL & CONSTRUCTION COMPANY | RAVINDRA NATH JE ASHOK KUMAR AE J K KAUSHAL XE | Circle 1 | Completed |
55
| 01/SE-3/CD-2/2018-19Dt04.05.2018 | PARISHAD PROJECT FUND | Construction of 128 Nos EWS houses in Sec-13 VVy-4 Lucknow | 0.00 | 708.96 15/12/2017 | 04/05/2018 04/05/2018 | 03/05/2020 | 04/05/2018 04/05/2018 | M/s Harihar contractor & suppliers 9984427700 | ADIL BEG,HEMANT KUMAR JE M.M.SRIVASTAVA AE A.K.MITTAL XE | Circle 3 | In Progress |
56
| 14/EE/2018-19 | INFRA | Strengthening of road construction of Toilet Block and Tinshade at Naurangilal Inter Collage Campus Aligarh | 0.00 | 46.69 27/06/2018 | 01/11/2018 01/11/2018 | 31/01/2019 | 01/11/2018 01/11/2018 | S.K. Engineering 9457193428 | MAYANK KUMAR KAUSHIK JE SASMIT KATIYAR AE XE | Circle 6 | Completed |
57
| 01/EE/CD-1/2019-20 | PARISHAD PROJECT FUND | Construction of 06 Nos. Kuda Ghar in differt. Sectors of Siddharth Vihar Yojna Ghaziabad. | 0.00 | 34.40 02/03/2019 | 26/06/2019 | 25/12/2019 | 26/06/2019 | M/s Shri Ram Construction Co. 9412469569 | NARENDRA PAL JE YOGENDRA KUMAR VERMA AE ATUL KUMAR SINGH XE | Circle 7 | In Progress |
58
| 07/SE-II/2019-20 | AWASTHAPNA FUND | Re-construction of Road from CO mandi thana Residance to end towards Railway Station Muzaffarnagar | 0.00 | 119.00 28/05/2019 | 21/09/2019 21/09/2019 | 20/02/2020 | 21/09/2019 21/09/2019 | M/s Om Shiv Construction 9837085092 | SURAJPAL JE M.B. KAUSHIK AE MUKESH YADAV XE | Circle 2 | In Progress |
59
| 18/SE(M)/CD-36/2015-16 | PARISHAD PROJECT FUND | const. 384 Nos. 2BHK (S+4) flats in Mandola Vihar Ghaziabad | 0.00 | 3376.76 30/09/2015 | 11/02/2016 11/02/2016 | 10/08/2017 | 11/02/2016 11/02/2016 | KASHYAPI INFRASTRUCTURE PVT. LTD. 9971799850 | BHARAT SINGH CD36,NANDA BALLABH CD36 JE SANJEEV SHUKLA,VIRENDRA KUMAR AE AMAN TYAGI XE | Circle Mantola | Completed |
60
| 05/SE(M)/2018-19 | PARISHAD PROJECT FUND | Construction of Balance Part of 24 M Road along scheme boundary | 0.00 | 308.16 28/08/2018 | 28/01/2019 28/01/2019 | 12/09/2019 | 28/01/2019 28/01/2019 | Shree Ji Infraproject P Ltd | ABHISHEK KUMAR MISHRA,RADHESHYAM JE ALOKSHEEL DWIVEDI,NARESH GUPTA AE AMAN TYAGI,SHOBHIT KUMAR PATHAK,UMA NATH SHUKLA XE | Circle Mantola | In Progress |
61
| 03/SE(M)/CD-38/2018-19 | PARISHAD PROJECT FUND | Const of 12M, 6M, & 6M set back Road in sec-16B | 0.00 | 186.00 28/04/2018 | 28/08/2018 20/08/2018 | 19/02/2019 | 28/08/2018 20/08/2018 | ANUJ ASSOCIATE 9411902544 | VEER SINGH,VIVEK KUMAR MAURYA JE ALOKSHEEL DWIVEDI,RAVINDRA BHATT,SATYENDRA SINGH AE AMAN TYAGI,BISHEMBER SINGH,SHOBHIT KUMAR PATHAK,UMA NATH SHUKLA XE | Circle Mantola | In Progress |
62
| 09/EE/19-20ED-1 | PARISHAD PROJECT FUND | SITC of 02 no. 1000 LPM 60 mtr. head KSB make Submersible pumping plant at Lohramau Yojna Sultanpur. | 0.00 | 11.68 18/03/2019 | 13/08/2019 | 12/09/2019 | 13/08/2019 | Preeti Electric works | | Circle Electrical | Completed |
63
| 06/EE/CD-8/2017-18 | PARISHAD PROJECT FUND | Laying of Sectorial Sewer in Sector-2 at Jagriti Vihar, Yojna-11, Meerut. | 0.00 | 50.90 23/09/2017 | 20/12/2017 20/12/2017 | 19/03/2018 | 20/12/2017 20/12/2017 | Rakesh Singh Nursery 9810117408 | SH. RAVINDRA KUMAR JE M BKAUSHIK AE M.B. KAUSHIK XE | Circle 2 | Completed |
64
| 01/EE/CD-8/2017-18 | PARISHAD PROJECT FUND | Supply & Fixing of 1000 Tree Guard at Scheme No. 11, Jagriti Vihar (Ext.), Meerut | 0.00 | 14.00 14/06/2017 | 14/06/2017 14/06/2017 | 13/09/2017 | 14/06/2017 14/06/2017 | Rajkanwar Enterprises 9927876456 | SH. RAVINDRA KUMAR JE VIRENDRA KUMAR AE M.B. KAUSHIK XE | Circle 2 | Completed |
65
| 03/EE/CD-8/2018-19 | PARISHAD PROJECT FUND | Internal Water Supply Distribution System in Sector-2 (Part) at Scheme-11, Jagriti Vihar (Ext.), Meerut. | 0.00 | 11.00 11/07/2018 | 25/10/2018 25/10/2018 | 24/01/2019 | 25/10/2018 25/10/2018 | Manpal 9917316437 | JE M BKAUSHIK AE M.B. KAUSHIK XE | Circle 2 | Completed |
66
| 02/E.E./C.D.-6/19-20 | PARISHAD PROJECT FUND | Const. internal drain culvert in sec. - 4 (Part) | 0.00 | 13.82 07/03/2019 | 02/07/2019 02/07/2019 | 01/10/2019 | 02/07/2019 02/07/2019 | M/S GURU CONSTRUCTION CO. 9997628189 | KHUSHALI JE M.B. KAUSHIK AE ARVIND KUMAR XE | Circle 2 | Completed |
67
| 06/EE/CD-38/2016-17 | PARISHAD PROJECT FUND | Const. of 9M Wide Road in sec-19 | 0.00 | 66.00 26/09/2016 | 22/12/2016 22/12/2016 | 21/04/2017 | 22/12/2016 22/12/2016 | SHIVAM CONTRACTOR 8755427501 | MUNNA LAL,RADHESHYAM JE ALOKSHEEL DWIVEDI,NARESH GUPTA,SATYENDRA SINGH AE BISHEMBER SINGH,D.V.SINGH,SHOBHIT KUMAR PATHAK XE | Circle Mantola | Completed |
68
| 02/SE-7/GZB/2011-12 | PARISHAD PROJECT FUND | Construction of Multi Storied (S+9) 108 Nos. (2BHK 36 and 3 BHK 72) | 0.00 | 1900.00 10/06/2011 | 03/08/2011 03/08/2011 | 02/02/2013 | 03/08/2011 03/08/2011 | SAI CONSTRUCTION COMPEY 9311189551 | | Circle 7 | Completed |
69
| 03/EE/CD-1GZB/2018-19DATE07-03-2019 | PARISHAD PROJECT FUND | Plantation work supply and fixing R.C.C. Pannel Tree Guards, Barbed wire fencing & MS gate in green belt of sec-7 Siddharth Vihar Yojna, Gzb. | 0.00 | 17.03 18/12/2018 | 07/03/2019 07/09/2019 | 06/07/2019 | 07/03/2019 07/09/2019 | M/S D.B.GARDEN TRADERS 9761410176 | YOGENDRA KUMAR GUPTA JE NARENDRA KUMAR,YOGENDRA KUMAR VERMA AE ATUL KUMAR SINGH XE | Circle 7 | In Progress |
70
| 11/EE/19-20ED-1 | PARISHAD PROJECT FUND | Const. of 235 mtr. deep 02 nos. tubewell boring by D.C. Rig matchine at Rawali Road Yojna Bijnor | 0.00 | 39.14 10/07/2019 | 26/08/2019 26/08/2019 | 25/10/2019 | 26/08/2019 26/08/2019 | Gopal Engineering works | | Circle Electrical | Completed |
71
| 01/EE/2019-20CD-28 | AWASTHAPNA FUND | Construction of C.C. Road & Drains in Rammohan Nagar, Shastri Puram Road, Sikandra, Agra | 0.00 | 89.98 12/02/2019 | 02/09/2019 02/09/2019 | 01/12/2019 | 02/09/2019 02/09/2019 | R. N. Agarwal 9319062251 | RAMSHANKAR JE ASHOK KUMAR SHARMA AE GIRISH CHANDRA XE | Circle 6 | Completed |
72
| 01/EE/CD-27/2018-19 | GEN. FUND | Grill Fixing Work at 30m Road (G-A) Ajantapuram Yojna Ghaziabad | 0.00 | 10.00 08/02/2019 | 15/02/2019 16/02/2019 | 25/02/2019 | 15/02/2019 16/02/2019 | M/s Ramesh Chand & Co. 9213288266 | MONAJ KUMAR RAO JE RIYAZUDDIN AE BHOLA NATH XE | Circle 7 | Completed |
73
| 14/SE(HQ)/CD-31 | CENTRAL AND STATE FUND | Constt. of 96 No. EWS (G+3) Houses (Group-A) under PMAY at Sultanpur | 0.00 | 378.34 28/02/2018 | 02/08/2019 02/08/2019 | 01/02/2021 | 02/08/2019 02/08/2019 | M/S Navneet Enterprises 9918381889 | MANOJ KUMAR JE RAJESH VERMA AE D.K. SRIVASTAVA XE | Circle HQ | In Progress |
74
| 17/EE/19-20ED-1 | PARISHAD PROJECT FUND | Mts. of Street light at scheeme no. 4 Vrindavan Yojna Lucknow. | 0.00 | 9.10 16/09/2019 | 11/11/2019 11/11/2019 | 10/12/2019 | 11/11/2019 11/11/2019 | 3D CREATION | | Circle Electrical | Completed |
75
| 18/EE/19-20ED-1 | PARISHAD PROJECT FUND | Maintenance of street Light at Amarpali Yojna Hardoi Road Lucknow. | 0.00 | 8.46 16/09/2019 | 20/11/2019 20/11/2019 | 19/12/2019 | 20/11/2019 20/11/2019 | 3D CREATION | | Circle Electrical | Completed |
76
| 03/EE/CD-27/2018-19 | PARISHAD PROJECT FUND | Const. of Surface Trunk Drain and Culvert at sect-3 (Part) | 0.00 | 40.32 29/01/2019 | 05/03/2019 05/03/2019 | 04/07/2019 | 05/03/2019 05/03/2019 | SHREE RAM CONSTRUCTION | A.D. SHANDILYA JE RIYAZUDDIN AE BHOLA NATH XE | Circle 7 | Completed |
77
| 03/SE-7/GZB/2013-14 | PARISHAD PROJECT FUND | Const. of four storied 576 nos LIG Houses in Brahmputra Enclave | 0.00 | 3870.00 10/02/2014 | 03/03/2014 03/03/2014 | 02/09/2015 | 03/03/2014 03/03/2014 | GAUTAM BUILDERS 7055008855 | AKHILESH DATT SANDILYE,MONAJ KUMAR RAO JE MONAJ KUMAR RAO,RIYAZUDDIN AE BHOLA NATH,RAJESH RANJAN XE | Circle 7 | Completed |
78
| 04/SE-7/GZB/2013-14 | PARISHAD PROJECT FUND | Const. of Four Storied 480 nos LIG Houses in Brahmputra Enclave sect-7 | 0.00 | 3672.38 06/02/2014 | 03/03/2014 03/03/2014 | 02/09/2015 | 03/03/2014 03/03/2014 | ANAND BUILDERS | DINESH PAL SINGH JE MONAJ KUMAR RAO,RIYAZUDDIN AE BHOLA NATH,RAJESH RANJAN XE | Circle 7 | Completed |
79
| 05/SE-7/GZB/2013-14 | PARISHAD PROJECT FUND | Const. of Multi storied 512 Nos LIG Houses in Brahmputra Enclave in sect- 7 | 0.00 | 3440.00 06/02/2014 | 03/03/2014 03/03/2014 | 02/09/2015 | 03/03/2014 03/03/2014 | Pandit Realtor Pvt Ltd 8929977910 | DINESH PAL SINGH JE MONAJ KUMAR RAO,RIYAZUDDIN AE BHOLA NATH,RAJESH RANJAN XE | Circle 7 | Completed |
80
| 02/SE-7/2013-14 | PARISHAD PROJECT FUND | Const. of Four Storyed (G+3) 448 Nos LIG House at Sector-7 Siddharth Vihar GHAZIABAD | 0.00 | 2448.26 06/02/2014 | 03/03/2014 03/03/2014 | 02/09/2015 | 03/03/2014 03/03/2014 | ANAND BUILDTECH PVT LTD 9810300761 | A.B. ANSARI,ALOK GUPTA,D.K. SRIVASTAVA,PREM PRAKASH,RADHEY SHYAM JE ASHOK KUMAR AGARWAL,S.K. VERMA AE LALIT MOHAN PANDEY,MOHD ALI SAFDAR XE | Circle 7 | Completed |
81
| 01/SE-7/2017-18 | PARISHAD PROJECT FUND | Laying of Rising Water Main Line From Pump Houses to CWR and CWR Sector-8 to OHT Situated at Sector-7, Siddharth Vihar, GZB | 0.00 | 245.38 24/07/2017 | 16/09/2017 16/09/2017 | 15/01/2018 | 16/09/2017 16/09/2017 | HMS INFRATECH PVT LTD 9837500055 | PREM PRAKASH,RADHEY SHYAM JE ASHOK KUMAR AGARWAL,S.K. VERMA AE MOHD ALI SAFDAR XE | Circle 7 | Completed |
82
| 01/SE-7/2018-19 | PARISHAD PROJECT FUND | Const. of Community Centre in Sector-9, Siddharh Vihar, Ghaziabad | 0.00 | 192.10 12/03/2018 | 27/07/2018 27/07/2018 | 26/07/2019 | 27/07/2018 27/07/2018 | Mohan Infradevelopers Pvt Ltd 9675411111 | ARUN KUMAR SINGH VISHAN JE ASHOK KUMAR AGARWAL AE LALIT MOHAN PANDEY XE | Circle 7 | Completed |
83
| 02/SE-7/2012-13 | PARISHAD PROJECT FUND | Const. of Multi storyed Building (Ganga, yamuna & Hindon Enclave) in Sector-7, Siddharth Vihar GZB. | 0.00 | 35000.00 27/12/2011 | 12/07/2012 12/07/2012 | 11/01/2015 | 12/07/2012 12/07/2012 | LARSEN & TOUBRO LIMITED 09450000009 | LOKESH KUMAR,RAJEEV SARSWAT,SUDHIR KUMAR JE ASHOK KUMAR AGARWAL,BHUVNESHWAR SINGH,SHOBHIT KUMAR PATHAK AE LALIT MOHAN PANDEY,MOHD ALI SAFDAR XE | Circle 7 | Completed |
84
| 12/EE/19-20ED-1 | PARISHAD PROJECT FUND | Annual Mts. of 4 Nos. Otis lift in office complex sector-09 at Vrindavan Yojna No. 2 Phase-2 Lucnow. | 0.00 | 8.74 01/06/2019 | 01/10/2019 01/10/2019 | 30/09/2020 | 01/10/2019 01/10/2019 | OTIS ELEVATOR CO.(INDIA) LTD. | | Circle Electrical | Completed |
85
| 13/EE/19-20ED-1 | PARISHAD PROJECT FUND | Construction of 220 mtr. deep 01 No. Tubewell Boring By D.G. Rig machine at Sector-15 Vrindavan Yojna No. 4 Lucknow | 0.00 | 23.36 19/09/2019 | 24/10/2019 24/10/2019 | 23/12/2019 | 24/10/2019 24/10/2019 | GOPAL ELECTRICALS | | Circle Electrical | In Progress |
86
| 14/EE/19-20ED-1 | PARISHAD PROJECT FUND | Mts. of Street light at Manjhola Yojna No. 4 Phase-2 Moradabad. | 0.00 | 8.18 16/09/2019 | 30/10/2019 | 29/11/2019 | 30/10/2019 | Swastikk Electricals | | Circle Electrical | Completed |
87
| 02/EE/CD-38/2018-19 | PARISHAD PROJECT FUND | Const. of Internal 18 M wide Road In sec-1B | 0.00 | 124.00 28/03/2018 | 28/05/2018 28/05/2018 | 27/09/2018 | 28/05/2018 28/05/2018 | ANUJ ASSOCIATE 9411902544 | MUNNA LAL,RADHESHYAM JE SATYENDRA SINGH AE BISHEMBER SINGH,D.V.SINGH,S.K. SIRVASTAVA,SHOBHIT KUMAR PATHAK XE | Circle Mantola | Completed |
88
| 04/EE/CD-38/2018-19 | PARISHAD PROJECT FUND | Laying of Water Supply line sec 15 (Plot Pocket) & 16 B Rising Main sec-17 | 0.00 | 61.00 26/09/2018 | 19/12/2018 19/12/2018 | 18/03/2019 | 19/12/2018 19/12/2018 | RAMAXE CONSTRUCTION 9811554477 | JEET SINGH,VEER SINGH JE ALOKSHEEL DWIVEDI,RAVINDRA BHATT,SATYENDRA SINGH AE AMAN TYAGI,BISHEMBER SINGH,SHOBHIT KUMAR PATHAK,UMA NATH SHUKLA XE | Circle Mantola | In Progress |
89
| 06/SE(M)/2015-16 | PARISHAD PROJECT FUND | Construction of 1856 No Multistory Houses in sec-7 | 0.00 | 45000.00 18/04/2015 | 03/07/2015 03/07/2015 | 02/07/2020 | 03/07/2015 03/07/2015 | N.C.C.LIMITED 09952301417 | ABHISHEK KUMAR MISHRA,AJAY KUMAR AGNIHOTRI,H.S.TIWARI,JEET SINGH,LOKENDRA KUMAR,NARESH KUMAR GUPTA,U.S.CHAURASIYA,VEER SINGH,VIVEK KUMAR MAURYA JE ALOKSHEEL DWIVEDI,AMAN TYAGI,NAVEEN KUMAR JAIN,O.P. VERMA,RAM AVTAR MITTAL,SATYENDRA SINGH AE AKHILESHWAR SINGH,BISHEMBER SINGH,D.V.SINGH,K.P.TRIPATHI,LALTA PRASAD,MANEESH KUMAR PATHAK,S.K. SIRVASTAVA,SHOBHIT KUMAR PATHAK XE | Circle Mantola | In Progress |
90
| 15/EE/19-20ED-1 | PARISHAD PROJECT FUND | Balance Ext. Electrification work of EWS & LIG Flats at sector-13 in Vrindavan yojna Lucknow | 0.00 | 119.05 22/10/2019 | 05/11/2019 05/11/2019 | 04/02/2020 | 05/11/2019 05/11/2019 | Electro Builders | | Circle Electrical | In Progress |
91
| 16/EE/19-20ED-1 | PARISHAD PROJECT FUND | Construction of 33 KV Line for Connecting 33/11 KV S/S Switcheted in various sector of vrindavan yojna to 220/132 KV S/S Switcheted in Avadh Vihar Yojna Lucknow. by Crossing Railway Line | 0.00 | 185.64 03/10/2019 | 11/11/2019 11/11/2019 | 10/02/2020 | 11/11/2019 11/11/2019 | Preeti Electric works | | Circle Electrical | Completed |
92
| 02/EE2019-20 | AWASTHAPNA FUND | Construction of Inter Locking Road, Drains & Culvert at Behind ATV upto Railway Line, Mathura. | 0.00 | 65.66 18/02/2019 | 30/09/2019 30/09/2019 | 29/12/2019 | 30/09/2019 30/09/2019 | TRIMURTI ENTERPRISES | SANTOSH KUMAR JE R.K. GANGWAR AE SRI H.S. SHARMA XE | Circle 6 | In Progress |
93
| 03/EE2019-20 | AWASTHAPNA FUND | Construction of Inter Locking Road, Drains & Culvert at Shakti Dhaam Colony Aurangabad, Mathura. | 0.00 | 56.93 18/02/2019 | 30/09/2019 30/09/2019 | 29/12/2019 | 30/09/2019 30/09/2019 | TRIMURTI ENTERPRISES | SANTOSH KUMAR JE R.K. GANGWAR AE SRI H.S. SHARMA XE | Circle 6 | In Progress |
94
| 20/EE/19-20 | PARISHAD PROJECT FUND | Construction of 11 KV Feeder of 33/11 KV Sub Staion in Vrindavan Yojna No-4 Lucknow Group-B | 0.00 | 41.67 14/11/2019 | 27/11/2019 27/11/2019 | 26/01/2020 | 27/11/2019 27/11/2019 | PREETI ELECTRIC WORK 9150011801 | | Circle Electrical | Completed |
95
| 02/EE/CD38/2019-20 | PARISHAD PROJECT FUND | Construction of 2 No Parks in Sec-15 | 0.00 | 15.50 14/10/2019 | 31/12/2019 31/12/2019 | 31/03/2020 | 31/12/2019 31/12/2019 | SNG Enterprises | RADHESHYAM JE NARESH GUPTA AE AMAN TYAGI,SHOBHIT KUMAR PATHAK,UMA NATH SHUKLA XE | Circle Mantola | In Progress |
96
| 3268/A-4/511 | PARISHAD PROJECT FUND | Construction of drain and culvert in spining mill awasiya yojna Etawah | 0.00 | 77.50 27/09/2018 | 26/11/2019 26/11/2019 | 25/05/2020 | 26/11/2019 26/11/2019 | M/s Siwansi Concrete Product 9412183483 | SRI ANIL KUMAR CHAUDHARY JE ARVIND KUMAR AE PRADEEP KUMAR XE | Circle 4 | In Progress |
97
| 01/EE/CD-12/2019-20 | PARISHAD PROJECT FUND | External Painting work of EWS Blocks at Gokul Gram Yojna No -1, Munnu Khera, Lucknow | 0.00 | 0.00 21/11/2019 | 21/11/2019 | 20/02/2020 | 21/11/2019 | M/S Shivrudram Construction 9838308833 | HIMANSHU SINGH JE A.K.SINHA AE SHASHANK PANDEY XE | Circle Vrindavan | Completed |
98
| 28/EE/19-20ED-1 | PARISHAD PROJECT FUND |